SRI TAKADA INDUSTRIES (MALAYSIA) SDN. BHD.

Date of Inspection: 15~19 /June/2019


Page: 1 of 2

RE: INSPECTION AND REPAIR OF DEFORMING TANKS EP-P/R/S-110-1/2

E. INSPECTION OF BOTTOM NOZZLE OFFSET


FROM AGITATOR NOZZLE

Agitator
Nozzle

Bottom
Nozzle

Offset

DEFORMING
ANGLE, ⁰ OFFSET (mm)
TANK
0⁰
0⁰ 0.0

90⁰ 4.0
4mm
EP-P-110-1
270⁰ 2mm 90⁰
180⁰ 2.0

270⁰ 0.0
180⁰
0⁰
0⁰ 9.0
9mm
90⁰ 0.0
EP-P-110-2
270⁰ 90⁰
180⁰ 0.0

270⁰ 0.0
180⁰
0⁰
0⁰ 5.0
5mm
90⁰ 0.0
EP-R-110-1
270⁰ 7mm 90⁰
180⁰ 0.0

270⁰ 7.0
180⁰
SRI TAKADA INDUSTRIES (MALAYSIA) SDN. BHD. Date of Inspection: 15~19 /June/2019
Page: 2 of 2

RE: INSPECTION AND REPAIR OF DEFORMING TANKS EP-P/R/S-110-1/2

E. INSPECTION OF BOTTOM NOZZLE OFFSET


FROM AGITATOR NOZZLE

DEFORMING
ANGLE, ⁰ OFFSET (mm)
TANK
0⁰
0⁰ 9.0
9mm
90⁰ 6.0
EP-R-110-2
270⁰ 6mm 90⁰
180⁰ 0.0

270⁰ 0.0
180⁰
0⁰
0⁰ 3.0

90⁰ 10.0
3mm
EP-S-110-1
270⁰ 10mm 90⁰
180⁰ 0.0

270⁰ 0.0
180⁰
0⁰
0⁰ 2.0

90⁰ 0.0
2mm
EP-S-110-2
270⁰ 6mm 90⁰
180⁰ 0.0

270⁰ 6.0
180⁰
Notes:
1. Offset value are taken from the plumb line extension originating from the center of the
Agitator nozzle (AG) compared to the center of the bottom nozzle (N2).