Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
PULSATION DAMPER
(SEE NOTE 3)
GMS2
PFT3
PMI3 PULSATION DAMPER
(SEE NOTE 3)
GMS2 PFT3
BY INSTRUMENTS
BY PIPING
PMI3
BY INSTRUMENTS
BY PIPING
TIME: 07:27:51
HORIZONTAL VERTICAL
INSTALLATION INSTALLATION
HOOK-UP: PG-STD-003
3. PULSATION DAMPER SUPPLIED WITH GAUGE. 2 ISSUED FOR CONSTRUCTION GC DS GN 31-Mar-10 DAMPER & MULTI-PORT GAUGE VALVE
1 REVISED AS NOTED KRF PMB COMM 09-Feb-09 CARTAGENA EXPANSION PROJECT
0 ISSUED FOR DESIGN KRF PMB COMM 24-Aug-09
THIS DOCUMENT IS THE PROPERTY OF CHICAGO BRIDGE & IRON COMPANY ("CB&I"). IT MAY CONTAIN INFORMATION DESCRIBING TECHNOLOGY
OWNED BY CB&I AND DEEMED TO BE COMMERCIALLY SENSITIVE. IT IS TO BE USED ONLY IN CONNECTION WITH WORK PERFORMED BY CB&I.
REPRODUCTION IN WHOLE OR IN PART FOR ANY PURPOSE OTHER THAN WORK PERFORMED BY CB&I IS FORBIDDEN EXCEPT BY EXPRESS WRITTEN
PERMISSION OF CB&I. IT IS TO BE SAFEGUARDED AGAINST BOTH DELIBERATE AND INADVERTENT DISCLOSURE TO ANY THIRD PARTY.
FOR: Refineria de Cartagena S.A.
DRAWN: CK'D: APPD: DATE: SCALE:
NO. REVISION DRAWN CK'D APPD DATE
PMB RSB COMM 18-Aug-08 N/A PROJ NO: 166000 DWG NO: 000-DG-IC04-0036 REV: 3