Documenti di Didattica
Documenti di Professioni
Documenti di Cultura
Boiler monitoring :
description Range / action Remarks
1. boiler blow down valve Open / close Every 8hours open blow down
valve for 5sec , be careful
- blowdown water is
pressurize and hot.
- Slowly open/close to
avoid and shock for the
boiler
2. Boiler pressure 20~60 psig any higher pressure , shutdown
the boiler.
Boiler shutdown:
Check list :