SRI TAKADA INDUSTRIES (MALAYSIA) SDN. BHD.

Date of Inspection: 15~19 /June/2019


Page: 1 of 1

RE: INSPECTION AND REPAIR OF DEFORMING TANKS EP-P/R/S-110-1/2

C. MEASUREMENT OF OFFSET GAP BETWEEN SADDLE'S


BASE AND FOUNDATION SUPPORT

15 x
x
16 x 1
x
2
x x
13
x x 3
14 4

12
x x6
11x
x5
x x
10 8
x9 x G
7
Foundation 10 mm 10 mm

DEFORMING TANK
Location Gap, G
EP-P-110-1 EP-P-110-2 EP-R-110-1 EP-R-110-2 EP-S-110-1 EP-S-110-2
1 0.30 0.00 1.45 0.00 0.40 0.00
2 0.25 0.20 1.70 0.70 0.80 0.00
S45
3 0.50 1.30 0.07 0.80 1.30 4.80
4 0.50 1.50 0.50 1.20 2.40 5.50
5 2.20 1.30 0.00 5.40 0.00 3.15
6 1.90 1.25 0.50 5.30 0.00 2.80
S135
7 0.80 0.03 0.65 4.50 6.50 2.80
8 0.85 0.04 1.30 4.20 6.10 2.80
9 0.00 2.20 0.55 0.04 4.30 0.20
10 0.00 2.40 0.80 0.00 4.10 0.00
S225
11 2.40 1.70 0.25 5.50 8.10 4.00
12 2.50 1.30 0.30 5.40 7.90 3.80
13 0.00 0.00 0.45 0.00 0.00 1.19
14 0.70 0.45 1.25 0.60 0.00 2.80
S315
15 3.20 0.60 0.80 4.20 3.00 0.35
16 3.70 1.50 1.40 5.10 3.35 2.00
Notes:
1. All dimension are in milimeters (mm).
2. Measurements taken are 10 mm (approximately) from the inner and outer edge on both side of all 4 saddles.
3. Feeler gauge was used for gap measurements below 1.0 mm. Taper gauge was used for gap measurements above 1.0 mm.