Sei sulla pagina 1di 4

Republic of the Philippines

Department of Public Works and Highways


Region X
OFFICE OF THE REGIONAL DIRECTOR
Engineer's Hill, Bulua, Cagayan de Oro City

CONCRETE POURING PERMIT No. 6


Date: July 8, 2019

14K00302 - Reconstruction of Damaged Flood Control Works, Revetment along


Name of Project: Cagayan de Oro River, Puntod-Consolation, Sta. 1+530 - Sta 1 +695, Cagayan de
Oro City
Location: Cagayan de Oro City
Contractor VICTORIANO C. LIM CONSTRUCTION
Part of Structure to
405 -Structural Concrete (RCBC/Slab) Estimated Qty. 7.20
be poured
Station Limits/
Sta. 1+569.50
Section
Date of Pouring July 11, 2019 Time of Pouring 1:15 PM

Requested by: ARIEL P. CALLO


Victoriano C. Lim Const. Project in Charge

CHECKLIST
Concrete Vibrator Field Density Test
Protective Covering Materials Beam/Cylinder molds
Warning Signs/Barricades/Flagmen Curing Materials
Concrete Saw Slump Cone
Concrete Block Spacers Plumbmness
Finishing Tools/Equipment (Screeder, Quality of Materials Used (Result of Design/Trial Mix Test
broom, etc.) Reports, etc.
Line and Grade alignment (form setting, Lighting System
elevations, etc.
Required construction equipment Electrical Lay-out (Roughing-ins/embedments)
Rebars sizes, spacing and number Plumbing Lay-out (Roughing-ins/embedments)
Rebar installation requirements Falsework/Formworks Adequacy
Checked by:

Materials Engineer JAIME M. BANAAG JR. DATE


(Name & Signature)
REMARKS/
RECOMMENDATIONS

Resident Engineer LUKE RIGEL C. HEBRON DATE


(Name & Signature)
REMARKS/
RECOMMENDATIONS

Project Engineer LEOWALD L. PECORE DATE


Project Engineer LEOWALD L. PECORE DATE
(Name & Signature)

Request: Approved Disapproved


REMARKS/
RECOMMENDATIONS
uly 8, 2019

ment along
95, Cagayan de

cu.m.

LLO
Project in Charge

gn/Trial Mix Test