Provincial General Services Office

Department
Supply Management Division
Procedures Delivery, Inspection and Acceptance of Supplies, Materials and Equipment

Policy
No. Transaction Flow Responsible Person(s) Detailed Procedures
Guidelines
Based on COA Training
Start Handbook on PSMS

PGSO Inspectorate Team - Inspector will ask from the Deliveries must be made
Receive goods Supplier approved copy of within the stipulated
/supplies P.O. In case the Supplier time reflected on PO, and
delivered by does not have a copy, the during weekdays and
former will ask from the within office hour.
suppliers
Supply Mgt. Personnel
concerned. No delivery shall be
- Inspector, will cross-check accepted w/o the
the goods on PO w/ the approved P.O.
goods on the Delivery
1
Receipt (DR) or Sales The DR/SI must specify
Invoice (SI) and the actual exactly the correct
goods delivered if they all descriptions or
coincide. specifications of the
- Inspector will sign the items delivered based on
DR/SI after thorough the PO.
inspection.
- Then the Accepting Officer
will sign the receive
portion of said DR/SI.
- Prepares the following IAR must indicate exactly
PGSO Supply Mgt. Division Personnel documents in support for what is written in the DR
Preparation of payment:
supporting  Inspection and ARE (for items 5,000
documents for Acceptance Report pesos and above) should
(IAR) have complete
payment of
 Acknowledgement description/specification
goods/supplies Receipt For Equipment of the items (brand,
delivered by (ARE) model, color, serial
Supplier  Inventory Custodian Slip number, length, etc.).
(ICS) Complete name and
 Waste Material Report signature of end-user
(WMR) must be reflected on the
 Requisition and Issue “receipt portion”
2
Slip (RIS)
PACCO  Voucher ICS (for items below
5,000 pesos)

WMR must have actual


submission of waste
material

RIS must bear the


complete name and
signature of the end-user