Sei sulla pagina 1di 4

MD SHAHNAWAZ

At-Post-Adsar
Dist-Jamui, Pin Code-811307
State-Bihar
Mobile No-+91-7352058263
Email-shahnawa121@gmail.com

About Me
Piping Foreman/PTW Holder
Experienced Piping Foreman With A Demonstrated History Of Working In The Oil & Energy Industry.
Skilled In Power Plants, Heat Exchangers, Pumps, ASME Standards, And Valves. Strong Engineering
Professional With A Diploma Focused In Mechanical Engineering From Maharashtra State Board Of
Technical Education.
Education
 Diploma In Mechanical Engineering Passed From MSBTE. (2008-2011)

 S.S.C passed From Janta High School, Adsar(2008)

Professional Qualifications
 Safety Education
 H2s Warne's And Education Procedure
 Permit To Work Training
 Fire Extinguishers
 Basic Life Support
 Gas Tester
 Breathing Apparatus

Career Highlights
Overall 08 years of experience achieved in rendering engineering services in mechanical, piping fabrication,
and installation on onshore site for various Oil, Gas, Power and petrochemical plants. Duties include
performing general engineering function such as miscellaneous procedures, preparation, material takeoff for
bill of quantities, preparation of isometric drawings, including spooling cutting sequence, weld mapping,
hydro testing, preparation of tie-in packages, perform system walk through or line checking, punch list
maintenance work in daily routine work in live plant, commissioning of plant major and minor shutdown,
issuing and receiving hot and cold permit system

Piping Skills
• Knowledge of ASME code & ASME section.
• Design of pipe &determining the pipe schedule.
• Knowledge of pipe fittings, pipes and materials.
• Generating line list and material take off (MTO)
• Preparation of isometric drawing.
• Understanding section of flange rating.
• Design of seamless blank or blind.
• Fundamentals of pipe stress analysis.
• Testing of piping system (Hydro test & pneumatic test)
• Ability to read isometric drawing and P&ID.
• Knowledge of equipment layout and GRP/FRP/GRE Piping.(Underground &Above ground)
• Blinding &de-blinding, knowledge of heater, Vessel, Heat exchanger, boiler pre-shutdown& Shutdown
Work Experience
Total Experience (08 Years)

Date Of Employment : 22/June/2017 to 08/January/2019


Company : Tozzi Ramsis Co Wll, Bahrain
Project : Alba PS 5 Project, Bahrain
Role : Piping Foreman/PTW Holder

Date Of Employment : 24/Jan/2015 to 29/April/2017


Company : Hyundai Engineering, Abu Dhabi
Project : Mirfa Power Plant, Abu Dhabi
Role : Piping Foreman

Date Of Employment : 09/June/2013 to 30/Dec/2014


Company : Samsung Engineering, K.S.A
Project : Shyabah Project #2, K.S.A
Role : Piping Foreman/PTW Holder

Date Of Employment : 10/Sept/2011 to 12/March/2013


Company : L&T Engineering
Project : Ntpc Barh, India
Role : Piping Foreman

Duties & Responsibility


 Responsible for delivering the field mechanical & piping work in a safe and effective manner that
does NO HARM to employees, the environment or equipment. Responsible for ensuring the
Mechanical & piping work is delivered in a timely and cost effective manner to meet the planned
schedule and budget. .I am responsible for ensuring that all work is completed in accordance with
the project specification, drawings and other relevant documentation.
 Prepare work permits and obtain required authorizations.
Organizes crew, pigs, tools, spares as per pigging schedule.
Prepare work permits and obtain required authorizations.
Liases with operations to insert and receive pigs (as applicable) inside Central Degassing Stations.
Receives and launches pigs (as applicable) in off-site valving stations by manipulating required valves.
Arranges spares and maintains pigs, pig launchers, receivers and pig indicators.
 good knowledge on installation on all types of rotating equipments
 Coordination with consultants
 Clients & Contractor, Preparing Techno Commercial offers.
 Negotiation & close the deal, purchasing material.
 Inspection on site time to time
 Estimating & costing of the project, Execute the duct on site.
 Fabrication of spool with respect to the ISO-METRIC Drawing release by the planning dept.
 Familiar in General arrangement diagram, piping & instrument diagram and Isometric diagram.
 Inspection of piping fit up like class wise material used, joint no., loop no., piping classes, colour coding,
gap, overlap between two joints, before welding given proper supports, branching are stub on or stub
out, field joint marking
 Fabrication and installation of piping base materials like CS, SS, Alloy steel pipes, GRP/GRE/FRP
Pipes ,fittings, flanges, valves.
 Fit-up checking at all sizes IBR, NON –IBR, ALLOY STEEL, LTCS and SS Material.
 To co-ordinate the materials flow.
 Resolving about any quarries with material specifications w.r.t.SAP.
 Knowledge of codes & standards followed by design of piping system in process piping like ASTM,
ASME, API, etc.
 Performing the functions of troubleshooting and preventive / breakdown maintenance for reducing
Mechanical Equipments downtime to minimum.
 Conducting regular inspection and tests to ensure the performance capacity of various machines and
equipments.
 Conducting safety audits to prevent accidents and ensure compliance with regulatory norms
 Supervised the fabrication of spools, weldolates, thredolates, elbows, weld neck flange etc. as per iso -
drawing.
 Supervised the one piece of offset bend through miter cut 22.50 , 300, 450, 900 as per drawing.
 Two pieces welded turn on 450, 900, four pieces welded turn on 900, as per drawing.
 Fabrication of support as per drawing
 Supervised the erection of piping spools and jacket line around 20,000 inch dia
 Review and report of departmental head the day to day progress
 Coordination with vendors
 Day to day micro planning and mobilization of site teams & follow up the work progress
 Supervised the test package and punching
 Supervised the erection, assembles, alignment and welding the spools as per GAD and isometric drawing
 Supervised the erection, assembles, alignment and welding of different types of support as per GAD and
Isometric drawing
 Supervised the erection, assembles of alignment of valves (Gate Valves, Globe Valves, Relief Valves,
angle valves, check valves etc.) as per GAD and Isometric drawing

PROJECT MANAGEMENT ACTIVITIES


a. Discussions with client and consultant for work front availability and technical clarifications.
b. Discussions with subcontractor and subordinates to achieve scheduled targets.
c. Analyzing total scope and planning of site activities as per client requirements.
d. Discussions with top management staff and manpower.
e. Preparing weekly, monthly schedules for piping jobs and getting approval from clients.
f. Preparing measurement sheets and getting approval from clients.
g. Discussions with client for changes in routing of pipelines, deviation and site problems.
h. Certification/Approval of subcontract billing.
i. Preparing reconciliation statement at the end of project activities

MECHANICAL CLEARENCE
a. Freezing the hydro test loops from P&ID with the help of line schedule
b. Preparing checklist and deploying appropriate manpower for liquidation
c. Checking the isometric ,GAD,P&ID and the lines list are latest revision
d. Preparing as built isometric
e. Incorporating as built isometric in GAD
f. Checking of erection materials used,as per P.M.S
g. Checking the coordinates, elevation and support as per drawings and standards
h. Checking all vents drains, on line instruments as per drawings and standards.
i. Checking adequacy of small bore supports, internal grinding of flow orifice.

FLUSHING & TESTING


a. Coordination with QA/QC department for QC clearance
b. Arranging manpower for flushing/temporary lines for flushing
c. Selecting and arranging pressure gauge blinds hydro test pumps and compressors for the loop
being tested
d. Checking for temporary arrangement of support for heavy volume pipes
e. Checking leaks and pressure drops
f. Offering for hydrotest to clients for approval
g. Maintaining the test records

PRE-COMMISSIONING
a. Checking all fastener and gaskets provided are as per standards
b. Arranging temporary inlet and outlet lines for flushing
c. Checking the torque required for flange connection tightness
d. Getting approval from client for box-up and pre-commissioning
. e. Re-instatement of sub-system
f. Nitrogen preservation and air blowing.
g. LOTO Activity.

Languages
 Hindi
 English
 Arabic

Computer Proficiency
 Word 2010
 Excel 2010
 Power Point 2010
 Operating System Windows 7/vista/ 2K / XP / 2K3/7 Server.
 Application MS – Office, Excel, Words 16, BMS, Fortran Language.
 Web Technology Internet (Email, Attachment, F.T.P etc).

Personal Interests
Meeting people from diverse background and making friends, listening to music, meditation.

Passport Details
Passport No- M 5234578 Issue Date- 12/01/2015
Place of Issue- Patna ExpiryDate-11/01/2025

Personal Details
Father’s Name: Md Mustaq Marital Status : Single
Birthday: March 03, 1993 Nationality : Indian
Gender: Male

Declaration
I, Md Shahnawaz , hereby declare that the information contained herein is true and correct to the best of my
knowledge and belief.
. Shahnawaz

Potrebbero piacerti anche