CHECK LIST FOR COMMISSIONING

Remarks
S.No DESCRIPTION OF ACTIVITY STATUS-TANK 1 STATUS-TANK 2 STATUS-TANK 3 COMMON WORKS
Completed Pending Completed Pending Completed Pending Completed Pending
A Materials Required
1 Civil Works for Pump House
2 Structurals for Pump House
3 Reinforcements for Pump House
4 Roofing Sheet
5 LED Light Fittings

B SUPPLY ITEMS

1 Flow Merer
2 Pipes
3 Fittings
4 Valves
5 Strainers
6 Gaskets
7 Bolts & Nuts
8 Floating Suctions
9 1 Micron Filter
10 5 Micron Filter
11 Pumps- 2 Nos

C TANKAGES WORKS
1 Construction of 200 KLs Tanks- Fabrication
2 Manhole-A
3 Manhole-B
4 Sump
5 Centre Hatch
6 SS Nozzle- 80 mm-4 Nos ( Gauge Hatch & Vent )
7 SS Nozzle- 100 mm-1 No( Filling )
8 SS Nozzle- 80 mm-2 Nos ( Sampling )
9 SS Nozzle- 150 mm-1 No( Outlet )
10 SS Nozzle- 150 mm-1 No( Outlet ) ( Extn)
11 Radiography of Balance Weld Joints
12 Hydrotesting of Tank
13 Earthing Boss
14 External Painting of Tank
15 Internal Painting of Tank
16 Erection of Tank
17 Earthing
18 Slope Check
19 Holding Down Strips
20 Turn Buckle fixing
21

D CIVIL WORKS ( Tank Location )


1 Earth work
2 Concrete Work
3 Brick Wall
4 Buttress Wall

5 Concrete Work Over Buttress wall

6 G.I. pipes
7 Sand filling

8 Compaction

9 Concreting over sand fill

D PIPING WORKS ( Tank Location )


1 Piping Fabrication

2 Radiography

3 Hydro test of Fabricated Pipes

4 Painting of Pipelines

5 Pimp-1 Erectoin

6 Pimp-2 Erectoin

7 Valves Erection
8 Strainers' Erection
9 Flange Joints
10 Erection of Floating Suctions
11 Erection of 1 Micron Filter
12 Erection of 5 Micron Filter
13 Erection of Flow Meter
Remarks
S.No DESCRIPTION OF ACTIVITY STATUS-TANK 1 STATUS-TANK 2 STATUS-TANK 3 COMMON WORKS
Completed Pending Completed Pending Completed Pending Completed Pending

E ELECTRICAL WORKS

1 Cable Termination

2 Light Fittings

F OTHERS

1
2
3