Construction of Pipeline with MS pipes including manufacture, supply, delivery,of M.S Pipes
conforming to is 3589/2001 including in lining with cement mortar (1:2) 15mm thick using 4 numbers
of 6mm dia M.S.Rings at each end of the pipe and out coating with cement mortar (1:3) 30mm thick
by shortcreting or gunetting duly providing wire mesh of size 50x50x3mm including cost of all
materials, labour charges, transportation ,lowering,laying and jointing of pipe lines true to alignment
and gradient, trench excavtion for pipe lines in all soils except Rock requring blasting, and refilling
trenches with excavated earth(other than rocky soils and boulders) with watering and tamping and
removeing surplus earth from site of work , but excluding taxes & duties, etc. including Cost of
Hydrostatic Filed Test Pressure, Cost of Site Welding, Jointing Materials, Cost of Transportation of
Water, Emptying Pipe Line After Completion Of Field Testing
Cost includes Earth Work excavation, Laying and Jointing, Pressure Testing, Refilling etc
complete. But, excluding Taxes and Contractor Profit.
Sl Dia Thic Working Material Loweri Siza of Earth 75% Contractor Total cost
No kne Pressure cost ng, L&J trench work Extra profit @ (Rs)
ss in Excavati 13.615%
Kg/Cm^2 on
Nos Amount
2 1140000
10 353643.5
75 25804650
7 3242120
2 1323316
11 4576594
3 1680219
1 560073
8 6400832
3 1362055
1 611178.8
1 873112.55
36 6502212
6 1283064
1 231365
22 3642166
8 1590240
1 216302.4
40 6712120
8 1608241.2
1 218552.3
2 618940 13.70518
12 1566558
4 624096.8
28 539840
2 559000
69 4949163
74 15549279.6
2 40480
2 3066
9 161990.1
2 48880
1000cum 3667000
18631cum 75516100.8
8591cum 42530604.6
455cum 2736324.5
1300cum 10673090
100cum 669455
174cum 1098105.3
320cum 2626976
594Rmt 1483812
135 967005
22Rmt 20064
655MT 40829556
169.83cum 473706.82
6 39168882
1500cum 989700
10000cum 1941000
450Rmt 2876557.5
53 56551
53 118296
4 165641.2
1 90573
705 323292351
Month 25.07.2015 SSR 2015-16 JUNE
H2=HR Plates
(1.6&2mm
-Avg) 44500 BWSC Pipes
Rods
(5.5/6mm ) 42500 Class 300 350 400 450 500
450 MM DI
500 MM DI
600 MM DI
700 MM DI
800 MM DI
900 MM DI
1000 MM D
1100 MM D
1200 MM D
1100 24317
1200 28427
16 Kg/cm2
3104
3332
3625
3931
4642
5671
6875
8308
9735
11179
13179
16190
18363
21265
24061
26461
28687
31475
35283
AC -Couplings
Class - 20 Class - 25
280.00 371.00
332.00 408.00
424.00 532.00
596.00 749.00
1015.00 1287.00
1303.00 1631.00
1830.00 2339.00
2221.00 2803.00
2906.00 3607.00
3508.00 4391.00
4287.00 5382.00
6052.00 7711.00
8255.00 10674.00
9529.00 12213.00
10796.00 13856.00
12145.00 15602.00
13569.00 17452.00
16658.00 21461.00
44500 Basic+CED+ST & freight Wh=Weight of HR Plate required (Kg.) per metre of pipe
42500 Basic+CED+ST & freight Ww = Weight of wire rods required (kg) per metre of pipe.
6300 including all duties,taxes&frieght Wc= Weight of Cement required (Kg.) per metre of pipe.
=(H2-H1)/1000 X Wh. R2 (Wire R=(W2-W1)/1000 X Ww. R3 (Cement=(C2-C1)/1000 X Wc .
Revised BWSC Pipes rates with HR plate 44500, Wire rods 42500, cement 6300
BAR WRAPPED STEEL CYLINDRICAL (BWSC) PIPES CONFORMING TO IS 15155 - 2002, Ex-factory excluding transportation, tax
Unit Rs. Rs. Rs. Rs. Rs. Rs. Rs. Rs.
4 -12 Kg/c 14 Kg/cm2 16 Kg/cm2 18 Kg/cm2 20 Kg/cm2 22 Kg/cm2 24 Kg/cm2 26 Kg/cm2
metre of pipe.
=(C2-C1)/1000 X Wc .
tory excluding transportation, taxes and duties etc., for Bar wrapped steel cylindrical pipes.
Rs. Rs.
28 Kg/cm2 30
Kg/cm2
2977 3134
3594 3783
4437 4637
5236 5912
3096 6619
7371 7842
9891 10405
12906 13744
16250 17286
19730 21080
24248 25997
31800 34611
37739 41561
Data based on 2015-16 Common SSR
MA 0%
Earthwork excavation in all soils upto SDR using 2/3 machinery and 1/3rd manual labour Common SSR 2015-16
Rate Analysis : Rate Add: LI 13% Total Sand for bedding/encasing: Rate Earth workEarth work classification : Rate/cum
1 E/W Rate -using machinery 81.28 - 81.28 Cost of sand for filling - 302.00 1 Sand or LooSand or Loose soils wet sand(8b)
2 Diff. of 20a & 20b (of 8,9,12,13) 0.00 0.00 Conveyance charges 15 km lead 313.16 2 Loamy clayey
Loamy clayey soils like BC and OG soils (9b)
3 Cost of refilling included in e/w 0.00 Seignorage charges 40/1.13615 35.21 3 Slushy SoilsSlushy Soils (10b)
4 Cost of sand filling 741.82 - 741.82 Filling charges - 91.45 4 Clayey Soil Clayey Soils(11b)
5 E/W rate - manual(as per Std. data) 112.84 112.84 Deduct stacking stacking 5 Hard gravellHard gravelly soils (12b)
Add: MA on filling charges 0.00 6 Mixture of Mixture of gravel and SDR (13b)
E/w rate for 2/3rd machinery & 1/3rd manual 91.80 /cum Total: 741.82 Total: 112.84
Average Manual earth work rate with LA & LI - per cum: 112.84
PVC pipes - Earth work
1 Earth work excavation in all soils upto SDR except hard rock requiring blasting for P.V.C pipes with 150 mm thick sand cushion and filling with
excavated soils including laying jointing testing of pipe line but excluding cost of materials etc. complete
Pipe dia in mm = 63 mm 75 mm 90 mm 110 mm 125 mm 140 mm 160 mm 180 mm 200 mm 225 mm 250 mm 280 mm 315 mm
1 Earth work 64.26 64.26 64.26 64.26 64.26 64.26 80.78 80.78 80.78 99.14 99.14 99.14 99.14
2 Extra allowance at 75% 19.75 19.75 19.75 19.75 19.75 19.75 24.82 24.82 24.82 30.47 30.47 30.47 30.47
3 Sand cushion cost 77.89 77.89 77.89 77.89 77.89 77.89 89.02 89.02 89.02 100.15 100.15 100.15 100.15
4 Refilling charges 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
5 Lowering, Laying, Jointing & HF testing 6.24 7.43 8.91 10.89 12.38 13.86 15.84 17.82 19.80 22.28 24.75 27.72 31.19
6 Add MA 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Total 168.14 169.33 170.81 172.79 174.28 175.76 210.47 212.45 214.43 252.04 254.51 257.48 260.95
Pipe dia in mm = 63 mm 75 mm 90 mm 110 mm 125 mm 140 mm 160 mm 180 mm 200 mm 200 mm 250 mm 280 mm 315 mm
1 Earth work 64.26 64.26 64.26 64.26 64.26 64.26 80.78 80.78 80.78 99.14 99.14 99.14 99.14
2 Extra allowance 19.75 19.75 19.75 19.75 19.75 19.75 24.82 24.82 24.82 30.47 30.47 30.47 30.47
3 Refilling charges 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
4 Laying, Jointing & H F Testing 37.00 41.00 46.00 53.00 64.00 67.00 72.00 80.00 87.00 96.00 102.00 112.00 183.00
5 Add MA 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Total 121.01 125.01 130.01 137.01 148.01 151.01 177.61 185.61 192.61 225.61 231.61 241.61 312.61
PSC pipes - Earth work
3 Earth work excavation in all soils upto SDR except hard rock requiring blasting for PSC pipes and filling with
excavated soils including laying jointing testing of pipe line but excluding cost of materials etc. complete
Trench size 1.0m x 1.4m 1.1m x 1.6m 1.2m x 1.7m 1.3m x 1.8m 1.4m x 1.9m 1.5m x 2.0m 1.6m x 2.1m 2.0m x 2.6m
Pipe dia in mm = 350 mm 400 mm 450 mm 500 mm 600 mm 700 mm 800 mm 900 mm 1000 mm 1400 mm
1 Earth work 128.52 128.52 128.52 161.57 187.27 214.81 244.19 275.40 308.45 477.36
2 Extra allowance 39.49 39.49 39.49 49.65 57.55 66.01 75.04 84.63 94.79 146.69
3 Refilling charges 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
4 Laying, jointing, testing HFT pressure 213.00 230.00 266.00 283.00 348.00 408.00 462.00 506.00 584.00 656.00
including cost of ruuber rings, cost of
transportation of water and emptying
pipe line after completion of field testing.
5 Add MA 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
5 Total 381.01 398.01 434.01 494.22 592.82 688.82 781.23 866.03 987.23 1280.05
Trench size 1.0m x 1.4m 1.0mx1.40m 1.1m x 1.6m 1.2m x 1.7m 1.3mx 1.8m 1.4m x 1.9m 1.5mx 2.0m 1.6mx 2.1m 1.7m x 2.2m 1.8m x 2.3m
Pipe dia in mm = 300 mm 350 mm 400 mm 450 mm 500 mm 600 mm 700 mm 800 mm 900 mm 1000 mm 1100 mm 1200 mm
1 Earth work 128.52 128.52 128.52 128.52 161.57 187.27 214.81 244.19 275.40 308.45 343.33 380.05
2 Extra allowance 39.49 39.49 39.49 39.49 49.65 57.55 66.01 75.04 84.63 94.79 105.51 116.79
3 Refilling charges 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Trench size 0.9 x 1.2 0.9 x 1.3 1.0 x 1.4 1.1 x 1.6 1.2 x 1.7 1.3x1.8
Pipe dia in mm = 80 mm 100 mm 125 mm 150 mm 200 mm 250 mm 300 mm 350 mm 400 mm 450 mm 500 mm 600 mm 700 mm
1 Earth work 99.14 99.14 99.14 99.14 107.41 107.41 107.41 128.52 128.52 128.52 161.57 187.27 214.81
2 Extra allowance 30.47 30.47 30.47 30.47 33.01 33.01 33.01 39.49 39.49 39.49 49.65 57.55 66.01
3 Sand cushion cost 100.15 100.15 100.15 100.15 100.15 100.15 100.15 111.27 111.27 111.27 122.40 133.53 144.65
4 Refilling charges 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
sub-total 229.76 229.76 229.76 229.76 240.56 240.56 240.56 279.29 279.29 279.29 333.62 378.35 425.48
Lowering, Laying, jointing, testing HFT
pressure including cost of ruuber rings, cost
5 of transportation of water and emptying pipe
line after completion of field testing.
35.00 52.00 57.00 68.00 89.00 107.00 132.00 224.00 336.00 409.00 520.00 559.00 624.00
Add MA
0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Total
264.76 281.76 286.76 297.76 329.56 347.56 372.56 503.29 615.29 688.29 853.62 937.35 1049.48
Pipe dia in mm = 300 350 400mm 450mm 500 mm 600mm 700mm 800mm 900mm 1000mm 1100mm 1200mm 1300mm
1 Earth work 128.52 128.52 128.52 128.52 161.568 187.272 214.812 244.188 275.4 308.448 358.938 396.576 436.05
2 Extra allowance 39.49 39.49 39.49 39.49 49.65 57.55 66.01 75.04 84.63 94.79 110.30 121.87 134.00
3 Refilling charges 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Laying, jointing, testing HFT pressu 306 360 449.00 528.00 575.00 673.00 767.00 880.00 992.00 1087.00 1232.00 1344.00 1439.00
Add MA 0 0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Total 474.01 528.01 617.014 696.014 786.2176 917.8204 1047.8234 1199.2266 1352.03 1490.2336 1701.239 1862.443 2009.048
illing with excavated soils including laying jointing testing of pipe line but excluding cost of materials etc. complete
Data based on 2015-16 Common SSR
Trench size 0.90m x 1.20m 0.90m x 1.30m 1.0m x 1.4m 1.10x 1.60 1.20 x 1.70 1.30 x 1.80 1.4x1.9m 1.4x1.9m 1.5x2.0m
Pipe dia in mm = 80 mm 100 mm 125 mm 150 mm 200 mm 250 mm 300 mm 350 mm 400 mm 450 mm 500 mm 600 mm 700 mm 750 mm 800 mm 900 mm
1 Earth work 99.14 99.14 99.14 99.14 107.41 107.41 107.41 128.52 128.52 128.52 161.57 187.27 214.81 244.19 244.19 275.40
2 Extra allowance 30.47 30.47 30.47 30.47 33.01 33.01 33.01 39.49 39.49 39.49 49.65 57.55 66.01 75.04 75.04 84.63
3 Refilling charges 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
4 Lowering 18.30 23.25 30.24 37.88 55.07 74.40 96.23 120.70 147.30 178.19 207.72 277.34 357.81 401.11 447.83 544.42
5 Jointing and Hydraulic field 23.42 31.32 38.98 46.67 55.10 62.11 85.89 106.54 116.32 127.50 165.11 194.92 249.53 272.96 354.28 421.84
testing
6 Add MA 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Total 171.33 184.18 198.83 214.16 250.58 276.92 322.53 395.26 431.64 473.71 584.05 717.08 888.16 993.30 1121.34 1326.29
CI pipes - Earth work
9 Earth work excavation in all soils upto SDR except hard rock requiring blasting for CI (Cast Iron) s/s pipes and filling with excavated soils including
laying jointing testing of pipe line but excluding cost of materials etc. complete
Trench size 0.90m x 1.20m 0.90m x 1.30m 1.0m x 1.4m 1.10x 1.60 1.20 x 1.70 1.30 x 1.80 1.4x1.9m 1.4x1.9m 1.5x2.0m
Pipe dia in mm = 80 mm 100 mm 125 mm 150 mm 200 mm 250 mm 300 mm 350 mm 400 mm 450 mm 500 mm 600 mm 700 mm 750 mm 800 mm 900 mm
1 Earth work 99.14 99.14 99.14 99.14 107.41 107.41 107.41 128.52 128.52 128.52 161.57 187.27 214.81 244.19 244.19 275.40
2 Extra allowance 30.47 30.47 30.47 30.47 33.01 33.01 33.01 39.49 39.49 39.49 49.65 57.55 66.01 75.04 75.04 84.63
3 Refilling charges 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
4 Lowering 18.30 23.25 30.24 37.88 55.07 74.40 96.23 120.70 147.30 178.19 207.72 277.34 357.81 401.11 447.83 544.42
5 Jointing and Hydraulic field 23.42 31.32 38.98 46.67 55.10 62.11 85.89 106.54 116.32 127.50 165.11 194.92 249.53 272.96 354.28 421.84
testing
6 Add MA 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
Total 171.33 184.18 198.83 214.16 250.58 276.92 322.53 395.26 431.64 473.71 584.05 717.08 888.16 993.30 1121.34 1326.29
1.6x2.1m
1000 mm
308.45
94.79
0.00
656.55
463.05
0.00
1522.83
1.6x2.1m
1000 mm
308.45
94.79
0.00
656.55
463.05
0.00
1522.83
Data based on 2015-16 Common SSR - for HDPE pipes
Month 25.07.2015 JUNE
HDPE PE80 Raw material : ### (excluding CED) Cost of specials : 0.50
HDPE PE100 Raw material :### (excluding CED)
Earth work excavation in all soils upto SDR except hard rock requiring blasting for HDPE 'filling with excavated soils including laying jointing testing of pipe line including cost of materials
etc. complete
Pipe dia in mm = 63 mm 75 mm 90 mm 110 mm 125 mm 140 mm 160 mm 180 mm 200 mm 225 mm 250 mm 280 mm
A) Materials component
1 Cost of pipe 105.00 149.00 212.00 318.00 406.00 510.00 667.00 839.00 1037.00 1338.00 1646.00 2063.00
2 Cost of specials (0.50%) 0.53 0.75 1.06 1.59 2.03 2.55 3.34 4.20 5.19 6.69 8.23 10.32
3 Earthwork,L/J 121.01 125.01 130.01 137.01 148.01 151.01 177.61 185.61 192.61 225.61 231.61 241.61
Cost of pipe 226.53 274.75 343.07 456.60 556.04 663.56 847.94 1028.80 1234.79 1570.30 1885.84 2314.93
Add Contractors profit@13 30.84 37.41 46.71 62.17 75.70 90.34 115.45 140.07 168.12 213.80 256.76 315.18
Total 257.37 312.16 389.78 518.76 631.74 753.90 963.39 1168.88 1402.91 1784.10 2142.60 2630.10
HDPE PE 100 Clas 8 kg/cm2
Pipe dia in mm = 63 mm 75 mm 90 mm 110 mm 125 mm 140 mm 160 mm 180 mm 200 mm 225 mm 250 mm 280 mm
A) Materials component
1 Cost of pipe 134.00 190.00 271.00 404.00 521.00 652.00 849.00 1074.00 1327.00 1711.00 2114.00 2646.00
2 Cost of specials (0.50%) 0.67 0.95 1.36 2.02 2.61 3.26 4.25 5.37 6.64 8.56 10.57 13.23
3 Earthwork,L/J 121.01 125.01 130.01 137.01 148.01 151.01 177.61 185.61 192.61 225.61 231.61 241.61
Cost of Pipe 255.68 315.96 402.36 543.03 671.61 806.27 1030.85 1264.98 1526.24 1945.17 2356.18 2900.84
Add Contractors profit@13 34.81 43.02 54.78 73.93 91.44 109.77 140.35 172.23 207.80 264.83 320.79 394.95
Total 290.49 358.97 457.14 616.96 763.05 916.04 1171.20 1437.21 1734.04 2210.00 2676.97 3295.79
Pipe dia in mm = 63 mm 75 mm 90 mm 110 mm 125 mm 140 mm 160 mm 180 mm 200 mm 225 mm 250 mm 280 mm
A) Materials component
1 Cost of pipe 162.00 229.00 325.00 482.00 626.00 784.00 1021.00 1293.00 1594.00 2059.00 2542.00 3178.00
2 Cost of specials (0.50%) 0.81 1.15 1.63 2.41 3.13 3.92 5.11 6.47 7.97 10.30 12.71 15.89
3 Earthwork,L/J 121.01 125.01 130.01 137.01 148.01 151.01 177.61 185.61 192.61 225.61 231.61 241.61
Cost of Pipe 283.82 355.15 456.63 621.42 777.14 938.93 1203.71 1485.07 1794.58 2294.91 2786.32 3435.50
Add Contractors profit@13 38.64 48.35 62.17 84.61 105.81 127.83 163.89 202.19 244.33 312.45 379.36 467.74
Total 322.46 403.51 518.80 706.02 882.94 1066.76 1367.60 1687.27 2038.91 2607.36 3165.68 3903.24
Pipe dia in mm = 63 mm 75 mm 90 mm 110 mm 125 mm 140 mm 160 mm 180 mm 200 mm 225 mm 250 mm 280 mm
A) Materials component
1 Cost of pipe 212.00 302.00 429.00 645.00 827.00 1041.00 1356.00 1712.00 2120.00 2675.00 3302.00 4149.00
2 Cost of specials (0.50%) 1.06 1.51 2.15 3.23 4.14 5.21 6.78 8.56 10.60 13.38 16.51 20.75
3 Earthwork,L/J 121.01 125.01 130.01 137.01 148.01 151.01 177.61 185.61 192.61 225.61 231.61 241.61
Cost of Pipe 334.07 428.52 561.15 785.23 979.14 1197.21 1540.39 1906.17 2323.21 2913.99 3550.12 4411.36
Add Contractors profit@13 45.48 58.34 76.40 106.91 133.31 163.00 209.72 259.52 316.30 396.74 483.35 600.61
Total 379.55 486.86 637.55 892.14 1112.45 1360.21 1750.11 2165.69 2639.51 3310.72 4033.47 5011.96
t of materials
3351.00 4201.00 5520.00 7144.00 8499.00 9935.00 ### ### 0.00 0.00 0.00 0.00 0.00 0.00 0.00
16.76 21.01 27.60 35.72
312.61 372.01 395.01 420.01
3680.37 4594.02 5942.61 7599.73
501.08 625.48 809.09 1034.70
4181.45 5219.49 6751.70 8634.43
Pipe dia in mm = 100 mm 150 mm 200 mm 250 mm 300 mm 350 mm 400 mm 450 mm 500 mm 600 mm 700 mm 750 mm 800 mm 900 mm 1000 mm
1 Cost of pipe ### ### ### ### ### ### ### ### ### ### ### ### ### ### 22235.00
2 Transportation charges and
176.00 264.00 264.00 440.00 528.00 704.00 792.00 968.00 1144.00 1496.00 2200.00 2640.00 4488.00 4488.00 4488.00
Loading, unloading and stacking
3 Cost of specials (1.5%) 15.93 23.54 31.43 41.24 52.23 65.10 78.50 93.92 109.26 144.11 186.30 209.07 230.70 281.37 333.53
4 Earthwork, L/J 184.18 214.16 250.58 276.92 322.53 395.26 431.64 473.71 584.05 717.08 888.16 993.30 ### ### 1522.83
Cost of pipe ### ### ### ### ### ### ### ### ### ### ### ### ### ### 28579.36
Add Contractors
5 195.80 281.93 359.57 477.50 596.99 749.42 889.76 1061.51 1241.87 1628.92 2136.80 2420.80 2889.11 3383.83 3891.08
profit@13.615%
Total ### ### ### ### ### ### ### ### ### ### ### ### ### ### 32470.43
1 Class DI K7
Trench size 0.9m x 1.2m 0.9m x 1.3m 1.0m x 1.4m 1.1 x 1.61.2 x 1.7 1.3x1.8m 1.4x1.9m 1.4x1.9m 1.5x2.0m 1.6x2.1m
Pipe dia in mm = 100 mm 150 mm 200 mm 250 mm 300 mm 350 mm 400 mm 450 mm 500 mm 600 mm 700 mm 750mm 800 mm 900 mm 1000 mm
1 Cost of pipe 892.00 ### ### ### ### ### ### ### ### ### ### ### ### ### 20036.00
2 Transportation charges and
176.00 264.00 264.00 352.00 528.00 616.00 704.00 880.00 1056.00 1496.00 2200.00 2640.00 4488.00 4488.00 4488.00
Loading, unloading and stacking
3 Cost of specials (1.50%) 13.38 18.53 25.83 34.65 44.51 56.01 67.98 81.78 97.47 144.71 167.84 188.06 207.83 253.56 300.54
4 Earthwork, L/J 184.18 214.16 250.58 276.92 322.53 395.26 431.64 473.71 584.05 717.08 888.16 993.30 ### ### 1522.83
Cost of pipe ### ### ### ### ### ### ### ### ### ### ### ### ### ### 26347.37
Add Contractors
172.31 235.77 308.03 404.85 525.82 653.69 780.90 937.73 1121.27 1634.45 1966.69 2227.19 2678.37 3127.62 3587.19
5 profit@13.615%
Total ### ### ### ### ### ### ### ### ### ### ### ### ### ### 29934.56
0
Data based on 2015-16 Common SSR - for BWSC pipes
H2=HR Plates (1.6&2mm -Avg) 44500 W2=Wire Rods (5.5/6mm
42500 ) C2=Cement 6300 Month 25.07.201 JUNE
Conveyance 290 Km from Patancheru, Hyd.
Cost of specials 0.50
1 Earth work excavation in all soils except hard rock requiring blasting for BWSC pipes and filling with excavated soils including laying jointing testing of pipe line
including cost of materials etc. complete
3 Cost of specials (0.50%) 0.00 16.36 19.82 21.75 24.02 26.85 35.39 42.67 48.50 59.95 67.70
Part A Total ----------- 3471.06 4227.42 4676.25 5225.32 5884.05 7631.49 9156.67 10511.20 12873.55 14553.10
B) Labour component
4 Earthwork excavation & Refilling 528.01 594.01 644.01 644.01 807.22 977.82 1134.82 1290.23 1502.03 1665.23
PartB Total ----------- 528.01 594.01 644.01 644.01 807.22 977.82 1134.82 1290.23 1502.03 1665.23
Cost of pipe 3999.07 4821.43 5320.26 5869.33 6691.27 8609.31 ### 11801.43 14375.58 16218.33
6 Add contractors profit @ 13.615% 544.47 656.44 724.35 799.11 911.02 1172.16 1401.19 1606.76 1957.24 2208.13
Grand Total 4543.55 5477.87 6044.62 6668.44 7602.28 9781.46 ### 13408.19 16332.82 18426.46
3 Cost of specials (0.50%) 0.00 16.36 19.82 21.75 24.10 27.18 35.89 43.73 52.31 62.41 74.05
Part A Total ----------- 3471.06 4227.42 4676.25 5241.40 5949.38 7732.99 9368.73 11277.01 13367.01 15828.45
B) Labour component
4 Earthwork excavation & Refilling 528.01 594.01 644.01 644.01 807.22 977.82 1134.82 1290.23 1502.03 1665.23
PartB Total ----------- 528.01 594.01 644.01 644.01 807.22 977.82 1134.82 1290.23 1502.03 1665.23
Cost of pipe 3999.07 4821.43 5320.26 5885.41 6756.59 8710.81 ### 12567.24 14869.04 17493.68
6 Add contractors profit @ 13.615% 544.47 656.44 724.35 801.30 919.91 1185.98 1430.06 1711.03 2024.42 2381.76
Grand Total 4543.55 5477.87 6044.62 6686.71 7676.50 9896.79 ### 14278.27 16893.45 19875.44
3 BWSC Class 16 Kg/cm2
Trench size 1.0m x 1.4m 1.1 x 1.6m 1.2 x 1.7m1.3 x 1.8m1.4 x 1.9m1.5 x 2.0m1.6 x 2.1m
Pipe dia in mm BWSC 300 mm 350 mm 400 mm 450 mm 500 mm 600 mm 700 mm 800 mm 900 mm 1000 mm
A) material component
1 Cost of pipes 3272.00 3964.00 4372.00 4892.00 5514.00 7284.00 9331.00 11188.00 13416.00 15870.00
2 Cost of specials (0.50%) 0.00 16.36 19.82 21.86 24.46 27.57 36.42 46.66 55.94 67.08 79.35
3 Transportation charges, including loading at factory, un- As per SSR 182.70 243.60 304.50 397.30 487.20 519.10 580.00 762.70 823.60 945.40
loading at site and stacking. Page 330
Part A Total ----------- 3471.06 4227.42 4698.36 5313.76 6028.77 7839.52 9957.66 12006.64 14306.68 16894.75
B) Labour component
4 Earthwork excavation & Refilling 528.01 594.01 644.01 644.01 807.22 977.82 1134.82 1290.23 1502.03 1665.23
PartB Total ----------- 528.01 594.01 644.01 644.01 807.22 977.82 1134.82 1290.23 1502.03 1665.23
Cost of pipe 3999.07 4821.43 5342.37 5957.77 6835.99 8817.34 ### 13296.87 15808.71 18559.98
6 Add contractors profit @ 13.615% 544.47 656.44 727.36 811.15 930.72 1200.48 1510.24 1810.37 2152.36 2526.94
Grand Total 4543.55 5477.87 6069.74 6768.92 7766.71 10017.82 ### 15107.23 17961.07 21086.93
Part A Total ----------- 3471.06 4247.52 4761.68 5371.05 6291.08 8258.61 10528.50 12717.18 15235.30 17961.06
B) Labour component
4 Earthwork excavation & Refilling 528.01 594.01 644.01 644.01 807.22 977.82 1134.82 1290.23 1502.03 1665.23
PartB Total ----------- 528.01 594.01 644.01 644.01 807.22 977.82 1134.82 1290.23 1502.03 1665.23
Cost of pipe 3999.07 4841.53 5405.69 6015.06 7098.29 9236.43 11663.32 14007.40 16737.33 19626.29
6 Add contractors profit @ 13.615% 544.47 659.17 735.98 818.95 966.43 1257.54 1587.96 1907.11 2278.79 2672.12
Grand Total 4543.55 5500.71 6141.67 6834.01 8064.73 10493.96 ### 15914.51 19016.12 22298.41
5 BWSC Class 20 Kg/cm2
Trench size 1.0 x 1.4 1.1 x 1.6 1.2 x 1.7 1.3 x 1.8 1.4 x 1.9 1.5 x 2 1.6 x 2.1
Pipe dia in mm BWSC 300 mm 350 mm 400 mm 450 mm 500 mm 600 mm 700 mm 800 mm 900 mm 1000 mm
A) material component
1 Cost of pipes 3272.00 4022.00 4483.00 5188.00 6054.00 8112.00 ### 12643.00 15231.00 18056.00
2 Cost of specials (0.50%) 0.00 16.36 20.11 22.42 25.94 30.27 40.56 52.32 63.22 76.16 90.28
3 Transportation charges, including loading at factory, un- As per SSR 182.70 243.60 304.50 397.30 487.20 519.10 580.00 762.70 823.60 945.40
Page 330
loading at site and stacking.
Part A Total ----------- 3471.06 4285.71 4809.92 5611.24 6571.47 8671.66 11096.32 13468.92 16130.76 19091.68
B) Labour component
4 Earthwork excavation & Refilling 528.01 594.01 644.01 644.01 807.22 977.82 1134.82 1290.23 1502.03 1665.23
PartB Total ----------- 528.01 594.01 644.01 644.01 807.22 977.82 1134.82 1290.23 1502.03 1665.23
Cost of pipe 3999.07 4879.72 5453.93 6255.25 7378.69 9649.48 ### 14759.14 17632.79 20756.91
6 Add contractors profit @ 13.615% 544.47 664.37 742.55 851.65 1004.61 1313.78 1665.27 2009.46 2400.70 2826.05
Grand Total 4543.55 5544.10 6196.48 7106.91 8383.30 10963.26 ### 16768.60 20033.49 23582.97
Cost of pipes 4043.29 4921.93 5659.95 6465.30 7670.14 9997.21 ### 15737.01 18384.53 22375.97
6 Add contractors profit @ 13.615% 550.49 670.12 770.60 880.25 1044.29 1361.12 1746.55 2142.59 2503.05 3046.49
Grand Total 4593.79 5592.06 6430.56 7345.55 8714.43 11358.33 ### 17879.60 20887.58 25422.46
7 BWSC Class 24 Kg/cm2
Trench size 1.0 x 1.4m 1.1 x 1.6m 1.2 x 1.7m 1.3 x 1.8m 1.4 x 1.9m 1.5 x 2m 1.6 x 2.1m
Pipe dia in mm BWSC 300 mm 350 mm 400 mm 450 mm 500 mm 600 mm 700 mm 800 mm 900 mm 1000 mm
A) material component
1 Cost of pipes 3403.00 4166.00 4871.00 5645.00 6649.00 8909.00 ### 14414.00 17601.00 21498.00
2 Cost of specials (0.50%) 0.00 17.02 20.83 24.36 28.23 33.25 44.55 59.10 72.07 88.01 107.49
3 Transportation charges, including loading at factory, un- As per SSR 182.70 243.60 304.50 397.30 487.20 519.10 580.00 762.70 823.60 945.40
loading at site and stacking. Page 330
Part A Total ----------- 3602.72 4430.43 5199.86 6070.53 7169.45 9472.65 12459.10 15248.77 18512.61 22550.89
B) Labour component
4 Earthwork excavation & Refilling 528.01 594.01 644.01 644.01 807.22 977.82 1134.82 1290.23 1502.03 1665.23
PartB Total ----------- 528.01 594.01 644.01 644.01 807.22 977.82 1134.82 1290.23 1502.03 1665.23
Cost of pipes 4130.73 5024.44 5843.87 6714.54 7976.66 10450.47 ### 16539.00 20014.64 24216.12
6 Add contractors profit @ 13.615% 562.40 684.08 795.64 914.18 1086.02 1422.83 1850.81 2251.78 2724.99 3297.03
Grand Total 4693.13 5708.52 6639.51 7628.72 9062.69 11873.30 ### 18790.78 22739.63 27513.15
1.7m x 2.2m 1.8m x 2.3m
1100mm 1200mm
20010 22132
2111.20 2946.40
100.05 110.66
22221.25 25189.06
1931.84 2156.84
1931.84 2156.84
### ###
3288.44 3723.14
### ###
1100mm 1200mm
20388 22865
2111.20 2946.40
101.94 114.33
22601.14 25925.73
1931.84 2156.84
1931.84 2156.84
### ###
3340.16 3823.44
### ###
1.7m x 2.2m 1.8m x 2.3m
1100mm 1200mm
20702 23816
103.51 119.08
2111.20 2946.40
22916.71 26881.48
1931.84 2156.84
1931.84 2156.84
### ###
3383.13 3953.57
### ###
22750 26257
113.75 131.29
2111.20 2946.40
24974.95 29334.69
1931.84 2156.84
1931.84 2156.84
### ###
3663.36 4287.57
### ###
1.7m x 2.2m 1.8m x 2.3m
1100mm 1200mm
25035 28874
125.18 144.37
2111.20 2946.40
27271.38 31964.77
1931.84 2156.84
1931.84 2156.84
### ###
3976.02 4645.66
### ###
26627 31126
133.14 155.63
2111.20 2946.40
28871.34 34228.03
1931.84 2156.84
1931.84 2156.84
### ###
4193.85 4953.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
### ###
1.7m x 2.2m 1.8m x 2.3m
1100mm 1200mm
29611 33903
148.06 169.52
2111.20 2946.40
31870.26 37018.92
1931.84 2156.84
1931.84 2156.84
### ###
4602.15 5333.78
### ###
Data based on 2015-16 Common SSR - for PSCpipes
HT Wire Cement 6300 Month 25.07.2015
Earth work excavation in all soils upto SDR except hard rock requiring blasting for PSC pipes 'filling with excavated soils including laying jointing testing of pipe
line including cost of materials etc. complete
Cost of specials : 1.50
Conveyance: ### (Min Distance of 100 Km should be considered)
PCC Pipes Class : 4 Kg/cm2
Trench size 1.0 x 1.4m 1.05 x 1.65m 1.1 x 1.7m 1.2 x 1.7m 1.3 x 1.8m 1.4 x 1.9m 1.5 x 2.0m 1.6 x 2.1m
Pipe dia in mm = PCCP 400 mm 450 mm 500 mm 600 mm 700 mm 800 mm 900 mm 1000 mm
1 Cost of pipes 5299.00 5760.00 6297.00 7490.00 8658.00 10175.00 12064.00 13990.00
Transportation charges, including loading at factory, un-
2 120.00 120.00 170.00 190.00 300.00 300.00 300.00 480.00
loading at site and stacking.
3 Cost of specials (1.50%) 79.49 86.40 94.46 112.35 129.87 152.63 180.96 209.85
Part A Total -----------> 5498.49 5966.40 6561.46 7792.35 9087.87 10627.63 12544.96 14679.85
1 Cost of pipes 5299.00 5760.00 6297.00 7546.00 8795.00 10366.00 12064.00 14317.00
Transportation charges, including loading at factory, un-
2 120.00 120.00 170.00 190.00 300.00 300.00 300.00 480.00
loading at site and stacking.
3 Cost of specials (1.50%) 79.49 86.40 94.46 113.19 131.93 155.49 180.96 214.76
Part A Total -----------> 5498.49 5966.40 6561.46 7849.19 9226.93 10821.49 12544.96 15011.76
Cost of pipes 5299.00 5760.00 6311.00 7646.00 8960.00 10596.00 12593.00 14660.00
Cost of specials (1.50%) 79.49 86.40 94.67 114.69 134.40 158.94 188.90 219.90
Part A Total -----------> 5498.49 5966.40 6575.67 7950.69 9394.40 11054.94 13081.90 15359.90
Cost of pipes 5299.00 5787.00 6401.00 7779.00 9135.00 10826.00 12880.00 15015.00
Transportation charges, including loading at factory, un-
120.00 120.00 170.00 190.00 300.00 300.00 300.00 300.00
loading at site and stacking.
Cost of specials (1.50%) 79.49 86.81 96.02 116.69 137.03 162.39 193.20 225.23
Part A Total -----------> 5498.49 5993.81 6667.02 8085.69 9572.03 11288.39 13373.20 15540.23
Cost of pipes 5326.00 5856.00 6477.00 7902.00 9301.00 11036.00 13167.00 15367.00
Transportation charges, including loading at factory, un-
120.00 120.00 170.00 190.00 300.00 300.00 300.00 300.00
loading at site and stacking.
Cost of specials (1.50%) 79.89 87.84 97.16 118.53 139.52 165.54 197.51 230.51
Part A Total -----------> 5525.89 6063.84 6744.16 8210.53 9740.52 11501.54 13664.51 15897.51
Cost of pipes 5383.00 5940.00 6583.00 8026.00 9462.00 11250.00 13425.00 15660.00
Transportation charges, including loading at factory, un-
120.00 120.00 170.00 190.00 300.00 300.00 300.00 300.00
loading at site and stacking.
Cost of specials (1.50%) 80.75 89.10 98.75 120.39 141.93 168.75 201.38 234.90
Part A Total -----------> 5583.75 6149.10 6851.75 8336.39 9903.93 11718.75 13926.38 16194.90
Cost of pipes 5479.00 6061.00 6682.00 8216.00 9665.00 11512.00 13773.00 16067.00
Transportation charges, including loading at factory, un-
120.00 120.00 170.00 190.00 300.00 300.00 300.00 300.00
loading at site and stacking.
Cost of specials (1.50%) 82.19 90.92 100.23 123.24 144.98 172.68 206.60 241.01
Part A Total -----------> 5681.19 6271.92 6952.23 8529.24 10109.98 11984.68 14279.60 16608.01
Cost of pipes 5570.00 6144.00 6831.00 8392.00 9924.00 11788.00 14117.00 16487.00
Transportation charges, including loading at factory, un-
120.00 120.00 170.00 190.00 300.00 300.00 300.00 300.00
loading at site and stacking.
Cost of specials (1.50%) 83.55 92.16 102.47 125.88 148.86 176.82 211.76 247.31
Part A Total -----------> 5773.55 6356.16 7103.47 8707.88 10372.86 12264.82 14628.76 17034.31
Cost of pipes 5640.00 6240.00 6941.00 8570.00 10118.00 12106.00 14460.00 16919.00
Transportation charges, including loading at factory, un-
120.00 120.00 170.00 190.00 300.00 300.00 300.00 300.00
loading at site and stacking.
Cost of specials (1.50%) 84.60 93.60 104.12 128.55 151.77 181.59 216.90 253.79
Part A Total -----------> 5844.60 6453.60 7215.12 8888.55 10569.77 12587.59 14976.90 17472.79
1.7 x 2.3m 1.8m x 2.4m 1.9x2.5 2.0x2.6 2.1x2.7 2.2x2.8 2.3x2.9 2.4x3.0 2.5x3.1 2.6x3.2
1100 mm 1200mm 1300mm 1400mm 1500mm 1600mm 1700mm 1800mm 1900mm 2000mm
15571.00 17661 19663 21578 23698 26725 28791 31566 36864 39362
480.00 950.00 950.00 950.00 950.00 950.00 1140.00 1140.00 1140.00 1210.00
233.57 264.92 294.95 323.67 355.47 400.88 431.87 473.49 552.96 590.43
16284.57 18875.92 20907.95 22851.67 25003.47 28075.88 30362.87 33179.49 38556.96 41162.43
1701.24 1862.44 2009.05 2208.05 2438.46 2642.26 2943.47 3136.07 3408.08 3636.48
2448.77 2823.53 3120.15 3411.88 3736.22 4182.27 4534.66 4944.36 5713.54 6099.37
20434.57 23561.89 26037.14 28471.60 31178.14 34900.41 37840.99 41259.92 47678.58 50898.29
1.7 x 2.3m 1.8m x 2.4m 1.9x2.5 2.0x2.6 2.1x2.7 2.2x2.8 2.3x2.9 2.4x3.0 2.5x3.1 2.6x3.2
1100 mm 1200mm 1300mm 1400mm 1500mm 1600mm 1700mm 1800mm 1900mm 2000mm
15571.00 18115 20189 22176 24365 27468 29652 32470 37895 41316
480.00 950.00 950.00 950.00 950.00 950.00 1140.00 1140.00 1140.00 1210.00
233.57 271.73 302.84 332.64 365.48 412.02 444.78 487.05 568.43 619.74
16284.57 19336.73 21441.84 23458.64 25680.48 28830.02 31236.78 34097.05 39603.43 43145.74
1701.24 1862.44 2009.05 2208.05 2438.46 2642.26 2943.47 3136.07 3408.08 3636.48
2448.77 2886.27 3192.84 3494.52 3828.39 4284.95 4653.64 5069.29 5856.02 6369.40
20434.57 24085.43 26643.72 29161.21 31947.32 35757.23 38833.89 42302.41 48867.52 53151.62
1.7 x 2.3m 1.8m x 2.4m 1.9x2.5 2.0x2.6 2.1x2.7 2.2x2.8 2.3x2.9 2.4x3.0 2.5x3.1 2.6x3.2
1100 mm 1200 mm 1300 mm 1400 mm 1500 mm 1600 mm 1700 mm 1800 mm 1900 mm 2000 mm
16373.00 18576.00 20724.00 22801.00 25034.00 28227.00 30564.00 34239.00 39868.00 42641.00
480.00 950.00 950.00 950.00 950.00 950.00 1140.00 1140.00 1140.00 1210.00
245.60 278.64 310.86 342.02 375.51 423.41 458.46 513.59 598.02 639.62
17098.60 19804.64 21984.86 24093.02 26359.51 29600.41 32162.46 35892.59 41606.02 44490.62
1701.24 1862.44 2009.05 2208.05 2438.46 2642.26 2943.47 3136.07 3408.08 3636.48
2559.60 2949.97 3266.77 3580.89 3920.84 4389.84 4779.67 5313.75 6128.67 6552.50
21359.43 24617.06 27260.68 29881.95 32718.81 36632.50 39885.60 44342.41 51142.77 54679.60
1.7 x 2.3m 1.8m x 2.4m 1.9x2.5 2.0x2.6 2.1x2.7 2.2x2.8 2.3x2.9 2.4x3.0 2.5x3.1 2.6x3.2
1100 mm 1200 mm 1300 mm 1400 mm 1500 mm 1600 mm 1700 mm 1800 mm 1900 mm 2000 mm
16745.00 19035.00 21260.00 23428.00 25692.00 29643.00 32187.00 35336.00 41033.00 44004.00
480.00 950.00 950.00 950.00 950.00 950.00 1140.00 1140.00 1140.00 1210.00
251.18 285.53 318.90 351.42 385.38 444.65 482.81 530.04 615.50 660.06
17476.18 20270.53 22528.90 24729.42 27027.38 31037.65 33809.81 37006.04 42788.50 45874.06
1701.24 1862.44 2009.05 2208.05 2438.46 2642.26 2943.47 3136.07 3408.08 3636.48
2611.00 3013.40 3340.84 3667.54 4011.77 4585.52 5003.96 5465.35 6289.66 6740.86
21788.42 25146.37 27878.79 30605.01 33477.61 38265.42 41757.23 45607.46 52486.24 56251.40
1.7 x 2.3m 1.8m x 2.4m 1.9x2.5 2.0x2.6 2.1x2.7 2.2x2.8 2.3x2.9 2.4x3.0 2.5x3.1 2.6x3.2
1100 mm 1200 mm 1300 mm 1400 mm 1500 mm 1600 mm 1700 mm 1800 mm 1900 mm 2000 mm
17137.00 19506.00 21810.00 24052.00 27075.00 30505.00 33163.00 36407.00 43117.00 46383.00
480.00 950.00 950.00 950.00 950.00 950.00 1140.00 1140.00 1140.00 1210.00
257.06 292.59 327.15 360.78 406.13 457.58 497.45 546.11 646.76 695.75
17874.06 20748.59 23087.15 25362.78 28431.13 31912.58 34800.45 38093.11 44903.76 48288.75
1701.24 1862.44 2009.05 2208.05 2438.46 2642.26 2943.47 3136.07 3408.08 3636.48
2665.18 3078.49 3416.85 3753.77 4202.89 4704.64 5138.83 5613.35 6577.66 7069.62
22240.47 25689.53 28513.04 31324.60 35072.47 39259.47 42882.74 46842.53 54889.49 58994.85
1.7 x 2.3m 1.8m x 2.4m 1.9x2.5 2.0x2.6 2.1x2.7 2.2x2.8 2.3x2.9 2.4x3.0 2.5x3.1 2.6x3.2
1100 mm 1200 mm 1300 mm 1400 mm 1500 mm 1600 mm 1700 mm 1800 mm 1900 mm 2000 mm
17495.00 19927.00 22294.00 25287.00 27835.00 31367.00 34989.00 38420.00 44774.00 47823.00
480.00 950.00 950.00 950.00 950.00 950.00 1140.00 1140.00 1140.00 1210.00
262.43 298.91 334.41 379.31 417.53 470.51 524.84 576.30 671.61 717.35
18237.43 21175.91 23578.41 26616.31 29202.53 32787.51 36653.84 40136.30 46585.61 49750.35
1701.24 1862.44 2009.05 2208.05 2438.46 2642.26 2943.47 3136.07 3408.08 3636.48
2714.65 3136.67 3483.73 3924.44 4307.92 4823.76 5391.17 5891.53 6806.64 7268.62
22653.31 26175.02 29071.19 32748.79 35948.90 40253.53 44988.47 49163.90 56800.33 60655.44
1.7 x 2.3m 1.8m x 2.4m 1.9x2.5 2.0x2.6 2.1x2.7 2.2x2.8 2.3x2.9 2.4x3.0 2.5x3.1 2.6x3.2
1100 mm 1200 mm 1300 mm 1400 mm 1500 mm 1600 mm 1700 mm 1800 mm 1900 mm 2000 mm
17942.00 20449.00 23529.00 26053.00 28983.00 33513.00 36634.00 40175.00 46395.00 50049.00
480.00 950.00 950.00 950.00 950.00 950.00 1140.00 1140.00 1140.00 1210.00
269.13 306.74 352.94 390.80 434.75 502.70 549.51 602.63 695.93 750.74
18691.13 21705.74 24831.94 27393.80 30367.75 34965.70 38323.51 41917.63 48230.93 52009.74
2714.65 3136.67 3483.73 3924.44 4307.92 4823.76 5391.17 5891.53 6806.64 7268.62
2914.40 3382.29 3855.18 4263.98 4721.09 5417.33 5951.75 6509.22 7493.36 8070.75
24320.18 28224.70 32170.85 35582.21 39396.76 45206.79 49666.44 54318.38 62530.93 67349.10
1.7 x 2.3m 1.8m x 2.4m 1.9x2.5 2.0x2.6 2.1x2.7 2.2x2.8 2.3x2.9 2.4x3.0 2.5x3.1 2.6x3.2
1100 mm 1200 mm 1300 mm 1400 mm 1500 mm 1600 mm 1700 mm 1800 mm 1900 mm 2000 mm
18413.00 21483.00 24187.00 26835.00 30690.00 34466.00 37666.00 41414.00 47771.00 51630.00
480.00 950.00 950.00 950.00 950.00 950.00 1140.00 1140.00 1140.00 1210.00
276.20 322.25 362.81 402.53 460.35 516.99 564.99 621.21 716.57 774.45
19169.20 22755.25 25499.81 28187.53 32100.35 35932.99 39370.99 43175.21 49627.57 53614.45
2714.65 3136.67 3483.73 3924.44 4307.92 4823.76 5391.17 5891.53 6806.64 7268.62
2979.49 3525.18 3946.11 4372.04 4956.99 5549.03 6094.37 6680.44 7683.52 8289.23 0.00
24863.33 29417.10 32929.65 36484.00 41365.26 46305.78 50856.53 55747.18 64117.72 69172.30
1.7 x 2.3m 1.8m x 2.4m 1.9x2.5 2.0x2.6 2.1x2.7 2.2x2.8 2.3x2.9 2.4x3.0 2.5x3.1 2.6x3.2
1100 mm 1200 mm 1300 mm 1400 mm 1500 mm 1600 mm 1700 mm 1800 mm 1900 mm 2000 mm
19446.00 22221.00 25014.00 28573.00 32692.00 35392.00 38643.00 42653.00 49071.00 53033.00
480.00 950.00 950.00 950.00 950.00 950.00 1140.00 1140.00 1140.00 1210.00
291.69 333.32 375.21 428.60 490.38 530.88 579.65 639.80 736.07 795.50
20217.69 23504.32 26339.21 29951.60 34132.38 36872.88 40362.65 44432.80 50947.07 55038.50
2714.65 3136.67 3483.73 3924.44 4307.92 4823.76 5391.17 5891.53 6806.64 7268.62
3122.24 3627.17 4060.39 4612.22 5233.65 5677.00 6229.38 6851.66 7863.17 8483.11
26054.58 30268.16 33883.34 38488.25 43673.95 47373.64 51983.20 57175.99 65616.87 70790.22