Sei sulla pagina 1di 11

Government of Nepal

National Reconstruction Authority


Central Level Project Implementation Unit (EDU)
Gyaneshwor, Kathmandu

2M/F-1D Toilet- Stone


(May 2019)
X Y
A-02 A-02
8700
A B C D
7800 450 7800 450

2650 2150 2650


550 750 2150 900 2150 750 550

3000
450

450
PARTITION WALL
INCINERATOR

650
450
V2 V1 V2

750
350
350

550
450
1
FRONT ELEVATION

4850

4850
3950

3950
Water Trough

Water Trough
D3 D3 D3 D3

3600
3250

3250
TOILET FEMALE TOILET
MALE TOILET 1800x3250

5050
2300x3250 5.85 Sq. M. 2300x3250
7.47 Sq. M. 7.47 Sq. M.

450

450
350
350

D2 D1 D2

800
2
600 V2 V2
1100

1100
550 750 450 900 1150 1000 350 900 450 750 550 450
1100 mm Wide Corridor 1100 mm Wide Corridor

3000
3600 1200
2400 300 300
450 2500 2800 2500 450
1100

1100

Up INCINERATOR

1350
250
250

450
5400
ROOF PLAN A-02

X
A-02 A-02
BACK ELEVATION
GROUND FLOOR PLAN X Y
Area = 31.19 Sq. M.

1000 900 750


12mm SOLID MS SQUARE ROD
@75-100mm SPACING BETWEEN ROD
900

3000
3000
375
INCINERATOR

VENTILATION V1 (1 NO.)

750
550
450

450
(Scale= 1:25)
750
2100

2100

2100

SIDE ELEVATION SIDE ELEVATION


DOORS & WINDOWS SCHEDULE:
750
S.N. SYMBOL SIZES NOS. REMARKS
V1 900x 375 1 MS Frame
375

1.

375
2. V2 750x 325 4 MS Frame
3. D1 1000 x 2100 1 UPVC/ Wood/ Frame & Shutter
VENTILATION V2 (4 NO.) 4. D2 900 x 2100 2 UPVC/ Wood/ Frame & Shutter
(Scale= 1:25)
0 0.25M 0.5M 0.75M 1M 1.25M 5. D3 750 x 2100 4 UPVC/ Wood/ Frame & Shutter
DOOR D1 (2 NO.) DOOR D2 (2 NO.) DOOR D3 (4 NOS.) 1:25

(Scale= 1:25) TOTAL 12


(Scale= 1:25) (Scale= 1:25) 0 1M 2M 3M 4M 5M
1:100

Date : May019 Sheet No:


Government of Nepal TITLE :
Scale : 1:75
National Reconstruction Authority 2M/F-1D Toilet- GROUND FLOOR PLAN
Central Level Project Implementation Unit (EDU)
Gyaneshwor, Kathmandu
Stone (May 2019) Designed by :
Checked by :
Approved by :
1
110 mm Brick Layer
2 1
450 +3000 ROOF LEVEL

1250
RCC LINTEL (125x150)

RCC LINTEL (350x150) RCC LINTEL (350x150) +2250 LINTEL LEVEL

150 158
RCC SILL (350x75) +1725 SILL LEVEL

2875
D2
D3 +1137 DOWEL LEVEL

2558
75 mm Thick Precast
Slab Cover

2100
2100

75
+662 DOWEL LEVEL
525 12575

452

950
1373
150x150 Opening

150
712
On Wall To Drop Waste
CORRIDOR FEMALE TOILET 525 ± 0.00 PLINTH LEVEL

150 150 150 150


± 0.00 LVL. ± 0.00 LVL.

150

75
-450 GROUND LEVEL

280
350 350

300
HARDEN CEMENT CONCRETE FLOORING
HARDEN CEMENT CONCRETE FLOORING

300

300
75 THICK P.C.C. (1:2:4) 50 MM THICK P.C.C. (1:2:4)
100 MM GRAVEL SOILING
150MM THICK GRAVEL SOLING

300
2 1 COMPACTED EARTH
RUBBLE STONE MASONRY (1:6)
+3000 TOP BEAM LEVEL COMPACTED EARTH

WALL SECTION AT Y-Y

125
400 350

900 (Scale= 1:40) 900

625
450
RCC LINTEL (350x150) RCC LINTEL (350x150)
1250

150
150

RCC SILL (350x75)

375
V1

75
3000

513
D1
2100

75
SEMI DRESSED STONE MASONARY (1:6)
400
75

-450 GROUND LEVEL


587

250 TOILET ± 0.00 PLINTH LEVEL


200 100 50

CORRIDOR ± 0.00 LVL.


250 150

150
50

650 -450 GROUND LEVEL


350 350
250 2200 HARDEN CEMENT CONCRETE FLOORING
500

125 125
75 THICK P.C.C. (1:2:4)
HARDEN CEMENT CONCRETE FLOORING
300

300

150 600 150 150MM THICK GRAVEL SOLING 50 MM THICK P.C.C. (1:2:4)
100 MM GRAVEL SOILING
50 50 COMPACTED EARTH
300

900 COMPACTED EARTH


100MM THICK P.C.C. (1:2:4)
150MM THICK GRAVEL SOLING RUBBLE STONE MASONRY (1:6)

900
WALL SECTION AT X-X 900
COMPACTED EARTH
(Scale= 1:40)

Date : May019 Sheet No:


Government of Nepal TITLE :
Scale : 1:40
National Reconstruction Authority 2M/F-1D Toilet- SECTIONS
Central Level Project Implementation Unit (EDU)
Gyaneshwor, Kathmandu
Stone (May 2019) Designed by :
Checked by :
Approved by :
2
I
A-03

650
230 525 12575 1

125 75
200x200 Metal Door
To Prevent Smoke
Entering Latrine

Tile Upto 600mm Height


450 From Slab Level

300 100

600
J J Conical Cap

1120
870
A-03 A-03
50Ø Hole On Two Sides

225

100 100
150x150 Opening
On Wall To Drop Waste 150

277
125

750
± 0.00 LVL.

550
135
8Ø MS Grill mesh (630x505) 450
at 25mm Spacing For
Burning Waste MS Clamp Secured To Wall
I
INCINERATOR PLAN A-03
-450 LVL. Tile Upto 600mm Height
Cement Punning Over Screed From Slab Level
(Scale= 1:25)

300
ISNB 135 MS Pipe 350 100mm Thick RCC Slab
300 100

Conical Cap ISNB 135 MS Pipe Cement Plaster

1310

225

100
± 0.00 LVL.

300

100
MS Clamp Secured To Wall

550
450

350
277

75 mm Thick Precast
Slab Cover -450 LVL.
250 150 325
Cement Punning Over Screed

75

300
350 100mm Thick RCC Slab
525 12575 Cement Plaster

452

300
ISNB 135 MS Pipe
900

950
WATER TROUGH SECTION DETAIL AT Y
1310

1415
150 150x150 Opening
On Wall To Drop Waste (Scale= 1:25)
525
± 0.00 LVL.
Handrail 8Ø MS Grill mesh (630x505)
75 mm Thick Precast Slab Cover At 25mm Spacing For

75
Burning Waste

280 125x75 RCC Band

315
75

75
40 mm Harden Cement
Concrete Slope Flooring -450MM LVL. 900
350
WATER TROUGH SECTION DETAIL AT Z
(Scale= 1:25)
715

150x150 Opening With


300

200x200 Metal Flap On


1415

Latrine Side Y
Z A-03
Harden Cement Concrete Flooring A-03
50 mm Thick P.C.C. (1:2:4)
310

200
630 100 mm Gravel Soiling
Compacted Earth
200

125x75 RCC Band


280

750
180 180
550

550
125mm Thick Brick Wall
350

350mm Thick Cross Wall


350mm Thick Cross Wall
900
Harden Cement Concrete Flooring
50 mm Thick P.C.C. (1:2:4)
SECTION AT J-J TYPICAL WATER TROUGH ELEVATION
SECTION AT I - I 100 mm Gravel Soiling (Scale= 1:25) (Scale= 1:25)
(Scale= 1:25) Compacted Earth

Date : May019
Government of Nepal TITLE : Sheet No:
Scale : As Mentioned
National Reconstruction Authority 2M/F-1D Toilet- INCINERATOR & WATER
Central Level Project Implementation Unit (EDU)
Gyaneshwor, Kathmandu
Stone (May 2019) TROUGH DETAILS Designed by :
Checked by :
Approved by :
3
A B C D
7800
2650 2150 2650

1120

75
125
PARTITION BRICK WALL
INCINERATOR

650
600 463 750 2238 900 75 600
125 125 75
870

350

350
1

554

554
180

180

180

180
488 TPH GRAB BAR
488 488 488

575
975 350 975
975 975

1175

1175
WC

750

750
SPRAY

400

400

400

400
830
D3 D3 FT
Foldable Hinge
D3 D3

546
700 625 275 700 700 275 625 700
3250

3600
3250
1092
2300 1800 FEMALE TOILET

Water Trough
MALE TOILET 2300x3250
2300x3250 1800x3250
546
Water Trough 5.85 Sq. M. 7.47 Sq. M.

1034
1025
7.47 Sq. M.

5050
FT H.C.C. Flooring H.C.C. Flooring
H.C.C. Flooring 2300
Slope 1:50 1800 Slope 1:50
50 50 50 50
604 604 BASIN 650 650
750

750
550

700
650
150
554

554
2
350

350
600 550 750 450 900 1150 1000 350 900 450 750 550 600
1100

1100
1100 mm Wide Corridor Slope 1:50 1100 mm Wide Corridor

2400 300 300


1100

1100
Up

1350
250

250
5400

GROUND FLOOR BLOWOUT PLAN


(Scale= 1:50)

Date : May019
Government of Nepal TITLE : Sheet No:
Scale : As Mentioned
National Reconstruction Authority 2M/F-1D Toilet- TOILET BLOW UP PLAN
Central Level Project Implementation Unit (EDU)
Gyaneshwor, Kathmandu
Stone (May 2019) Designed by :
Checked by :
Approved by :
4
CL

350
A B C D 350
M 8650
2650 2150 2650
425 350 2300 350 1800 350 2300 350 425
8Ø@150MM C/C STIRRUPS
BOND STONE

475 350 475

475 350 475


425

425
4 -12Ø

1300
1
100mmØ Concrete Core
700

150
M M M 350mm THICK STONE MASONRY (1:6)
4800

4800
3600

3600
3950

3950

1200
475 350 475 475 350 475 475 350 475 475 350 475
1300

750
100MM HEIGHT SKIRTING
475 350 475

475 350 475

475 350 475


100mmØ CONCRETE CORE (1:2:4)

300
1300

2 WITH 1 NO. 16mmØ BAR 125 350 125 HARDEN CEMENT C


ONCRETE FLOORING
425

425
325 350 325 75MM THICK P.C.C. (1:2:4)
N N

300

300
350
200MM THICK GRAVEL SOLING
150 600 150 COMPACTED EARTH
4950 900 2800
2650 2150 2650 STONE MASONRY IN
BOND STONE CEMENT SAND MORTAR (1:6)

300

300
8650 1200
50 50
TRENCH PLAN 350 STONE MASONRY WALL PLAN AT CORNER

200 100
100MM THICK P.C.C. (1:2:4)
(Scale= 1:100)
(Scale= 1:25)
200MM THICK GRAVEL SOLING

CL
150 1000 150
CL 1300
350
BOND STONE 350 FOOTING DETAIL AT M-M
OR, 8Ø STEEL BAR (Scale= 1:20)
EMBEDDED IN M20
4 -12Ø 8Ø@150MM C/C STIRRUPS
600

8Ø@150MM C/C STIRRUPS GRADE IN STONE ± 0.00 PLINTH LVL


± 0.00 PLINTH LVL CAN BE PROVIDED 4 -12Ø
350

150
150

350mm THICK STONE


600

MASONRY (1:6) BOND STONE - 450 GROUND LVL


300

- 450 GROUND LVL

750
1-16Ø (CONCRETE CORE)
750

300
100MM HEIGHT SKIRTING
300

100MM HEIGHT SKIRTING


HARDEN CEMENT
STONE MASONRY 350mm THICK STONE MASONRY (1:6) 125 125 HARDEN CEMENT CONCRETE FLOORING
125 125 75MM THICK P.C.C. (1:2:4)
CONCRETE FLOORING VERTICAL WALL SECTION
75MM THICK P.C.C. (1:2:4) 200MM THICK GRAVEL SOLING

300

300
(Scale= 1:25)
300

300

200MM THICK GRAVEL SOLING COMPACTED EARTH


100mmØ CONCRETE CORE (1:2:4) 150 150
50 50 COMPACTED EARTH 350mm THICK STONE MASONRY IN
WITH 1 NO. 16mmØ BAR
STONE MASONRY (1:6)
200 100

CEMENT SAND MORTAR (1:6)


STONE MASONRY IN

300

300
CEMENT SAND MORTAR (1:6) 100MM x100 MM THICK PCC SOLING
50 50

100
200 100
100MM THICK P.C.C. (1:2:4)
350

350
200MM THICK GRAVEL SOLING
150 700 150
BOND STONE BOND STONE
1000 1200 1200 150 1000 150
FOOTING DETAIL AT N-N STONE MASONRY WALL PLAN AT T-JUNCTION 1300
(Scale= 1:20) FOOTING DETAIL AT CONCRETE CORE
(Scale= 1:25)
(Scale= 1:20)
Date : May019
Government of Nepal TITLE : Sheet No:
Scale : As Mentioned
National Reconstruction Authority 2M/F-1D Toilet- TRENCH PLAN & DETAILS
Central Level Project Implementation Unit (EDU)
Gyaneshwor, Kathmandu
Stone (May 2019) Designed by :
Checked by :
Approved by :
5
A M B C D A B C D A B C D
7800 S 7800 U 7800
2650 2150 2650 2650 2150 2650 2650 2150 2650
350 2300 350 1800 350 2300 350 350 2300 350 1800 350 2300 350 350 2300 350 1800 350 2300 350

1 350
1

350

350

350
1

350

350
3 NOS.-12mmØ (T/O)

M M M S R R U
3950

3950

225 125
3950

3950
3600

3600

3600

3600

3950

3950
3250

3250

3250

3250

3600

3600
3250

3250

350
2-L-8mmØ
N @100mm c/c

3 NOS.-12mmØ (T/O)
230
2 2
350

350

350

350
2

350

350
SECTION -1-1

1100

1100

1100
(Scale= 1:25)
N
4800 350 2650 4800 350 2650 2650 350 1800 350 2650
2650 2150 2650 2650 2150 2650 2650 2150 2650
7800 7800 7800
LINTEL BAND LAYOUT PLAN SILL BAND LAYOUT PLAN ROOF LVL BEAM PLAN
AT 2100 MM LVL AT 1725 MM LVL AT 2558 MM LVL
(Scale= 1:100) (Scale= 1:100) As Per door/
A B 2 -10Ø
C D (Scale= 1:100)
7800 window length 350
75 75
1200 250 1200 2150 1200 250 1200
2 -10Ø 350
2300 1800 2300

350
350 350 350 350
1375 4550 1375 OUT IN
350

350
1 2 -10Ø

75
2 -10Ø

75
8 @150mm c/c 8 @150mm c/c
8 @150mm c/c

8 @150mm c/c
8Ø @150mm c/c Stirrups 8Ø @150mm c/c Stirrups
8 @150mm c/c

8 @150mm c/c
1200

1200
1200
2 No. 8Ø Bar 2 No. 8Ø Bar 2 No. 8Ø Bar
TYPICAL VERTICAL 8Ø @150mm c/c Stirrups

REINFORCEMENT DETAIL TYPICAL SILL DETAIL


(FOR DOORS & WINDOWS) SECTION AT S-S
(Scale= 1:20)
(Scale= 1:20) TYPICAL SILL DETAIL
3950

3950
1200

1200
3250

3250
SECTION AT R-R
(Scale= 1:20)
8 @150mm c/c

8 @150mm c/c

8 @150mm c/c
2 No. 8Ø Bar 350 350
2 No. 8Ø Bar 2 No. 8Ø Bar
1200

1200
1200

1200

8 @150mm c/c 8 @150mm c/c 8 @150mm c/c 1375


2 -10Ø 2 -10Ø
2
350

350
8Ø @150mm c/c Stirrups
1375 375 900 1150 1000 1375

150

150
2 -12Ø 2 -12Ø
1296

1100

8Ø @150mm c/c Stirrups

4800 2650
350
2650 2150 2650
7800
TYPICAL LINTEL DETAIL TYPICAL LINTEL DETAIL
SECTION AT M-M SECTION AT N-N
DOWEL REINFORCEMENT PLAN & DETAILS (Scale= 1:20) (Scale= 1:20)
AT 662 MM, 1137 MM LVL
(Scale= 1:50)
Date : May019
Government of Nepal TITLE : Sheet No:
Scale : As Mentioned
National Reconstruction Authority 2M/F-1D Toilet- LINTEL, SILL & BEAM BAND
Central Level Project Implementation Unit (EDU)
Gyaneshwor, Kathmandu
Stone (May 2019) PLAN & DETAILS, DOWEL
REINFORCEMENT DETAILS
Designed by :
Checked by :
Approved by :
6
A B C D

2650 2150 2650

900

900
1080

1080
663 663

480 480

3600

3600
480 795 795 480

1080

1080
900

900
2650 2150 2650

SLAB REINFORCEMENT PLAN


(Scale= 1:50)

A 2650
B 2150
C 2650
D
795 645 645 795
450 400
10mmØ@150mm c/c 10mmØ@150mm c/c
450
8mmØ@150mm c/c 10mmØ@300mm c/c 8mmØ@150mm c/c 10mmØ@300mm c/c 8mmØ@150mm c/c 400
125

(DISTRIBUTION BAR) (NEGATIVE BAR) (DISTRIBUTION BAR) (NEGATIVE BAR) (DISTRIBUTION BAR)

480 663 538 538 663 480


10mmØ@150mm c/c 10mmØ@150mm c/c

SLAB SECTION -X-X


(SCALE = 1:30)

Date : May019
Government of Nepal TITLE : Sheet No:
Scale : As Mentioned
National Reconstruction Authority 2M/F-1D Toilet- SLAB REINFORCEMENT
Central Level Project Implementation Unit (EDU)
Gyaneshwor, Kathmandu
Stone (May 2019) DETAILS Designed by :
Checked by :
Approved by :
7
Ø75 WW TO WWC WWC WWC
SOAK PIT A Ø75 WW B C Ø75 WW D
Ø110 S
MH
Ø110 S Ø110 S
MH A B C D
Ø20 CW TO Ø25 CW Ø25 CW INLET FROM
Ø75 WW

Ø75 WW

Ø75 WW
Ø110 S TO

Ø110 S Ø110 S
SEPTIC TANK Ø110 S Ø110 S
ADMIN/ LAB OUTLET EXTERNAL SYSTEM/SOURCE
Ø75 S

Ø75 S
Ø1
10

Ø25 CW
S 1000 LITERS TANK
0S
INCINERATOR INCINERATOR ON 3M HIGH MS STAGING
Ø1 1
10
S Ø1 (TANK TO BE LOCATED ON

Ø75 WW
HIGHER ELEVATION)
1 1 Ø20 CW Ø20 CW Ø20 CW Ø20 CW
Ø75 S

Ø20 CW
Ø20 CW
Ø75 S

Ø20 CW

Ø15 CW
Ø15 CW
Ø75 WW Water Trough

Water Trough
Ø75 WWWater Trough

Water Trough
Ø75 WW

Ø20 CW
MALE TOILET FEMALE TOILET MALE TOILET FEMALE TOILET
Ø75 S

Ø75 S

Ø20 CW
Ø20 CW
Ø20 CW Ø20 CW
2 2
1100 mm Wide Corridor 1100 mm Wide Corridor 1100 mm Wide Corridor 1100 mm Wide Corridor

Up Up

SOIL, WASTE PIPE LAYOUT WATER SUPPLY PIPE LAYOUT

Date : May019
Government of Nepal TITLE : Sheet No:
Scale : As Mentioned
National Reconstruction Authority 2M/F-1D Toilet- WATER SUPPLY, SOIL, WASTE
Central Level Project Implementation Unit (EDU)
Gyaneshwor, Kathmandu
Stone (May 2019) PIPE LAYOUT & WATER Designed by :
Checked by :
Approved by :
8
1900
300 350 1200 350 300

C
SLO
PE
A IN-LET A

1000

450
P-05
OUT LET P-05
Sand Filling
PE TO SOAK PIT
SLO OPENING
(c X d) 150mm Brick Wall B 600x600 R.C.C
1200 B
350mm Stone Masonary P-05 P-05 Removable Cover
350mm Stone Masonary
in Cement Mortar
in Cement Mortar A
190 600 350 1100 150 900 350
3640 600x600 R.C.C
PLAN OF SOAK PIT COVER SLAB
Removable Cover PLAN OF BOTTOM REINFORCEMENT
PLAN OF SEPTIC TANK
120mm Thk. R.C.C Slab B 8 Ø (DIST)
Removable Cover
GL 475
PLAN OF SOAK PIT
250 100 75mm Thk. P.C.C (1:3:6) 125mm Thk. R.C.C Slab
IN-LET
150

150
d
C A
820

300

OUT LET

As Per Site
150
50 GL

150
450

TO SOAK PIT
Effluent Level

860
150mm Brick Wall IN-LET
SECTION AT Z-Z
2070

100mm Thk. P.C.C (1:3:6) STEP

1200
150mm Gravel Soling 350mm Stone Masonary
in Cement Mortar 350mm Stone Masonary
in Cement Mortar
150
1:40 SLOPE 1:40 SLOPE
Gravel Packing 3NOS-10 Ø

H
Sand Filling (TYPICAL TOP BARS)

150mm Thk. P.C.C (1:3:6)


150mm Gravel Soling SECTION AT A-A

475 (L/4)
N Stonework

S
375

SECTION AT B-B 1900


INLET OUTLET

230
450

M
INLET OUTLET PLAN OF SOAK PIT COVER SLAB

450
P INLET OUTLET R
375

PLAN OF TOP REINFORCEMENT

230
375 450 375 375 450 375 3NOS 10 T CORNER BARS
(TOP & BOTTOM BARS) TYPICAL BARS
375 600 375 PLAN
CI Cover PLAN
PLAN GL RCC Slab CI Rain Inlet Cover

500
100

8 Ø @ 8"C/C
GL RCC Slab
MAX. 1500

Stonework
100
VARIES

CI Manhole Cover 8 Ø @ 6"C/C


MAX. 1500

INLET Stonework X X
VARIES

GL RCC Slab 625


OUTLET INLET P-05 P-05
100

Stonework
100

PCC 1:3:6 OUTLET


MAX. 1500
VARIES

100

12mm Cement Plaster PCC 1:3:6 500


INLET IN 1:4 C/M Rammed Earth
Rammed Earth
Cement Plaster
OUTLET Cement Plaster
100

1:4 With Punning


1:4 With Punning
PCC 1:3:6
SECTION M-M SECTION R-R 190 600 350 1100 150 900 350
SECTION P-P 2500
GL GL PLAN OF SEPTIC TANK
100MAX. 1500100
100MAX. 1500100

SEWER MANHOLE 12mm Cement Plaster 12mm Cement Plaster REINFORCEMENT DETAIL OF SEPTIC TANK COVER SLAB
VARIES
VARIES

In 1:4 C/M In 1:4 C/M


FOR DEPTH UPTO 1.5M PCC Benching PCC Benching
625 625
B
ST

CB
SECTION N-N SECTION S-S B 500
500 A
WASTE CHAMBER RAIN INLET CHAMBER
MANHOLE & CHAMBERS SECTION AT X-X

Date : May019
Government of Nepal TITLE : Sheet No:
Scale : As Mentioned
National Reconstruction Authority 2M/F-1D Toilet- SOAK PIT & SEPTIC TANK
Central Level Project Implementation Unit (EDU)
Gyaneshwor, Kathmandu
Stone (May 2019) DETAILS Designed by :
Checked by :
Approved by :
9
SB-1/S1 SB-2/S1 SB-5/S1 SB-6/S1
L1 L1 L1 L1

SB-8/S1 SB-3/S1 SB-7/S2 Cable From Main Panel Board


L1 2 Nos 2.5 Sq mm Cu wire Multistranded + 1X 1.5
SB-1/DB SB-2/DB SB-5/DB SB-6/DB Sq mm Cu Wire
SB-2/S1
L1 SB-4/S1 L1 6 A DP MCB WITH
ENCLOSURE
MALE TOILET FEMALE TOILET
To Toilet Light Ckt

TOILET LIGHT DISTRIBUTION SYSTEM


SB-7/DB
SB-8/DB
SB-2/DB SB-3/DB SB-4/DB
SB-7/S1 L1 L1

Up

LEGENDS
S.No. Symbols Description Mounting Height
1. 6 W LED Square Panel Light of 360 Lumen Attached to the Ceiling

6 A DP MCB WITH ENCLOSURE 2.5 m above the Ground Level


2.

TOILET 1-3(T) PLAN


LIGHT LAYOUT

Date : May019
Government of Nepal TITLE : Sheet No:
Scale : As Mentioned
National Reconstruction Authority 2M/F-1D Toilet- LIGHT, POWER & DB LAYOUT
Central Level Project Implementation Unit (EDU)
Gyaneshwor, Kathmandu
Stone (May 2019) PLAN Designed by :
Checked by :
Approved by :
10