Review chiller logs & discuss operational problems & trends Check & record voltages on each leg
Record any abnormal conditions Check & recondition contact tips as needed
Purge units
Check accuracy of all control gauges; recalibrate as needed
Record elapsed run times & start counts
Verify accuracy of all thermometers
Drain, clean and inspect purge drum
Test high condenser pressure safeties
Clean sight glass
Test low evaporator temperature safeties
Lubricate purge motor
Check the operation of all pump auxillary contacts Megger compressor motor
Test operation of oil temperature & pressure controls Run purge & test operation