ULUBELU UNIT 3&4 GEOTHERMAL POWER PROJECT

DOCUMENT REVIEW & COMMENT SHEET

Document No.:  UBL3&4‐E‐1‐LO‐EF‐CWO‐001P  Rev.  4  Date:  05 May 2015 


Document Title:  P&I Diagram Main Cooling Water System for Unit 3  Comment No.:  1485/PGE/UBL3&4‐EPCC/2015‐C 
Contractor Name:  Consortium of Sumitomo Corporation and PT Rekayasa Industri  Status :  Not Approved 

No.  References  EMPLOYER’S COMMENTS  By  CONTRACTOR’S RESPONSES 


1.  Suction and Discharge  Refer to Cause and Effect Diagram, pressure on suction and discharge line of  CTR Contractor agreed. 
Pressure Hot Well Pump  Hot Well Pump will be indicate on DCS 
2.  Hot Well Pump mechanical  Refer to C&E Diagram and Setting Value, flow will Indicate on DCS and  CTR Contractor agreed. 
seal water  initiate alarm and Trip the pump when flow ≤ 0.36 m3/hr (Low) 

Page 1 of 1