COST ANALYSIS OF EXCAVATION

BOQ ITEM
SR. NO. DESCRIPTION OF ITEM UNIT
NOS
Eaeth work in excavation of all kind of soil by Mechanical means
(Hydraulic excavator)/Manual means (exceeding 30cm in depth, 1.5 m in
width as well as 10 sqm on plan) including getting getting out and
disposal of excavated earth lead upto 50 m and lift upto 1.5m as directed
by Eng-In-Charge.

Details of Cost for 10 Cum


Average output of Hydraulic Excavator per hour =30 Cum
1 MACHINARY
1.1 Hydraulic Excavator (3D) with driver and fuel Day
1.2 Hire and running charges of loader Day
2 LABOUR
2.1
2.6.1 Day
Mate
2.2 Coolie Day
TOTAL
3 Add 1% @ Water Charges 1%
TOTAL
4 Add 14.5% @ GST 15%
TOTAL
5 Add 15% @ CPOH 15%
TOTAL
6 Add 1% @ CESS 1%
TOTAL COST OF 10 CUM CUM
TOTAL COST OF 1 CUM CUM
ATION
QUANTITY RATE AMOUNT

0.041 7000 287


0.041 5000 205

0.32 617 197.44


1.2 558 669.6
1359.04
13.5904
1372.6304
199.031408
1571.661808
235.7492712
1807.4110792
18.074110792
1825.485189992
182.5485189992
COST ANALYSIS OF MORTAR
BOQ ITEM
SR. NO. DESCRIPTION OF ITEM UNIT
NOS
CEMENT MORTAR 1 : 4
Details of Cost for 1 Cum
1 MATERIAL
( 0.268 cum of cement = 0.38 tonne)
1.1 Portland Cement tonne
1.2 Carriage of Cement tonne
1.3 Find Sand ( Zone IV) cum
1.4 Carriage of Sand cum
3.4
2 LABOUR ( for measuring , carrying, deposing and mixing)
2.1 Beldar Day
2.2 Bhisti Day
2.3 Hire and running charges of mechanical mixer L.S
2.4 Sundries L.S
TOTAL
Add 1% @ Water Charges 1%
TOTAL
TOTAL COST OF 1 CUM CUM
TAR
QUANTITY RATE AMOUNT

0.38 6000 2280


0.38 92.24 35.0512
1.07 1400 1498
1.07 103.77 111.0339

0.75 558 418.5


0.07 617 43.19
26.91 2 53.82
13.52 2 27.04
4466.6351
44.666351
4511.301451
4511.301451
COST ANALYSIS OF BRICK MASONRY
BOQ ITEM
SR. NO. DESCRIPTION OF ITEM UNIT
NOS
Brick work with common burnt clay F.P.S (non modular)
bricks of class designation 7.5 in foundation and plinth
in
CEMENT MORTAR 1 : 4
Details of Cost for 1 Cum
1 MATERIAL
1.1 common burnt clay F.P.S (non modular) brick class designation 7.5 1000 Nos
1.2 Carriage of Brick 1000 Nos
1.3 Cement Mortar 1:4 Rate as per BOQ Item 3.4 Cum
2 LABOUR ( for measuring , carrying, deposing and mixing)
2.1 Mason (brick layer) 1st class Day
2.2 6.1.1 Mason (brick layer) 2nd class Day
2.3 Coolie Day
2.4 Bhisti Day
2.5 Sundries L.S
TOTAL
Add 1% @ Water Charges 1%
TOTAL
Add 14% @ GST 15%
TOTAL
Add 15% @ CPOH 15%
TOTAL
Add 1% @ Cess 1%
TOTAL
TOTAL COST OF 1 CUM CUM
ASONRY
QUANTITY RATE AMOUNT

0.494 5500 2717


0.494 276.72 136.69968
0.25 4511 1127.75

0.36 738 265.68


0.36 679 244.44
1.37 558 764.46
0.2 617 123.4
2.73 2 5.46
5384.88968
53.8488968
5438.7385768
788.617093636
6227.355670436
934.1033505654
7161.4590210014
71.61459021
7233.0736112114
7233.0736112114
COST ANALYSIS OF RCC
BOQ ITEM
SR. NO. DESCRIPTION OF ITEM UNIT
NOS
Providing and laying in position cement concrete of
1:2:4 grade of 20 mm nominal size aggregate excluding
the cost of centering,shuttering,finishing and
reinforcement (all work upto Plinth level).

Details of Cost for 1 Cum


MATERIAL
20 mm nominal size aggregate cum
10 mm nominal size aggregate cum
Carraiage of Stone aggregate below 40 mm nominal size cum
Coarse sand zone (III) cum
Carriage of sand cum
Portland cement (0.225 cum) tonne
Carriage of cement tonne
4.1.3 LABOUR
Mason day
Beldar day
Bhisti day
Hire charges of concrete mixer 0.25 to 0.40 cum with hooper day
Vibrator needle type 40mm day
Sundries L.S
TOTAL
Add 1% @ Water Charges 1%
TOTAL
Add 14% @ GST 15%
TOTAL
Add 15% @ CPOH 15%
TOTAL
Add 1% @ Cess 1%
TOTAL COST OF 1 CUM
TOTAL COST OF 1 CUM CUM
C
QUANTITY RATE AMOUNT

0.67 1350 904.5


0.22 1350 297
0.89 103.77 92.3553
0.445 1350 600.75
0.445 103.77 46.17765
0.32 4940 1580.8
0.32 92.4 29.568

0.17 709 120.53


2 558 1116
0.9 617 555.3
0.07 800 56
0.07 370 25.9
14.3 2 28.6
5453.48095
54.5348095
5508.0157595
798.6622851275
6306.6780446275
946.0017066941
7252.6797513216
72.5267975132
RS 7325.2065488348
Say 7300
COST ANALYSIS OF PCC
BOQ ITEM
SR. NO. DESCRIPTION OF ITEM UNIT
NOS
Providing and laying in position cement concrete of
1:2:4 grade of 20 mm nominal size aggregate excluding
the cost of centering and shuttering (all work upto Plinth
level).
Details of Cost for 1 Cum
MATERIAL
20 mm nominal size aggregate cum
10 mm nominal size aggregate cum
Carraiage of Stone aggregate below 40 mm nominal size cum
Coarse sand zone (III) cum
Carriage of sand cum
Portland cement (0.225 cum) tonne
Carriage of cement tonne
LABOUR
4.1.3 Mason day
Beldar day
Bhisti day
Hire charges of concrete mixer 0.25 to 0.40 cum with hooper day
Vibrator needle type 40mm day
Sundries L.S
TOTAL
Add 1% @ Water Charges 1%
TOTAL
Add 14% @ GST 15%
TOTAL
Add 15% @ CPOH 15%
TOTAL
Add 1% @ Cess 1%
TOTAL COST OF 1 CUM
TOTAL COST OF 1 CUM CUM
C
QUANTITY RATE AMOUNT

0.67 1350 904.5


0.22 1350 297
0.89 103.77 92.3553
0.445 1350 600.75
0.445 103.77 46.17765
0.32 4940 1580.8
0.32 92.4 29.568

0.1 709 70.9


1.63 558 909.54
0.7 617 431.9
0.07 800 56
0.07 370 25.9
14.3 2 28.6
5073.99095
50.7399095
5124.7308595
743.0859746275
5867.8168341275
880.1725251191
6747.9893592466
67.4798935925
RS 6815.4692528391
Say 6800
COST ANALYSIS OF BRICK MASONRY
BOQ ITEM
SR. NO. DESCRIPTION OF ITEM UNIT
NOS
20 mm cement plaster

CEMENT MORTAR 1 : 4
Details of Cost for 10Cum
1 MATERIAL
1.1 Cement Mortar 1:4 Rate as per BOQ Item 3.4 Cum
2 LABOUR ( for measuring , carrying, deposing and mixing)
2.1 Mason Day
2.2 Coolie Day
2.3 6.1.1 Bhisti Day
2.4 Scaffolding Sundries L.S
TOTAL
Add 1% @ Water Charges 1%
TOTAL
Add 14% @ GST 15%
TOTAL
Add 15% @ CPOH 15%
TOTAL
Add 1% @ Cess 1%
TOTAL COST OF 10 CUM
TOTAL COST OF 1 CUM CUM
ASONRY
QUANTITY RATE AMOUNT

0.224 4511 1010.464

0.94 709 666.46


1.02 558 569.16
1.1 617 678.7
12.61 2 25.22
2950.004
29.50004
2979.50404
432.0280858
3411.5321258
511.72981887
3923.26194467
39.2326194467
3962.4945641167
Say 396.2494564117