100%(2)Il 100% ha trovato utile questo documento (2 voti)
260 visualizzazioni1.169 pagine
This document contains the proceedings from a conference on bridge engineering. It includes sections on the planning and management of major bridge projects like the Incheon Bridge, design and construction of cable-stayed bridges, general bridge engineering topics, and bridge substructures. The document contains several papers on the Incheon Bridge project in Korea as well as other major bridges from around the world.
Descrizione originale:
Deskripsi ringkas mengenai perencanaan hingga pelaksanaan konstruksi incheon bridge
This document contains the proceedings from a conference on bridge engineering. It includes sections on the planning and management of major bridge projects like the Incheon Bridge, design and construction of cable-stayed bridges, general bridge engineering topics, and bridge substructures. The document contains several papers on the Incheon Bridge project in Korea as well as other major bridges from around the world.
This document contains the proceedings from a conference on bridge engineering. It includes sections on the planning and management of major bridge projects like the Incheon Bridge, design and construction of cable-stayed bridges, general bridge engineering topics, and bridge substructures. The document contains several papers on the Incheon Bridge project in Korea as well as other major bridges from around the world.
014.jpg 114,361,168,380 Preface [page]10 014.jpg 116,410,217,429 Participants List [page]12 014.jpg 116,458,308,477 Organizing Committee Members [page]13 014.jpg 158,704,409,723 The art of program management [page]30 014.jpg 158,531,650,550 Incheon Bridge: Facts and the state of the art [page]18 014.jpg 159,753,525,771 Conceptual and aesthetical bridge design [page]38 014.jpg 158,800,692,819 Stonecutters Bridge Hong Kong Design and construction [page]50 014.jpg 160,848,474,867 Super longspan bridge R&D center in Korea [page]60 014.jpg 159,1022,530,1041 Historical background of the Incheon Bridge project [page]66 014.jpg 159,1070,509,1088 The role of the contractors checking engineer [page]76 014.jpg 158,1118,626,1137 Project financing for BTO section of Incheon Bridge project [page]78 014.jpg 159,1167,545,1185 Fast-track method applied in the Incheon Bridge project [page]88 014.jpg 158,1215,551,1233 The present and future of KECs overseas business [page]94 014.jpg 158,1262,800,1280 Visitor management in Incheon Bridge Project during construction [page]104 015.jpg 187,370,624,390 Corrosion protection and diagnosis for suspension bridge cable [page]110 015.jpg 186,417,938,438 Windtunnel verification of an aerodynamic analysis approach for stabilizing cable design [page]114 015.jpg 185,467,851,486 Design & construction of Incheon Bridge CSB pylon [page]120 015.jpg 186,515,743,532 Development and application of integrated geometry control system in Incheon Bridge [page]134 015.jpg 185,562,837,581 Evaluation of aerodynamic stability for Incheon Bridge [page]142 015.jpg 184,610,849,627 The design of cablestayed bridge with elliptic pylon [page]152 015.jpg 186,659,769,678 Design and erection of Incheon Bridge [page]166 015.jpg 186,707,858,725 Erection of girders and stay cables for Incheon Bridge [page]178 015.jpg 187,755,971,772 Plan and construction of cable-stayed bridge side span by large block method [page]198 015.jpg 186,802,969,820 The planning and basic design of Ulsan grand bridge [page]208 015.jpg 187,851,584,868 BusanGeoje fixed link project [page]218 015.jpg 186,899,801,917 The planning and design of the 2nd Namhae Bridge [page]232 015.jpg 186,948,740,966 Analysis of cable supported structure considering cable sliding [page]240 015.jpg 186,995,717,1013 Construction of cable stayed bridge with elliptic pylon [page]248 016.jpg 157,370,559,390 LRFD vs KBDC for the design of Incheon Bridge [page]260 016.jpg 158,418,810,437 Development of new PSC box girder bridge with concretefilled FRP struts [page]270 016.jpg 158,467,776,486 Aesthetic lighting design on Incheon Bridge [page]280 016.jpg 159,515,769,534 Design and construction of hybrid arch bridge [page]292 016.jpg 159,562,854,580 High performance expansion joints for the Incheon Bridge [page]306 016.jpg 159,610,888,629 Friction dampers for stay cables dynamic stability on Incheon Bridge [page]318 016.jpg 159,659,979,676 Toll collection system and freeway traffic management system in Incheon Bridge project [page]328 016.jpg 158,705,895,723 Design and quality control to increase durability in Incheon Bridge project [page]346 016.jpg 159,754,746,773 Construction of extradosed bridge in the government financed section [page]364 016.jpg 158,804,829,821 Application of prestressed composite truss girder in Incheon Bridge project [page]372 016.jpg 158,850,779,868 Design checking and construction management of PFCM spans in the Incheon Bridge [page]380 016.jpg 159,899,645,919 Incheon Bridge elastomeric bearings & pot bearings [page]400 016.jpg 158,947,815,965 Bridge health monitoring system in Incheon Bridge [page]412 016.jpg 158,995,814,1013 Chloride diffusivity test of the high durable concrete for Incheon Bridge [page]418 016.jpg 158,1043,917,1061 Traffic safety and disaster management facilities in Incheon Bridge project [page]428 016.jpg 159,1091,714,1107 Maintenance and management system of Incheon Bridge [page]438 017.jpg 186,369,472,388 Geotechnical designs of Incheon Bridg [page]444 017.jpg 185,418,536,437 Technical trends for long span bridge foundations [page]456 017.jpg 186,466,870,485 Ship impact protection design for the Incheon Bridge [page]466
017.jpg 186,515,931,533 Pile load tests in the Incheon Bridge project [page]488 017.jpg 185,563,955,580 Design and construction of pile-bents in Incheon Bridge private investment project [page]500 017.jpg 185,611,979,629 Modeling experiments, design and construction for bridge scour protection [page]512 017.jpg 186,658,508,677 PC house for Incheon Bridge pile-cap [page]530 017.jpg 185,706,702,724 Bridge surface pavement of the Incheon Bridge [page]536 017.jpg 186,754,1002,773 Ground improvements for embankment sections on the soft grounds in Incheon Bridge project [page]550 017.jpg 185,803,963,819 Construction of the shipimpact protective dolphin in Incheon Bridge project [page]564 017.jpg 185,852,817,868 Assessment of resistance factors of drilled shaft embedded in weathered rock for LRFD [page]572