Sei sulla pagina 1di 8

OPRNS ARAMCO OVERSEAS COMPANY

IMI

IMI
B
PMT

AAQ

AAQ
CERT

UFA

UFA
ENG

SSI
JD

THIS DOCUMENT AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO PRODUCTION IN THE WHOLE SHALL BE MADE WITHOUT THE PRIOR WRITTEN CONSENT OF THE OWNER.
ISSUED FOR APPROVAL

ISSUED FOR REVIEW


DESCRIPTION

KING SALMAN INTERNATIONAL COMPLEX FOR MARITIME


INDUSTRIES AND SERVICES
25-00053-0006

25-00053-0006
JOB/EWO

PACKAGE # 4, 5 & 6
MARITIME YARD PROJECT (MYP)
REV NO

Contract No: 6600042822 (OOK)


A

DISC. ENG'R.

SSI
DATE 16-JUL-19
DATASHEET – POTABLE WATER BREAK TANK - PACKAGE 6
PROJ. ENG'R.

DATE 16-JUL-19
FS
ISSUED FOR REVIEW
CONST. AGENCY

SEPCO
DATE 16-JUL-19

OPERATIONS

IMI
DATE 16-JUL-19

REVIEWED BY:

_______________
DATE__________

APPROVED BY:

_______________
DATE__________
_____________
VERIFICATION
CONTROL
NUMBER

DATE:
EDSD
THIS INDICATES THAT REV. NO. B
OF THIS DOCUMENT IS COVERED,

CERTIFICATION REQUIREMENTS,

(DOC.) NO.25-00053-0006-333
REVISION CERTIFICATION

DOCUMENT COMPLETION

MECHANICAL DATASHEET DOC/DWG. TYPE PLANT NO. INDEX DOC/DWG No. SHT. No. REV. NO.
FOR ALL APPROVAL /

DATASHEET – POTABLE WATER BREAK TANK - PKG. 6 DAT 1


963 D RE-622617
CERTIFICATE

KING SALMAN INTERNATIONAL COMPLEX FOR MARITIME INDUSTRIES AND SERVICES OF B


RAS AL-KHAIR SAUDI ARABIA JO: 25-00053-0006 8
BY

Form No. SEPCO-MYP-DC-TMP-0011 Rev. 2


ARAMCO OVERSEAS COMPANY
OPRNS

IMI

IMI
B

HOLD REGISTER

ID Description Section Required Actions Target Closing Code


PMT

AAQ

AAQ
CERT

UFA

UFA
ENG

SSI
JD

THIS DOCUMENT AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO PRODUCTION IN THE WHOLE SHALL BE MADE WITHOUT THE PRIOR WRITTEN CONSENT OF THE OWNER.
ISSUED FOR APPROVAL

ISSUED FOR REVIEW


DESCRIPTION

25-00053-0006

25-00053-0006
JOB/EWO
REV NO

DISC. ENG'R.

SSI
DATE 16-JUL-19

PROJ. ENG'R.

FS
DATE 16-JUL-19

CONST. AGENCY

SEPCO
DATE 16-JUL-19

OPERATIONS

IMI
DATE 16-JUL-19

REVIEWED BY:

_______________
DATE__________

APPROVED BY:

_______________
DATE__________
_____________
VERIFICATION
CONTROL
NUMBER

DATE:
EDSD

OF THIS DOCUMENT IS COVERED,

CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.

(DOC.) NO.25-00053-0006-333
REVISION CERTIFICATION

DOCUMENT COMPLETION

MECHANICAL DATASHEET DOC/DWG. TYPE PLANT NO. INDEX DOC/DWG No. SHT. No. REV. NO.
FOR ALL APPROVAL /

DATASHEET – POTABLE WATER BREAK TANK - PKG. 6 DAT 2


963 D RE-622617
CERTIFICATE

KING SALMAN INTERNATIONAL COMPLEX FOR MARITIME INDUSTRIES AND SERVICES OF B


RAS AL-KHAIR SAUDI ARABIA JO: 25-00053-0006 8
BY
B

Form No. SEPCO-MYP-DC-TMP-0011 Rev. 2


OPRNS
ARAMCO OVERSEAS COMPANY
IMI

IMI
API STD 650 STORAGE TANK DATA SHEET
* For boxes marked with *, if blank, Mfr. shall determine and submit data.
AAQ

AAQ
PMT

GENERAL Special Documentation Package Requirements:

THIS DOCUMENT AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO PRODUCTION IN THE WHOLE SHALL BE MADE WITHOUT THE PRIOR WRITTEN CONSENT OF THE OWNER.
Measurement Units to be used in API Std 650: SI ¢ US Customary £
B
CERT

UFA

UFA

1. Manufacturer* Contract No.*


Address*
Mfg. Serial No.* Year Built* Edition & Addendum to API 650* API 650 12th Edition, ADD 2
ENG

SSI
JD

2. Purchaser Contract No.


Address
ISSUED FOR APPROVAL

ISSUED FOR REVIEW

Tank Designation 963-D-6400 A/B/C Potable Water Storage Tanks


DESCRIPTION

3. Owner/Operator ARAMCO OVERSEAS COMPANY Location

4. Size Limitations* - Tank Diameter* 21 m Shell Height* 14 m


Capacity: Maximum* 4846 m3 Net Working* 4000 m3 Criteria:* -
25-00053-0006

25-00053-0006
JOB/EWO

5. Products Stored:
Liquid Potable Water Design Specific Gravity.: 1 at 20-35 °C
REV NO

Minimum Design Specific Gravity - at - °C


Blanketing Gas N.A. Vapor Pressure N.A. kPa at Max. Operating Temp.

DISC. ENG'R. % Aromatic - Suppl. Spec. - H2S Service? Yes £ No ¢ Suppl. Spec. -
Other Special Service Conditions? Yes £ No £ Suppl. Spec. -
SSI

DATE 16-JUL-19

DESIGN AND TESTING Purchaser to Review Design Prior to Ordering Material? Yes ¢ No £

PROJ. ENG'R.

6. Applicable API A £ B ¢ C £ D £ E ¢ F £ G £ H £ I ¢ J £ L £ M £ O £ P ¢ S £ U ¢ V ¢ W £
Standard 650 Appendices:*
FS

DATE 16-JUL-19 7. Max. Design. Temp. 85 °C Min. Design Metal Temp.* 2 °C Design Liquid Level* 13368 mm
Design Internal Pressure Atm+Liquid Ht. Design External Pressure - kPa Internal Pressure Combination Factor -

CONST. AGENCY External Pressure Combination Factor - Maximum Fill Rate m3/hr Maximum Emptying Rate m3/hr

Flotation Considerations? Yes £ No ¢ Flot. Suppl. Spec:* N.A. Applied Supplemental Load Spec. N.A.
SEPCO

DATE 16-JUL-19 8. Seismic Design? Yes ¢ No £ Annex E ¢ Alternate Seismic Criteria - Seismic Use Group SUG III
MBE Site Class D Vertical Seismic Design? Yes £ No Vertical Ground Motion Accelerator Av:

OPERATIONS Basis of Lateral Acceleration (Select one): ¢ Mapped Seismic Parameters? Ss 0.091g S1 0.032g S0 ; £ Site-Specific Procedures?: MCE
Design Required? Yes ¢ No £ ; £ Other (Non-ASCE) Methods
IMI ¢ Freeboard Required for SUG Design
DATE 16-JUL-19

9. Wind Velocity for non-U.S. sites, 50-yr wind speed (3-sec Gust)* 183.6 kph (ASCE 7-10)

REVIEWED BY: Top Wind Girder Style* VTA Dimensions* mm Use Top Wind Girder as Walkway? Yes £ No ¢
Intermediate Wind Girders?* Yes £ No £ Intermediate Wind Girder Style* VTA Dimensions* mm
_______________ Check Buckling in Corroded Cond.? Yes ¢ No £
DATE__________

10. Shell Design: 1-Ft Mthd?* ¢ Variable-Des-Pt Mthd?* £ ; Elastic Anal. Mthd?* Yes £ No ¢ Alternate £

APPROVED BY: Plate Stacking Criteria* Centerline-Stacked? Yes £ No ¢ ; Flush-Stacked? Inside ¢ Outside £
Plate Widths (Shell course heights) as shown below: ; Course Thicknesses? Minimum Required as Below (VTA)
_______________ 1 14Thk. X 2000 2 12Thk. X 2000 3 11Thk. X 2000 4 9Thk. X 2000 5 8Thk. X 2000
DATE__________ 6 6Thk. X 2000 7 6Thk. X 2000 8 9 10
11 12 13 14 15
_____________
VERIFICATION
CONTROL
NUMBER

DATE:
EDSD

Joint Efficiency* 100 % Shell-to-Bottom Weld Type* VTA Shell-to-Bottom Weld Insp Mthd* VTA
BY:

Exceptions to Seal-welded Attachments (see Section 5.1.3.7): Wind girder -intermittent weld
CERTIFICATION REQUIREMENTS, BY
THIS INDICATES THAT REV. NO. B
OF THIS DOCUMENT IS COVERED,

MECHANICAL DATASHEET DWG. TYPE PLANT NO. INDEX DOCUMENT NO. SHT. NO. REV. NO.
(DOC.) NO.25-00053-0006-333
REVISION CERTIFICATION

DOCUMENT COMPLETION

DAT 3
FOR ALL APPROVAL /

DATASHEET – POTABLE WATER BREAK TANK - PKG. 6


963 D RE-622617
B
CERTIFICATE

OF
KING SALMAN INTERNATIONAL COMPLEX FOR MARITIME INDUSTRIES AND SERVICES
RAS AL-KHAIR SAUDI ARABIA JO: 25-00053-0006 8
ARAMCO OVERSEAS COMPANY
OPRNS

IMI

IMI
API STD 650 STORAGE TANK DATA SHEET
* If box is blank, Manufacturer shall determine and submit data.
AAQ

AAQ
PMT

11. Open-Top and Fixed Roofs: Open Top? Yes £ No ¢


B

THIS DOCUMENT AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO PRODUCTION IN THE WHOLE SHALL BE MADE WITHOUT THE PRIOR WRITTEN CONSENT OF THE OWNER.
Fixed Roof Type* SUPPORTED CONE ROOF Roof Support Columns*: Pipe £ Or Structural Shape ¢ VTA
Cone Slope* 1:6 Dome or Umbrella Radius* N.A. Weld Joints* VTA
CERT

UFA

UFA

(Lap, Butt, Other)


Seal Weld Underside of: Lap-Joints? Yes £ No £ ; Seal Weld Underside of Wind Girder Joints? Yes £ No £
Gas-tight? Yes £ No ¢ Joint Efficiency* VTA %
ENG

SSI
JD

Thickness* 7 mm Snow Load * N.A. App.Suppl. Load Spec.* N.A. Column Lateral Load -
Normal Venting Devices* VTA Emergency Venting Devices* VTA
Free Vents in Areas Where Snow and Ice May Block Vent* N.A.
ISSUED FOR APPROVAL

ISSUED FOR REVIEW

For Non-Frangible Roofs: Seal Weld Roof Plates to Top Angle on the Inside? Yes £ No £ ; Weld rafters to Roof Plates Yes £ No £
DESCRIPTION

Roof-to-Shell Detail* VTA Radial Projection of Horizontal Component of Top Angle* Inward £ Outward ¢

12. Bottom: Thickness* 9 mm Style* CONE UP Slope* 1:120 Weld Joint Type* LAP
Provide Drip Ring? Yes ¢ No £ Alternate Spec. -
Annular Ring? Yes ¢ No £ Annular Ring: Minimum Radial Width* 700 mm Thickness* 9 mm
25-00053-0006

25-00053-0006
JOB/EWO

13. Foundation: Furnished by* OTHER Type* RING WALL


Soil Allow. Bearing Pressure* Per Spec.* Anchors: Size* VTA Qty* VTA
Foundation Design Loads: Base Shear Force: Wind* Seismic* Overturning Moment: Wind* Seismic*
REV NO

Ring Forces: Weight of Shell + Roof New* Corroded* Roof Live Load* Internal Pressure*
Partial Vacuum* Wind* Seismic* Hydrotest Exemption design per 7.3.6, Item 2) a)

DISC. ENG'R. Bottom Forces: Floor Wt. New* Corroded* Product Wt.* Water Wt.* Internal Pressure*
Partial Vacuum* Other Foundation Loads* Min. Projection of Fdn. Above Grade:
SSI

DATE 16-JUL-19 14. Exemption from hydrotest? Yes £ No ¢ Responsibility of Providing Hydrotest Water: By Purchaser £ By Manufacturer ¢
Hydro-Test Fill Height* FULL m Settlement Measurements Required? Yes ¢ No £ Extended Duration of Hydro-Test

PROJ. ENG'R. £ Predicted Settlement Profile is Attached


Responsibility for Setting Water Quality: Purchaser £ Manufacturer ¢ Supplemental Test Water Quality Spec.
FS Test Water Source & Disposal Tie-In Locations Hydro-Test Annex J Tank? Yes £ No ¢
DATE 16-JUL-19 Post-Pressure-Test Activities Required of the Manufacturer Broom Clean £ Potable Water Rinse £ Dry Interior £
Other £

CONST. AGENCY

15. Inspection by in Shop; in Field


SEPCO Supplemental NDE Responsibility Supplemental NDE Spec.
(Purch., Mfg., Other)
DATE 16-JUL-19

Positive Material Identification? Yes £ No ¢ PMI Requirements: -

OPERATIONS Max. Plate Thickness for Shearing


Must Welds not exceeding 1/4 in Be Multi-Pass? Yes £ No ¢ Must Welds greater than 1/4 in. Be Multi-Pass? Yes ¢ No £
IMI Leak Test Mthd: Roof* Visual Only Shell* Hydrotest Shell Noz./Manhole Reinf. Plt.* Pneumatic Test
DATE 16-JUL-19 Bottom* Vacuum Test
Modify or Waive API Dimensional Tolerances (see 7.5)? Yes £ No ¢ Specify:

REVIEWED BY: Specify Additional Tolerances, if any, and Circumferential and Vertical Measurement Locations:
• Allowable Plumbness: Measure and Record at a Minimum of Locations or Every ft around the Tank, at
_______________ the Following Shell Heights: (select one box): £ 1/3 H, 2/3 H, and H £ Top of Each Shell Course £ Other:
DATE__________ • Allowable Roundness: ** Measure Radius and Record at a Minimum of Locations or Every m
around the Tank, at the Following Shell Heights (select one box):

APPROVED BY: £ Top of Tank, H £ 1/3 H, 2/3 H, and H £ Top of Each Shell Course £ Other:

_______________ **See Data Sheet Instructions for the Maximum Allowable Additional Radial Tolerance.
DATE__________
_____________
VERIFICATION
CONTROL
NUMBER

DATE:
EDSD

CERTIFICATION REQUIREMENTS, BY
THIS INDICATES THAT REV. NO. B
OF THIS DOCUMENT IS COVERED,

MECHANICAL DATASHEET DWG. TYPE PLANT NO. INDEX DOCUMENT NO. SHT. NO. REV. NO.
(DOC.) NO.25-00053-0006-333
REVISION CERTIFICATION

DOCUMENT COMPLETION

DAT 4
FOR ALL APPROVAL /

DATASHEET – POTABLE WATER BREAK TANK - PKG. 6


963 D RE-622617
B
CERTIFICATE

KING SALMAN INTERNATIONAL COMPLEX FOR MARITIME INDUSTRIES AND SERVICES


OF
RAS AL-KHAIR SAUDI ARABIA JO: 25-00053-0006 8
ARAMCO OVERSEAS COMPANY
OPRNS

IMI

IMI
API STD 650 STORAGE TANK DATA SHEET
* If box is blank, Manufacturer shall determine and submit data.

THIS DOCUMENT AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO PRODUCTION IN THE WHOLE SHALL BE MADE WITHOUT THE PRIOR WRITTEN CONSENT OF THE OWNER.
PMT

AAQ

AAQ

16. Coatings: B

Internal Coatings by: Manufacturer Per Spec.* VTA (Note-16)


CERT

UFA

UFA

External Coating by: Manufacturer Per Spec.* VTA (Note-16)


ENG

SSI
JD

Under-Bottom Coating by: Manufacturer Per Spec.* VTA (Note-16)


ISSUED FOR APPROVAL

ISSUED FOR REVIEW

17. Cathodic Protection System? Yes ¢ No £ Per Spec.* Sacrificial Cathodic Protection With Anode Monitoring System (AA-036388)
DESCRIPTION

18. Leak Detection System? Yes £ No ¢ Per Spec.*

19. Release Prevention Barrier? Yes £ No £ Per Spec.*


25-00053-0006

25-00053-0006
JOB/EWO

20. Tank Measurement System: Required? Yes £ No £ Remote Capability Required? Yes £ No £
By:* Per Spec.*

21. Weight of Tank: Full of Water* 4968500 kg Empty* 127500 kg Shipping* 127500 kg Brace/Lift Spec.* -
REV NO

(Note-12) (Note-12) (Note-12)


A

22. References*: API Std 650, Annex L

DISC. ENG'R.

SSI

DATE 16-JUL-19 23. Notes*:


1) Meteorological and seismic design data shall be as per Basis of Design - Onshore Civil & Structural Works (Doc. No. RE-614002) and

PROJ. ENG'R. Basis of Design of Building & structure (RE-612001):

- For wind load, Importance factor=1.15


FS - For seismic load, Importance factor=1.5
DATE 16-JUL-19 2) Tanks shall be designed and fabricated in accordance with API 650 12th Edition, ADD 2 (alternatively, BS EN 14015 is also acceptable).
3) Though the tank diameter is less than 36m, allowable loads on tank openings shall be considered as per Annex. P of API 650.

CONST. AGENCY 4) Refer Saudi Aramco drawing AB-036003 for manways and vent.
5) Material certification for all pressure parts and its attachments shall be to EN 10204 Type 3.1 and for non pressure part EN 10204 Type 2.2.
SEPCO 6) Nozzle sizes and quantity to be finalised/ confirmed during detailed engineering.
DATE 16-JUL-19 7) Spare nozzles and manways shall be provided with blind flanges by tank vendor.
8) Goose neck vent with bird screen to be provided by Vendor as per Saudi Aramco Specification and with corrosion resistant material.

OPERATIONS 9) Nozzle orientation shall be provided to tank Vendor later once the piping is finalized.
10) Refer P&ID No. RA-636402 (Sheet 1).
IMI 11) Nozzle N5 Outlet to FW System shall be provided with vortex breaker.
DATE 16-JUL-19 12) All provided thickness are minimum required and hence Vendor to recalculate and provide thicknesses and weights as per actual design.
13) Foundation design is by others (i.e. SEPCO). Equipment load data for foundation design, foundation foot print along with anchoring details

REVIEWED BY: to the foundation and anchor bolts to be provided by Vendor.


14) Each potable water tank is provided with 514m3 fire water reserve including 10% free board fire water.
_______________ 15) All elevations are on hold and shall be finalized during detail design.
DATE__________ 16) The paint systems and total dry film thickness (DFT) for internal and external surfaces shall be suitable for use with potable water. The
following paint systems are recommended based on previous installations in a similar environment. However, the Supplier shall finalize the

APPROVED BY: required paint system.


Internal Surface: Degrease, Blast clean to BS4232 – second quality, Galvanise 85 microns, Prime with etched/ epoxy primer to 50 microns DFT,
_______________ Apply finish coat of solvent free epoxy with 250 microns DFT. Total DFT is 385 microns (minimum).
DATE__________ External Surface: Degrease, Blast clean to BS4232 – Second Quality, Galvanise 85 microns, Prime with etched/ epoxy zinc phosphate to
100 microns DFT, Apply high build epoxy to 100 microns DFT, Apply finish coat of high build polyamide cured re-coatable epoxy to 100 microns
_____________
VERIFICATION
CONTROL
NUMBER

DATE:

DFT, Total DFT 385 microns (minimum) to be suitable for long term service in a marine environment.
EDSD

Base: Tank bottom underside shall be applied with 1 coat of black bitumen paint.
17) The nozzle flange which connect to GRP line connection shall be Flat Face (FF) type, and requirement shall be updated during detail design.
CERTIFICATION REQUIREMENTS, BY
THIS INDICATES THAT REV. NO. B
OF THIS DOCUMENT IS COVERED,

(DOC.) NO.25-00053-0006-333
REVISION CERTIFICATION

DOCUMENT COMPLETION

MECHANICAL DATASHEET DWG. TYPE PLANT NO. INDEX DOCUMENT NO. SHT. NO. REV. NO.
FOR ALL APPROVAL /

DATASHEET – POTABLE WATER BREAK TANK - PKG. 6 DAT 5


963 D RE-622617
CERTIFICATE

KING SALMAN INTERNATIONAL COMPLEX FOR MARITIME INDUSTRIES AND SERVICES


OF B
RAS AL-KHAIR SAUDI ARABIA JO: 25-00053-0006 8
ARAMCO OVERSEAS COMPANY
OPRNS

IMI

IMI
API STD 650 STORAGE TANK DATA SHEET
* If box is blank, Manufacturer shall determine and submit as per Annex L.
AAQ

AAQ
PMT

Table 1 MATERIALS OF CONSTRUCTION

THIS DOCUMENT AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO PRODUCTION IN THE WHOLE SHALL BE MADE WITHOUT THE PRIOR WRITTEN CONSENT OF THE OWNER.
Component Material*/Thickness* C.A. Component Material*/Thickness* C.A.
CERT

UFA

UFA

Shell, Course 1 to 7 ASTM A283 Gr.C 3 mm Reinforcing Pads ASTM A283 Gr.C 3 mm
Roof ASTM A283 Gr.C 1.5 mm Manhole/Nozzle Necks ASTM A106 Gr. B 3 mm
Roof Structure ASTM A36 1.5 mm Manhole/Nozzle Flanges ASTM A 105 3 mm
ENG

SSI
JD

Bottom ASTM A283 Gr.C 3 mm Flange Covers ASTM A 105 3 mm


Annular Ring (if Required) ASTM A283 Gr.C 3 mm Anchor Attachments SA 36 3 mm
Other Structures (Platforms/ Staircase etc.) ASTM A36 1.5 mm Submerged Piping ASTM A 106 Gr. B 3 mm
ISSUED FOR APPROVAL

ISSUED FOR REVIEW

Earthing Lugs ASTM A283 Gr.C 3 mm Wetted Structurals ASTM A283 Gr.C 3 mm
DESCRIPTION

Non-wetted Structurals SA 36 1.5 mm

+ Check here if C.A. is to apply to each exposed surface £

Table 2 BOLTS and ANCHORS


25-00053-0006

25-00053-0006
JOB/EWO

Component Head Type* Bolt or Anchor Material* Nut Material* Thread Series* C.A.
Flange Bolting ASTM A 193 Gr. B7 ASTM A 194 Gr. 2H Zero
Structural Bolting ASTM A325 ASTM A325 3 mm
Anchor Bolts ASTM F1554 SA 36 3 mm
REV NO

++ Total C.A., on the nominal diameter.

DISC. ENG'R.

Table 3 NOZZLE and MANHOLE SCHEDULE* (for Fixed Roof, Shell, and Bottom)(NOTE-6)
SSI Full Gasket
Pen. Bearing
DATE 16-JUL-19
Size, Neck Sch On Surf. Gasket Gasket Proj. to FF
NPS, or or Wall Reinf. Plate Open. Flange Type Flange Class Dimen. and Thick. and Mat’l. and or CL or from
Mark Service Dia. (In.) Thick. Dimensions (Y/N) (Note-17) or Thick. Finish Dimen. Descript. Datum Lines
PROJ. ENG'R. N1 INLET (from Royal Comm.) 14" Sch. 60 WNRF 150#
N2 LT (Float Type) 1" Sch. XXS WNRF 150#
FS N3 LIT (Radar Type) 2" Sch. 160 WNRF 150#
DATE 16-JUL-19 N4 DRAIN 2" Sch. 160 WNRF 150#
N5 OUTLET (to FW System) 10" Sch. 80 WNRF 150#

CONST. AGENCY N6 OUTLET (to PW System) 14" Sch. 60 WNRF 150#


N7 OVERFLOW 16" Sch. 60 WNRF 150#
SEPCO N8 LIT (Radar Type) 4" Sch. 120 WNRF 150#
(Note-15)
DATE 16-JUL-19 N9 VENT (NOTE-8) 8" Sch. 100 WNRF 150#
N10 TI 1.5" Sch. XXS WNRF 150#

OPERATIONS N11A LG Guide Support 1.5" Sch. 160 WNRF 150#


N11B LG (Float & Scale Type) 1.5" Sch. 160 WNRF 150#

IMI N11C LG Guide Support 1.5" Sch. 160 WNRF 150#


DATE 16-JUL-19

MW 1 SHELL MANWAY 24" API 650 API 650 API 650

REVIEWED BY: MW 2 ROOF MANWAY 24" API 650 API 650 API 650

_______________

DATE__________

APPROVED BY:

_______________

DATE__________
_____________
VERIFICATION
CONTROL
NUMBER

DATE:
EDSD

CERTIFICATION REQUIREMENTS, BY
THIS INDICATES THAT REV. NO. B
OF THIS DOCUMENT IS COVERED,

(DOC.) NO.25-00053-0006-333
REVISION CERTIFICATION

DOCUMENT COMPLETION

MECHANICAL DATASHEET DWG. TYPE PLANT NO. INDEX DOCUMENT NO. SHT. NO. REV. NO.
FOR ALL APPROVAL /

DATASHEET – POTABLE WATER BREAK TANK - PKG. 6 DAT 6


963 D RE-622617
CERTIFICATE

KING SALMAN INTERNATIONAL COMPLEX FOR MARITIME INDUSTRIES AND SERVICES OF B


RAS AL-KHAIR SAUDI ARABIA JO: 25-00053-0006 8
ARAMCO OVERSEAS COMPANY
OPRNS

IMI

IMI
API STD 650 STORAGE TANK DATA SHEET
* If box is blank, Manufacturer shall determine and submit data.
AAQ

AAQ
PMT

THIS DOCUMENT AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO PRODUCTION IN THE WHOLE SHALL BE MADE WITHOUT THE PRIOR WRITTEN CONSENT OF THE OWNER.
24. Platform, Stairway, and Railing: Galvanizing Req’d?* Yes ¢ No £ Stairway Style* Helical Walk Surf. Type* -
(Straight or Helical)
CERT

UFA

UFA

Stair and Walkway Clear Width* National Safety Standards*


Architectural/Structural Specification*
Gauger’s Platform Req’d? Yes ¢ No £ Qty Req’d.* Per Spec. *
ENG

SSI
JD

25. Jacket Required?* Yes £ No ¢ Other Heaters/Coolers Required?* Yes £ No ¢


Supplemental Jacket, Heater, or Cooler Specifications* -
ISSUED FOR APPROVAL

ISSUED FOR REVIEW


DESCRIPTION

26. Mixer/Agitator: Quantity N.A. Size* - Per Spec. * -

27. Insulation: Required? Yes £ No ¢ Thickness* - in. Material* -


Per Specs* - Responsibility for Insulation and Installation -
(Purchaser, Manufacturer, Others)
25-00053-0006

25-00053-0006
JOB/EWO

28. Structural Attachments: Lift Lugs?* Yes £ No ¢ Desc.* -


Shell Anchorage?* Yes £ No £ Type* VTA Scaffold Cable Support? Yes £ No £
REV NO

29. Various Other Items: Welded Flush-Type: Shell Connection £ Cleanout Fitting £ Waive Application of Annex P? Yes £ No ¢
Miscellany #1 Miscellany #2

DISC. ENG'R. Miscellany #3 Miscellany #4


Miscellany #5 Miscellany #6
SSI

DATE 16-JUL-19

Table 4 OTHER TANK APPURTENANCES*


PROJ. ENG'R. Service or
Mark Quantity Size Orientation Height from Datum Material Remarks
Description

FS

DATE 16-JUL-19

CONST. AGENCY

SEPCO

DATE 16-JUL-19

OPERATIONS

IMI

DATE 16-JUL-19

REVIEWED BY:

_______________

DATE__________

APPROVED BY:

_______________

DATE__________
_____________
VERIFICATION
CONTROL
NUMBER

DATE:
EDSD

CERTIFICATION REQUIREMENTS, BY
THIS INDICATES THAT REV. NO. B
OF THIS DOCUMENT IS COVERED,

MECHANICAL DATASHEET DWG. TYPE PLANT NO. INDEX DOCUMENT NO. SHT. NO. REV. NO.
(DOC.) NO.25-00053-0006-333
REVISION CERTIFICATION

DOCUMENT COMPLETION

DAT 7
FOR ALL APPROVAL /

DATASHEET – POTABLE WATER BREAK TANK - PKG. 6


963 D RE-622617
B
CERTIFICATE

KING SALMAN INTERNATIONAL COMPLEX FOR MARITIME INDUSTRIES AND SERVICES


OF
RAS AL-KHAIR SAUDI ARABIA JO: 25-00053-0006 8
ARAMCO OVERSEAS COMPANY
OPRNS

IMI

IMI
API STD 650 STORAGE TANK DATA SHEET

TANK SKETCH
AAQ

AAQ
PMT

THIS DOCUMENT AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO PRODUCTION IN THE WHOLE SHALL BE MADE WITHOUT THE PRIOR WRITTEN CONSENT OF THE OWNER.
CERT

B
UFA

UFA

N9
ENG

SSI
JD

FIXED CONE ROOF


1:6 SLOPE
ISSUED FOR APPROVAL

ISSUED FOR REVIEW

N11 N8
DESCRIPTION

N11 C
N11 MW2
B
A

(Note-15)
25-00053-0006

25-00053-0006

N7
JOB/EWO

N1 HHLL = 13368 mm
HLL = 13268 mm
LLL = 4769 mm
N2 LLLL = 4669 mm
REV NO

DISC. ENG'R. 21m I.D N10

SSI
14m Ht

DATE 16-JUL-19

N6
PROJ. ENG'R.
N3

FS

DATE 16-JUL-19 MW1


N5
2999mm Fire Water Reserve (Note-14)

CONST. AGENCY
N4
1:120 SLOPE
SEPCO

DATE 16-JUL-19

VORTEX BREAKER

OPERATIONS

IMI

DATE 16-JUL-19

REVIEWED BY:

_______________

DATE__________

APPROVED BY:

_______________

DATE__________
_____________
VERIFICATION
CONTROL
NUMBER

DATE:
EDSD

CERTIFICATION REQUIREMENTS, BY
THIS INDICATES THAT REV. NO. B
OF THIS DOCUMENT IS COVERED,

MECHANICAL DATASHEET DWG. TYPE PLANT NO. INDEX DOCUMENT NO. SHT. NO. REV. NO.
(DOC.) NO.25-00053-0006-333
REVISION CERTIFICATION

DOCUMENT COMPLETION

DAT 8
FOR ALL APPROVAL /

DATASHEET – POTABLE WATER BREAK TANK - PKG. 6


963 D RE-622617
B
CERTIFICATE

KING SALMAN INTERNATIONAL COMPLEX FOR MARITIME INDUSTRIES AND SERVICES


OF
RAS AL-KHAIR SAUDI ARABIA JO: 25-00053-0006 8

Potrebbero piacerti anche