This document provides a project report for Salome's Garden located in Cabantian, Davao City. It outlines the scope of work for various project items including a covered car park, proposed Christmas house, 3-storey warehouse, staircase at the function hall, proposed male and female toilets, and a main entrance archway and guardhouse. For each item, it indicates the architect in charge, percent completion to date, target completion date, and any remarks or recommendations. The report was prepared by Architect Mariel Ausan Regoniel.
This document provides a project report for Salome's Garden located in Cabantian, Davao City. It outlines the scope of work for various project items including a covered car park, proposed Christmas house, 3-storey warehouse, staircase at the function hall, proposed male and female toilets, and a main entrance archway and guardhouse. For each item, it indicates the architect in charge, percent completion to date, target completion date, and any remarks or recommendations. The report was prepared by Architect Mariel Ausan Regoniel.
This document provides a project report for Salome's Garden located in Cabantian, Davao City. It outlines the scope of work for various project items including a covered car park, proposed Christmas house, 3-storey warehouse, staircase at the function hall, proposed male and female toilets, and a main entrance archway and guardhouse. For each item, it indicates the architect in charge, percent completion to date, target completion date, and any remarks or recommendations. The report was prepared by Architect Mariel Ausan Regoniel.
Location: Cabantian, Barangay Buhangin, Davao City
F & M COLLABORATIVE ARCHITECTS - PROJECT REPORT
DATE: 13 June 2019 Item PROJECT Architect-in-charge % ACCOMPLISHMENT START TARGET COMPLETION REMARKS / RECOMMENDATIONS SCOPE OF WORK PREVIOUS PRESENT TO DATE DATE DATE
1.0 COVERED CARPARK
a. Architectural Arch. Alexie M.R. 100% b. Structural 100% c. Electrical 0% d. Plumbing 0% e. Landscaping 0% By: Landscape Architect Contact person: Mr. ERIC GERONIMO email: firstkabukiran.eeg@gmail.com
2.0 PROPOSED CHRISTMAS HOUSE
a. Architectural Arch. Alexie M.R. 0% FGF advise: Design and Material specifications Roofing shall be Asphalt Shingles Source out of Materials from online suppliers Other materials to be selected for approval of Mam Sally b. Structural 0% c. Electrical 0% d. Plumbing 0% c. Interior works - design and Specifications: 0% - Bar counter design and details 0% - Design of chimney 0% - Wall finishes 0% - Paint color specification 0% - Open ceiling at dining with exposed rafters except Toilet & Pantry 0% - Furniture Selection 0% - Decorative lighting selection 0% d. Landscaping 0% By: Landscape Architect
3.0 PROPOSED 200 SQ.M. 3-STOREY WAREHOUSE
a. Architectural Arch. Alexie M.R. 0% Ask for other requirements from Mam Sally b. Structural 0% Ground Floor: Extension of Commissary/Kitchen c. Electrical 0% 2nd Floor: Function area d. Plumbing 0% 3rcd Floor: Storage area e. Interior works 0% f. Landscaping 0% By: Landscape Architect
4.0 STAIRCASE AT FUNCTION HALL
a. Architectural Justin 0% For follow-up on site b. Structural 0% For follow-up on site c. Electrical 0% d. Plumbing 0% e. Landscaping 0% By: Landscape Architect
Prepared by: Arch. Mariel Ausan Regoniel
Project title: SALOME'S GARDEN Location: Cabantian, Barangay Buhangin, Davao City
5.0 PROPOSED MALE AND FEMALE TOILET
a. Architectural Justin 0% Proposed new Toilet for Function Hall users b. Structural 0% Female Toilet: Provide 6 cubicles and c. Electrical 0% vanity counter with mirror d. Plumbing 0% Male Toilet: Provide 3 cubicles with 3 urinals
6.0 MAIN ENTRANCE ARCHWAY AND GUARDHOUSE
a. Architectural Justin 0% b. Structural 0% c. Electrical 0% d. Plumbing 0% e. Landscaping 0% By: Landscape Architect