RVPR CONSTRUCTION PVT LTD

SAFE WORK PROCEDURE


Project Name : 3*8 MW STPP Name of Customer : NTPC /PVUNL

Department : CIVIL Name of Client : BHEL,TBG

Location : PVUNL, PATRATU Name of Working Agency : RVPR

Job Title : AREA GRADING Doc no : RVPR/SWP/00

Job Duration : Work order no :


Condition of Tools Reference to
Activities Person Responsible
SL NO Hazards Safety Precautions and Tackles Document/Criteria&
(Sequence of work) & PH NO
Ok/Not ok Remarks
 Prior to start the work the work SS/ENGG- 25(WORK
permit will be filled up in PERMIT SYSTEM)
triplicate to clarify the type of SS/ENGG-07(PPE’S)
work involved. SS/ENGG-
 Proximity / six directional 13(BARRICADING)
hazards of the area and SS/ENGG-
necessary precautions will be 45(MANAGEMENT OF
carryout. FIRST AID CASES IN
 Area will be barricaded with SHOP FLOOR)
1 General  Statutory warning tapes/safety nets
Prohibitions wherever is required
 Jobs carried out under
supervision
 Approach to DB ,panels,
switches to be kept clear
 First aid box must keep near the
work area.
 Employees will be made
acquainted with the use of

[Type text]
Client Representative safety Representative of client working agency safety Representative of working agency
RVPR CONSTRUCTION PVT LTD
safety appliances
 Job specific safety briefing will
be given before start the each
shift
 Co-ordination will be
maintaining with all other
agencies
 Proper identification mark will
be provided for every winch
unit/Rig unit
 Area should be cleaned before
starting the job and after
completed the job
 Lifting equipments, accessories
will be deployed at site
appropriately .Test certificates
of lifting equipments will be
ready at site& will be produced
on demand.
 Pollution under control
certificates for all vehicles
should be take from authorized
agency
 Unnecessary water
accumulation will be avoided
 Pest control will be deployed for
mosquito
 Contract board with details of
site supervisor& contact
number will be displayed
 Follow the all requirements of
OHSAS,TSL ,safety standards
and all legal appliances law
 Daily safety talk on Risk and
Rescue management at site

[Type text]
Client Representative safety Representative of client working agency safety Representative of working agency
RVPR CONSTRUCTION PVT LTD
Sl. Activities Hazards Control measures/Safety Precautions Responsible Condition References to
no Person & Ph no of Tools & Document/Criteria
Tackles & Remarks

2 Excavation &  Cave - in  Get clearance before starting


Backfilling  Electric the work from client SS/Engg/GEN -01
Shock. representatives / authorized
 Pipeline person of client.
Damage.

 Snake bite.  Anticipating identified bush area


by bamboos, stick or rod.
SS/Engg/GEN -03
 Foot injury.  Provide safety shoe and
gumboot.

 Immediately give the first – aid


treatment.

[Type text]
Client Representative safety Representative of client working agency safety Representative of working agency
RVPR CONSTRUCTION PVT LTD
 Slip,Trip &  Barrication should be provided
Falling. on the Excavated area.
 Provided Hard barrication,if the
Excavated area’s depth is more
than 1.5mtr.
 Provided warning signage &
caution board near Excavation
area.

Excavation &
Backfilling.  Ground water  De-watering continuously if
spillage. water spillage found on
Excavated area.

 Soil collapse.  Applied shoring process and


use safety net if the soil in
collapsible condition.
 Don’t kept the loose soil from
1mtr of the excavation area.

 Overhead  Operator & Signalman should


High voltage be briefed about overhead high
Transmission voltage Transmission line if any
line. at working area.

[Type text]
Client Representative safety Representative of client working agency safety Representative of working agency
RVPR CONSTRUCTION PVT LTD
 Equipment  Do not overload on the vehicle.
Toppling.  Do not allowed the
unauthorized person to
operate the vehicle.
 Checking the condition of Tools
Excavation & & Tackles before starting the
Backfilling work.
 Always provided a well trained
signalman / flagman on the
 Struck by. vehicle.
 Reverse Horn and back
indicator should be in working
condition.
 Do not comes under the
circumstances of Excavator’s
swing area.
 Always maintain a safe distance
of 3-5mtr from Excavator’s
swing area.

 Do not drive above 20km/hr at


site.
 Road
accident.  Followed all Traffic rules during
driving the vehicle.

[Type text]