Sei sulla pagina 1di 1

PROJECT : DURGAPUR HALDIA PIPELINE (PART-B)

CLIENT : GAIL (INDIA) LIMITED


PMC : Engineers India Limited (EIL)
CONTRACTOR : KALPATARU POWER TRANSMISSION LTD.
Doc. No:GAIL/EIL/KPTL/DHPL/ML-11/F-01, Rev.00
Radiographic Film Interpretation Report
Chainage/KM : KM……… SFD : Report No. :

Pipe Size /WT : 30" OD X Thickness Technique : Date of RT :

IQI
Material Gr. : API 5L Gr. X70- PSL2 Welding Process: : Film Type :
Designation
Developing Darkroom
Source : Internal X - Ray /External - Ray / Gamma Ray : : degree celcious
Time Temp
Sensitivity : Less than Lead Screens Accept.
Film Density : 2-3.5 : : API 1104 Latest Edition and EIL Spec.
and equal to 2 % Thk F………..B…………. Criteria
Required wire : Visible wire :
Welder no. FOR NDT FOR FOR
Sr.No KM/ Joint No Segment Observation Remarks
R/H Filler C AGENCY KPTL EIL/GAIL

Legends : ACC - Accepted, REP-Repair, RS-Reshoot, RT- Retake, C/O- Cut Out, GRS- Grind & Reshoot, CRS-Clean & Reshoot, CS -Check Surface, FM -Film mark, LD-Low Density, HD-High Density, EU-External Under cut, IU:
Internal Root Under Cut,P-Porosity, CP-Cluster Porosity, HB-Hollow Bead, SI-Slag Inclusion, ESI-Elongated Slag Inclusion, BT-Burn Through, IP-Inadequate penetration, IPD-Inadequate penetration due to high-low, ICP-
Inadequate Cross penetration, IF-Incomplete Fusion, IFD-Incomplete Fusion due to Cold Lap, IC-Internal Concavity,C/S-Check Shot

FOR NDT AGENCY FOR KPTL EIL/GAIL

Sign.: Sign: Sign :

Name: Name: Name :

Date : Date: Date :

Potrebbero piacerti anche