Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
Inaccessible
AGENDA
1. Introduction
1. Challenges & Conventional Methods
THE
SAPEX
STANDARD
Swamp Asphalt
1
5/9/19
NSN: 5675-01-471-2683
1. INTERNAL SURFACE AREA & WELDED DESIGN 3. LOCKING PINS ON ALL SIDES
• MAXIMAL LOAD SPREADING AND COMPRESSIVE • ENSURES LATERAL TRANSMISSION OF LOADS,
LOADING CAPACITY (DYNAMIC & STATIC) NO STEPS/GAPS IN SURFACE – A CONTINUOUS
AND SAFE OPERATING PLATFORM
2
5/9/19
2. OVERLAPPING FLANGES
• ENSURES LOAD SPREADING TO ADJACENT MATS
AND FULL CONNECTIVITY, FLEXIBILITY IN
DESIGN CONFIGURATIONS
3
5/9/19
2. OVERLAPPING FLANGES
• ENSURES LOAD SPREADING TO ADJACENT MATS
AND FULL CONNECTIVITY, FLEXIBILITY IN
DESIGN CONFIGURATIONS
Options
Pad Design
Road Design
4
5/9/19
Ø Subgrade
Evaluate pentration resistance of sample
Ø Load CBR =
penetration resistance of crushed rock
Ø Mat
Analysis Based on CBR and Load
Calculate
Jobsite
Design
5
5/9/19
AGENDA
1. Introduction
1. Challenges & Conventional Methods
THE
SAPEX
STANDARD
Construction
BUMA
Chevron Indonesia
Pertamina UBEP
Bormindo Sanga Sanga
Bintang Newcrest / NHM
KPC Delapan
Altus VICO
Pertamina
Ramba
Nations Petroleum
ExxonMobil
Leighton
Pertamina
EP
Bunyu
Tately
Titan Infra / Servo Salamander
BP Tanggu LNG
Ophir
CSTS
Talisman Krakatau Steel EPC
PGN SAKA
Multi Prima
Golden Spike
Mandala
PT Persero
PT PP Genting Oil
Halliburton PT HK
Bandar Indah
Permata
Talisman/Repsol Indonesia
East Jabung
6
5/9/19
7
5/9/19
8
5/9/19
9
5/9/19
10
5/9/19
11
5/9/19
12
5/9/19
CPI HO-5R55F
CPI HO-5R55F
13
5/9/19
14
5/9/19
Containment
sump
Secondary
containment
12-well
cellar
2000 HP rig
Containment ditch
Pollution ditch
12-well cellar
2000 HP rig
15
5/9/19
Pipeline Operations
16
5/9/19
Pipeline Operations
DURA-BASE
Road
17
5/9/19
Well depth: 30,000 feet (>9,100 meters) - Drilling rig: Unit rig 201 (4000
HP)
Well Pad: 3.3 hectares; Access Road: 396m entirely matted w/ DURA-
BASE
Coastal marsh and D&C operations lasted >2 years =
DURA-BASE on job ~30 months
18
5/9/19
4000 HP Rig
Well Depth:
30,000ft
(>9,100m)
“Largest
Land Rig in
the World”
Net Benefit
• 3,500+ Wells Drilled and Worked Over in Indonesia Using the Dura-Base Composite Mat
System
• Road, Location & Pad Construction Down Time Nearly Eliminated
• HSE Focus ensures Long term stakeholder confidence
19
5/9/19
20
5/9/19
Thank You!
21