Sei sulla pagina 1di 2

CONTRACT No: 551-16-BD-443-00

MATERIALS /SERVICE REQUEST FORM


Category - 3r

Reference No: BN551-MSRF-1164 Date : 12-May-2019 CRITICALITY : URGENT Descipline : Mechanical Mechanical WO# 4069251

Item Description Intended Use in


Sl. Unit of Available q-ty in Required Specification Category - 3rd Remarks / Justification
SAP MM code (short descripition
No measure stock Quantity (full details in the technical details form) Party Service full in technical detail form) Name of Unit/System Phase Tag of Equipment/System

Elbow 90, 6" sch 40, A234, LR, SMLS, ASME B16.9,
4 See attached technical specification - 218, fire water
1 N/A with mill test report EA 0 Spares PHASE I 218-P21801A
Mill test report is required system
Elbow 90, 10" sch 40, A234, LR, SMLS, ASME B16.9,
4 See attached technical specification - 218, fire water
2 N/A with mill test report EA 0 Spares PHASE I 218-P21801A
Mill test report is required system
Flange, 6" Sche 40, WNRF, CL150, A105, ASME B16.5,
13 See attached technical specification - 218, fire water
3 N/A with mill test report EA 0 Spares PHASE I 218-P21801A
Mill test report is required system
Flange, 6" Sche 40, WNRF, CL300, A105, ASME B16.5,
2 See attached technical specification - 218, fire water
4 N/A with mill test report EA 0 Mill test report is required Spares PHASE I 218-P21801A
These material are required to system
Check Valve, 10", DUAL PLATE WAFER LUG TYPE, CLASS 150, SUITABLE FOR implement the modifcation for addition
INSTALLATION BETWEEN FLANGES FF TO ASME B16,5, BODY/COVER ASTM A395 of a pressure relief valve (PRV) on the
GRADE 60-40-18, TRIM NICKEL-ALUMINIUM BRONZE, DIM TO API 594 TYPE A See attached technical specification - electric fire water pump P-21801A 218, fire water
5 N/A with mill test report EA 0 1 Spares PHASE I 218-P21801A
Mill test report is required piping as per GBOPM-OPE-MOC-ME-0029. system
The modification will prevent the high
pressure events which are caused by the
Flange, 10" Sche 40, WNRF, CL150, A105, ASME B16.5 pump P-21801A. The high pressure has
16 See attached technical specification - 218, fire water
6 N/A with mill test report EA 0 Mill test report is required Spares led to many failures on the firewater PHASE I 218-P21801A
system
underground network due to the
Gasket, 10" CL150, 2mm thick, compressed non-asbestos flat ring CNAF, ASME absence of pressure relieving device. 218, fire water
7 11001974 B16.21 EA 0 24 See attached technical specification Spares PHASE I 218-P21801A
system
pipe, 10" Sch 40, A106, ASME B36.10M, SMLS
24 See attached technical specification - 218, fire water
8 N/A with mill test report m 0 Mill test report is required Spares PHASE I 218-P21801A
system
pipe, 6" Sch 40, A106, ASME B36.10M, SMLS,
24 See attached technical specification - 218, fire water
9 N/A with mill test report m 0 Mill test report is required Spares PHASE I 218-P21801A
system
Reducer, eccentric, 10"x6" sch40, A105, B16.9,
1 See attached technical specification - 218, fire water
10 N/A with mill test report EA 0 Mill test report is required Spares PHASE I 218-P21801A
system

Note: 1) For all Non-Standard / Engineering Items pls attach Technical Spec. Note: 2) Provide complete item description with material master codes, manufacturer names, part numbers, copy of brochures etc, if any, for all standard items

Note: 3) If items exceed 10nr use another MSRF sheet. Note: 4) The fileds - Discipline; WO#; Name of system/unit; Tag; Remarks/Justification are mandatory to fill up.
Requested by Reviewed By GPNB Dept. Head Approved by - For and on behalf of GPNB Head of Maintenance
Name with B2B/Position Mohammed abdullah / wisam malik Name: Name:

Signature Signature Signature


CONTRACT No: 551-16-BD-443-00
MATERIALS /SERVICE REQUEST FORM
Category - 3r

Reference No: BN551-MSRF-1164 Date : 12-May-2019 CRITICALITY : URGENT Descipline : Mechanical Mechanical WO# 4069251

Item Description Intended Use in


Sl. Unit of Available q-ty in Required Specification Category - 3rd Remarks / Justification
SAP MM code (short descripition
No measure stock Quantity (full details in the technical details form) Party Service full in technical detail form) Name of Unit/System Phase Tag of Equipment/System

Tee reducing, 8"x6" Sch 40, A106, B16.9,


1 See attached technical specification - 218, fire water
11 N/A with mill test report EA 0 Spares PHASE I 218-P21801A
Mill test report is required system
Studs, 100mm long, Dia 3/4", full thread, with 2 heavy hex head nuts, ASTM
A193 Gr. B/A194 Gr. 2H, UNC thread, zinc plated, bi-chromate treated, ASME 48 218, fire water
12 N/A B18.2.1 & B18.2.2 EA 0 See attached technical specification Spares PHASE I 218-P21801A
system
Studs, 140mm long, Dia 3/4", full thread, with 2 heavy hex head nuts, ASTM
A193 Gr. B/A194 Gr. 2H, UNC thread, zinc plated, bi-chromate treated, ASME 24 218, fire water
13 N/A B18.2.1 & B18.2.2 EA 0 See attached technical specification Spares PHASE I 218-P21801A
system
Studs, 135mm long, Dia 7/8", full thread, with 2 heavy hex head nuts, ASTM
A193 Gr. B/A194 Gr. 2H, UNC thread, zinc plated, bi-chromate treated, ASME 50 218, fire water
14 N/A B18.2.1 & B18.2.2 EA 0 See attached technical specification Spares PHASE I 218-P21801A
system
These material are required to
Studs, 115mm long, Dia 7/8", full thread, with 2 heavy hex head nuts, ASTM
A193 Gr. B/A194 Gr. 2H, UNC thread, zinc plated, bi-chromate treated, ASME implement the modifcation for addition 218, fire water
15 N/A EA 0 68 See attached technical specification Spares of a pressure relief valve (PRV) on the PHASE I 218-P21801A
B18.2.1 & B18.2.2 system
electric fire water pump P-21801A
THREADOLET,10"X2",A105,3000LB,MSS SP97 / ASME B16.11, NPT thread piping as per GBOPM-OPE-MOC-ME-0029.
2 See attached technical specification - 218, fire water
16 N/A EA 0 Spares The modification will prevent the high PHASE I 218-P21801A
Mill test report is required system
Sight Glass, 2" NPT Male, hex head, max pressure (16 bar / 230 PSI) or higher pressure events which are caused by the
2 See attached technical specification - pump P-21801A. The high pressure has 218, fire water
17 N/A EA 0 Spares PHASE I 218-P21801A
Mill test report is required
led to many failures on the firewater system
Column UC 152x152x30, material BS EN 10025 S275 J2, A36 underground network due to the
See attached technical specification - 218, fire water
18 N/A m 0 6
Mill test report is required
Spares absence of pressure relieving device. system
PHASE I 218-P21801A
Wear Pad, for 10" pipe, A106 Gr. B, with mill test report. Wear Pad, for 10" pipe, A106 Gr. B, refer to attachment
#2 - Mill test report is required 218, fire water
19 N/A EA 0 1 Spares
system
PHASE I 218-P21801A
Plate, 6 mm thick, A37 Gr. B Plate, 6 mm thick, A37 Gr. B
218, fire water
20 N/A m2 0 1 Spares
system
PHASE I 218-P21801A
Anchor Bolt, hot dip galvanized, M36, length 1000mm, 2 nuts, with lock nut & Anchor Bolt, hot dip galvanized, M36, length 1000mm, 2
anchor plate & washer. nuts, with lock nut & anchor plate & washer, referr to 218, fire water
21 N/A EA 0 8
attachment #4 Spares
system
PHASE I 218-P21801A

Tee Equal, 10" x10" Sch 20, A106, B16.9


218, fire water
22 N/A EA 0 1 See attached technical specification Spares
system
PHASE I 218-P21801A

Note: 1) For all Non-Standard / Engineering Items pls attach Technical Spec. Note: 2) Provide complete item description with material master codes, manufacturer names, part numbers, copy of brochures etc, if any, for all standard items

Note: 3) If items exceed 10nr use another MSRF sheet. Note: 4) The fileds - Discipline; WO#; Name of system/unit; Tag; Remarks/Justification are mandatory to fill up.
Requested by Reviewed By GPNB Dept. Head Approved by - For and on behalf of GPNB Head of Maintenance
Name with B2B/Position Mohammed abdullah / wisam malik Name: Name:

Signature Signature Signature

Potrebbero piacerti anche