BH 9

Column Pile Load from Load from Working Pile


No. of Pile Remark
Marking Marking KTP (T) AC (T) Load (T) Capacity (T)
4-C2 5C1 400 276 100 5 500 OK
4C6 2C 145 125 100 2 200 OK
4-C11 2B 111 114.5 70 2 140 OK
4-C12 2B 115 114.5 70 2 140 OK
4-C13 2B 111 114.5 70 2 140 OK
4-C19 1C1 68 55 100 1 100 OK
4-C20 1C1 68 55 100 1 100 OK
4-C21 1C1 68 55 100 1 100 OK
4C-26 4B 227 153 70 4 280 OK
BW17 5B1 328 227 70 5 350 OK
4-W3 2B1 99 78 70 2 140 OK
4-W4 2B1 100 78 70 2 140 OK
BC71 2C 147 115 100 2 200 OK
BC72 2C 147 115 100 2 200 OK
BC77 4B 247 191 70 4 280 OK
BC81 4B 255 240 70 4 280 OK
BC85 1C2 88 60 100 1 100 OK
BC86 2B 102 107 70 2 140 OK
4HS2 8B3 485 310 70 8 560 OK

BH 13

Column Pile Load from Load from Working Pile


No. of Pile Remark
Marking Marking KTP (T) AC (T) Load (T) Capacity (T)
4-C3 6C 400 296 83 6 498 OK
4-C7 2C 145 125 83 2 166 OK
4-C14 2B 115 114.5 65 2 130 OK
4-W5 2B1 99 78 65 2 130 OK
4-W6 2B1 100 78 65 2 130 OK
4-C22 1C1 68 55 83 1 83 OK
BW18 5C1 328 227 83 5 415 OK
BC78 4B 247 191 65 4 260 OK
4-C15 2B 111 114.5 65 2 130 OK
4-C23 1C1 68 55 83 1 83 OK
BC82 4C 255 240 83 4 332 OK
4-C27 4B 227 153 65 4 260 OK
BC87 2B 88 60 65 2 130 OK
BC88 2B 102 107 65 2 130 OK
BC73 2C 147 115 83 2 166 OK
BC74 2C 147 115 83 2 166 OK
BC75 2C 147 115 83 2 166 OK
BC89 2B 88 60 65 2 130 OK
4-C4 6C 400 296 83 6 498 OK
4-C8 2C 145 125 83 2 166 OK
4-C16 2B 115 114.5 65 2 130 OK
4-C24 1C1 68 55 83 1 83 OK
4-C28 4B 227 153 65 4 260 OK
BW19 4B4 221 129 65 4 260 OK
4-W7 2B1 99 78 65 2 130 OK
4-W8 2B1 100 78 65 2 130 OK
4HS3 8B3 485 310 65 8 520 OK
4HS4 8B3 485 310 65 8 520 OK
SCE CONSULTANTS (PTE) LTD.
CONSULTING CIVIL & STRUCTURAL ENGINEERS
1 Jalan Kilang Timor #06-02 Pacific Tech Centre S'pore 159303 Tel. : 6337 2828 Fax : 6339 9313

Job No. SCC263 Project DYNASTY GARDEN Sheet No

Date

Subtitle PILE LOADING Designed by

Checked by

BH 1

Column Pile Load from Load from Working Pile


No. of Pile Remark
Marking Marking KTP (T) AC (T) Load (T) Capacity (T)
BW20 5C 240 185 100 5 500 OK
BW21 3B2 155 126 70 3 210 OK
4-W1 3B3 105 78 70 3 210 OK
BC79 2C 102 106 100 2 200 OK
4-C9 3B 123 122 70 3 210 OK
4-C17 2B 71 55 70 2 140 OK

BH 5

Column Pile Load from Load from Working Pile


No. of Pile Remark
Marking Marking KTP (T) AC (T) Load (T) Capacity (T)
4-C1 8C 410 303.5 79 8 632 OK
4-C5 2C 148 125 79 2 158 OK
4-C10 3B 123 122 70 3 210 OK
4-C18 1C1 71 79 1 79 OK
4-C25 4C 218 153 79 4 316 OK
BW16 6B1 328 227 70 6 420 OK
4-W2 3B3 105 78 70 3 210 OK
BC69 2C 150 115 79 2 158 OK
BC70 2C 147 115 79 2 158 OK
BC76 3C 247 191 79 3 237 NOT OK
BC80 3C 255 240 79 3 237 NOT OK
BC83 2B 88 60 70 2 140 OK
BC84 2B 102 107 70 2 140 OK
SCE CONSULTANTS (PTE) LTD.
CONSULTING CIVIL & STRUCTURAL ENGINEERS
1 Jalan Kilang Timor #06-02 Pacific Tech Centre S'pore 159303 Tel. : 6337 2828 Fax : 6339 9313

Job No. SCC263 Project DYNASTY GARDEN Sheet No

Date

Subtitle PILE CAPACITY Designed by

Checked by

BH 1

fcu = 45 N/mm2

Facter of Safety for Skin Fri = 1.5

Facter of Safety for End Be = 3.0

Limiting qsl = 200 KN/m2 C1= 2.5 KN/m2

Limiting qbl = 11000 KN/m2 C2= 2.5 KN/m2