THIS DOCUMENT AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO PRODUCTION IN THE WHOLE SHALL BE MADE WITHOUT THE PRIOR WRITTEN CONSENT OF THE OWNER.
ISSUED FOR APPROVAL
25-00053-0006
JOB/EWO
PACKAGE # 4, 5 & 6
MARITIME YARD PROJECT (MYP)
REV NO
DISC. ENG'R.
SSI
DATE 16-JUL-19
DATASHEET – POTABLE WATER BREAK TANK - PACKAGE 6
PROJ. ENG'R.
DATE 16-JUL-19
FS
ISSUED FOR REVIEW
CONST. AGENCY
SEPCO
DATE 16-JUL-19
OPERATIONS
IMI
DATE 16-JUL-19
REVIEWED BY:
_______________
DATE__________
APPROVED BY:
_______________
DATE__________
_____________
VERIFICATION
CONTROL
NUMBER
DATE:
EDSD
THIS INDICATES THAT REV. NO. B
OF THIS DOCUMENT IS COVERED,
CERTIFICATION REQUIREMENTS,
(DOC.) NO.25-00053-0006-333
REVISION CERTIFICATION
DOCUMENT COMPLETION
MECHANICAL DATASHEET DOC/DWG. TYPE PLANT NO. INDEX DOC/DWG No. SHT. No. REV. NO.
FOR ALL APPROVAL /
IMI
IMI
B
HOLD REGISTER
AAQ
AAQ
CERT
UFA
UFA
ENG
SSI
JD
THIS DOCUMENT AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO PRODUCTION IN THE WHOLE SHALL BE MADE WITHOUT THE PRIOR WRITTEN CONSENT OF THE OWNER.
ISSUED FOR APPROVAL
25-00053-0006
25-00053-0006
JOB/EWO
REV NO
DISC. ENG'R.
SSI
DATE 16-JUL-19
PROJ. ENG'R.
FS
DATE 16-JUL-19
CONST. AGENCY
SEPCO
DATE 16-JUL-19
OPERATIONS
IMI
DATE 16-JUL-19
REVIEWED BY:
_______________
DATE__________
APPROVED BY:
_______________
DATE__________
_____________
VERIFICATION
CONTROL
NUMBER
DATE:
EDSD
CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.
(DOC.) NO.25-00053-0006-333
REVISION CERTIFICATION
DOCUMENT COMPLETION
MECHANICAL DATASHEET DOC/DWG. TYPE PLANT NO. INDEX DOC/DWG No. SHT. No. REV. NO.
FOR ALL APPROVAL /
IMI
API STD 650 STORAGE TANK DATA SHEET
* For boxes marked with *, if blank, Mfr. shall determine and submit data.
AAQ
AAQ
PMT
THIS DOCUMENT AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO PRODUCTION IN THE WHOLE SHALL BE MADE WITHOUT THE PRIOR WRITTEN CONSENT OF THE OWNER.
Measurement Units to be used in API Std 650: SI ¢ US Customary £
B
CERT
UFA
UFA
SSI
JD
25-00053-0006
JOB/EWO
5. Products Stored:
Liquid Potable Water Design Specific Gravity.: 1 at 20-35 °C
REV NO
DISC. ENG'R. % Aromatic - Suppl. Spec. - H2S Service? Yes £ No ¢ Suppl. Spec. -
Other Special Service Conditions? Yes £ No £ Suppl. Spec. -
SSI
DATE 16-JUL-19
DESIGN AND TESTING Purchaser to Review Design Prior to Ordering Material? Yes ¢ No £
PROJ. ENG'R.
6. Applicable API A £ B ¢ C £ D £ E ¢ F £ G £ H £ I ¢ J £ L £ M £ O £ P ¢ S £ U ¢ V ¢ W £
Standard 650 Appendices:*
FS
DATE 16-JUL-19 7. Max. Design. Temp. 85 °C Min. Design Metal Temp.* 2 °C Design Liquid Level* 13368 mm
Design Internal Pressure Atm+Liquid Ht. Design External Pressure - kPa Internal Pressure Combination Factor -
CONST. AGENCY External Pressure Combination Factor - Maximum Fill Rate m3/hr Maximum Emptying Rate m3/hr
Flotation Considerations? Yes £ No ¢ Flot. Suppl. Spec:* N.A. Applied Supplemental Load Spec. N.A.
SEPCO
DATE 16-JUL-19 8. Seismic Design? Yes ¢ No £ Annex E ¢ Alternate Seismic Criteria - Seismic Use Group SUG III
MBE Site Class D Vertical Seismic Design? Yes £ No Vertical Ground Motion Accelerator Av:
OPERATIONS Basis of Lateral Acceleration (Select one): ¢ Mapped Seismic Parameters? Ss 0.091g S1 0.032g S0 ; £ Site-Specific Procedures?: MCE
Design Required? Yes ¢ No £ ; £ Other (Non-ASCE) Methods
IMI ¢ Freeboard Required for SUG Design
DATE 16-JUL-19
9. Wind Velocity for non-U.S. sites, 50-yr wind speed (3-sec Gust)* 183.6 kph (ASCE 7-10)
REVIEWED BY: Top Wind Girder Style* VTA Dimensions* mm Use Top Wind Girder as Walkway? Yes £ No ¢
Intermediate Wind Girders?* Yes £ No £ Intermediate Wind Girder Style* VTA Dimensions* mm
_______________ Check Buckling in Corroded Cond.? Yes ¢ No £
DATE__________
10. Shell Design: 1-Ft Mthd?* ¢ Variable-Des-Pt Mthd?* £ ; Elastic Anal. Mthd?* Yes £ No ¢ Alternate £
APPROVED BY: Plate Stacking Criteria* Centerline-Stacked? Yes £ No ¢ ; Flush-Stacked? Inside ¢ Outside £
Plate Widths (Shell course heights) as shown below: ; Course Thicknesses? Minimum Required as Below (VTA)
_______________ 1 14Thk. X 2000 2 12Thk. X 2000 3 11Thk. X 2000 4 9Thk. X 2000 5 8Thk. X 2000
DATE__________ 6 6Thk. X 2000 7 6Thk. X 2000 8 9 10
11 12 13 14 15
_____________
VERIFICATION
CONTROL
NUMBER
DATE:
EDSD
Joint Efficiency* 100 % Shell-to-Bottom Weld Type* VTA Shell-to-Bottom Weld Insp Mthd* VTA
BY:
Exceptions to Seal-welded Attachments (see Section 5.1.3.7): Wind girder -intermittent weld
CERTIFICATION REQUIREMENTS, BY
THIS INDICATES THAT REV. NO. B
OF THIS DOCUMENT IS COVERED,
MECHANICAL DATASHEET DWG. TYPE PLANT NO. INDEX DOCUMENT NO. SHT. NO. REV. NO.
(DOC.) NO.25-00053-0006-333
REVISION CERTIFICATION
DOCUMENT COMPLETION
DAT 3
FOR ALL APPROVAL /
OF
KING SALMAN INTERNATIONAL COMPLEX FOR MARITIME INDUSTRIES AND SERVICES
RAS AL-KHAIR SAUDI ARABIA JO: 25-00053-0006 8
ARAMCO OVERSEAS COMPANY
OPRNS
IMI
IMI
API STD 650 STORAGE TANK DATA SHEET
* If box is blank, Manufacturer shall determine and submit data.
AAQ
AAQ
PMT
THIS DOCUMENT AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO PRODUCTION IN THE WHOLE SHALL BE MADE WITHOUT THE PRIOR WRITTEN CONSENT OF THE OWNER.
Fixed Roof Type* SUPPORTED CONE ROOF Roof Support Columns*: Pipe £ Or Structural Shape ¢ VTA
Cone Slope* 1:6 Dome or Umbrella Radius* N.A. Weld Joints* VTA
CERT
UFA
UFA
SSI
JD
Thickness* 7 mm Snow Load * N.A. App.Suppl. Load Spec.* N.A. Column Lateral Load -
Normal Venting Devices* VTA Emergency Venting Devices* VTA
Free Vents in Areas Where Snow and Ice May Block Vent* N.A.
ISSUED FOR APPROVAL
For Non-Frangible Roofs: Seal Weld Roof Plates to Top Angle on the Inside? Yes £ No £ ; Weld rafters to Roof Plates Yes £ No £
DESCRIPTION
Roof-to-Shell Detail* VTA Radial Projection of Horizontal Component of Top Angle* Inward £ Outward ¢
12. Bottom: Thickness* 9 mm Style* CONE UP Slope* 1:120 Weld Joint Type* LAP
Provide Drip Ring? Yes ¢ No £ Alternate Spec. -
Annular Ring? Yes ¢ No £ Annular Ring: Minimum Radial Width* 700 mm Thickness* 9 mm
25-00053-0006
25-00053-0006
JOB/EWO
Ring Forces: Weight of Shell + Roof New* Corroded* Roof Live Load* Internal Pressure*
Partial Vacuum* Wind* Seismic* Hydrotest Exemption design per 7.3.6, Item 2) a)
DISC. ENG'R. Bottom Forces: Floor Wt. New* Corroded* Product Wt.* Water Wt.* Internal Pressure*
Partial Vacuum* Other Foundation Loads* Min. Projection of Fdn. Above Grade:
SSI
DATE 16-JUL-19 14. Exemption from hydrotest? Yes £ No ¢ Responsibility of Providing Hydrotest Water: By Purchaser £ By Manufacturer ¢
Hydro-Test Fill Height* FULL m Settlement Measurements Required? Yes ¢ No £ Extended Duration of Hydro-Test
CONST. AGENCY
REVIEWED BY: Specify Additional Tolerances, if any, and Circumferential and Vertical Measurement Locations:
• Allowable Plumbness: Measure and Record at a Minimum of Locations or Every ft around the Tank, at
_______________ the Following Shell Heights: (select one box): £ 1/3 H, 2/3 H, and H £ Top of Each Shell Course £ Other:
DATE__________ • Allowable Roundness: ** Measure Radius and Record at a Minimum of Locations or Every m
around the Tank, at the Following Shell Heights (select one box):
APPROVED BY: £ Top of Tank, H £ 1/3 H, 2/3 H, and H £ Top of Each Shell Course £ Other:
_______________ **See Data Sheet Instructions for the Maximum Allowable Additional Radial Tolerance.
DATE__________
_____________
VERIFICATION
CONTROL
NUMBER
DATE:
EDSD
CERTIFICATION REQUIREMENTS, BY
THIS INDICATES THAT REV. NO. B
OF THIS DOCUMENT IS COVERED,
MECHANICAL DATASHEET DWG. TYPE PLANT NO. INDEX DOCUMENT NO. SHT. NO. REV. NO.
(DOC.) NO.25-00053-0006-333
REVISION CERTIFICATION
DOCUMENT COMPLETION
DAT 4
FOR ALL APPROVAL /
IMI
IMI
API STD 650 STORAGE TANK DATA SHEET
* If box is blank, Manufacturer shall determine and submit data.
THIS DOCUMENT AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO PRODUCTION IN THE WHOLE SHALL BE MADE WITHOUT THE PRIOR WRITTEN CONSENT OF THE OWNER.
PMT
AAQ
AAQ
16. Coatings: B
UFA
UFA
SSI
JD
17. Cathodic Protection System? Yes ¢ No £ Per Spec.* Sacrificial Cathodic Protection With Anode Monitoring System (AA-036388)
DESCRIPTION
25-00053-0006
JOB/EWO
20. Tank Measurement System: Required? Yes £ No £ Remote Capability Required? Yes £ No £
By:* Per Spec.*
21. Weight of Tank: Full of Water* 4968500 kg Empty* 127500 kg Shipping* 127500 kg Brace/Lift Spec.* -
REV NO
DISC. ENG'R.
SSI
CONST. AGENCY 4) Refer Saudi Aramco drawing AB-036003 for manways and vent.
5) Material certification for all pressure parts and its attachments shall be to EN 10204 Type 3.1 and for non pressure part EN 10204 Type 2.2.
SEPCO 6) Nozzle sizes and quantity to be finalised/ confirmed during detailed engineering.
DATE 16-JUL-19 7) Spare nozzles and manways shall be provided with blind flanges by tank vendor.
8) Goose neck vent with bird screen to be provided by Vendor as per Saudi Aramco Specification and with corrosion resistant material.
OPERATIONS 9) Nozzle orientation shall be provided to tank Vendor later once the piping is finalized.
10) Refer P&ID No. RA-636402 (Sheet 1).
IMI 11) Nozzle N5 Outlet to FW System shall be provided with vortex breaker.
DATE 16-JUL-19 12) All provided thickness are minimum required and hence Vendor to recalculate and provide thicknesses and weights as per actual design.
13) Foundation design is by others (i.e. SEPCO). Equipment load data for foundation design, foundation foot print along with anchoring details
DATE:
DFT, Total DFT 385 microns (minimum) to be suitable for long term service in a marine environment.
EDSD
Base: Tank bottom underside shall be applied with 1 coat of black bitumen paint.
17) The nozzle flange which connect to GRP line connection shall be Flat Face (FF) type, and requirement shall be updated during detail design.
CERTIFICATION REQUIREMENTS, BY
THIS INDICATES THAT REV. NO. B
OF THIS DOCUMENT IS COVERED,
(DOC.) NO.25-00053-0006-333
REVISION CERTIFICATION
DOCUMENT COMPLETION
MECHANICAL DATASHEET DWG. TYPE PLANT NO. INDEX DOCUMENT NO. SHT. NO. REV. NO.
FOR ALL APPROVAL /
IMI
IMI
API STD 650 STORAGE TANK DATA SHEET
* If box is blank, Manufacturer shall determine and submit as per Annex L.
AAQ
AAQ
PMT
THIS DOCUMENT AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO PRODUCTION IN THE WHOLE SHALL BE MADE WITHOUT THE PRIOR WRITTEN CONSENT OF THE OWNER.
Component Material*/Thickness* C.A. Component Material*/Thickness* C.A.
CERT
UFA
UFA
Shell, Course 1 to 7 ASTM A283 Gr.C 3 mm Reinforcing Pads ASTM A283 Gr.C 3 mm
Roof ASTM A283 Gr.C 1.5 mm Manhole/Nozzle Necks ASTM A106 Gr. B 3 mm
Roof Structure ASTM A36 1.5 mm Manhole/Nozzle Flanges ASTM A 105 3 mm
ENG
SSI
JD
Earthing Lugs ASTM A283 Gr.C 3 mm Wetted Structurals ASTM A283 Gr.C 3 mm
DESCRIPTION
25-00053-0006
JOB/EWO
Component Head Type* Bolt or Anchor Material* Nut Material* Thread Series* C.A.
Flange Bolting ASTM A 193 Gr. B7 ASTM A 194 Gr. 2H Zero
Structural Bolting ASTM A325 ASTM A325 3 mm
Anchor Bolts ASTM F1554 SA 36 3 mm
REV NO
DISC. ENG'R.
Table 3 NOZZLE and MANHOLE SCHEDULE* (for Fixed Roof, Shell, and Bottom)(NOTE-6)
SSI Full Gasket
Pen. Bearing
DATE 16-JUL-19
Size, Neck Sch On Surf. Gasket Gasket Proj. to FF
NPS, or or Wall Reinf. Plate Open. Flange Type Flange Class Dimen. and Thick. and Mat’l. and or CL or from
Mark Service Dia. (In.) Thick. Dimensions (Y/N) (Note-17) or Thick. Finish Dimen. Descript. Datum Lines
PROJ. ENG'R. N1 INLET (from Royal Comm.) 14" Sch. 60 WNRF 150#
N2 LT (Float Type) 1" Sch. XXS WNRF 150#
FS N3 LIT (Radar Type) 2" Sch. 160 WNRF 150#
DATE 16-JUL-19 N4 DRAIN 2" Sch. 160 WNRF 150#
N5 OUTLET (to FW System) 10" Sch. 80 WNRF 150#
REVIEWED BY: MW 2 ROOF MANWAY 24" API 650 API 650 API 650
_______________
DATE__________
APPROVED BY:
_______________
DATE__________
_____________
VERIFICATION
CONTROL
NUMBER
DATE:
EDSD
CERTIFICATION REQUIREMENTS, BY
THIS INDICATES THAT REV. NO. B
OF THIS DOCUMENT IS COVERED,
(DOC.) NO.25-00053-0006-333
REVISION CERTIFICATION
DOCUMENT COMPLETION
MECHANICAL DATASHEET DWG. TYPE PLANT NO. INDEX DOCUMENT NO. SHT. NO. REV. NO.
FOR ALL APPROVAL /
IMI
IMI
API STD 650 STORAGE TANK DATA SHEET
* If box is blank, Manufacturer shall determine and submit data.
AAQ
AAQ
PMT
THIS DOCUMENT AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO PRODUCTION IN THE WHOLE SHALL BE MADE WITHOUT THE PRIOR WRITTEN CONSENT OF THE OWNER.
24. Platform, Stairway, and Railing: Galvanizing Req’d?* Yes ¢ No £ Stairway Style* Helical Walk Surf. Type* -
(Straight or Helical)
CERT
UFA
UFA
SSI
JD
25-00053-0006
JOB/EWO
29. Various Other Items: Welded Flush-Type: Shell Connection £ Cleanout Fitting £ Waive Application of Annex P? Yes £ No ¢
Miscellany #1 Miscellany #2
DATE 16-JUL-19
FS
DATE 16-JUL-19
CONST. AGENCY
SEPCO
DATE 16-JUL-19
OPERATIONS
IMI
DATE 16-JUL-19
REVIEWED BY:
_______________
DATE__________
APPROVED BY:
_______________
DATE__________
_____________
VERIFICATION
CONTROL
NUMBER
DATE:
EDSD
CERTIFICATION REQUIREMENTS, BY
THIS INDICATES THAT REV. NO. B
OF THIS DOCUMENT IS COVERED,
MECHANICAL DATASHEET DWG. TYPE PLANT NO. INDEX DOCUMENT NO. SHT. NO. REV. NO.
(DOC.) NO.25-00053-0006-333
REVISION CERTIFICATION
DOCUMENT COMPLETION
DAT 7
FOR ALL APPROVAL /
IMI
IMI
API STD 650 STORAGE TANK DATA SHEET
TANK SKETCH
AAQ
AAQ
PMT
THIS DOCUMENT AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO PRODUCTION IN THE WHOLE SHALL BE MADE WITHOUT THE PRIOR WRITTEN CONSENT OF THE OWNER.
CERT
B
UFA
UFA
N9
ENG
SSI
JD
N11 N8
DESCRIPTION
N11 C
N11 MW2
B
A
(Note-15)
25-00053-0006
25-00053-0006
N7
JOB/EWO
N1 HHLL = 13368 mm
HLL = 13268 mm
LLL = 4769 mm
N2 LLLL = 4669 mm
REV NO
SSI
14m Ht
DATE 16-JUL-19
N6
PROJ. ENG'R.
N3
FS
CONST. AGENCY
N4
1:120 SLOPE
SEPCO
DATE 16-JUL-19
VORTEX BREAKER
OPERATIONS
IMI
DATE 16-JUL-19
REVIEWED BY:
_______________
DATE__________
APPROVED BY:
_______________
DATE__________
_____________
VERIFICATION
CONTROL
NUMBER
DATE:
EDSD
CERTIFICATION REQUIREMENTS, BY
THIS INDICATES THAT REV. NO. B
OF THIS DOCUMENT IS COVERED,
MECHANICAL DATASHEET DWG. TYPE PLANT NO. INDEX DOCUMENT NO. SHT. NO. REV. NO.
(DOC.) NO.25-00053-0006-333
REVISION CERTIFICATION
DOCUMENT COMPLETION
DAT 8
FOR ALL APPROVAL /