1.3.1 Design Sewage Flow
3 3 3 3
ITEM m /day m /hr m /min m /sec
Daily Average Flow 114,000 4,750.0 79.17 1.319
Proposed Project
B.1 -2
Detailed Design Study on Water Supply Final Report
and Sewerage System for Astana City
SEWAGE INLET
Grit Chamber
(Return Sludge)
Aeration Tank
B.1 -3
Detailed Design Study on Water Supply Final Report
and Sewerage System for Astana City
B.1 -4
Detailed Design Study on Water Supply Final Report
and Sewerage System for Astana City
B.1 -5
Detailed Design Study on Water Supply Final Report
and Sewerage System for Astana City
1.6.2 Result
(1) Primary Sedimentation Tank
Primary Sludge Solids Content % 2.0
Primary Sludge Generation (dry solid) kg/d 12,932
3
Primary Sludge Volume m /d 647
B.1 -6
Detailed Design Study on Water Supply Final Report
and Sewerage System for Astana City
(6) Digester
Digested Sludge Solids Content % 3.0
Digested Sludge Generation (dry solid) kg/d 16,452
3
Digested Sludge Volume m /d 548
3
Digestion Gas Generation m /d 10,968
B.1 -7
Detailed Design Study on Water Supply Final Report
and Sewerage System for Astana City
PRIMARY SECONDARY
INLET SEDIMENTATION AERATION TANK SEDIMENTATION OUTLET
TANK TANK
Recovery Ratio: 40%
Q Nm3/d 10,968
Q m3/d 74 (V7)
Q m3/d 316 (V4) Q m3/d 548 (V5) Q m3/d 548 (V6) CAKE kg/d 14,807 (S7)
SS kg/d 15,781 (S4) SS kg/d 27,420 (S5) SS kg/d 16,452 (S6) Water Content % 20.0
C % 5.0 C % 5.0 C % 3.0
GRAVITY
THICKENER
2. CAPACITY CALCULATION
D= 811 mm to 574 mm
adopt 800 mm
Diameter D 24.0 m
Depth H 3.9 m
(Half of volume is used for pump pit.)
Check
2
Retention Time T' (D x 3.14 / 4 x H) / 2 / Q3-M = 6.3 min
B.1 -9
Detailed Design Study on Water Supply Final Report
and Sewerage System for Astana City
Structure
Channel Number CN 2
2.2.4 Result
B.1 -10
Detailed Design Study on Water Supply Final Report
and Sewerage System for Astana City
Structure
= 673.2 m
28.0m
0.60m
B.1 -11
Detailed Design Study on Water Supply Final Report
and Sewerage System for Astana City
2.3.4 Result
B.1 -12
Detailed Design Study on Water Supply Final Report
and Sewerage System for Astana City
Structure
Width W 32.0 m
Length L 119.0 m
Check
3
Tank Volume V' WxLxH = 15,232 m
2.4.4 Result
B.1 -13
Detailed Design Study on Water Supply Final Report
and Sewerage System for Astana City
Structure
= 1,009.8 m
28.0m
0.60m
B.1 -14
Detailed Design Study on Water Supply Final Report
and Sewerage System for Astana City
2.5.4 Result
B.1 -15
Detailed Design Study on Water Supply Final Report
and Sewerage System for Astana City
D= 811 mm to 574 mm
adopt 800 mm
Diameter D 24.0 m
Depth H 3.65 m
(Half of volume is used for pump pit.)
Check
2
Retention Time T' (D x 3.14 / 4 x H) / 2 / Q2-M = 5.9 min
B.1 -16
Detailed Design Study on Water Supply Final Report
and Sewerage System for Astana City
Primary Sludge
(2) Sludge V1 =
3
647 m /day (From Balance Sheet)
Structure
Diameter D 20.0 m
Depth H 3.5 m
Check
2
Retention Time T' (D x 3.14 / 4 x H x TN) / (V1 / 24) = 81.6 hr
More than 15 …OK
2.7.1.4 Result
B.1 -17
Detailed Design Study on Water Supply Final Report
and Sewerage System for Astana City
Waste Sludge
<A-Tank>
Width W1 6.7 m
Length L1 8.95 m
Depth H1 4.2 m
<B-Tank>
Width W2 6.7 m
Length L2 9.1 m
Depth H2 4.2 m
Check
= 3.7 hr
More than 3 …OK
2.7.2.4 Result
Dimension A-Tank Width 6.7m x Length 8.95m x Depth 4.2m (252m3) x 1 unit
B.1 -18
Detailed Design Study on Water Supply Final Report
and Sewerage System for Astana City
Waste Sludge
Mechanical Thickener
T2 24 hours/day
3
Thickened Sludge Volume Vol V2 x (7 / T1) / T2 ≥ 138 m /hr
2.7.3.4 Result
3
Screw Press Thickener 75m /hr x 3 units (including 1 stand-by)
B.1 -19
Detailed Design Study on Water Supply Final Report
and Sewerage System for Astana City
= 27.420 t/day
3
(2) Sludge V3 + V4 = 233 + 316 = 548 m /day
Structure
<A-Tank>
Width W1 3.5 m
Length L1 5.85 m
Depth H1 2.5 m
<B-Tank>
Width W2 3.5 m
Length L2 7.6 m
Depth H2 2.5 m
Check
= 5.1 hr
More than 3 …OK
2.7.4.4 Result
Dimension A-Tank Width 3.5m x Length 5.85m x Depth 2.5m (51m3) x 1 unit
B.1 -20
Detailed Design Study on Water Supply Final Report
and Sewerage System for Astana City
2.8 Digester
2.8.1 Design Condition
Thickened Sludge
Structure
Depth H1 8m
2
Required Volume Vol V5 x T1 = 3288 m
1/2
Diameter D1 {V * 4 / (TN1 x 3.14 x H1} ^ 16.18 m
therefore 17.0 m
Check
2
Digestion Time T1' (D1 x 3.14 / 4 x H1 x TN1) / V5 = 6.6 days
B.1 -21
Detailed Design Study on Water Supply Final Report
and Sewerage System for Astana City
Depth H2 6m
Diameter D2 13.0 m
Check
2
Storage Time T2' (D2 x 3.14 / 4 x H2 x TN2) / GV = 3.5 hr
Between 2-4 …OK
2.8.4 Result
2.8.4.1 Digester
Dimension Diameter 17m x Depth 8m (1815m3) x 2 tanks
B.1 -22
Detailed Design Study on Water Supply Final Report
and Sewerage System for Astana City
Digester Sludge
Width W 7.7 m
Length L 3.5 m
Depth H 2.5 m
Check
2.9.1.4 Result
B.1 -23
Detailed Design Study on Water Supply Final Report
and Sewerage System for Astana City
Digester Sludge
T2 24 hours/day
2.9.2.4 Result
B.1 -24
Detailed Design Study on Water Supply Final Report
and Sewerage System for Astana City
Width W 7.7 m
Length L 8.0 m
Depth H 2.5 m
Check
2.9.3.4 Result
B.1 -25
Detailed Design Study on Water Supply Final Report
and Sewerage System for Astana City
Sludge Hopper
Length L 3.0 m
Height H 1.7 m
3
Hopper Volume V WxLxH= 15.3 adopt 15 m
Check
2.9.4.4 Result
B.1 -26
Detailed Design Study on Water Supply Final Report
and Sewerage System for Astana City
Width W 3.6 m
Length L 1.1 m
Depth H 1.8 m
Check
2.10.1.4 Result
B.1 -27
Detailed Design Study on Water Supply Final Report
and Sewerage System for Astana City
Width W 4.7 m
Length L 3.3 m
Depth H 4.2 m
Check
2.10.2.4 Result
B.1 -28
Detailed Design Study on Water Supply Final Report
and Sewerage System for Astana City
Width W 4.7 m
Length L 3.3 m
Depth H 4.2 m
Check
2.10.3.4 Result
B.1 -29