Amman 10/9/2018
Ref: CB /PT /01/18
M.S Al Shabab Contracting Company
Attention Eng. Osama AL- Aqrabawi
Subject : PT Slabs
Dear Sir,
Reference is made to the above mentioned project subject, we have been reviewing
projects design, made an assessment and came out with the following:
Basement 1, Mezzanine, GF ,1st,2nd,3rd,4thFloors (Approx. Area 21800M2).
Basement 1 Floor
Mezzanine Floor
Ground Floor
4th Floor
Payment terms
40% Of the Total value Advance Payment upon signing the Contract
40% Upon ordering of Materials .
20% Upon Completion of stressing and Grouting .
or to be agreed
Note: (100% of The Value for Slab will be paid upon completing
Grouting) No Retention is considered .
*** Prestressing steel Strands based on USD 1150/ MT as of 1/8/2018
Price Based on JOD/ U$D Exchange Rate as per CBJ rate of
10/9/2018 .
Any change in price, or Rate will be adjusted accordingly
Regards
Ahmad Qunies