Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
SYSTEM
DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO. REV NO.
A 1 A
A 1 A
DESIGN CALCULATION FOR THE HVAC SYSTEM
JUBAIL SAUDI ARABIA JOB ORDER NO. DWG. CONT. SHT.
INTERNAL LOAD DATA:
Internal loads involve components of cooling loads which arises from sources internal to the
conditioned space. The following components shall be dealt with in the proceeding items :
LIGHTING :
The details of the lighting loads in each room is taken from actual lighting load calculation.
The Summary of lighting load is enclosed for reference.
Formula
Qs = 3.41 x qw x Fu x Fs x CLF
Where :
Qs = Sensible cooling load in BTU/Hr.
CLF = 1, Since lights will be turned on more than 16 Hrs. per day.
DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO. REV NO.
0
A 0 0 1 OF 3 A
DESIGN CALCULATION FOR THE HVAC SYSTEM
Where :
qs = Sensible heat gain per person
= Table 4.5 ASHRAE GRP - 158
DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO. REV NO.
0
A 0 0 2 OF 3 A
DESIGN CALCULATION FOR THE HVAC SYSTEM
JUBAIL SAUDI ARABIA JOB ORDER NO. 0 DWG. CONT. SHT. 0
Latent Heat gain from people (Ql) :
Where :
qL = Latent heat gain per person
= Table 4.5 ASHRAE GRP - 158
The heat gain are due to the heat dissipated by equipment's inside the building.
The actual load dissipation from the each panel is taken from the each equipment
manufacturer & as summarized by the Design Engineer - Electrical.
DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO. REV NO.
0
A 0 0 3 OF 3 A
DESIGN CALCULATION FOR THE HVAC SYSTEM
JUBAIL SAUDI ARABIA JOB ORDER NO. 0 DWG. CONT. SHT. 0
Floor & Roof Area Wall, Door Partition Light. Equip.
Nos. of
Sl # Zone Name
L(M) W(M) Area(M ) 2 People
NW NE SE SW Watts Watts
Area of room = D6,D7 Size(single) = 2.4 0.9 D6 Size(Single) = 2.4 0.9 NW = 9.6x5.235
54.6 X 22.1 = 1206.7 M2 Area of the door 4.5 M2 Area of the door 2.2 M2 51.12 sq.mt
Area of the door 48.0 Ft2 Area of the door 24.0 Ft2 550.2 sq.ft
179.1 X 72.5 = 12988.3 FT 2
D3 Size(Double) = 2.4 2.4
Area of the door 6.0 M2
1 Control Room FC.HT = 3.0 M Area of the door 64.1 Ft2 NE = 7.31 x 5.23 23328.0 17144.0 2.0
FC.HT = 9.8 Ft Total area of the door 112.1 Ft2 Total area of the door 24.0 Ft2 38.267 sq.mt
Avg. Height of wall 17.7 FT Avg. Height of wall 19.1 FT Avg. Height of wall 21.6 FT 411.8 sq.ft
RF.HT = 5.8 M Width of the wall 155.8 FT Width of the wall 49.4 FT Width of the wall 84.5 FT
RF.HT = 19.1 Ft Area of the wall 2757.7 Ft2 Area of the wall 944.1 Ft2 Area of the wall 1821.3 Ft2
Net area of the wall 2645.6 Ft2 Net area of the wall 920.1 Ft2 Net area of the wall 1821.3 Ft2
Area of room =
15.0 X 8.8 = 131.8 M2
RF.HT = 4.8 M
RF.HT = 15.8 Ft
Floor & Roof Area Wall, Door Partition Light. Equip.
Nos. of
Sl # Zone Name
L(M) W(M) Area(M )
2 People
NW NE SE SW Watts Watts
Area of room =
8.0 X 3.4 = 27.0 M2
RF.HT = 5.0 M
RF.HT = 16.4 Ft
Area of room =
5.5 X 4.2 = 22.7 M2
RF.HT = 4.8 M
RF.HT = 15.8 Ft
Floor & Roof Area Wall, Door Partition Light. Equip.
Nos. of
Sl # Zone Name
L(M) W(M) Area(M )2 People
NW NE SE SW Watts Watts
Area of room =
3.9 X 4.2 = 16.3 M2
RF.HT = 3.3 M
RF.HT = 10.7 Ft
Floor & Roof Area Wall, Door Partition Light. Equip.
Nos. of
Sl # Zone Name
L(M) W(M) Area(M )2 People
NW NE SE SW Watts Watts
Area of room = D4 Size(single) = 2.0 0.9 D1 Size(Double) = 3.1 2.5
37.2 X 8.7 = 325.1 M 2
Area of the door 1.9 M 2
Area of the door 7.7 M2 SE =7.2 x 4.986
Area of the door 20.0 Ft 2
Area of the door 83.4 Ft2 36 sq.mt
122.0 X 28.7 = 3499.6 FT2 D5 Size(Single) = 2.0 1.1 387.3 sq.ft
Area of the door 2.1 M2
13 34.5kV SWGR FC.HT = 0.0 M Area of the door 22.9 Ft2 3369.6 22510.0 2.0
FC.HT = 0.0 Ft Total area of the door 42.9 Ft2 Total area of the door 83.4 Ft2 Total area of the door 0.0 Ft2
Avg. Height of wall 16.4 FT Avg. Height of wall 16.4 FT Avg. Height of wall 16.4 FT
RF.HT = 5.0 M Width of the wall 98.4 FT Width of the wall 28.7 FT Width of the wall 75.3 FT
RF.HT = 16.4 Ft Area of the wall 1609.6 Ft2 Area of the wall 469.1 Ft2 Area of the wall 1231.8 Ft2
Net area of the wall 1566.7 Ft2 Net area of the wall 385.7 Ft2 Net area of the wall 1231.8 Ft2
Area of room =
37.3 X 8.8 = 329.1 M2
14.4X4.986
122.4 X 28.9 = 3542.6 FT2 71.798 M2
772.4 FT2
SWGR CABLE
14 FC.HT = 0.0 M 1814.4 11670.0 2.0
BASMENT
FC.HT = 0.0 Ft
RF.HT = 3.3 M
RF.HT = 10.8 Ft
GIS CABLE
16 FC.HT = 0.0 M 5875.2 8619.0 2.0
BASEMENT
FC.HT = 0.0 Ft
RF.HT = 3.0 M
RF.HT = 9.8 Ft
Plenum Area 17034.4 54.6 x 5.235 = 285.83 3076.6 2.76x5.235 = 14.45 155.54
3.4 x 4.804 = 16.33 175.77
8.8 x 4.804 = 42.28 455.1
2.8 x 5.05 = 14.14 152.2
938.61
VENTILATION, EXHAUST AND PRESSURIZATION FOR GIS BUILDING :
(AHU 1&2)
EXHAUST AND VENTILATION CALCULATION:
Ventilation
We shall design the system in such a way that a positive pressurization is achieved.
Introduction of Outdoor air into the system through a fresh air opening / grilles into the
machine room shall eventually produce heat both sensible and latent in nature.
Where :
Qs = Sensible heat gain, BTU/Hr.
QL = Latent heat gain, BTU/Hr.
To = Design outside ambient temperature - 120 F
o
Please refer to the Computer Generated Calculation Sheets enclosed with this document for
the details.
Exhaust
a) Battery room
From SES-K-100 clause No. 10.11 the recommended air changes for the Battery room is 12.
Hence No. of air changes considered in the calculation is 12 AC/Hr. The detailed calculation of
the Battery room exhaust system is enclosed.
b) Toilet room
From SES-K-100 clause No. 10.11 the recommended air changes for the Toilet room is 10.
Hence No. of air changes considered in the calculation is 10 AC/Hr. The detailed calculation of
the toilet room exhaust system is enclosed.
DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO. REV NO.
0
A 0 0 1 OF 5 A
DESIGN CALCULATION FOR THE HVAC SYSTEM
JUBAIL SAUDI ARABIA JOB ORDER NO. 0 DWG. CONT. SHT. 0
PRESSURIZATION
Site Condition
Outside temperature : 120 o
F 49 o
C
Prevailing wind direction : 22 N
o
DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO. REV NO.
0
DESIGN CALCULATION FOR THE HVAC SYSTEM
A 0 0 2 OF 5 A
#REF! SAUDI ARABIA JOB ORDER NO. 0 DWG. CONT. SHT. 0
Qexh = 0.0
Make-up air required to pressurize the conditioned space.
Qp = {Qexh + (Po/P1) Qexh + (Po/P1) Qx + Qx}
Where:
Qp = Air required to pressurize the space to required
static pressure in CFM
Qexh = Exhaust air by Powered Exhaust fan - in cfm
Qx = Ex-filtration of the air from the space in cfm.
Po = Outside static pressure acting on wall in In. of w.g.
Pi = Inside static pressure of the conditioned space In.w.g.
Assumptions:
In this design, for the purpose of analysis, following assumptions are made:
Design Static pressure inside the conditioned space to be positive relative to atmosphere.
As per SES-K-100 & SES-P-119.43, the required pressure inside the conditioned space
shall be maintained at 0.2 inches of w.g.
Surface pressure relative to the static pressure is equivalent to the static pressure acting
on the building wall. I.e. P0=Pv = 0.22 in of W.G
Qexh = 0 CFM
Qx = 134 CFM
Qp = {0+(0.218526/0.418526)x0}+{(0.218526/0.418526) x134+ 134}
Qp = 204.0
Qp = 204.0 cfm
Note:
As per SES-K-100, Sec.-10, minimum of 10% of supply air required for fresh
air make up. From air balancing table enclosed, required make up is greater
than the Qp indicated above. Hence adopt Qp as make up, which is 2283 CFM.
DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO. REV NO.
0
DESIGN CALCULATION FOR THE HVAC SYSTEM
A 0 0 3 OF 5 A
JUBAIL SAUDI ARABIA JOB ORDER NO. 0 DWG. CONT. SHT. 0
Summary is as below:
Total Supply Total Outside Exhaust Air %.O.A. % Press.
Area Air - CFM Air CFM CFM - -
230KV GIS 46,347 4,635 0 10.00% 9.74%
AIR BALANCING:
Supply Air Return Air Exhaust Air Press. Air Ex.A
SL# Zone Name
CFM CFM CFM CFM CFM
1 230kV GIS BUILDING 42,558 38,336 0.0 4137 85
2 CABLE BASEMENT 2,767 2,498 0.0 269 0
3 MECH. ROOM 1,022 879 0.0 95 49
TOTAL 46,347 41,712 0 4501 134
Say = 1400 Pa
DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO. REV NO.
0
A 0 0 4 OF 5 A
DESIGN CALCULATION FOR THE HVAC SYSTEM
Use 0.12 in2/ft2 for (Double door & single door weather stripped Ref. ASHRAE fundamentals.
Room Name Door Designation Door Area M2 [Ft]2 Leakage Area (in)2 Leakage Air
CMH (cfm)
230kV GIS BUILDING D1+ 6 D3 29.28 315.17 37.82 85.32
MECH. ROOM D2 + D4 16.67 179.43 21.53 48.58
Total CFM = 134
DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO. REV NO.
0
A 0 0 5 OF 5 A
DESIGN CALCULATION FOR THE HVAC SYSTEM
JUBAIL SAUDI ARABIA JOB ORDER NO. 0 DWG. CONT. SHT. 0
VENTILATION, EXHAUST AND PRESSURIZATION FOR CONTROL BUILDING :
Where :
Qs = Sensible heat gain, BTU/Hr.
QL = Latent heat gain, BTU/Hr.
To = Design outside ambient temperature - 120 F
o
Please refer to the Computer Generated Calculation Sheets enclosed with this document for the
details.
Exhaust
a) Battery room
From SES-K-100 clause No. 10.11 the recommended air changes for the Battery room is 12. Hence
No. of air changes considered in the calculation is 12 AC/Hr. The detailed calculation of the Battery
room exhaust system is enclosed.
b) Toilet room
From SES-K-100 clause No. 10.11 the recommended air changes for the Toilet room is 10. Hence No.
of air changes considered in the calculation is 10 AC/Hr. The detailed calculation of the toilet room
exhaust system is enclosed.
DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO. REV NO.
0
A 0 0 1 OF 5 A
DESIGN CALCULATION FOR THE HVAC SYSTEM
JUBAIL SAUDI ARABIA JOB ORDER NO. 0 DWG. CONT. SHT. 0
PRESSURIZATION
Site Condition
Outside temperature : 120 F
o
49 o
C
Prevailing wind direction : 22 N
o
DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO. REV NO.
0
DESIGN CALCULATION FOR THE HVAC SYSTEM
A 0 0 2 OF 5 A
JUBAIL SAUDI ARABIA JOB ORDER NO. 0 DWG. CONT. SHT. 0
Qexh = Exhaust air in Battery room +Exhaust air Toilet room
= 3,320 + 289
(Ref. To detailed calculation of Battery room and
toilet room exhaust fan sizing)
= 3609 CFM
Make-up air required to pressurize the conditioned space.
Qp = {Qexh + (Po/P1) Qexh + (Po/P1) Qx + Qx}
Where:
Qp = Air required to pressurize the space to required
static pressure in CFM
Qexh = Exhaust air by Powered Exhaust fan - in cfm
Qx = Ex-filtration of the air from the space in cfm.
Po = Outside static pressure acting on wall in In. of w.g.
Pi = Inside static pressure of the conditioned space In.w.g.
Assumptions:
In this design, for the purpose of analysis, following assumptions are made:
Design Static pressure inside the conditioned space to be positive relative to atmosphere.
As per SES-K-100 & SES-P-119.43, the required pressure inside the conditioned space
shall be maintained at 0.2 inches of w.g.
Surface pressure relative to the static pressure is equivalent to the static pressure acting
on the building wall. I.e. P0=Pv = 0.2185 in of W.G
Qexh = 3609 cfm(Exhaust in Battery room&Toilet room)
Qx = 65 cfm
Qp = {3609+(0.218526/0.418526)x3609}+{(0.218526/0.418526) x 65+ 65}
Qp = 5592 cfm
Note: As per TES-K-100.01, REV.0, Sec.-10, minimum of 10% of supply air required for fresh
air make up. From air balancing table enclosed, required make up is greater
than the Qp indicated above. Hence adopt Qp as make up, which is 2283 CFM.
Summary is as below:
Total Supply Total Outside Exhaust Air %.O.A. % Press.
Area
Air - CFM Air CFM CFM - -
28,645 5,592 3,609 19.52% 7.68%
Percent of outside air = Outside Air x 100
Supply air
DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO. REV NO.
0
A 0 0 4 OF 5 A
DESIGN CALCULATION FOR THE HVAC SYSTEM
Use 0.12 in2/ft2 for (Double door & single door weather stripped Ref. ASHRAE fundamentals.
Room Name Door Designation Door Area M2 [Ft]2 Leakage Area (in)2 Leakage Air
CMH (cfm)
PUMP ROOM Dd 4.88 52.53 6.30 14.22
CORRIDOR Dd 5.9536 64.08 7.69 17.35
WORK SHOP Ds 1.8572 19.99 2.40 5.41
Control Room Dd+2Ds 9.6681 104.07 12.49 28.17
Total CFM = 65
DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO. REV NO.
0
A 0 0 5 OF 5 A
DESIGN CALCULATION FOR THE HVAC SYSTEM
JUBAIL SAUDI ARABIA JOB ORDER NO. 0 DWG. CONT. SHT. 0
VENTILATION, EXHAUST AND PRESSURIZATION SWGR Building :
Where :
Qs = Sensible heat gain, BTU/Hr.
QL = Latent heat gain, BTU/Hr.
To = Design outside ambient temperature - 120 F
o
Please refer to the Computer Generated Calculation Sheets enclosed with this document for the
details.
Exhaust
a) Battery room
From SES-K-100 clause No. 10.11 the recommended air changes for the Battery room is 12.
Hence No. of air changes considered in the calculation is 12 AC/Hr. The detailed calculation of the
Battery room exhaust system is enclosed.
b) Toilet room
From SES-K-100 clause No. 10.11 the recommended air changes for the Toilet room is 10. Hence
No. of air changes considered in the calculation is 10 AC/Hr. The detailed calculation of the toilet
room exhaust system is enclosed.
DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO. REV NO.
0
A 0 0 1 OF 5 A
DESIGN CALCULATION FOR THE HVAC SYSTEM
JUBAIL SAUDI ARABIA JOB ORDER NO. 0 DWG. CONT. SHT. 0
PRESSURIZATION
Site Condition
Outside temperature : 120 o
F 49 o
C
Prevailing wind direction : 22 N
o
DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO. REV NO.
0
DESIGN CALCULATION FOR THE HVAC SYSTEM
A 0 0 2 OF 5 A
#REF! SAUDI ARABIA JOB ORDER NO. 0 DWG. CONT. SHT. 0
Qexh = 0.0 CFM
Make-up air required to pressurize the conditioned space.
Qp = {Qexh + (Po/P1) Qexh + (Po/P1) Qx + Qx}
Where:
Qp = Air required to pressurize the space to required
static pressure in CFM
Qexh = Exhaust air by Powered Exhaust fan - in cfm
Qx = Ex-filtration of the air from the space in cfm.
Po = Outside static pressure acting on wall in In. of w.g.
Pi = Inside static pressure of the conditioned space In.w.g.
Assumptions:
In this design, for the purpose of analysis, following assumptions are made:
Design Static pressure inside the conditioned space to be positive relative to atmosphere.
As per SES-K-100 & SES-P-119.43, the required pressure inside the conditioned space
shall be maintained at 0.2 inches of w.g.
Surface pressure relative to the static pressure is equivalent to the static pressure acting
on the building wall. I.e. P0=Pv = 0.2185 in of W.G
Qexh = 0 cfm(Exhaust in Battery room&Toilet room)
Qx = 57 cfm
Qp = {0.0+(0.218526/0.418526)x0.0}+{(0.218526/0.418526) x 58+ 58}
Qp = 88.3
Qp = 88 cfm
Note:
As per SES-K-100, Sec.-10, minimum of 10% of supply air required for fresh
air make up. From air balancing table enclosed, required make up is greater
than the Qp indicated above. Hence adopt Qp as make up, which is 2283 CFM.
DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO. REV NO.
0
DESIGN CALCULATION FOR THE HVAC SYSTEM
A 0 0 3 OF 5 A
JUBAIL SAUDI ARABIA JOB ORDER NO. 0 DWG. CONT. SHT. 0
Summary is as below:
Total Supply Total Outside Exhaust Air %.O.A. % Press.
Area Air - CFM Air CFM CFM - -
10,177 1,018 0.0 10.00% 9.49%
AIR BALANCING:
Supply Air Return Air Exhaust Air Press. Air Ex.A
SL# Zone Name
CFM CFM CFM CFM CFM
1 34.5kV SWGR Building 6,410 5,776 0.0 605 29
2 CABLE BASEMENT 2,754 2,493 0.0 261 0
3 MECH. ROOM 1,013 891 0.0 93 29
TOTAL 10,177 9,159 0.0 960 58
DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO. REV NO.
0
A 0 0 4 OF 5 A
DESIGN CALCULATION FOR THE HVAC SYSTEM
Use 0.12 in2/ft2 for (Double door & single door weather stripped Ref. ASHRAE fundamentals.
Room Name Door Designation Door Area M2 [Ft]2 Leakage Area (in)2 Leakage Air
CMH (cfm)
34.5kV SWGR Building D1 + D5 9.86 106.13 12.74 28.73
MECH. ROOM D2 + D5 9.83 105.81 12.70 28.64
Total CFM = 57
DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO. REV NO.
0
A 0 0 5 OF 5 A
DESIGN CALCULATION FOR THE HVAC SYSTEM
JUBAIL SAUDI ARABIA JOB ORDER NO. 0 DWG. CONT. SHT. 0
SUMMARY OF COOLING LOAD:
REV
DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO.
NO.
A 0 0 1 OF 1 A
DESIGN CALCULATION FOR THE HVAC SYSTEM
DWG. CONT.
JUBAIL SAUDI ARABIA JOB ORDER NO. 0 SHT.
0
15. SAND TRAP LOUVER AND FRESH AIR FILTER SIZING 230 GIS BUILDING:
15.1 DATA
15.1.1 Required Fresh Air 4,635 CFM
2187 L/s
15.1.2 Velocity through louvers 1.52 M/s (Ref: Clause 6(d) of PTS)
299.21 FPM
15.4 From the graph pressure loss across the louver is= 0.18 in.W.G.
15.7.1 Select a 2" thick panel filter for fresh air intake.
15.7.2 The pressure drop across the filter is 0.06 in.W.G. (Clean)
The pressure drop across the filter is 0.5 in.W.G. (Dirty)
DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO. REV NO.
0
A 0 0 1 OF 1 A
A 0 0 1 OF 1 A
DESIGN CALCULATION FOR THE HVAC SYSTEM
JUBAIL SAUDI ARABIA JOB ORDER NO. 0 DWG. CONT. SHT. 0
15. SAND TRAP LOUVER AND FRESH AIR FILTER SIZING CONTROL BUILDING :
15.1 DATA
15.1.1 Required Fresh Air 5,592 CFM
2639 L/s
15.1.2 Velocity through louvers 1.52 M/s (Ref: Clause 6(d) of PTS)
299.21 FPM
15.4 From the graph pressure loss across the louver is= 0.18 in.W.G.
15.7.1 Select a 2" thick panel filter for fresh air intake.
15.7.2 The pressure drop across the filter is 0.06 in.W.G. (Clean)
The pressure drop across the filter is 0.5 in.W.G. (Dirty)
DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO. REV NO.
0
A 0 0 1 OF 1 A
A 0 0 1 OF 1 A
DESIGN CALCULATION FOR THE HVAC SYSTEM
JUBAIL SAUDI ARABIA JOB ORDER NO. 0 DWG. CONT. SHT. 0
15. SAND TRAP LOUVER AND FRESH AIR FILTER SIZING SWGR BUILDING :
15.1 DATA
15.1.1 Required Fresh Air 1,018 CFM
480 L/s
15.1.2 Velocity through louvers 1.52 M/s (Ref: Clause 6(d) of PTS)
299.21 FPM
15.4 From the graph pressure loss across the louver is= 0.18 in.W.G.
15.7.1 Select a 2" thick panel filter for fresh air intake.
15.7.2 The pressure drop across the filter is 0.06 in.W.G. (Clean)
The pressure drop across the filter is 0.5 in.W.G. (Dirty)
DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO. REV NO.
0
A 0 0 1 OF 1 A
A 0 0 1 OF 1 A
DESIGN CALCULATION FOR THE HVAC SYSTEM
JUBAIL SAUDI ARABIA JOB ORDER NO. 0 DWG. CONT. SHT. 0
ELECTRIC DUCT HEATER SIZING FOR GIS BUILDING :
Data:
Calculation.
Desired heating capacity in KW Total heating required in BTUH.
3413 BTU/Hr./kW
= 81.09 kW
DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO. REV NO.
0
A 0 0 1 OF 1 A
DESIGN CALCULATION FOR THE HVAC SYSTEM
JUBAIL SAUDI ARABIA JOB ORDER NO. 0 DWG. CONT. SHT. 0
ELECTRIC DUCT HEATER SIZING FOR CONTROL BUILDING :
EDH-1
Data:
Calculation.
Desired heating capacity in KW Total heating required in BTUH.
3413 BTU/Hr./kW
= 90.81 kW
The maximum ampere rating per step = 48.00 amps. (As per TEC-EOA Std.)
DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO. REV NO.
0
A 0 0 1 OF 1 A
DESIGN CALCULATION FOR THE HVAC SYSTEM
JUBAIL SAUDI ARABIA JOB ORDER NO. 0 DWG. CONT. SHT. 0
ELECTRIC DUCT HEATER SIZING FOR SWGR :
EDH-2
Data:
Calculation.
Desired heating capacity in KW Total heating required in BTUH.
3413 BTU/Hr./kW
= 24.51 kW
The maximum ampere rating per step = 48.00 amps. (As per TEC-EOA Std.)
DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO. REV NO.
0
A 0 0 1 OF 1 A
DESIGN CALCULATION FOR THE HVAC SYSTEM
JUBAIL SAUDI ARABIA JOB ORDER NO. 0 DWG. CONT. SHT. 0
BATTERY ROOM EXHAUST FAN SIZING:
DATA
Notes
Number of Air changes required for the battery room is 12 as per the clause
No.4.1.10 of SES-P-119-19 & clause No.10.9 of SES-K-100. Hence 12 air changes
per hour is considered in calculation.
Calculation
Volume of Battery room V= 10.1x9.9x4.7 M3
= 469.953 M3
= 16596.23 Ft3
Fan capacity in CFM = Room volume x No. Of Air changes/Hr
60
= 16596.23x12 / 60
= 3319 CFM
Pressure loss through the exhaust duct = 0.332 in.W.G. (Ref. To comp. Cal
enclosed)
SAY = 0.332 IN W.G (83 Pa)
DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO. REV NO.
0
A 0 0 1 OF 1 A
A 0 0 1 OF 1 A
DESIGN CALCULATION FOR THE HVAC SYSTEM
JUBAIL SAUDI ARABIA JOB ORDER NO. 0 DWG. CONT. SHT. 0
TOILET EXHAUST FAN SIZING :
DATA
Notes:
Number of Air changes required for the toilet is 6-10 as per the clause No.4.1.11 of SES-P-119-19
& clause No.10.11 of SES-K-100. Hence 10 air changes per hour is considered in calculation.
Calculation
Volume of Toilet Room V= 3.9x4.2x3 M3
= 49.14 M3
= 1735.36 Ft3
Fan capacity in CFM = Room volume x No. Of Air changes/Hr
60
= 1735.36x10 / 60
Use fan capacity of = 289 CFM
= 492 CMH
Pressure loss through the exhaust duct = 0.225 in.W.G. (Ref. To comp. Cal
enclosed)
SAY = 0.225 IN W.G (56.5 Pa)
DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO. REV NO.
0
A 0 0 1 OF 1 A
A 0 0 1 OF 1 A
DESIGN CALCULATION FOR THE HVAC SYSTEM
JUBAIL SAUDI ARABIA JOB ORDER NO. 0 DWG. CONT. SHT. 0
GATE HOUSE EXHAUST FAN SIZING :
DATA
Notes:
Number of Air changes required for the toilet is 6-10 as per the clause No.4.1.11 of SES-P-119-19
& clause No.10.11 of SES-K-100. Hence 10 air changes per hour is considered in calculation.
Calculation
Volume of Toilet Room V= 1.6x2.1x2.3 M3
= 7.728 M3
= 272.91 Ft3
Fan capacity in CFM = Room volume x No. Of Air changes/Hr
60
= 272.91x10 / 60
Use fan capacity of = 45 CFM
= 77 CMH
Pressure loss through the exhaust duct = 0.202 in.W.G. (Ref. To comp. Cal
enclosed)
SAY = 0.20 IN W.G (50 Pa)
DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO. REV NO.
0
A 0 0 1 OF 1 A
DESIGN CALCULATION FOR THE HVAC SYSTEM
JUBAIL SAUDI ARABIA JOB ORDER NO. 0 DWG. CONT. SHT. 0
GATE HOUSE ACCU/AHU :
DRAWING TITLE INDEX PLANT DRAWING NO. SHEET NO. REV NO.
0
A 0 0 1 OF 1 A
DESIGN CALCULATION FOR THE HVAC SYSTEM
JUBAIL SAUDI ARABIA JOB ORDER NO. 0 DWG. CONT. SHT. 0
Pressure Relife Damper Sizing Critiria:
Selected Zones
10% Of System Air will be considered for (SWGR & GIS) and Total air for toilet
Q= V X A
Where
V Velocity
A Area
SHEET
DRAWING TITLE INDEX PLANT DRAWING NO. REV NO.
NO.
0
DESIGN CALCULATION FOR THE HVAC SYSTEM
A 0 0 1 A
DWG. CONT.
JUBAIL SAUDI ARABIA PROJECT NO. 0 SHT.
0