Time Line Time of Project Work

July 2019
No Activities Time
1 Field survey 1 Hari

2 Installation a New Cable LAN and CCTV 3 Hari

3 Installation Access Point, Switch Hub, And Rack Server 1 Hari

4 Installation Acces Door 1 hari

5 Configuration IP Address 1 Hari

6 Testing and commissioning 1 Hari