THE SEKSARIA BISWAN SUGAR FACTORY LTD., BISWAN


Off Season Power Generation & Consumption Report Date: 5-06-2019
S.N DESCRIPTIO DG SET 32MW TG / GRID SUPPLY
625 KVA 380 KVA 250 KVA TODAY TODATE TODAY
Run Hrs 24.00
KWH 60250.00
HSD Consumed
Load in Amps. 4350.00
HSD (Ltr /KWH)
KWH /Ltr
Rs./ KWH 6.00
Total 361500.00

Load in Amps. Run Hrs


1 Tube-Well (SG55 A 16.00
2 Tube-Well (Par57 A 20.00
3 UGR 45 A 24.00
4 Adm.Block 180.00
5 Mill House 100.00
6 E.T.P. 285.00
7 Bending M/c, 65.00
8 Co-Generatio 352 KWH
9 Colony 157 A

THE SEKSARIA BISWAN SUGAR FACTORY LTD., BISWAN


Off Season Power Generation & Consumption Report Date: 06-06-2019
S.N DESCRIPTIO DG SET 132/ 11 KV GRID SUPPLY
625 KVA 380 KVA 250 KVA TODAY TODATE TODAY
Run Hrs 24.00
KWH 43740.00
HSD Consumed
Load in Amps. 3153.00
HSD (Ltr /KWH)
KWH /Ltr
Rs./ KWH 6.00
Total 262440.00

Load in Amps. Run Hrs


1 Tube-Well (SG55 A 18.00
2 Tube-Well (Park in)
3 UGR 45 A 24.00
4 Adm.Block 115 A
5 Mill House 105 A
6 E.T.P. 260 A
7 Bending M/c, 35 A
8 Co-Generatio 362 KWH
9 Colony 152 A

Page 1
Sheet1

THE SEKSARIA BISWAN SUGAR FACTORY LTD., BISWAN


Off Season Power Generation & Consumption Report Date: 07-06-2019
S.N DESCRIPTIO DG SET 132/ 11 KV GRID SUPPLY
625 KVA 380 KVA 250 KVA TODAY TODATE TODAY
Run Hrs 24.00
KWH 32610.00
HSD Consumed
Load in Amps. 2350.00
HSD (Ltr /KWH)
KWH /Ltr
Rs./ KWH 6.00
Total 195660.00

Load in Amps. Run Hrs


1 Tube-Well (SG55 A 18.00
2 Tube-Well (Park in)
3 UGR 45 A 24.00
4 Adm.Block 110 A
5 Mill House 105 A
6 E.T.P. 200 A
7 Bending M/c, 40 A
8 Co-Generatio 358 KWH
9 Colony 147 A

THE SEKSARIA BISWAN SUGAR FACTORY LTD., BISWAN


Off Season Power Generation & Consumption Report Date: 08-06-2019
S.N DESCRIPTIO DG SET 132/ 11 KV GRID SUPPLY
625 KVA 380 KVA 250 KVA TODAY TODATE TODAY
Run Hrs 24.00
KWH 31370.00
HSD Consumed
Load in Amps. 2260.00
HSD (Ltr /KWH)
KWH /Ltr
Rs./ KWH 6.00
Total 188220.00

Load in Amps. Run Hrs


1 Tube-Well (SG55 A 22.00
2 Tube-Well (Park in)
3 UGR 45 A 7.10
4 Adm.Block 110 A
5 Mill House 95 A
6 E.T.P. 195 A
7 Bending M/c, 50 A
8 Co-Generatio 364 KWH

Page 2
Sheet1
9 Colony 145 A

THE SEKSARIA BISWAN SUGAR FACTORY LTD., BISWAN


Off Season Power Generation & Consumption Report Date: 09-06-2019
S.N DESCRIPTIO DG SET 132/ 11 KV GRID SUPPLY
625 KVA 380 KVA 250 KVA TODAY TODATE TODAY
Run Hrs 24.00
KWH 27680.00
HSD Consumed
Load in Amps. 1995.00
HSD (Ltr /KWH)
KWH /Ltr
Rs./ KWH 6.00
Total 166080.00

Load in Amps. Run Hrs


1 Tube-Well (SG55 A 18.00
2 Tube-Well (Park in)
3 UGR 45 A 5.30
4 Adm.Block 95 A
5 Mill House 65 A
6 E.T.P. 180 A
7 Bending M/c, 40 A
8 Co-Generatio 358 KWH
9 Colony 139 A

THE SEKSARIA BISWAN SUGAR FACTORY LTD., BISWAN


Off Season Power Generation & Consumption Report Date: 10-06-2019
S.N DESCRIPTIO DG SET 132/ 11 KV GRID SUPPLY
625 KVA 380 KVA 250 KVA TODAY TODATE TODAY
Run Hrs 24.00
KWH 20390.00
HSD Consumed
Load in Amps. 1470.00
HSD (Ltr /KWH)
KWH /Ltr
Rs./ KWH 6.00
Total 122340.00

Load in Amps. Run Hrs


1 Tube-Well (SG)
2 Tube-Well (Par57A 6.30
3 UGR
4 Adm.Block 90 A
5 Mill House 65 A
6 E.T.P. 185 A
7 Bending M/c, 50 A

Page 3
Sheet1
8 Co-Generatio 350 KWH
9 Colony 131 A

THE SEKSARIA BISWAN SUGAR FACTORY LTD., BISWAN


Off Season Power Generation & Consumption Report Date: 11-06-2019
S.N DESCRIPTIO DG SET 132/ 11 KV GRID SUPPLY
625 KVA 380 KVA 250 KVA TODAY TODATE TODAY
Run Hrs 0.30 0.15 0.45 0.45 23.15
KWH 150.00 42.00 192.00 192.00 12820.00
HSD Consum 45.00 11.00 56.00 56.00
Load in Amps. 600.00 490.00 900.00
HSD (Ltr /KW 0.30 0.26 0.29 0.29
KWH /Ltr 3.33 3.82 3.43 3.43
Rs./ KWH 20.40 17.81 19.83 19.83 6.00
Total 3060 748 3808 3808 76920.00

Load in Amps. Run Hrs


1 Tube-Well (SG)
2 Tube-Well (Par57A 10.30
3 UGR
4 Adm.Block 95 A
5 Mill House 65 A
6 E.T.P. 155 A
7 Bending M/c, 50 A
8 Co-Generatio 260 KWH
9 Colony 131 A

THE SEKSARIA BISWAN SUGAR FACTORY LTD., BISWAN


Off Season Power Generation & Consumption Report Date: 12-06-2019
S.N DESCRIPTIO DG SET 132/ 11 KV GRID SUPPLY
625 KVA 380 KVA 250 KVA TODAY TODATE TODAY
Run Hrs 1.25 1.25 2.10 22.35
KWH 400.00 400.00 592.00 10960.00
HSD Consum 123.00 123.00 179.00
Load in Amps. 500.00 500.00 790.00
HSD (Ltr /KW 0.31 0.31 0.30
KWH /Ltr 3.25 3.25 3.31
Rs./ KWH 20.91 20.91 20.56 6.00
Total 8364 8364 12172 65760.00

Load in Amps. Run Hrs


1 Tube-Well (SG)
2 Tube-Well (Par57A 17.15
3 UGR
4 Adm.Block 90 A
5 Mill House 60 A
6 E.T.P. 140 A

Page 4
Sheet1
7 Bending M/c, 50 A
8 Co-Generatio 146 KWH
9 Colony 131 A

THE SEKSARIA BISWAN SUGAR FACTORY LTD., BISWAN


Off Season Power Generation & Consumption Report Date: 13-06-2019
S.N DESCRIPTIO DG SET 132/ 11 KV GRID SUPPLY
625 KVA 380 KVA 250 KVA TODAY TODATE TODAY
Run Hrs 0.30 0.30 2.40 23.30
KWH 180.00 180.00 772.00 11290.00
HSD Consum 54.00 54.00 233.00
Load in Amps. 640.00 640.00 810.00
HSD (Ltr /KW 0.30 0.30 0.30
KWH /Ltr 3.33 3.33 3.31
Rs./ KWH 20.40 20.40 20.52 6.00
Total 3672 3672 15844 67740.00

Load in Amps. Run Hrs


1 Tube-Well (SG)
2 Tube-Well (Par57A 13.30
3 UGR 45 A 0.50
4 Adm.Block 85 A
5 Mill House 60 A
6 E.T.P. 130 A
7 Bending M/c, 50 A
8 Co-Generatio 22 KWH
9 Colony 131 A

THE SEKSARIA BISWAN SUGAR FACTORY LTD., BISWAN


Off Season Power Generation & Consumption Report Date: 14-06-2019
S.N DESCRIPTIO DG SET 132/ 11 KV GRID SUPPLY
625 KVA 380 KVA 250 KVA TODAY TODATE TODAY
Run Hrs 2.40 24.00
KWH 772.00 12540.00
HSD Consumed 233.00
Load in Amps. 900.00
HSD (Ltr /KWH) 0.30
KWH /Ltr 3.31
Rs./ KWH 20.52 6.00
Total 15844 75240.00

Load in Amps. Run Hrs


1 Tube-Well (Ba57A 8.00
2 Tube-Well (Par57A 6.00
3 UGR 45 A 1.00
4 Adm.Block 90 A
5 Mill House 60 A

Page 5
Sheet1
6 E.T.P. 100 A
7 Bending M/c, 50 A
8 Co-Generatio 180 KWH
9 Colony 105 A

THE SEKSARIA BISWAN SUGAR FACTORY LTD., BISWAN


Off Season Power Generation & Consumption Report Date: 15-06-2019
S.N DESCRIPTIO DG SET 132/ 11 KV GRID SUPPLY
625 KVA 380 KVA 250 KVA TODAY TODATE TODAY
Run Hrs 2.40 24.00
KWH 772.00 9330.00
HSD Consumed 233.00
Load in Amps. 670.00
HSD (Ltr /KWH) 0.30
KWH /Ltr 3.31
Rs./ KWH 20.52 6.00
Total 15844 55980.00

Load in Amps. Run Hrs


1 Tube-Well (Ba57A 6.30
2 Tube-Well (Par57A 8.00
3 UGR 45 A 9.00
4 Adm.Block 90 A
5 Mill House 70 A
6 E.T.P. 80 A
7 Bending M/c, 110 A
8 Co-Generatio 180 KWH
9 Colony 105 A

THE SEKSARIA BISWAN SUGAR FACTORY LTD., BISWAN


Off Season Power Generation & Consumption Report Date: 16-06-2019
S.N DESCRIPTIO DG SET 132/ 11 KV GRID SUPPLY
625 KVA 380 KVA 250 KVA TODAY TODATE TODAY
Run Hrs 2.40 24.00
KWH 772.00 10240.00
HSD Consumed 233.00
Load in Amps. 735.00
HSD (Ltr /KWH) 0.30
KWH /Ltr 3.31
Rs./ KWH 20.52 6.00
Total 15844 61440.00

Load in Amps. Run Hrs


1 Tube-Well (Ba57A 5.25
2 Tube-Well (Par57A 8.25
3 UGR 45 A 8.45
4 Adm.Block 110 A

Page 6
Sheet1
5 Mill House 65 A
6 E.T.P. 95 A
7 Bending M/c, 50 A
8 Co-Generatio 1120.6 KWH
9 Colony 105 A

THE SEKSARIA BISWAN SUGAR FACTORY LTD., BISWAN


Off Season Power Generation & Consumption Report Date: 17-06-2019
S.N DESCRIPTIO DG SET 132/ 11 KV GRID SUPPLY
625 KVA 380 KVA 250 KVA TODAY TODATE TODAY
Run Hrs 2.40 24.00
KWH 772.00 11250.00
HSD Consumed 233.00
Load in Amps. 745.00
HSD (Ltr /KWH) 0.30
KWH /Ltr 3.31
Rs./ KWH 20.52 6.00
Total 15844 67500.00

Load in Amps. Run Hrs


1 Tube-Well (Ba57A 11.00
2 Tube-Well (Par57A 9.00
3 UGR 45 A 9.00
4 Adm.Block 120 A
5 Mill House 60 A
6 E.T.P. 95 A
7 Bending M/c, 50 A
8 Co-Generatio 1286 KWH
9 Colony 105 A

THE SEKSARIA BISWAN SUGAR FACTORY LTD., BISWAN


Off Season Power Generation & Consumption Report Date: 18-06-2019
S.N DESCRIPTIO DG SET 132/ 11 KV GRID SUPPLY
625 KVA 380 KVA 250 KVA TODAY TODATE TODAY
Run Hrs 2.35 2.35 5.15 21.25
KWH 670.00 670.00 1442.00 8880.00
HSD Consum 203.00 203.00 436.00
Load in Amps. 480.00 480.00 640.00
HSD (Ltr /KW 0.30 0.30 0.30
KWH /Ltr 3.30 3.30 3.31
Rs./ KWH 20.60 20.60 20.56 6.00
Total 13804 13804 29648 53280.00

Load in Amps. Run Hrs


1 Tube-Well (Ba57A 8.35
2 Tube-Well (Par57A 7.10
3 UGR 45 A 9.45

Page 7
Sheet1
4 Adm.Block 125 A
5 Mill House 60 A
6 E.T.P. 95 A
7 Bending M/c, 50 A
8 Co-Generatio 922 KWH
9 Colony 105 A

THE SEKSARIA BISWAN SUGAR FACTORY LTD., BISWAN


Off Season Power Generation & Consumption Report Date: 19-06-2019
S.N DESCRIPTIO DG SET 132/ 11 KV GRID SUPPLY
625 KVA 380 KVA 250 KVA TODAY TODATE TODAY
Run Hrs 5.15 24.00
KWH 1442.00 9540.00
HSD Consumed 436.00
Load in Amps. 710.00
HSD (Ltr /KWH) 0.30
KWH /Ltr 3.31
Rs./ KWH 20.56 6.00
Total 29648 57240.00

Load in Amps. Run Hrs


1 Tube-Well (Ba57A 14.45
2 Tube-Well (Par57A 2.35
3 UGR 45 A 8.30
4 Adm.Block 125 A
5 Mill House 50 A
6 E.T.P. 95 A
7 Bending M/c, 50 A
8 Co-Generatio 848 KWH
9 Colony 105 A

THE SEKSARIA BISWAN SUGAR FACTORY LTD., BISWAN


Off Season Power Generation & Consumption Report Date: 20-06-2019
S.N DESCRIPTIO DG SET 132/ 11 KV GRID SUPPLY
625 KVA 380 KVA 250 KVA TODAY TODATE TODAY
Run Hrs 5.15 24.00
KWH 1442.00 9310.00
HSD Consumed 436.00
Load in Amps. 690.00
HSD (Ltr /KWH) 0.30
KWH /Ltr 3.31
Rs./ KWH 20.56 6.00
Total 29648 55860.00

Load in Amps. Run Hrs


1 Tube-Well (Ba57A 10.20
2 Tube-Well (Par57A 5.45

Page 8
Sheet1
3 UGR 45 A 8.50
4 Adm.Block 120 A
5 Mill House 50 A
6 E.T.P. 90 A
7 Bending M/c, 50 A
8 Co-Generatio 864 KWH
9 Colony 115 A

THE SEKSARIA BISWAN SUGAR FACTORY LTD., BISWAN


Off Season Power Generation & Consumption Report Date: 21-06-2019
S.N DESCRIPTIO DG SET 132/ 11 KV GRID SUPPLY
625 KVA 380 KVA 250 KVA TODAY TODATE TODAY
Run Hrs 5.15 24.00
KWH 1442.00 10410.00
HSD Consumed 436.00
Load in Amps. 760.00
HSD (Ltr /KWH) 0.30
KWH /Ltr 3.31
Rs./ KWH 20.56 6.00
Total 29648 62460.00

Load in Amps. Run Hrs


1 Tube-Well (Ba57A 2.20
2 Tube-Well (Par57A 11.05
3 UGR 45 A 8.45
4 Adm.Block 125 A
5 Mill House 50 A
6 E.T.P. 95 A
7 Bending M/c, 50 A
8 Co-Generatio 1200 KWH
9 Colony 119 A

THE SEKSARIA BISWAN SUGAR FACTORY LTD., BISWAN


Off Season Power Generation & Consumption Report Date: 22-06-2019
S.N DESCRIPTIO DG SET 132/ 11 KV GRID SUPPLY
625 KVA 380 KVA 250 KVA TODAY TODATE TODAY
Run Hrs 5.15 24.00
KWH 1442.00 9600.00
HSD Consumed 436.00
Load in Amps. 750.00
HSD (Ltr /KWH) 0.30
KWH /Ltr 3.31
Rs./ KWH 20.56 6.00
Total 29648 57600.00

Load in Amps. Run Hrs


1 Tube-Well (Ba57A 1.30

Page 9
Sheet1
2 Tube-Well (Par57A 12.20
3 UGR 45 A 9.30
4 Adm.Block 125 A
5 Mill House 50 A
6 E.T.P. 95 A
7 Bending M/c, 50 A
8 Co-Generatio 901 KWH
9 Colony 119 A

THE SEKSARIA BISWAN SUGAR FACTORY LTD., BISWAN


Off Season Power Generation & Consumption Report Date: 23-06-2019
S.N DESCRIPTIO DG SET 132/ 11 KV GRID SUPPLY
625 KVA 380 KVA 250 KVA TODAY TODATE TODAY
Run Hrs 5.15 24.00
KWH 1442.00 7640.00
HSD Consumed 436.00
Load in Amps. 560.00
HSD (Ltr /KWH) 0.30
KWH /Ltr 3.31
Rs./ KWH 20.56 6.00
Total 29648 45840.00

Load in Amps. Run Hrs


1 Tube-Well (Ba57A 6.20
2 Tube-Well (Par57A 1.10
3 UGR 45 A 8.45
4 Adm.Block 110 A
5 Mill House 50 A
6 E.T.P. 150 A
7 Bending M/c, 35 A
8 Co-Generatio 682 KWH
9 Colony 119 A

THE SEKSARIA BISWAN SUGAR FACTORY LTD., BISWAN


Off Season Power Generation & Consumption Report Date: 24-06-2019
S.N DESCRIPTIO DG SET 132/ 11 KV GRID SUPPLY
625 KVA 380 KVA 250 KVA TODAY TODATE TODAY
Run Hrs 5.15 24.00
KWH 1442.00 8170.00
HSD Consumed 436.00
Load in Amps. 650.00
HSD (Ltr /KWH) 0.30
KWH /Ltr 3.31
Rs./ KWH 20.56 6.00
Total 29648 49020.00

Load in Amps. Run Hrs

Page 10
Sheet1
1 Tube-Well (Ba57A 2.35
2 Tube-Well (Park in)
3 UGR 45 A 5.00
4 Adm.Block 160 A
5 Mill House 65 A
6 E.T.P. 140 A
7 Bending M/c, 40 A
8 Co-Generatio 1354 KWH
9 Colony 105 A

THE SEKSARIA BISWAN SUGAR FACTORY LTD., BISWAN


Off Season Power Generation & Consumption Report Date: 25-06-2019
S.N DESCRIPTIO DG SET 132/ 11 KV GRID SUPPLY
625 KVA 380 KVA 250 KVA TODAY TODATE TODAY
Run Hrs 5.15 24.00
KWH 1442.00 8170.00
HSD Consumed 436.00
Load in Amps. 650.00
HSD (Ltr /KWH) 0.30
KWH /Ltr 3.31
Rs./ KWH 20.56 6.00
Total 29648 49020.00

Load in Amps. Run Hrs


1 Tube-Well (Ba57A 5.20
2 Tube-Well (Park in)
3 UGR
4 Adm.Block 110 A
5 Mill House 90 A
6 E.T.P. 150 A
7 Bending M/c, 40 A
8 Co-Generatio 1406 KWH
9 Colony 105 A

THE SEKSARIA BISWAN SUGAR FACTORY LTD., BISWAN


Off Season Power Generation & Consumption Report Date: 26-06-2019
S.N DESCRIPTIO DG SET 132/ 11 KV GRID SUPPLY
625 KVA 380 KVA 250 KVA TODAY TODATE TODAY
Run Hrs 5.15 24.00
KWH 1442.00 7460.00
HSD Consumed 436.00
Load in Amps. 540.00
HSD (Ltr /KWH) 0.30
KWH /Ltr 3.31
Rs./ KWH 20.56 6.00
Total 29648 44760.00

Page 11
Sheet1
Load in Amps. Run Hrs
1 Tube-Well (Ba57A 3.05
2 Tube-Well (Park in)
3 UGR
4 Adm.Block 95 A
5 Mill House 65 A
6 E.T.P. 90 A
7 Bending M/c, 80 A
8 Co-Generatio 1450 KWH
9 Colony 109 A

THE SEKSARIA BISWAN SUGAR FACTORY LTD., BISWAN


Off Season Power Generation & Consumption Report Date: 27-06-2019
S.N DESCRIPTIO DG SET 132/ 11 KV GRID SUPPLY
625 KVA 380 KVA 250 KVA TODAY TODATE TODAY
Run Hrs 5.15 24.00
KWH 1442.00 7670.00
HSD Consumed 436.00
Load in Amps. 550.00
HSD (Ltr /KWH) 0.30
KWH /Ltr 3.31
Rs./ KWH 20.56 6.00
Total 29648 46020.00

Load in Amps. Run Hrs


1 Tube-Well (Ba57A 1.40
2 Tube-Well (Park in)
3 UGR
4 Adm.Block 100 A
5 Mill House 65 A
6 E.T.P. 85 A
7 Bending M/c, 80 A
8 Co-Generatio 1702 KWH
9 Colony 102 A

THE SEKSARIA BISWAN SUGAR FACTORY LTD., BISWAN


Off Season Power Generation & Consumption Report Date: 28-06-2019
S.N DESCRIPTIO DG SET 132/ 11 KV GRID SUPPLY
625 KVA 380 KVA 250 KVA TODAY TODATE TODAY
Run Hrs 2.55 2.55 8.10 24.00
KWH 830.00 830.00 2272.00 43740.00
HSD Consum 258.00 258.00 694.00
Load in Amps. 700.00 700.00 3153.00
HSD (Ltr /KW 0.31 0.31 0.31
KWH /Ltr 3.22 3.22 3.27
Rs./ KWH 21.14 21.14 20.77 6.00

Page 12
Sheet1
Total 17544 17544 47192 262440.00

Load in Amps. Run Hrs


1 Tube-Well (SG55 A 18.00
2 Tube-Well (Park in)
3 UGR 45 A 24.00
4 Adm.Block 115 A
5 Mill House 105 A
6 E.T.P. 260 A
7 Bending M/c, 35 A
8 Co-Generatio 362 KWH
9 Colony 152 A

Page 13
Sheet1

BISWAN
Date: 5-06-2019
2MW TG / GRID SUPPLY REMARKS Last Year
TODATE 1) Crushing Season CKWH Crushing
24.00 2) Sugar Process Co HSD Consumed Season
60250.00 3) Distillery is runnin HSD(Ltr/KWH) 2017-18 was
MW TG set. KWH /Ltr running
4350.00 Colony Supply 24.00
Tube well S.G.; 18.15 Hrs
Bank: 10.20 Hr
6.00 UGR 3 no for 24 hrs
361500.00

BISWAN
Date: 06-06-2019
32/ 11 KV GRID SUPPLY REMARKS Last Year
TODATE 1.Distillery Power: KWH Crushing
48.00 HSD Consumed Season
103990.00 HSD(Ltr/KWH) 2017-18 was
KWH /Ltr running
3153.00 Colony Supply 24.00
Tube well S.G.; 19.15 Hrs
Park in 18 Hrs
6.00 UGR 3 no for 24 hrs
623940.00

Page 14
Sheet1

BISWAN
Date: 07-06-2019
32/ 11 KV GRID SUPPLY REMARKS Last Year
TODATE 1.Distillery Power: KWH Crushing
72.00 HSD Consumed Season
136600.00 HSD(Ltr/KWH) 2017-18 was
KWH /Ltr running
2350.00 Colony Supply 24.00
Tube well S.G.; 22 Hrs
Park in 17 Hrs
6.00 UGR 3 no for 24 hrs
819600.00

BISWAN
Date: 08-06-2019
32/ 11 KV GRID SUPPLY REMARKS Last Year
TODATE 1.Distillery Power: KWH Crushing
96.00 HSD Consumed Season
167970.00 HSD(Ltr/KWH) 2017-18 was
KWH /Ltr running
2260.00 Colony Supply 24.00
Tube well S.G.; 22.2 Hrs
Park in 18.50Hrs
6.00 UGR 3 no for 24 hrs
1007820.00

Page 15
Sheet1

BISWAN
Date: 09-06-2019
32/ 11 KV GRID SUPPLY REMARKS Last Year
TODATE 1.Distillery Power: KWH Crushing
120.00 HSD Consumed Season
195650.00 HSD(Ltr/KWH) 2017-18 was
KWH /Ltr running
1995.00 Colony Supply 24.00
Tube well S.G.; 20.3 Hrs
Park in 16.30 Hrs
6.00 UGR 3 no for 24 hrs
1173900.00

BISWAN
Date: 10-06-2019
32/ 11 KV GRID SUPPLY REMARKS Last Year
TODATE 1.Distillery Power: KWH Crushing
144.00 HSD Consumed Season
216040.00 HSD(Ltr/KWH) 2017-18 was
KWH /Ltr running
1470.00 Colony Supply 24.00
Tube well S.G.; 22.2 Hrs
Park in 19*.00 Hrs
6.00 UGR 3 no for 24 hrs
1296240.00

Page 16
Sheet1

BISWAN
Date: 11-06-2019
32/ 11 KV GRID SUPPLY REMARKS Last Year
TODATE 1.Distillery Power: KWH Crushing
167.15 HSD Consumed
228860.00 HSD(Ltr/KWH)
KWH /Ltr
900.00 Colony Supply 24.00
Tube well S.G.; 23 Hrs
Park in 17*.00 Hrs
6.00 UGR 3 no for 24 hrs
1373160.00

BISWAN
Date: 12-06-2019
32/ 11 KV GRID SUPPLY REMARKS Last Year
TODATE 1.Distillery Power: KWH Crushing
189.50 HSD Consumed Season
239820.00 HSD(Ltr/KWH) 2017-18 was
KWH /Ltr running
790.00 Colony Supply 24.00
Tube well S.G.; 21 Hrs
Park in 19.00 Hrs
6.00 UGR 3 no for 24 hrs
1438920.00

Page 17
Sheet1

BISWAN
Date: 13-06-2019
32/ 11 KV GRID SUPPLY REMARKS Last Year
TODATE 1.Distillery Power: KWH
213.20 HSD Consumed
251110.00 HSD(Ltr/KWH)
KWH /Ltr
810.00 Colony Supply
Tube well
Park in
6.00 UGR
1506660.00

BISWAN
Date: 14-06-2019
32/ 11 KV GRID SUPPLY REMARKS Last Year
TODATE 1.Distillery Power: KWH Crushing
237.20Jet Cleaning: Distiller HSD Consumed Season
263650.00 Boiling House: 2050 HSD(Ltr/KWH) 2017-18 was
KWH /Ltr running
900.00 Colony Supply 24.00
Tube well S.G.; 19 Hrs
Park in 16 Hrs
6.00 UGR 3 no for 24 hrs
1581900.00

Page 18
Sheet1

BISWAN
Date: 15-06-2019
32/ 11 KV GRID SUPPLY REMARKS Last Year
TODATE 1.Distillery Power: KWH Crushing
261.20
Jet Cleaning: Distiller HSD Consumed Season
272980.00Boiling House: 187 HSD(Ltr/KWH) 2017-18 was
KWH /Ltr running
670.00 Colony Supply 24.00
Tube well S.G.; 21 Hrs
Park in 15 Hrs
6.00 UGR 3 no for 24 hrs
1637880.00

BISWAN
Date: 16-06-2019
32/ 11 KV GRID SUPPLY REMARKS Last Year
TODATE 1.Distillery Power: KWH Crushing
285.20
Jet Cleaning: Distiller HSD Consumed Season
283220.00Boiling House: 1450 HSD(Ltr/KWH) 2017-18 was
KWH /Ltr running
735.00 Colony Supply 24.00
Tube well S.G.; 20 Hrs
Park in 18 Hrs
6.00 UGR 3 no for 24 hrs
1699320.00

Page 19
Sheet1

BISWAN
Date: 17-06-2019
32/ 11 KV GRID SUPPLY REMARKS Last Year
TODATE 1.Distillery Power: KWH Crushing
309.20
Jet Cleaning: Distiller HSD Consumed Season
294470.00Boiling House: 1390 HSD(Ltr/KWH) 2017-18 was
KWH /Ltr running
745.00 Colony Supply 24.00
Tube well S.G.; 22 Hrs
Park in 20 Hrs
6.00 UGR 3 no for 24 hrs
1766820.00

BISWAN
Date: 18-06-2019
32/ 11 KV GRID SUPPLY REMARKS Last Year
TODATE 1.Distillery Power: KWH Crushing
330.45
Jet Cleaning: Distiller HSD Consumed Season
303350.00Boiling House: 1276 HSD(Ltr/KWH) 2017-18 was
KWH /Ltr running
640.00 Colony Supply 24.00
Tube well S.G.; 20 Hrs
Park in 19.5 Hrs
6.00 UGR 3 no for 24 hrs
1820100.00

Page 20
Sheet1

BISWAN
Date: 19-06-2019
32/ 11 KV GRID SUPPLY REMARKS Last Year
TODATE 1.Distillery Power: KWH Crushing
354.45
Jet Cleaning: Distiller HSD Consumed Season
312890.00Boiling House: 956 HSD(Ltr/KWH) 2017-18 was
KWH /Ltr running
710.00 Colony Supply 24.00
Tube well S.G.; 17 Hrs
Park in 15.3 Hrs
6.00 UGR 3 no for 24 hrs
1877340.00

BISWAN
Date: 20-06-2019
32/ 11 KV GRID SUPPLY REMARKS Last Year
TODATE 1.Distillery Power: 1 KWH Crushing
378.45
Jet Cleaning: HSD Consumed Season
322200.00Boiling House: 1233 HSD(Ltr/KWH) 2017-18 was
KWH /Ltr running
690.00 Colony Supply 24.00
Tube well S.G.; 16.3 Hrs
Park in 15.0 Hrs
6.00 UGR 3 no for 24 hrs
1933200.00

Page 21
Sheet1

BISWAN
Date: 21-06-2019
32/ 11 KV GRID SUPPLY REMARKS Last Year
TODATE 1.Distillery Power: KWH Crushing
402.45
Jet Cleaning: HSD Consumed Season
332610.00Boiling House: 1426 HSD(Ltr/KWH) 2017-18 was
KWH /Ltr running
760.00 Colony Supply 24.00
Tube well S.G.; 18 Hrs
Park in 17.0 Hrs
6.00 UGR 3 no for 24 hrs
1995660.00

BISWAN
Date: 22-06-2019
32/ 11 KV GRID SUPPLY REMARKS Last Year
TODATE 1.Distillery Power: KWH Crushing
426.45
Jet Cleaning: HSD Consumed Season
342210.00Boiling House: 1010 HSD(Ltr/KWH) 2017-18 was
KWH /Ltr running
750.00 Colony Supply 24.00
Tube well S.G.; 17 Hrs
Park in 20.0 Hrs
6.00 UGR 3 no for 24 hrs
2053260.00

Page 22
Sheet1

BISWAN
Date: 23-06-2019
32/ 11 KV GRID SUPPLY REMARKS Last Year
TODATE 1.Distillery Power: KWH Crushing
450.45
Jet Cleaning: HSD Consumed Season
349850.00Boiling House: 1060 HSD(Ltr/KWH) 2017-18 was
KWH /Ltr running
560.00 Colony Supply 24.00
Tube well S.G.; 20 Hrs
Park in 18.0 Hrs
6.00 UGR 3 no for 24 hrs
2099100.00

BISWAN
Date: 24-06-2019
32/ 11 KV GRID SUPPLY REMARKS Last Year
TODATE 1.Distillery Power: 1 KWH Crushing
474.45
Jet Cleaning: HSD Consumed Season
358020.00Boiling House: 1210 HSD(Ltr/KWH) 2017-18 was
KWH /Ltr running
650.00 Colony Supply 24.00
Tube well S.G.; 22 Hrs
Park in 15.0 Hrs
6.00 UGR 3 no for 24 hrs
2148120.00

Page 23
Sheet1

BISWAN
Date: 25-06-2019
32/ 11 KV GRID SUPPLY REMARKS Last Year
TODATE 1.Distillery Power: 1 KWH 9040
498.45
Jet Cleaning: HSD Consumed 0
366190.00Boiling House: 910 HSD(Ltr/KWH) 0
KWH /Ltr 0
650.00 Colony KWH 1210.00
Tube well S.G.; 1 Hrs
Park in 1.0 Hrs
6.00 UGR
2197140.00

BISWAN
Date: 26-06-2019
32/ 11 KV GRID SUPPLY REMARKS Last Year
TODATE 1.Distillery Power: KWH 9080
522.45 Jet Cleaning: HSD Consumed 0
373650.00 Boiling House: 849 HSD(Ltr/KWH) 0
KWH /Ltr 0
540.00 Colony KWH 1320.00
Tube well S.G.; 8.45 Hrs
Park in
6.00 UGR 2.4 Hrs ( 75 HP)
2241900.00

Page 24
Sheet1

BISWAN
Date: 27-06-2019
32/ 11 KV GRID SUPPLY REMARKS Last Year
TODATE 1.Distillery Power: 1 KWH 8400
546.45 HSD Consumed 0
381320.00 HSD(Ltr/KWH) 0
KWH /Ltr 0
550.00 Colony KWH 1190.00
Tube well S.G.; 6.1 Hrs
Park in
6.00 UGR 6.15 Hrs ( 75 HP)
2287920.00

BISWAN
Date: 28-06-2019
32/ 11 KV GRID SUPPLY REMARKS Last Year
TODATE 1.Distillery Power: KWH Crushing
48.00 HSD Consumed Season
103990.00 HSD(Ltr/KWH) 2017-18 was
KWH /Ltr running
3153.00 Colony Supply 24.00
Tube well S.G.; 19.15 Hrs
Park in 18 Hrs
6.00 UGR 3 no for 24 hrs

Page 25
Sheet1
623940.00