Sei sulla pagina 1di 6

ေေေေေေေေေေေေေေေေေေေေေေေေေေေေေ

==========================
Dike (wall) = တမ
Crest = ။မ
Abutment = ။မ
Conduit = ။မ
Culvert = ။မ
Cut-off wall = မဖ။မ
မ ၊မ မဖမ။
Cut-off trench = သ
မ ။မ
Coffer dam = တ
Divide wall = မရ။မ
Filter = မရစမ။မ
Catchment area = မရဆဧ
မ ၊မ မရဧ
မ ။မ
Cross drainage structure = မရန အ
မ ။မ
Barrage = မရခ
မ မတမမရလဆ
မ ။မ
Control tower = မရမစ။မ
မအ
Check structure = မ မ ။မ
(cross regulator) dam = မတ။မ
Diversion dam = မရလမတ။မ
Diversion weir = မရလဆ
မ ။မ
Diversion tunnel = မရလဥ
မ မခ
မ ါ ။မ
Basin area = မရဝမဧ
မ မ။
မ ။မ
Dead storage level = သ
။မ
Berm = အဆ
မ မရလ။မ
Emergency spillway = ပ
Full tank level = ကမပ။မ
Fall = မ။
Flume (aqueduct) = မရ။မ
Fish ladder = ငမ။မ
Free board = မရလႊမမ၊ မရလႊမမ
မ ။မ
Gallery = တမဥမမ။မ
Gate = မရမခ ။မ
Head regulator = မရခ
မ ။မ
Intake structure = မရမအ။မ
Separation wall = မရ။မ
Ring bund = မရတ
မ မ။
Breakthrough point = မပါ မ။
Valve = မရမခ ပ
မ ါ ။မ
Diaphragm wall = မရ။မ
Intake channel = မရမ။
Key trench = သ။မ
မ မ၊ မရမ။
Leading channel = ခ
Link channel = ဆမ။
မ ။မ
Main dam = ပမတ
Maximum water level = မမရ
မ ။မ
မ မရမခ ။မ
Navigation lock = ပ
Outlet = မရပ
မ ါ ။မ
Outfall channel = မရမ။
Power house = မရမစ။မ
Reservoir = ။မ
Regulation dam = မရတ
မ ။မ
Re-regulating dam = မရတ
မ မ။
Rock Toe = တ။မ
Rip-Rap = မရ။မ
Return Wall = ။မ
မ ။မ
Retaining Wall = မ
Spillway (service spillway) = မရလ
မ ။မ
Stilling basin = မရသ
မက
မ ။မ
မတ
Saddle dyke = ၾမ မ။
Syphon = မရ။မ
Sluice gate / flood gate = မရခ
မ ။မ
Silt excluder = မပါ ။မ
Shutter = မရခ
မ ။မ
Storage capacity = ။မ
Tank = မရကမ။
မ မ။
Toe drain = တရ
မ မခါ ။မ
Tunnel = ဥမမလ
မ လ။မ
Tail cluster = ရ
Under sluice = မရခ
မ ။မ
မ ၊မ မဝတ
Watershed = ၾ မ ။မ
Weir = မရလဆ
မ ။မ
မ မဧ မ။
Water spread area = ပ
မ မ။
Alignment = ၾ
Apron (launching apron) = မရအ
မ ခ။မ
Average rainfall = မမႈ။
မ မ။
Bearing pile = ဝမယ
Cill level = မမ
မ ။မ
Contour = မ။
မ ၊ စကၠ ႔
Cu sec = ပ မ ။
Coefficient = မ။
မ ။မ
Crushed rubble stone masonry = သ
Drainage = မရမ။
Discharge = မရထ
မႏ
မ ႏႈ။မ
Dredging = မခ မ။
မ မခ ။မ
Evaporation = ႔
မ။
Foundation = ခ
Feasibility study = မဖမ
မ ႈ။
မ ။မ
Final design = အၿသ
Firm power = မ။မ
Geo-hydrology = မဇဗ
မ ဒ။
မ ။မ
Grouting = တ
မ မမရမ
Hydraulics = လ မ ကၠ မန မ။
မ ဒ။
Hydrology = ဇမဗ
မ ဒ။
Hydro-geology = ဇလဗ
မ ဝဗ
Hydro-meteorology = ဇလလ မ ဒ။
Hydro-power = မရမစ။မ
မ။
Inflow = ဝမရ
Master plan = မမ။မ
မ ရ။မ
Mass concrete = က
Normal rain fall = မမႈ။
မ။
Outflow = ရ
မ ။မ
Pilot cut = ၾ
Permeability = မရႏ
မ ႏႈ။မ
Percolation = မရဝ
မ မခ ။မ
Reduced distance = ။မ
မပ
Reduced level = ပမလမ မထမ
မ မ။
Rehabilitation = မပလ
မခ
မ ။မ
မ မခ ။မ
Reclamation (amelioration) = မ
Reinforced concrete = မဖမကရ။မ
မမ
Soil-mechanic = မ မ ကၠ န
မ မ။
မ ။မ
Secondary power = ထဆ
Sheet pile = သ။မ
Thalweg = မရန မၾ။မ
Uplift = ၊မ က။မ
Wing wall = မ
Afflux bund = မရမ
Bund = မ
Branch canal (secondary) = မမမ
Bifurcation = မ
Canal = မ
Cropping pattern = မ
မအ
Crop water requirement = ရ မမ
Distributor (secondary) = လမ
Drip irrigation = အစမဆရ
မစမ နမ
Field channel = မရမ
မမ
Guide bund = ၾ
Irrigation = ဆမရခ
မမ
မ မႏ ႏႈမ
Irrigation duty = ဆရ
Irrigable area = ဆမဧ မ
Irrigated area = ဆမရဧ
မမ
မမ
Lining = န
မ မပ မခ မ
Land consolidation = မ
မဆ
Lift irrigation (pump irrigation) = ပမတမ မရစ
မ နမ
Main canal (primary) = မမ (မမ)
Minor (tertiary) = (မ လမ)
မ ၚဆမရစ
Surface irrigation = ပ မ နမ
Sprinkler irrigation = မရဆ
မ မရစ
မ နမ
မ မရစ
Sub irrigation = ဆ မ နမ
Trifurcation = မ
Tatil = မရမ
Water course = ၀မ(မ လၾ
မ မ)

Flood
မမ
Danger level = ရ
Dyke = /မတ
မ /မမရမ
Ebb tide = မရရ

Embankment = /မတ
မ /မမရမ
Flood protected area = မဧ မ
Flood tide = မရတမရ
မမ
Frequency = ႀဖ
မမ
Groyne = ကဒတ
Gibion = မ
Generation capacity = မ
မပ
Highest high water level = မ မမ
မမ
High water level = ပ
မမ
Installed capacity = တဆ
Low water level = မရစမမ
မ စမမ
Lowest low water level = အရ
မမ
Mean water level = ရ
Neap tide = မသပမရ
မက
Polder = ပ မမ
Probability = မဖတ
မ မမႈ
Ring bend = မ
Retirement = ပမမ
River training = မမၾ
မမ
Return period = မပမပၚ ႈ မ
မအ
Revetment = မ မမ
မတ
Sper = ႏ ႏႈဖ မမ
Sausage = မ
Spring tide = မရထပမရ
မမ
Training wall = ၾ
Tide board = မရမ
မ ပမမ
Tide cycle = ရ

Potrebbero piacerti anche