PROCESS LOADSHEET
PIT PUMP
P-0207
TOTAL OR PARTIAL REPRODUCTION AND/OR UTILIZATION OF THIS DOCUMENT ARE FORBIDDEN WITHOUT PRIOR
WRITTEN AUTHORIZATION OF THE OWNER
PT PERTAMINA EP
PEMBANGUNAN CENTRAL PROCESSING PLANT (CPP)
AREA GUNDIH
Contract Number : 4650001978 Job No. : 10001
Document Type : DTS Discipline : PRO Page : 1 of 5
REVISION STATUS
PPGJ-PRO-DTS-02.123
2 IFA
PPGJ-PRO-DTS-02.123
2 IFA
PROYEK PENGEMBANGAN GAS JAWA
(PPGJ)
BASIS
1. PUMP CAPACITY
Pump Capacity is based on rainfall intensiy 150 mm/hr for 2 hours of storm duration.
Dimension for Pit:
}
Length : 6 m
Width : 4 m Q = 17.44 GPM (Normal)
Depth : 5 m = 19.18 GPM (Rated)
4. FLUID PROPERTIES
Fluid Name = STORM WATER Viscosity = 0.89 cP
Density = 62.89 lb/ft3 Vapor Press. = 0.45 psia
5. ASSUMPTIONS
Assume pump centerline is 0.3 m above pit.
Assume Datum is at leg of D-0205
Assume Max LL is 1 m above pit.
Assume Height of D-0205's leg is 0.75 m.
Assume CWS Elevation is on grade level.
NOTES
ATTACHMENT-B
NOTES
1. Working Volume of Pump Pit = 0.125 m3 and will be emptied in 2.5 minutes.
2. Equipment elevation only an initial estimation.
ATTACHMENT-B
NOTES
1 Sketch not on scale.
REVISION : 2
DATE : 20-Jan-2012
PREP'D BY :
CHECKED BY :
APPR'D BY :
PENGADAAN PEKERJAAN PEMBANGUNAN
PABRIK MINYAK GORENG KAPASITAS 600.000 MTPY
PT. Industri Nabati Lestari
ATTACHMENT
NOTES
1. Line length and Pipe Fittings used for Pressure Drop Calculation Basis are Preliminary and Should be Verified during Detail Design
2. Governing Case is Case 1 (from Demin Tank to Boiler)
ATTACHMENT-A
NOTES REVISION :
DATE :
PREP'D BY :
CHECKED BY :
APPR'D BY :
ATTACHMENT B: HYDRAULIC CALCULATION SHEET