Retaining Wall

Cantilever 0.5
Assumtion: M 20 Concrete 0.75
No Water table 1
Select Surcharge in ton/m2 0.5 2
Angle of Repose 30 3
Earth Example: For 0.5 T/m2 5
P max = 0.33 x O.500+ 0.33 x2 x h 7
Ast. P max =0.17 + .66h T/m2 10
Vu at Face = 1.5( 0.17h+ 0.5 x h x 0.66h)
= 0.26h+ 0.5 h^2

Mu at Face = 1.5( 0.17h x h/2+ 0.66h x h/2 x h/3)


= 0.13h^2 + 0.17 h ^ 3

Depth Vu Tons Mu Tm D for Shear at face D for Mom at face Vu at Dist D D shear @D D provided Ast reqd. Input Dia Spacing
1.5 1.515 0.87 43 60.08 1.44 41.14 75 5.20 10 150
2 2.52 1.88 72.00 88.51 2.36 67.42 100 7.76 12 125
2.5 3.775 3.47 107.86 120.22 3.48 99.52 125 10.90 12 100
3 5.28 5.76 150.86 154.92 4.80 137.13 175 12.26 16 150
3.5 7.035 8.88 201.00 192.37 6.30 179.98 200 16.28 20 175
4 9.04 12.96 258.29 232.38 7.97 227.80 250 18.59 20 150
4.5 11.295 18.12 322.71 274.80 9.81 280.31 300 21.36 20 125
5 13.8 24.50 394.29 319.50 11.80 337.25 350 24.50 20 125
5.5 16.555 32.22 473.00 366.38 12.64 361.01 375 29.95 20 100
6 19.56 41.40 558.86 415.33 16.22 463.36 475 30.03 25 150
6.5 22.815 52.18 651.86 466.27 18.62 532.03 550 32.49 25 150
7 26.32 64.68 752.00 519.13 21.14 604.09 625 35.28 25 125
7.5 30.075 79.03 859.29 573.84 23.78 679.32 700 38.35 28 150
8 34.08 95.36 973.71 630.34 26.51 757.46 775 41.68 28 125
8.5 38.335 113.79 1095.29 688.58 29.34 838.29 850 45.24 28 125
9 40.5 123.93 1157.14 718.59 30.76 878.72 900 46.47 28 125
9.5 45.125 145.75 1289.29 779.30 33.71 963.08 975 50.37 28 100
10 50 170.00 1428.57 841.63 36.73 1049.56 1050 54.47 28 100
10.5 55.125 196.80 1575.00 905.53 39.83 1137.94 1150 57.47 28 100
11 60.5 226.27 1728.57 970.97 42.98 1227.99 1250 60.71 33.1 125
11.5 66.125 258.55 1889.29 1037.92 46.18 1319.51 1325 65.38 34.2 125
12 72 293.76 2057.14 1106.35 49.43 1412.29 1425 69.00 35.18571 125
12.5 78.125 332.03 2232.14 1176.21 52.71 1506.13 1525 72.80 36.17143 125
15 112.5 573.75 3214.29 1546.16 69.45 1984.33 2000 95.63 37.15714 100
Retaining Wall 1

propped Cantilever 1 0.5


2 0.7
Ast 3 1
4 2
Assumtion: M 20 Concrete 5 3
No Water table 6 5
Surcharge 500
0.5 kg/m2 7 7
Angle of Repose 30

P max = 0.33 x O.500+ 0.33 x2 x h Mu-ve=1.5*(1+1/15*(Pmax-Pmin)/( Pmax+Pmin))WL/8


P max = (0.17 + .66h) T/m2
Pmin=0.17 T/m2 Vu= 1.5*(0,.17h/2+.666*(0.338h*h)+ Mu/h
W= Total load per met=0.17h+0.33*h*h
Negative Mmt Steel
Depth Mu -ve Vu supportD for Bending
D for shear face V at Dist d D for sh at Dist d D provided Ast reqd. Input Dia Spacing
1.5 0.29 1.14 34.90 32 1.10 31 100 1.21 8 400
2 0.65 1.91 52.11 55 1.84 52 100 2.69 8 175
2.5 1.22 2.89 71.43 83 2.75 79 100 5.05 12 200
3 2.06 4.07 92.66 116 3.84 110 125 6.48 12 150
3.5 3.21 5.44 115.63 155 5.10 146 150 8.15 12 125
4 4.72 7.02 140.22 201 6.52 186 200 8.65 12 125
4.5 6.64 8.79 166.34 251 8.10 231 250 9.53 16 200
5 9.02 10.77 193.90 308 9.84 281 300 10.63 16 175
5.5 11.92 12.94 222.83 370 11.72 335 350 11.92 16 150
6 15.37 15.31 253.06 438 13.75 393 400 13.35 16 150
6.5 19.43 17.89 284.55 511 15.93 455 475 14.09 16 125
7 24.15 20.66 317.24 590 18.24 521 525 15.78 16 125
7.5 29.58 23.63 351.09 675 20.69 591 600 16.83 20 175
8 35.77 26.80 386.07 766 23.27 665 675 18.02 20 150
8.5 42.77 30.17 422.13 862 25.97 742 750 19.33 20 150
9 50.62 33.74 459.26 964 28.80 823 825 20.75 20 150
9.5 59.38 37.51 497.41 1072 31.74 907 925 21.65 25 225
10 69.09 41.48 536.55 1185 34.80 994 1000 23.27 25 200