Table for Bending Coefficients for Rectangular Panels Supported on SLABS.

xls
Four Sides with Provision for Torsion at Corners, Ref:Table 26, Annex D of IS:456-2000
-ve Moment Coefficients (Panel Types 1 to 9)
Panel Ratio of Spans ly / lx Long
Type 1 1.1 1.2 1.3 1.4 1.5 1.75 2 Span
0 1 1.1 1.2 1.3 1.4 1.5 1.75
1 0.032 0.037 0.043 0.047 0.051 0.053 0.060 0.065 0.032
2 0.037 0.043 0.048 0.051 0.055 0.057 0.064 0.068 0.037
3 0.037 0.044 0.052 0.057 0.063 0.067 0.077 0.085 0.037
4 0.047 0.053 0.060 0.065 0.071 0.075 0.084 0.091 0.047
5 0.045 0.049 0.052 0.056 0.059 0.060 0.065 0.069 0
6 0 0 0 0 0 0 0 0 0.045
7 0.057 0.064 0.071 0.076 0.080 0.084 0.091 0.097 0
8 0 0 0 0 0 0 0 0 0.057
9 0 0 0 0 0 0 0 0 0

+ve Moment Coefficients (Panel Types 1 to 9)


Panel Ratio of Spans ly / lx Long
Type 1.000 1.100 1.200 1.300 1.400 1.500 1.750 2.000 Span
0.000 1.000 1.100 1.200 1.300 1.400 1.500 1.750
1 0.024 0.028 0.032 0.036 0.039 0.041 0.045 0.049 0.024
2 0.028 0.032 0.036 0.039 0.041 0.044 0.048 0.052 0.028
3 0.028 0.033 0.039 0.044 0.047 0.051 0.059 0.065 0.028
4 0.035 0.040 0.045 0.049 0.053 0.056 0.063 0.069 0.035
5 0.035 0.037 0.040 0.043 0.044 0.045 0.049 0.052 0.035
6 0.035 0.043 0.051 0.057 0.063 0.068 0.080 0.088 0.035
7 0.043 0.048 0.053 0.057 0.060 0.064 0.069 0.073 0.043
8 0.043 0.051 0.059 0.065 0.071 0.076 0.087 0.096 0.043
9 0.056 0.064 0.072 0.079 0.085 0.089 0.100 0.107 0.056

Panel
Type ly/lx +ve BM coefficients Short span Long span
7 1.64 0.064 0.069 1.5 1.75 0.06686 0.043
7 2.18 0.073 0.073 2.1 2.00 0.07300 0.043
5 2.18 0.052 0.052 2.1 2.00 0.05200 0.035

Panel
Type -ve BM coefficients Short Span Long Span
7 1.64 0.084 0.091 1.5 1.75 0.08800 0.000
7 2.18 0.097 0.097 2.1 2.00 0.09700 0.000
5 2.18 0.069 0.069 2.1 2.00 0.06900 0.000
SLABS.xls
CONTENTS

S No Description Page No

1 #REF!

### #REF!

### #REF!

### #REF!

### #REF!

### #REF!

### #REF!

### #REF!

### #REF!

### #REF!

### #REF!

### #REF!

### #REF!

### #REF!

### #REF!

### #REF!

### #REF!

### #REF!

### #REF!

### #REF!

### DESIGN OF DECANTER WALL


CONTENTS

S No Description Page No

### DESIGN OF DECANTER FOOTING (MIDDLE)

### DESIGN OF DECANTER FOOTING (SIDES)

### CHECK FOR UPLIFT

### DESIGN OF BASE SLAB (RECTANGULAR)

### DESIGN OF BASE SLAB (CIRCULAR)

### DESIGN OF PRECAST SLAB

28 DESIGN OF LAUNDER
PROJECT
80 MLD CAPACITY SEWAGE TREATMENT PLANT BASED ON SBR PROCESS AT MADHAPAR, RAJKOT
CLIENT CONSULTANT
RAJKOT MUNICIPAL
CORPORATION (RMC)

SAPIENT TECHNO CONSULTANT, AHMEDABAD


CONTRACTOR CONSULTANT (CONTRACTOR)
GIRDHARI LAL AGGARWAL
CONTRACTORS PVT. LTD. DESIGN SOLUTIONS INC,
PANCHKULA-134117, PANCHKULA
glaggarwal@gmail.com

DESIGN CALCULATION FOR THICKNER RECIRCULATION SUMP,


TITLE RAJKOT

DOCUMENT GLACPL-RMC-SBR-DC-01

11/9/2017 B Submitted for Approval


DATE REV DESCRIPTION / REVISIONS
CONTENTS

S No Description Page No

1 DESIGN OF WALL W1 (STAAD) 1

2 DESIGN OF WALL W1A (STAAD) 52

3 DESIGN OF WALL W1C (STAAD) 110

4 DESIGN OF WALL W2 (STAAD) 156

5 DESIGN OF WALL W5A (STAAD) 207

6 DESIGN OF WALL W6 (STAAD) 258

7 DESIGN OF WALL W6A (STAAD) 280

8 DESIGN OF WALL W8A (STAAD) 315


INTRODUCTION & DESIGN BASIS
BASIS
SCOPE OF DESIGN REPORT

This document contains design calculations for Sequential Batch Reactor

Design Method : STAAD model has been prepared for Splitter Box. Design of Wall
W1C and Splitter Box Walls has been done using STAAD results. Hydrodynamic
loads for Splitter Box have been applied in the STAAD model.

Design of other walls has been done using coefficients from IS 3370 (Part 4). Slabs,
Footings and other components have been designed using standard excel sheets.
Hydrodyamnic loads have been added to the calculated moments in Design sheets.
Limiting Crack width has been taken as 0.2 mm

DESIGN CODES & REFERENCES


IS : 456-2000 Code of Practice for Plain and Reinforced Concrete

IS : 3370 - 2009 Code of Practice for for Concrete Structures for


Storage of Liquids

SP : 16 Design Aids for Reinforced Concrete

IS : 1893 - 2014 Criteria for Earthquake Resistant Design of


(Part 2) Structures
IS : 13920 - 1993 Ductile Detailing of Reinforced Concrete Structures
subjected to Seismic Forces

DESIGN CONSTANTS

Characteristic cube strength of Concrete, fck

Yield Strength of Steel, fy

Limiting Crack Width, w

Limiting Stress in reinforcement

Limiting moment of resistance index, Mu/(fck*b*d^2)

Unit Weight of Liquid, rw

Unit Weight of Soil, rs


Coefficient of lateral pressure due to soil, k

Clear Cover on Water Face

Clear Cover on Soil Face

Clear Cover Footing Base Slab

Clear Cover for Waist Slab of Staircase

Natural ground Level, NGL

Net Safe Bearing Capacity at 1.5 m from NGL


Gross Bearing Capacity for Footing 0.6 m th 185+18x(124-123.4+0.6)

CRACK WIDTH DUE TO TEMPERATURE

Refer Clause 10.3 of IS 3370 - 2009 (Part I)


Three options have been given for spacing of movement joints
Option 1 - Design for full restraint
Option 2 - Design for Partial restraint
Option 3 - Design for freedom of movement

Contraction Joints

We will go in for Option 1 and therefore no contraction joints will be provided. Crack
widths and spacing of cracks will be controlled by provision of reinforcement.

Temperatures have been assumed as below:


Fall in temperature between hydration peak and ambient for concreting, T1 =
Minimum temperature at the site =
Further fall in temperature wrt ambient temp, T2 =
Refer clause A-1.2 for Minimum reinforcement

Direct Tensile Strength for immature concrete, fct for M 30 =

Critical steel ratio (expressed as %) rcrit = fct /fy 1.3x100/500

Coefficient of thermal expansion of concrete a per oC =

Expansion Joints
While the temperature decreases from hydration peak to ambient temperature
(considered as 35 oC), the concrete shrinks and the resulting tension will cause
cracking in concrete.

Any increase in temperature beyond the ambient temperature will result in expansion
and the effect on concrete will be to reduce the cracking.
Since the ambient temperature is never expected to rise above the peak hydration
temperature, expansion joints to relieve the compressive stresses in concrete are not
required.

DESIGN OF BASE SLAB

Refer Test order No HIL/NC/TR/17/753 dated 18-09-17 for the tests conducted by
HILTI on 16 mm and 20 mm rebar for rock anchors

Capacity of 16 m dia rock anchor, 900 mm deep =

Capacity of 20 m dia rock anchor, 1200 mm deep =

Consider Factor of Safety =

Working Load for 16 mm dia rock anchor, 900 mm deep =

Working Load for 20 mm dia rock anchor, 1200 mm deep =

A STAAD model has been prepared with the location of anchors as shown in
drawing. Plate of 200 mm thick has been modelled with the uplift load.
Uplift Pressure = (124-123.4+0.2)x10
Self Weight of Base Slab = 25x0.2
Net Uplift Pressure =

As shown in drawing and as modelled in STAAD, rock anchors have been provided
at a distance of 1.0 m from the edge of the foundation.

Rock anchors are not required under the foundation of walls because the pressure
below the founadtion due to self weight of wall is more than the Uplift Pressure

Thickness of wall is varying from 800 mm bottom to 250 mm at 3.6 m from bottom
and for the balance portion thickness is 250 mm
Average thickness of wall for the bottom 3.6 m = 0.5x(800+250)
Thickness of wall for the balance height 1.9 m = 250
Average thickness of footing for 2.4 m inside SBR Basin 0.5x(600+200)
Average thickness of footing for 1.4 m inside SBR Basin 0.5x(600+200)

Total Self Weight of Wall & Footing per m length =

(3.6x525/1000+1.9x250/1000+2.4x400/1000+1.4x400/1000)x25

Pressure below the founadtion of strip 3.8 m wide (2.4 m + 1.4 m) per m =
Since pressure due to self weight is more than the uplift pressure, anchors are not
required under the foundations
30 N/mm2

500 N/mm2

0.1 mm

400 N/mm2

0.133

10.3 kN/m3

20.0 kN/m3
0.33

50 mm

45 mm

50 mm

25 mm

124.00 m

185 kN/m2
207 kN/m2

15 oC
5 oC
15 oC

1.3 N/mm2

0.26

0.70 E-05
88.0 kN

130.0 kN

1.5

58.7 kN

86.7 kN

8.0 kN/m2

5.0 kN/m2

3.0 kN/m2

525.0 mm

250.0 mm

400.0 mm

400.0 mm

97.1 kN

25.6 kN/m2
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

L&T Construction
Water & Effluent Treatment

80 MLD CAPACITY SEWAGE TREATMENT PLANT DOCUMENT NO.


PROJECT: BASED ON SBR PROCESS AT MADHAPAR,
RAJKOT GLACPL-RMC-SBR-DC-01

DATE 9-Nov-17
DESIGN CALCULATION FOR THICKNER
TITLE: RECIRCULATION SUMP, RAJKOT REV B

TAHAL GROUP
TAHAL CONSULTING ENGINEERS INDIA PVT. LTD

80 MLD CAPACITY SEWAGE TREATMENT PLANT DOCUMENT NO.


PROJECT: BASED ON SBR PROCESS AT MADHAPAR,
RAJKOT GLACPL-RMC-SBR-DC-01

DATE 9-Nov-17
DESIGN CALCULATION FOR THICKNER
TITLE: RECIRCULATION SUMP, RAJKOT REV B

CLIENT CONTRACTOR
RAJKOT
MUNICIPAL GIRDHARI LAL AGGARWAL
CORPORATION CONTRACTORS PVT . LTD.
(RMC)
80 MLD CAPACITY SEWAGE TREATMENT PLANT DOCUMENT NO.
PROJECT: BASED ON SBR PROCESS AT MADHAPAR,
RAJKOT GLACPL-RMC-SBR-DC-01
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

DATE 9-Nov-17
DESIGN CALCULATION FOR THICKNER
TITLE: RECIRCULATION SUMP, RAJKOT REV B
MENT NO.
RNALSTP20CDD003

28-Nov-18

R0

MENT NO.
RMC-SBR-DC-01

9-Nov-17

IA PVT. LTD

MENT NO.
RMC-SBR-DC-01

9-Nov-17

OR

HARI LAL AGGARWAL


RACTORS PVT . LTD.

MENT NO.
RMC-SBR-DC-01
MENT NO.
RNALSTP20CDD003

28-Nov-18

R0

9-Nov-17

B
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

DESIGN OF WALL W1
NT NO.
LSTP20CDD003

28-Nov-18

R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W1-DATA DESIGN OF WALL W1

DESIGNED THICKNESS
Height from bottom 0.00 7.50 10.40
Designed Thickness 850 600 350
Provided Thickness 850 600 350

Length of Wall = 12.50 m

Minimum reinforcement as per clause 8.1.1 of IS 3370 (Part 2) - 2009 0.24 %

Height Thickness Thickness for Temp.


Group Avg Th
From To From To From To Avg. Th
1 0.00 2.50 850 767 808 850 767 808
2 2.50 5.00 767 683 725 767 683 725
3 5.00 7.50 683 600 642 683 600 642
4 7.50 10.40 600 350 475 600 350 475

Direction and Type of Fill BOW BOF TOW TOF HOF

+Z Water Face Liquid 233.10 233.10 243.50 241.50 8.40

-Z Earth Face Earth 233.10 233.10 243.50 243.00 9.90

Fill k r Pressure Additional Loads, if any

+Z 1.00 10.30 86.52

-Z 0.33 20.00 65.93


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
O.
20CDD003

28-Nov-18

R0
O.
20CDD003

28-Nov-18

R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W1-1 DESIGN OF WALL W1 GROUP 1 Height from 0.00 to 2.50 m

Grade of Concrete, fck = 30 N/mm2 Grade of Steel, fy = 500 N/mm2

Limiting Moment of Resistance Index = 0.133

+Z Face -Z Face

Clear Cover = Water Face ### Earth Face ###

STAAD Group Analysis Report


Shear Membrane Bending Moment

Plate L/C SQX SQY SX SY (local) SXY Mx My kNm/m


(local) (local) (local) kN/m2 (local) kNm/m
kN/m2 kN/m2 kN/m2 kN/m2
Max Qx 13 19 SERVI 175.747 -204.886 -89.189 -449.804 149.909 56.238 2.171

Min Qx 53 17 FULL -185.212 99.422 201.882 -210.413 -111.874 171.917 20.745

Max Qy 13 18 EMPT 75.508 431.095 -98.982 -697.757 251.616 -94.516 -407.434

Min Qy 13 13 FULL1 138.241 -690.667 -231.346 -336.618 -133.134 167.604 416.672

Max Sx 26 14 FULL2 -0.052 9.156 317.069 -25.736 -32.86 -10.013 -17.055

Min Sx 26 13 FULL1 107.99 -453.237 -299.86 -362.936 -47.57 172.703 216.269

Max Sy 1 18 EMPT -54.586 172.454 221.815 387.857 172.217 -20.164 -144.87

Min Sy 13 18 EMPT 75.508 431.095 -98.982 -697.757 251.616 -94.516 -407.434

Max Sxy 13 18 EMPT 75.508 431.095 -98.982 -697.757 251.616 -94.516 -407.434

Min Sxy 1 13 FULL1 -16.374 -209.154 -277.148 -574.3 -255.459 46.192 172.929

Max Mx 26 13 FULL1 107.99 -453.237 -299.86 -362.936 -47.57 172.703 216.269

Min Mx 13 18 EMPT 75.508 431.095 -98.982 -697.757 251.616 -94.516 -407.434

Max My 13 13 FULL1 138.241 -690.667 -231.346 -336.618 -133.134 167.604 416.672

Min My 12 18 EMPT 1.464 359.074 -98.344 -321.658 195.104 -82.247 -437.312

Max Mxy 31 13 FULL1 -34.004 -92.752 -28.254 -166.425 -185.156 7.444 43.96

Min Mxy 13 18 EMPT 75.508 431.095 -98.982 -697.757 251.616 -94.516 -407.434
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

Results from STADD output

Max Vertical BM in wall creating tension on Water Face Max My 416.67 kN-m/m

Max Horizontal BM in wall creating tension on Water Face Max Mx 172.70 kN-m/m

Tension corresponding to Max Mx Sx-Max Mx 0 N/mm2

Max Vertical BM in wall creating tension on Earth Face Min My 437.31 kN-m/m

Max Horizontal BM in wall creating tension on Earth Face Min Mx 94.52 kN-m/m

Tension corresponding to Min Mx Sx-Min Mx 0 N/mm2

Max Tension in Wall Max Sx 0.317 N/mm2

BM at wall corresponding to Max Sx on Earth Face Mx-Max Sx 10.01 kN-m/m


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

Thickness check:
Required effective thickness SQRT(437.31x1000000x1.5/(0.133x30x1000))

Provided overall thickness

Min Ast for each surface zone (mm2/m) in % = 0.24 = 0.24x250x1000/100

Area of vertical reinforcement required on Water Face

Max My 416.67 kN-m/m

Effective Depth (mm) = 808-50-0.5x20

Mu / bd2 = 416.67x1.5x10^6/(1000x748^2)

Refer SP-16 Percentage of reinforcement required, %

Req area of Vertical reinf, Water Face, mm2 = MAX(0.269x748x1000/100,600)

Area of horizontal reinforcement required on Water Face

Max Mx 172.70 kN-m/ Corresponding Tension Sx = 0.000 N/mm2


Effective Depth (mm) = 808-50-0.5x16

Mu / bd2 = 172.7x1.5x10^6/(1000x750^2)

Refer SP-16 Percentage of reinforcement required, %

Required area of reinforcement for Mx, mm2 = 0.108x750x1000/100

Factored Tension, kN/m =0

Required area of reinf on each face for Sx, mm2 =0

Req area of Hor reinf, Water Face, mm2 = MAX(810+0,600)

Area of vertical reinforcement required on Earth Face

Min My 437.31 kN-m/m

Effective Depth (mm) = 808-45-0.5x16


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
Mu / bd2 = 437.31x1.5x10^6/(1000x755^2)

Refer SP-16 Percentage of reinforcement required, %

Req area of Vertical reinf, Earth Face, mm2 = MAX(0.278x755x1000/100,600)

Area of horizontal reinforcement required on Earth Face

Min Mx 94.52 kN-m/ Corresponding Tension Sx = 0.000 N/mm2


Effective Depth (mm) = 808-45-0.5x16

Mu / bd2 = 94.52x1.5x10^6/(1000x755^2)

Refer SP-16 Percentage of reinforcement required, %

Required area of reinforcement for Mx, mm2 = 0.058x755x1000/100

Factored Tension, N/m =0

Required area of reinf on each face for Sx, mm2 =0

Req area of Hor reinf, Earth Face, mm2 = MAX(438+0,600)

Ast Required Ast Provided

Vertical Water Face 2012 20-180+16-180 2861

Hor Water Face 810 00-000+16-150 1340

Vertical Earth Face 2099 16-180+16-180 2233

Hor Earth Face 600 00-000+16-150 1340


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

Check for Shear at Junction of Base and Wall

Max Qy, (18 EMPTY) = 0.431 Min Qy, (13 FULL1) = -0.691
Factored Shear Stress, N/mm2 = 1.5x0.691

Percentage of Steel provided on Water Face

Thickness of wall
Factor k for thickness of slab (Refer Clause 40.2.1.1 of IS 456)

Factor for enhanced Shear Stress near the support (Refer Clause 40.5.1 of IS 456)

Maximum shear stress in concrete for limit state method of design, tc max
Permissible Shear Stress, N/mm2 (Value from Table 19 of IS 456 * k * Enhancement)

W1-1 Check for Temperature Reinforcement (As per Annexure A of IS 3370 - 2009, Part 2)

Horizontal Direction

Ast Provided (both faces) = 1340+1340

Percentage of reinforcement provided = 2680/500/1000x100

Max spacing of cracks Smax = (fct/fb) * (f / 2 r) (2/3)x(0.5x(16+16)/2)x(100/0.54)

fct / fb = 2/3 for deformed bars as recommended in Code

Crack Width, Wmax = Smax * (a/2)* (T1 + T2)

988x(0.7/100000/2)x(15+15)

Permissible crack width = 0.1 mm, Hence OK


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
O.
20CDD003

28-Nov-18

R0

ding Moment

Mxy kNm/m

-31.288

34.699

-109.036

84.514

-4.775

22.955

-18.338

-109.036

-109.036

50.159

22.955

-109.036

84.514

-75.579

102.752

-109.036
O.
20CDD003

28-Nov-18

R0
O.
20CDD003

28-Nov-18

R0

405 mm

808 mm

600

748.0

1.117

0.269

2012

750.0

0.461

0.108

810

810

755.0
O.
20CDD003

28-Nov-18

R0
1.151

0.278

2099

755.0

0.249

0.058

438

600

% Ast

0.382%

0.177%

0.298%

0.177%
O.
20CDD003

28-Nov-18

R0

1.037

0.382%

808 mm

5.98

3.50

2.631

2680 mm2

0.54

988 mm

0.10 mm
O.
20CDD003

28-Nov-18

R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W1-1 CRACK WIDTH - FLEXURE (IS 3370 Part 2 - 2009, Annexure B)

Vertical Limiting crack width, w

Max My Characteristic cube strength of Concrete, fck

Yield Strength of Steel, fy

Modulus Elasticity of Concrete Ec = 5000 x SQRT( fck )

Modulus Elasticity of Steel, Es

Applied Moment at service condition, M

σcbc = 10 N/mm2 Modular Ratio, m, 280/(3*σcbc) =

Breadth, b (mm) = 1000 Depth, h (mm) = 808

Reinf, Ast mm2 = 20-180+16-180 2861 Clear Cover, CC mm = 50

Reinf, Asc mm2 = 16-180+16-180 2233 Clear Cover, CC mm = 45

Effecive Depth, d = 808-50-0.5x20

Cover to the centre of compression steel, d' = 45+0.5x16

Max spacing of bars, S =

acr = maximum spacing of tensile bar from outer edge of concrete (mm)

= SQRT((0.5x90)^2+(50+0.5x20)^2)-0.5x20

Depth of NA from Compression face = x

Solve equation = (bx2/2) + (1.5m-1) Asc (x - d') - m Ast (d-x) = 0 to get x. x=

(x - d ') bxf c x
A sc fsc = (1.5 m -1) A sc f c (d - ) + A sc f sc (d - d ') = M
x 2 3
f c (d - x)
Ast f st = (m -1) A st
x Solve these equations to get fc

Stress in extreme compression fibre, fc

Stress in Tension reinforcement, fst = 9.33x6.07x(748-159)/159


Distance from compression face to point where crack width is being calculated, a

Strain at the level considered, ε1 = (h - x)fs/Es(d - x)

Strain due to stiffening effect in concrete, ε2 = 1.5b(h - x)(a - x)/(3EsAs(d - x))

εm = Average surface strain = ε1 - ε2

Crack Width, w = 3 acr εm/(1+2(acr - Cmin)/(h - x))


MENT NO.
RNALSTP20CDD003

28-Nov-18

R0

0.1 mm

30 N/mm2

500 N/mm2

2.7E+04 N/mm2

2.0E+05 N/mm2

416.67 kN-m

9.33

748 mm

53 mm

90 mm

65.0 mm

159.0 mm

6.07 N/mm2

209.8 N/mm2
808 mm

1.16E-03

6.25E-04

5.31E-04

0.099 mm
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W1-1 CRACK WIDTH - FLEXURE & TENSION (IS 3370 Part 2 - 2009, Annexure B)

Horizontal Limiting crack width, w

Max Mx Characteristic cube strength of Concrete, fck

Sx-Max Mx Yield Strength of Steel, fy


Modulus Elasticity of Concrete Ec = 5000 x SQRT( fck )

Modulus Elasticity of Steel, Es

Applied Moment at service condition, M

Applied Tension at service condition, N 0

σcbc = 10 N/mm2 Modular Ratio, m, 280/(3*σcbc) =

Breadth, b (mm) = 1000 Depth, h (mm) = 808

Reinf, Ast mm2 = 00-000+16-150 1340 Clear Cover, CC mm = 50

Reinf, Asc mm2 = 00-000+16-150 1340 Clear Cover, CC mm = 45

Distance between centroid of Ast and Asc, Zs = 808-50-0.5x16-45-0.5x16

Distance - Centroid of Ast to CG of Ast & Asc, Xs = 1340x697/(1340+1340)

Modified Moment M' = M - N * Xs

Modified moment, M' > 0, section is in bending

Effecive Depth, d = 808-50-0.5x16

Cover to the centre of compression steel, d' = 45+0.5x16


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

bxf c bxf c x
A st f st - - A sc f sc = N (d - ) + A sc f sc (d - d ') = M - N X S
2 2 3

f c (d - x) (x - d ')
Ast fst = (m -1) A st A sc f sc = (1.5 m -1) A sc f c
x x

Solve above equations to get the value of fc and x

Depth of NA from Compression face = x

Stress in extreme compression fibre, fc

Stress in Tension reinforcement, fst

= (9.33-1)x3.8x(750-110.52)/110.52

Distance from compression face to point where crack width is being calculated, a

Max spacing of bars, S =

acr = maximum spacing of tensile bar from outer edge of concrete (mm)

= SQRT((0.5x150)^2+(50+0.5x16)^2)-0.5x16

Strain at the level considered, ε1 = (h - x)fs/Es(d - x)

Strain due to stiffening effect in concrete, ε2 = 1.5b(h - x)(a - x)/(3EsAs(d - x))

εm = Average surface strain = ε1 - ε2

Crack Width, w = 3 acr εm/(1+2(acr - Cmin)/(h - x))


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
MENT NO.
NALSTP20CDD003

28-Nov-18

R0

0.1 mm

30 N/mm2

500 N/mm2

2.7E+04 N/mm2

2.0E+05 N/mm2

172.70 kN-m

1.00 kN

9.33

697.0 mm

348.5 mm

172.4 kN-m

750 mm

53 mm
MENT NO.
NALSTP20CDD003

28-Nov-18

R0
MENT NO.
NALSTP20CDD003

28-Nov-18

R0

d ') = M - N X S

110.52 mm

3.80 N/mm2

183.2 N/mm2

808 mm

150 mm

86.8 mm

9.99E-04

1.42E-03

-4.20E-04

-0.099 mm
MENT NO.
NALSTP20CDD003

28-Nov-18

R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W1-1 CRACK WIDTH - FLEXURE & TENSION (IS 3370 Part 2 - 2009, Annexure B)

Horizontal Limiting crack width, w

Max Mx Characteristic cube strength of Concrete, fck

Sx-Max Mx Yield Strength of Steel, fy


Modulus Elasticity of Concrete Ec = 5000 x SQRT( fck )

Modulus Elasticity of Steel, Es

Applied Moment at service condition, M

Applied Tension at service condition, N 0

σcbc = 10 N/mm2 Modular Ratio, m, 280/(3*σcbc) =

Breadth, b (mm) = 1000 Depth, h (mm) = 808

Reinf, Ast mm2 = 00-000+16-150 1340 Clear Cover, CC mm = 50

Reinf, Asc mm2 = 00-000+16-150 1340 Clear Cover, CC mm = 45

Distance between centroid of Ast and Asc, Zs = 808-50-0.5x16-45-0.5x16

Distance - Centroid of Ast to CG of Ast & Asc, Xs = 1340x697/(1340+1340)

Modified Moment M' = M - N * Xs

Modified moment, M' > 0, section is in bending

Effecive Depth, d = 808-50-0.5x16

Cover to the centre of compression steel, d' = 45+0.5x16


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

bxf c bxf c x
A st f st - - A sc f sc = N (d - ) + A sc f sc (d - d ') = M - N X S
2 2 3
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

f c (d - x) (x - d ')
Ast fst = (m -1) A st A sc f sc = (1.5 m -1) A sc f c
x x

Solve above equations to get the value of fc and x

Depth of NA from Compression face = x

Stress in extreme compression fibre, fc

Stress in Tension reinforcement, fst

= (9.33-1)x3.8x(750-110.52)/110.52

Distance from compression face to point where crack width is being calculated, a

Max spacing of bars, S =

acr = maximum spacing of tensile bar from outer edge of concrete (mm)

= SQRT((0.5x150)^2+(50+0.5x16)^2)-0.5x16

Strain at the level considered, ε1 = (h - x)fs/Es(d - x)

Strain due to stiffening effect in concrete, ε2 = 1.5b(h - x)(a - x)/(3EsAs(d - x))

εm = Average surface strain = ε1 - ε2

Crack Width, w = 3 acr εm/(1+2(acr - Cmin)/(h - x))


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
MENT NO.
NALSTP20CDD003

28-Nov-18

R0

0.1 mm

30 N/mm2

500 N/mm2

2.7E+04 N/mm2

2.0E+05 N/mm2

172.70 kN-m

1.00 kN

9.33

697.0 mm

348.5 mm

172.4 kN-m

750 mm

53 mm
MENT NO.
NALSTP20CDD003

28-Nov-18

R0

d ') = M - N X S
MENT NO.
NALSTP20CDD003

28-Nov-18

R0

110.52 mm

3.80 N/mm2

183.2 N/mm2

808 mm

150 mm

86.8 mm

9.99E-04

1.42E-03

-4.20E-04

-0.099 mm
MENT NO.
NALSTP20CDD003

28-Nov-18

R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W1-2 DESIGN OF WALL W1 GROUP 2 Height from 2.50 to 5.00 m

Grade of Concrete, fck = 30 N/mm2 Grade of Steel, fy = 500 N/mm2

Limiting Moment of Resistance Index = 0.133

+Z Face -Z Face

Clear Cover = Water Face ### Earth Face ###

STAAD Group Analysis Report


Shear Membrane Bending Moment

Plate L/C SQX SQY SX SY (local) SXY Mx My kNm/m


(local) (local) (local) kN/m2 (local) kNm/m
kN/m2 kN/m2 kN/m2 kN/m2
Max Qx 118 18 EMPT 192.742 -105.665 -206.441 -89.982 82.774 -185.879 -28.867

Min Qx 105 13 FULL1-271.317 60.243 275.845 -10.216 -43.275 234.488 30.269

Max Qy 76 18 EMPT 22.715 114.671 -19.302 -291.32 165.762 38.164 -52.575

Min Qy 77 13 FULL1 -13.712 -131.899 -31.757 -271.773 -64.602 -55.757 -65.581

Max Sx 92 17 FULL -265.514 73.073 281.902 -69.052 -67.336 229.781 29.181

Min Sx 118 18 EMPT 192.742 -105.665 -206.441 -89.982 82.774 -185.879 -28.867

Max Sy 66 18 EMPT 92.575 -115.01 -105.377 51.119 121.361 -102.925 -17.555

Min Sy 78 18 EMPT 20.916 99.465 0.666 -345.621 121.587 57.193 -56.26

Max Sxy 69 18 EMPT 41.824 24.48 -44.739 -83.867 210.722 -33.035 -21.395

Min Sxy 69 17 FULL -119.368 -3.816 161.943 -217.722 -157.476 30.458 -16.555

Max Mx 105 13 FULL1-271.317 60.243 275.845 -10.216 -43.275 234.488 30.269

Min Mx 118 18 EMPT 192.742 -105.665 -206.441 -89.982 82.774 -185.879 -28.867

Max My 118 17 FULL -264.586 43.516 270.514 -31.704 -50.269 230.996 31.52

Min My 130 13 FULL1 -18.95 -28.728 59.652 -243.28 -46.742 -114.328 -122.274

Max Mxy 71 13 FULL1 -74.155 -44.351 69.102 -184.758 -142.026 -23.287 -35.628

Min Mxy 70 18 EMPT 33.002 48.319 -35.179 -125.494 206.74 -18.726 -26.674
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

Results from STADD output

Max Vertical BM in wall creating tension on Water Face Max My 31.52 kN-m/m

Max Horizontal BM in wall creating tension on Water Face Max Mx 234.49 kN-m/m

Tension corresponding to Max Mx Sx-Max Mx 0.276 N/mm2

Max Vertical BM in wall creating tension on Earth Face Min My 122.27 kN-m/m

Max Horizontal BM in wall creating tension on Earth Face Min Mx 185.88 kN-m/m

Tension corresponding to Min Mx Sx-Min Mx 0 N/mm2

Max Tension in Wall Max Sx 0.282 N/mm2

BM at wall corresponding to Max Sx on Water Face Mx-Max Sx 229.78 kN-m/m


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

Thickness check:
Required effective thickness SQRT(234.49x1000000x1.5/(0.133x30x1000))

Provided overall thickness

Min Ast for each surface zone (mm2/m) in % = 0.24 = 0.24x250x1000/100

Area of vertical reinforcement required on Water Face

Max My 31.52 kN-m/m

Effective Depth (mm) = 725-50-0.5x20

Mu / bd2 = 31.52x1.5x10^6/(1000x665^2)

Refer SP-16 Percentage of reinforcement required, %

Req area of Vertical reinf, Water Face, mm2 = MAX(0.025x665x1000/100,600)

Area of horizontal reinforcement required on Water Face

Max Mx 234.49 kN-m/ Corresponding Tension Sx = 0.276 N/mm2


Effective Depth (mm) = 725-50-0.5x20

Mu / bd2 = 234.49x1.5x10^6/(1000x665^2)

Refer SP-16 Percentage of reinforcement required, %

Required area of reinforcement for Mx, mm2 = 0.189x665x1000/100

Factored Tension, kN/m = 0.276x725x1.5

Required area of reinf on each face for Sx, mm2 = 0.5x300.2x1000/(0.8x500)

Req area of Hor reinf, Water Face, mm2 = MAX(1257+375,600)

Area of vertical reinforcement required on Earth Face

Min My 122.27 kN-m/m

Effective Depth (mm) = 725-45-0.5x16


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
Mu / bd2 = 122.27x1.5x10^6/(1000x672^2)

Refer SP-16 Percentage of reinforcement required, %

Req area of Vertical reinf, Earth Face, mm2 = MAX(0.095x672x1000/100,600)

Area of horizontal reinforcement required on Earth Face

Min Mx 185.88 kN-m/ Corresponding Tension Sx = 0.000 N/mm2


Effective Depth (mm) = 725-45-0.5x16

Mu / bd2 = 185.88x1.5x10^6/(1000x672^2)

Refer SP-16 Percentage of reinforcement required, %

Required area of reinforcement for Mx, mm2 = 0.145x672x1000/100

Factored Tension, N/m =0

Required area of reinf on each face for Sx, mm2 =0

Req area of Hor reinf, Earth Face, mm2 = MAX(974+0,600)

Ast Required Ast Provided

Vertical Water Face 600 00-000+20-180 1744

Hor Water Face 1632 00-000+20-100 3140

Vertical Earth Face 638 00-000+16-180 1117

Hor Earth Face 974 00-000+16-100 2010


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

Check for Shear at Junction of Base and Wall

Max Qy, (18 EMPTY) = 0.115 Min Qy, (13 FULL1) = -0.132
Factored Shear Stress, N/mm2 = 1.5x0.132

Percentage of Steel provided on Water Face

Thickness of wall
Factor k for thickness of slab (Refer Clause 40.2.1.1 of IS 456)

Factor for enhanced Shear Stress near the support (Refer Clause 40.5.1 of IS 456)

Maximum shear stress in concrete for limit state method of design, tc max
Permissible Shear Stress, N/mm2 (Value from Table 19 of IS 456 * k * Enhancement)

W1-2 Check for Temperature Reinforcement (As per Annexure A of IS 3370 - 2009, Part 2)

Horizontal Direction

Ast Provided (both faces) = 3140+2010

Percentage of reinforcement provided = 5150/500/1000x100

Max spacing of cracks Smax = (fct/fb) * (f / 2 r) (2/3)x(0.5x(20+16)/2)x(100/1.03)

fct / fb = 2/3 for deformed bars as recommended in Code

Crack Width, Wmax = Smax * (a/2)* (T1 + T2)

583x(0.7/100000/2)x(15+15)

Permissible crack width = 0.1 mm, Hence OK


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
O.
20CDD003

28-Nov-18

R0

ding Moment

Mxy kNm/m

-37.835

20.486

-46.592

29.415

23.872

-37.835

-44.186

-14.998

-95.531

81.585

20.486

-37.835

15.73

4.83

88.527

-97.747
O.
20CDD003

28-Nov-18

R0
O.
20CDD003

28-Nov-18

R0

297 mm

725 mm

600

665.0

0.107

0.025

600

665.0

0.795

0.189

1257

300.2

375

1632

672.0
O.
20CDD003

28-Nov-18

R0
0.406

0.095

638

672.0

0.617

0.145

974

974

% Ast

0.262%

0.467%

0.168%

0.299%
O.
20CDD003

28-Nov-18

R0

0.198

0.262%

725 mm

3.50

0.380

5150 mm2

1.03

583 mm

0.06 mm
O.
20CDD003

28-Nov-18

R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W1-2 CRACK WIDTH - FLEXURE (IS 3370 Part 2 - 2009, Annexure B)

Vertical Limiting crack width, w

Max My Characteristic cube strength of Concrete, fck

Yield Strength of Steel, fy

Modulus Elasticity of Concrete Ec = 5000 x SQRT( fck )

Modulus Elasticity of Steel, Es

Applied Moment at service condition, M

σcbc = 10 N/mm2 Modular Ratio, m, 280/(3*σcbc) =

Breadth, b (mm) = 1000 Depth, h (mm) = 725

Reinf, Ast mm2 = 00-000+20-180 1744 Clear Cover, CC mm = 50

Reinf, Asc mm2 = 00-000+16-180 1117 Clear Cover, CC mm = 45

Effecive Depth, d = 725-50-0.5x20

Cover to the centre of compression steel, d' = 45+0.5x16

Max spacing of bars, S =

acr = maximum spacing of tensile bar from outer edge of concrete (mm)

= SQRT((0.5x180)^2+(50+0.5x20)^2)-0.5x20

Depth of NA from Compression face = x

Solve equation = (bx2/2) + (1.5m-1) Asc (x - d') - m Ast (d-x) = 0 to get x. x=

(x - d ') bxf c x
A sc fsc = (1.5 m -1) A sc f c (d - ) + A sc f sc (d - d ') = M
x 2 3
f c (d - x)
Ast f st = (m -1) A st
x Solve these equations to get fc

Stress in extreme compression fibre, fc

Stress in Tension reinforcement, fst = 9.33x0.72x(665-124.5)/124.5


Distance from compression face to point where crack width is being calculated, a

Strain at the level considered, ε1 = (h - x)fs/Es(d - x)

Strain due to stiffening effect in concrete, ε2 = 1.5b(h - x)(a - x)/(3EsAs(d - x))

εm = Average surface strain = ε1 - ε2

Crack Width, w = 3 acr εm/(1+2(acr - Cmin)/(h - x))


MENT NO.
RNALSTP20CDD003

28-Nov-18

R0

0.1 mm

30 N/mm2

500 N/mm2

2.7E+04 N/mm2

2.0E+05 N/mm2

31.52 kN-m

9.33

665 mm

53 mm

180 mm

98.2 mm

124.5 mm

0.72 N/mm2

29.2 N/mm2
725 mm

1.62E-04

9.56E-04

-7.94E-04

-0.202 mm
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W1-2 CRACK WIDTH - FLEXURE & TENSION (IS 3370 Part 2 - 2009, Annexure B)

Horizontal Limiting crack width, w

Max Mx Characteristic cube strength of Concrete, fck

Sx-Max Mx Yield Strength of Steel, fy


Modulus Elasticity of Concrete Ec = 5000 x SQRT( fck )

Modulus Elasticity of Steel, Es

Applied Moment at service condition, M

Applied Tension at service condition, N 200.1

σcbc = 10 N/mm2 Modular Ratio, m, 280/(3*σcbc) =

Breadth, b (mm) = 1000 Depth, h (mm) = 725

Reinf, Ast mm2 = 00-000+20-100 3140 Clear Cover, CC mm = 50

Reinf, Asc mm2 = 00-000+16-100 2010 Clear Cover, CC mm = 45

Distance between centroid of Ast and Asc, Zs = 725-50-0.5x20-45-0.5x16

Distance - Centroid of Ast to CG of Ast & Asc, Xs = 2010x612/(3140+2010)

Modified Moment M' = M - N * Xs

Modified moment, M' > 0, section is in bending

Effecive Depth, d = 725-50-0.5x20

Cover to the centre of compression steel, d' = 45+0.5x16


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

bxf c bxf c x
A st f st - - A sc f sc = N (d - ) + A sc f sc (d - d ') = M - N X S
2 2 3
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

f c (d - x) (x - d ')
Ast fst = (m -1) A st A sc f sc = (1.5 m -1) A sc f c
x x

Solve above equations to get the value of fc and x

Depth of NA from Compression face = x

Stress in extreme compression fibre, fc

Stress in Tension reinforcement, fst

= (9.33-1)x4.1x(665-117.49)/117.49

Distance from compression face to point where crack width is being calculated, a

Max spacing of bars, S =

acr = maximum spacing of tensile bar from outer edge of concrete (mm)

= SQRT((0.5x100)^2+(50+0.5x20)^2)-0.5x20

Strain at the level considered, ε1 = (h - x)fs/Es(d - x)

Strain due to stiffening effect in concrete, ε2 = 1.5b(h - x)(a - x)/(3EsAs(d - x))

εm = Average surface strain = ε1 - ε2

Crack Width, w = 3 acr εm/(1+2(acr - Cmin)/(h - x))


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
MENT NO.
NALSTP20CDD003

28-Nov-18

R0

0.1 mm

30 N/mm2

500 N/mm2

2.7E+04 N/mm2

2.0E+05 N/mm2

234.49 kN-m

200.10 kN

9.33

612.0 mm

238.9 mm

186.7 kN-m

665 mm

53 mm
MENT NO.
NALSTP20CDD003

28-Nov-18

R0

d ') = M - N X S
MENT NO.
NALSTP20CDD003

28-Nov-18

R0

117.49 mm

4.10 N/mm2

159.2 N/mm2

725 mm

100 mm

68.1 mm

8.83E-04

5.37E-04

3.46E-04

0.067 mm
MENT NO.
NALSTP20CDD003

28-Nov-18

R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W1-2 CRACK WIDTH - FLEXURE & TENSION (IS 3370 Part 2 - 2009, Annexure B)

Horizontal Limiting crack width, w

Max Sx Characteristic cube strength of Concrete, fck

Mx-Max Sx Yield Strength of Steel, fy


Modulus Elasticity of Concrete Ec = 5000 x SQRT( fck )

Modulus Elasticity of Steel, Es

Applied Moment at service condition, M

Applied Tension at service condition, N 204.45

σcbc = 10 N/mm2 Modular Ratio, m, 280/(3*σcbc) =

Breadth, b (mm) = 1000 Depth, h (mm) = 725

Reinf, Ast mm2 = 00-000+20-100 3140 Clear Cover, CC mm = 50

Reinf, Asc mm2 = 00-000+16-100 2010 Clear Cover, CC mm = 45

Distance between centroid of Ast and Asc, Zs = 725-50-0.5x20-45-0.5x16

Distance - Centroid of Ast to CG of Ast & Asc, Xs = 2010x612/(3140+2010)

Modified Moment M' = M - N * Xs

Modified moment, M' > 0, section is in bending

Effecive Depth, d = 725-50-0.5x20

Cover to the centre of compression steel, d' = 45+0.5x16


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

bxf c bxf c x
A st f st - - A sc f sc = N (d - ) + A sc f sc (d - d ') = M - N X S
2 2 3
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

f c (d - x) (x - d ')
Ast fst = (m -1) A st A sc f sc = (1.5 m -1) A sc f c
x x

Solve above equations to get the value of fc and x

Depth of NA from Compression face = x

Stress in extreme compression fibre, fc

Stress in Tension reinforcement, fst

= (9.33-1)x4.01x(665-116.33)/116.33

Distance from compression face to point where crack width is being calculated, a

Max spacing of bars, S =

acr = maximum spacing of tensile bar from outer edge of concrete (mm)

= SQRT((0.5x100)^2+(50+0.5x20)^2)-0.5x20

Strain at the level considered, ε1 = (h - x)fs/Es(d - x)

Strain due to stiffening effect in concrete, ε2 = 1.5b(h - x)(a - x)/(3EsAs(d - x))

εm = Average surface strain = ε1 - ε2

Crack Width, w = 3 acr εm/(1+2(acr - Cmin)/(h - x))


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
MENT NO.
NALSTP20CDD003

28-Nov-18

R0

0.1 mm

30 N/mm2

500 N/mm2

2.7E+04 N/mm2

2.0E+05 N/mm2

229.78 kN-m

204.45 kN

9.33

612.0 mm

238.9 mm

180.9 kN-m

665 mm

53 mm
MENT NO.
NALSTP20CDD003

28-Nov-18

R0

d ') = M - N X S
MENT NO.
NALSTP20CDD003

28-Nov-18

R0

116.33 mm

4.01 N/mm2

157.5 N/mm2

725 mm

100 mm

68.1 mm

8.74E-04

5.38E-04

3.36E-04

0.065 mm
MENT NO.
NALSTP20CDD003

28-Nov-18

R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W1-3 DESIGN OF WALL W1 GROUP 3 Height from 5.00 to 7.50 m

Grade of Concrete, fck = 30 N/mm2 Grade of Steel, fy = 500 N/mm2

Limiting Moment of Resistance Index = 0.133

+Z Face -Z Face

Clear Cover = Water Face ### Earth Face ###

STAAD Group Analysis Report


Shear Membrane Bending Moment

Plate L/C SQX SQY SX SY (local) SXY Mx My kNm/m


(local) (local) (local) kN/m2 (local) kNm/m
kN/m2 kN/m2 kN/m2 kN/m2
Max Qx 144 18 EMPT 197.341 -95.806 -206.878 -106.266 67.88 -198.888 -33.215

Min Qx 131 13 FULL1-257.104 29.092 252.093 8.449 -21.746 224.439 30.77

Max Qy 131 13 FULL1-257.104 29.092 252.093 8.449 -21.746 224.439 30.77

Min Qy 131 18 EMPT 197.3 -100.251 -209.184 -101.451 75.184 -194.368 -31.32

Max Sx 131 17 FULL -254.062 29.002 254.227 -22.552 -43.653 223.174 31.205

Min Sx 131 18 EMPT 197.3 -100.251 -209.184 -101.451 75.184 -194.368 -31.32

Max Sy 144 13 FULL1 -242.19 14.295 232.194 9.708 -13.812 212.423 29.641

Min Sy 143 13 FULL1 -19.245 -13.871 72.33 -229.86 -38.621 -116.219 -121.932

Max Sxy 137 18 EMPT 71.809 -1.501 -90.462 -131.151 145.107 32.359 0.256

Min Sxy 141 17 FULL -33.305 -7.606 92.904 -189.537 -70.847 -98.468 -102.887

Max Mx 131 13 FULL1-257.104 29.092 252.093 8.449 -21.746 224.439 30.77

Min Mx 157 18 EMPT 194.037 -92.758 -201.271 -105.715 60.903 -199.895 -34.602

Max My 131 17 FULL -254.062 29.002 254.227 -22.552 -43.653 223.174 31.205

Min My 143 13 FULL1 -19.245 -13.871 72.33 -229.86 -38.621 -116.219 -121.932

Max Mxy 137 17 FULL -91.6 2.345 160.857 -188.716 -65.48 -48.102 -67.107

Min Mxy 136 18 EMPT 82.964 -9.132 -111.578 -112.939 139.441 10.038 -1.508
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

Results from STADD output

Max Vertical BM in wall creating tension on Water Face Max My 31.21 kN-m/m

Max Horizontal BM in wall creating tension on Water Face Max Mx 224.44 kN-m/m

Tension corresponding to Max Mx Sx-Max Mx 0.252 N/mm2

Max Vertical BM in wall creating tension on Earth Face Min My 121.93 kN-m/m

Max Horizontal BM in wall creating tension on Earth Face Min Mx 199.90 kN-m/m

Tension corresponding to Min Mx Sx-Min Mx 0 N/mm2

Max Tension in Wall Max Sx 0.254 N/mm2

BM at wall corresponding to Max Sx on Water Face Mx-Max Sx 223.17 kN-m/m


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

Thickness check:
Required effective thickness SQRT(224.44x1000000x1.5/(0.133x30x1000))

Provided overall thickness

Min Ast for each surface zone (mm2/m) in % = 0.24 = 0.24x250x1000/100

Area of vertical reinforcement required on Water Face

Max My 31.21 kN-m/m

Effective Depth (mm) = 642-50-0.5x20

Mu / bd2 = 31.21x1.5x10^6/(1000x582^2)

Refer SP-16 Percentage of reinforcement required, %

Req area of Vertical reinf, Water Face, mm2 = MAX(0.032x582x1000/100,600)

Area of horizontal reinforcement required on Water Face

Max Mx 224.44 kN-m/ Corresponding Tension Sx = 0.252 N/mm2


Effective Depth (mm) = 642-50-0.5x20

Mu / bd2 = 224.44x1.5x10^6/(1000x582^2)

Refer SP-16 Percentage of reinforcement required, %

Required area of reinforcement for Mx, mm2 = 0.238x582x1000/100

Factored Tension, kN/m = 0.252x642x1.5

Required area of reinf on each face for Sx, mm2 = 0.5x242.7x1000/(0.8x500)

Req area of Hor reinf, Water Face, mm2 = MAX(1385+303,600)

Area of vertical reinforcement required on Earth Face

Min My 121.93 kN-m/m

Effective Depth (mm) = 642-45-0.5x16


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
Mu / bd2 = 121.93x1.5x10^6/(1000x589^2)

Refer SP-16 Percentage of reinforcement required, %

Req area of Vertical reinf, Earth Face, mm2 = MAX(0.124x589x1000/100,600)

Area of horizontal reinforcement required on Earth Face

Min Mx 199.90 kN-m/ Corresponding Tension Sx = 0.000 N/mm2


Effective Depth (mm) = 642-45-0.5x16

Mu / bd2 = 199.9x1.5x10^6/(1000x589^2)

Refer SP-16 Percentage of reinforcement required, %

Required area of reinforcement for Mx, mm2 = 0.206x589x1000/100

Factored Tension, N/m =0

Required area of reinf on each face for Sx, mm2 =0

Req area of Hor reinf, Earth Face, mm2 = MAX(1213+0,600)

Ast Required Ast Provided

Vertical Water Face 600 00-000+20-180 1744

Hor Water Face 1688 00-000+20-100 3140

Vertical Earth Face 730 00-000+16-180 1117

Hor Earth Face 1213 00-000+16-100 2010


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

Check for Shear at Junction of Base and Wall

Max Qy, (13 FULL1) = 0.029 Min Qy, (18 EMPTY) = -0.100
Factored Shear Stress, N/mm2 = 1.5x0.1

Percentage of Steel provided on Water Face

Thickness of wall
Factor k for thickness of slab (Refer Clause 40.2.1.1 of IS 456)

Factor for enhanced Shear Stress near the support (Refer Clause 40.5.1 of IS 456)

Maximum shear stress in concrete for limit state method of design, tc max
Permissible Shear Stress, N/mm2 (Value from Table 19 of IS 456 * k * Enhancement)

W1-3 Check for Temperature Reinforcement (As per Annexure A of IS 3370 - 2009, Part 2)

Horizontal Direction

Ast Provided (both faces) = 3140+2010

Percentage of reinforcement provided = 5150/500/1000x100

Max spacing of cracks Smax = (fct/fb) * (f / 2 r) (2/3)x(0.5x(20+16)/2)x(100/1.03)

fct / fb = 2/3 for deformed bars as recommended in Code

Crack Width, Wmax = Smax * (a/2)* (T1 + T2)

583x(0.7/100000/2)x(15+15)

Permissible crack width = 0.1 mm, Hence OK


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
O.
20CDD003

28-Nov-18

R0

ding Moment

Mxy kNm/m

-35.469

11.64

11.64

-36.42

11.814

-36.42

7.527

3.361

-77.287

19.332

11.64

-35.002

11.814

3.361

30.496

-79.465
O.
20CDD003

28-Nov-18

R0
O.
20CDD003

28-Nov-18

R0

290 mm

642 mm

600

582.0

0.138

0.032

600

582.0

0.994

0.238

1385

242.7

303

1688

589.0
O.
20CDD003

28-Nov-18

R0
0.527

0.124

730

589.0

0.864

0.206

1213

1213

% Ast

0.300%

0.533%

0.192%

0.341%
O.
20CDD003

28-Nov-18

R0

0.150

0.300%

642 mm

3.50

0.400

5150 mm2

1.03

583 mm

0.06 mm
O.
20CDD003

28-Nov-18

R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W1-3 CRACK WIDTH - FLEXURE (IS 3370 Part 2 - 2009, Annexure B)

Vertical Limiting crack width, w

Max My Characteristic cube strength of Concrete, fck

Yield Strength of Steel, fy

Modulus Elasticity of Concrete Ec = 5000 x SQRT( fck )

Modulus Elasticity of Steel, Es

Applied Moment at service condition, M

σcbc = 10 N/mm2 Modular Ratio, m, 280/(3*σcbc) =

Breadth, b (mm) = 1000 Depth, h (mm) = 642

Reinf, Ast mm2 = 00-000+20-180 1744 Clear Cover, CC mm = 50

Reinf, Asc mm2 = 00-000+16-180 1117 Clear Cover, CC mm = 45

Effecive Depth, d = 642-50-0.5x20

Cover to the centre of compression steel, d' = 45+0.5x16

Max spacing of bars, S =

acr = maximum spacing of tensile bar from outer edge of concrete (mm)

= SQRT((0.5x180)^2+(50+0.5x20)^2)-0.5x20

Depth of NA from Compression face = x

Solve equation = (bx2/2) + (1.5m-1) Asc (x - d') - m Ast (d-x) = 0 to get x. x=

(x - d ') bxf c x
A sc fsc = (1.5 m -1) A sc f c (d - ) + A sc f sc (d - d ') = M
x 2 3
f c (d - x)
Ast f st = (m -1) A st
x Solve these equations to get fc

Stress in extreme compression fibre, fc

Stress in Tension reinforcement, fst = 9.33x0.88x(582-115.6)/115.6


Distance from compression face to point where crack width is being calculated, a

Strain at the level considered, ε1 = (h - x)fs/Es(d - x)

Strain due to stiffening effect in concrete, ε2 = 1.5b(h - x)(a - x)/(3EsAs(d - x))

εm = Average surface strain = ε1 - ε2

Crack Width, w = 3 acr εm/(1+2(acr - Cmin)/(h - x))


MENT NO.
RNALSTP20CDD003

28-Nov-18

R0

0.1 mm

30 N/mm2

500 N/mm2

2.7E+04 N/mm2

2.0E+05 N/mm2

31.21 kN-m

9.33

582 mm

53 mm

180 mm

98.2 mm

115.6 mm

0.88 N/mm2

33.1 N/mm2
642 mm

1.87E-04

8.52E-04

-6.65E-04

-0.166 mm
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W1-3 CRACK WIDTH - FLEXURE & TENSION (IS 3370 Part 2 - 2009, Annexure B)

Horizontal Limiting crack width, w

Max Mx Characteristic cube strength of Concrete, fck

Sx-Max Mx Yield Strength of Steel, fy


Modulus Elasticity of Concrete Ec = 5000 x SQRT( fck )

Modulus Elasticity of Steel, Es

Applied Moment at service condition, M

Applied Tension at service condition, N 161.784

σcbc = 10 N/mm2 Modular Ratio, m, 280/(3*σcbc) =

Breadth, b (mm) = 1000 Depth, h (mm) = 642

Reinf, Ast mm2 = 00-000+20-100 3140 Clear Cover, CC mm = 50

Reinf, Asc mm2 = 00-000+16-100 2010 Clear Cover, CC mm = 45

Distance between centroid of Ast and Asc, Zs = 642-50-0.5x20-45-0.5x16

Distance - Centroid of Ast to CG of Ast & Asc, Xs = 2010x529/(3140+2010)

Modified Moment M' = M - N * Xs

Modified moment, M' > 0, section is in bending

Effecive Depth, d = 642-50-0.5x20

Cover to the centre of compression steel, d' = 45+0.5x16


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

bxf c bxf c x
A st f st - - A sc f sc = N (d - ) + A sc f sc (d - d ') = M - N X S
2 2 3
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

f c (d - x) (x - d ')
Ast fst = (m -1) A st A sc f sc = (1.5 m -1) A sc f c
x x

Solve above equations to get the value of fc and x

Depth of NA from Compression face = x

Stress in extreme compression fibre, fc

Stress in Tension reinforcement, fst

= (9.33-1)x4.9x(582-115.92)/115.92

Distance from compression face to point where crack width is being calculated, a

Max spacing of bars, S =

acr = maximum spacing of tensile bar from outer edge of concrete (mm)

= SQRT((0.5x100)^2+(50+0.5x20)^2)-0.5x20

Strain at the level considered, ε1 = (h - x)fs/Es(d - x)

Strain due to stiffening effect in concrete, ε2 = 1.5b(h - x)(a - x)/(3EsAs(d - x))

εm = Average surface strain = ε1 - ε2

Crack Width, w = 3 acr εm/(1+2(acr - Cmin)/(h - x))


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
MENT NO.
NALSTP20CDD003

28-Nov-18

R0

0.1 mm

30 N/mm2

500 N/mm2

2.7E+04 N/mm2

2.0E+05 N/mm2

224.44 kN-m

161.78 kN

9.33

529.0 mm

206.5 mm

191.0 kN-m

582 mm

53 mm
MENT NO.
NALSTP20CDD003

28-Nov-18

R0

d ') = M - N X S
MENT NO.
NALSTP20CDD003

28-Nov-18

R0

115.92 mm

4.90 N/mm2

164.1 N/mm2

642 mm

100 mm

68.1 mm

9.26E-04

4.73E-04

4.53E-04

0.087 mm
MENT NO.
NALSTP20CDD003

28-Nov-18

R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W1-3 CRACK WIDTH - FLEXURE & TENSION (IS 3370 Part 2 - 2009, Annexure B)

Horizontal Limiting crack width, w

Max Sx Characteristic cube strength of Concrete, fck

Mx-Max Sx Yield Strength of Steel, fy


Modulus Elasticity of Concrete Ec = 5000 x SQRT( fck )

Modulus Elasticity of Steel, Es

Applied Moment at service condition, M

Applied Tension at service condition, N 163.068

σcbc = 10 N/mm2 Modular Ratio, m, 280/(3*σcbc) =

Breadth, b (mm) = 1000 Depth, h (mm) = 642

Reinf, Ast mm2 = 00-000+20-100 3140 Clear Cover, CC mm = 50

Reinf, Asc mm2 = 00-000+16-100 2010 Clear Cover, CC mm = 45

Distance between centroid of Ast and Asc, Zs = 642-50-0.5x20-45-0.5x16

Distance - Centroid of Ast to CG of Ast & Asc, Xs = 2010x529/(3140+2010)

Modified Moment M' = M - N * Xs

Modified moment, M' > 0, section is in bending

Effecive Depth, d = 642-50-0.5x20

Cover to the centre of compression steel, d' = 45+0.5x16


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

bxf c bxf c x
A st f st - - A sc f sc = N (d - ) + A sc f sc (d - d ') = M - N X S
2 2 3
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

f c (d - x) (x - d ')
Ast fst = (m -1) A st A sc f sc = (1.5 m -1) A sc f c
x x

Solve above equations to get the value of fc and x

Depth of NA from Compression face = x

Stress in extreme compression fibre, fc

Stress in Tension reinforcement, fst

= (9.33-1)x4.87x(582-115.66)/115.66

Distance from compression face to point where crack width is being calculated, a

Max spacing of bars, S =

acr = maximum spacing of tensile bar from outer edge of concrete (mm)

= SQRT((0.5x100)^2+(50+0.5x20)^2)-0.5x20

Strain at the level considered, ε1 = (h - x)fs/Es(d - x)

Strain due to stiffening effect in concrete, ε2 = 1.5b(h - x)(a - x)/(3EsAs(d - x))

εm = Average surface strain = ε1 - ε2

Crack Width, w = 3 acr εm/(1+2(acr - Cmin)/(h - x))


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
MENT NO.
NALSTP20CDD003

28-Nov-18

R0

0.1 mm

30 N/mm2

500 N/mm2

2.7E+04 N/mm2

2.0E+05 N/mm2

223.17 kN-m

163.07 kN

9.33

529.0 mm

206.5 mm

189.5 kN-m

582 mm

53 mm
MENT NO.
NALSTP20CDD003

28-Nov-18

R0

d ') = M - N X S
MENT NO.
NALSTP20CDD003

28-Nov-18

R0

115.66 mm

4.87 N/mm2

163.6 N/mm2

642 mm

100 mm

68.1 mm

9.23E-04

4.73E-04

4.50E-04

0.086 mm
MENT NO.
NALSTP20CDD003

28-Nov-18

R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W1-4 DESIGN OF WALL W1 GROUP 4 Height from 7.50 to 10.40 m

Grade of Concrete, fck = 30 N/mm2 Grade of Steel, fy = 500 N/mm2

Limiting Moment of Resistance Index = 0.133

+Z Face -Z Face

Clear Cover = Water Face ### Earth Face ###

STAAD Group Analysis Report


Shear Membrane Bending Moment

Plate L/C SQX SQY SX SY (local) SXY Mx My kNm/m


(local) (local) (local) kN/m2 (local) kNm/m
kN/m2 kN/m2 kN/m2 kN/m2
Max Qx 266 18 EMPT 716.967 182.553 -32.345 -68.068 -29.433 56.862 -62.717

Min Qx 267 17 FULL -353.132 49.452 -123.45 -280.377 167.852 22.487 -66.305

Max Qy 266 18 EMPT 716.967 182.553 -32.345 -68.068 -29.433 56.862 -62.717

Min Qy 261 13 FULL1 158.397 -276.402 -92.09 72.757 -27.759 6.337 -36.921

Max Sx 271 13 FULL1 105.218 60.278 134.436 -34.628 4.177 -29.992 -9.469

Min Sx 267 14 FULL2-226.539 -31.858 -252.375 -308.817 191.579 13.048 -68.377

Max Sy 261 18 EMPT 294.171 -251.69 28.739 106.985 -84.387 -77.694 -45.351

Min Sy 267 18 EMPT -30.054 -140.779 -243.803 -351.435 243.632 -2.989 -71.566

Max Sxy 267 18 EMPT -30.054 -140.779 -243.803 -351.435 243.632 -2.989 -71.566

Min Sxy 273 17 FULL 373.265 17.071 -100.75 -224.323 -146.143 -1.513 -74.759

Max Mx 196 13 FULL1-146.975 -39.547 119.858 -2.699 7.976 129.926 17.79

Min Mx 196 18 EMPT 187.082 -84.492 -164.992 -78.076 39.006 -181.875 -32.641

Max My 196 13 FULL1-146.975 -39.547 119.858 -2.699 7.976 129.926 17.79

Min My 208 13 FULL1 -24.422 9.641 98.472 -164.733 -6.279 -89.904 -93.327

Max Mxy 267 18 EMPT -30.054 -140.779 -243.803 -351.435 243.632 -2.989 -71.566

Min Mxy 201 18 EMPT 99.144 -34.367 -88.33 -106.877 47.487 -0.161 -34.137
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

Results from STADD output

Max Vertical BM in wall creating tension on Water Face Max My 17.79 kN-m/m

Max Horizontal BM in wall creating tension on Water Face Max Mx 129.93 kN-m/m

Tension corresponding to Max Mx Sx-Max Mx 0.12 N/mm2

Max Vertical BM in wall creating tension on Earth Face Min My 93.33 kN-m/m

Max Horizontal BM in wall creating tension on Earth Face Min Mx 181.88 kN-m/m

Tension corresponding to Min Mx Sx-Min Mx 0 N/mm2

Max Tension in Wall Max Sx 0.134 N/mm2

BM at wall corresponding to Max Sx on Earth Face Mx-Max Sx 29.99 kN-m/m


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

Thickness check:
Required effective thickness SQRT(181.88x1000000x1.5/(0.133x30x1000))

Provided overall thickness

Min Ast for each surface zone (mm2/m) in % = 0.24 = 0.24x237.5x1000/100

Area of vertical reinforcement required on Water Face

Max My 17.79 kN-m/m

Effective Depth (mm) = 475-50-0.5x20

Mu / bd2 = 17.79x1.5x10^6/(1000x415^2)

Refer SP-16 Percentage of reinforcement required, %

Req area of Vertical reinf, Water Face, mm2 = MAX(0.036x415x1000/100,570)

Area of horizontal reinforcement required on Water Face

Max Mx 129.93 kN-m/ Corresponding Tension Sx = 0.120 N/mm2


Effective Depth (mm) = 475-50-0.5x20

Mu / bd2 = 129.93x1.5x10^6/(1000x415^2)

Refer SP-16 Percentage of reinforcement required, %

Required area of reinforcement for Mx, mm2 = 0.273x415x1000/100

Factored Tension, kN/m = 0.12x475x1.5

Required area of reinf on each face for Sx, mm2 = 0.5x85.5x1000/(0.8x500)

Req area of Hor reinf, Water Face, mm2 = MAX(1133+107,570)

Area of vertical reinforcement required on Earth Face

Min My 93.33 kN-m/m

Effective Depth (mm) = 475-45-0.5x16


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
Mu / bd2 = 93.33x1.5x10^6/(1000x422^2)

Refer SP-16 Percentage of reinforcement required, %

Req area of Vertical reinf, Earth Face, mm2 = MAX(0.187x422x1000/100,570)

Area of horizontal reinforcement required on Earth Face

Min Mx 181.88 kN-m/ Corresponding Tension Sx = 0.000 N/mm2


Effective Depth (mm) = 475-45-0.5x16

Mu / bd2 = 181.88x1.5x10^6/(1000x422^2)

Refer SP-16 Percentage of reinforcement required, %

Required area of reinforcement for Mx, mm2 = 0.376x422x1000/100

Factored Tension, N/m =0

Required area of reinf on each face for Sx, mm2 =0

Req area of Hor reinf, Earth Face, mm2 = MAX(1587+0,570)

Ast Required Ast Provided

Vertical Water Face 570 00-000+20-180 1744

Hor Water Face 1240 00-000+20-090 3489

Vertical Earth Face 789 00-000+16-180 1117

Hor Earth Face 1587 00-000+16-100 2010


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

Check for Shear at Junction of Base and Wall

Max Qy, (18 EMPTY) = 0.183 Min Qy, (13 FULL1) = -0.276
Factored Shear Stress, N/mm2 = 1.5x0.276

Percentage of Steel provided on Water Face

Thickness of wall
Factor k for thickness of slab (Refer Clause 40.2.1.1 of IS 456)

Factor for enhanced Shear Stress near the support (Refer Clause 40.5.1 of IS 456)

Maximum shear stress in concrete for limit state method of design, tc max
Permissible Shear Stress, N/mm2 (Value from Table 19 of IS 456 * k * Enhancement)

W1-4 Check for Temperature Reinforcement (As per Annexure A of IS 3370 - 2009, Part 2)

Horizontal Direction

Ast Provided (both faces) = 3489+2010

Percentage of reinforcement provided = 5499/475/1000x100

Max spacing of cracks Smax = (fct/fb) * (f / 2 r) (2/3)x(0.5x(20+16)/2)x(100/1.16)

fct / fb = 2/3 for deformed bars as recommended in Code

Crack Width, Wmax = Smax * (a/2)* (T1 + T2)

517x(0.7/100000/2)x(15+15)

Permissible crack width = 0.1 mm, Hence OK


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
O.
20CDD003

28-Nov-18

R0

ding Moment

Mxy kNm/m

-51.673

37.431

-51.673

12.046

-13.258

41.025

8.034

42.004

42.004

-52.267

-7.071

-35.212

-7.071

-4.838

42.004

-59.442
O.
20CDD003

28-Nov-18

R0
O.
20CDD003

28-Nov-18

R0

261 mm

475 mm

570

415.0

0.155

0.036

570

415.0

1.132

0.273

1133

85.5

107

1240

422.0
O.
20CDD003

28-Nov-18

R0
0.786

0.187

789

422.0

1.532

0.376

1587

1587

% Ast

0.420%

0.827%

0.269%

0.476%
O.
20CDD003

28-Nov-18

R0

0.414

0.420%

475 mm

3.50

0.460

5499 mm2

1.16

517 mm

0.05 mm
O.
20CDD003

28-Nov-18

R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W1-4 CRACK WIDTH - FLEXURE (IS 3370 Part 2 - 2009, Annexure B)

Vertical Limiting crack width, w

Max My Characteristic cube strength of Concrete, fck

Yield Strength of Steel, fy

Modulus Elasticity of Concrete Ec = 5000 x SQRT( fck )

Modulus Elasticity of Steel, Es

Applied Moment at service condition, M

σcbc = 10 N/mm2 Modular Ratio, m, 280/(3*σcbc) =

Breadth, b (mm) = 1000 Depth, h (mm) = 475

Reinf, Ast mm2 = 00-000+20-180 1744 Clear Cover, CC mm = 50

Reinf, Asc mm2 = 00-000+16-180 1117 Clear Cover, CC mm = 45

Effecive Depth, d = 475-50-0.5x20

Cover to the centre of compression steel, d' = 45+0.5x16

Max spacing of bars, S =

acr = maximum spacing of tensile bar from outer edge of concrete (mm)

= SQRT((0.5x180)^2+(50+0.5x20)^2)-0.5x20

Depth of NA from Compression face = x

Solve equation = (bx2/2) + (1.5m-1) Asc (x - d') - m Ast (d-x) = 0 to get x. x=

(x - d ') bxf c x
A sc fsc = (1.5 m -1) A sc f c (d - ) + A sc f sc (d - d ') = M
x 2 3
f c (d - x)
Ast f st = (m -1) A st
x Solve these equations to get fc

Stress in extreme compression fibre, fc

Stress in Tension reinforcement, fst = 9.33x0.86x(415-95.7)/95.7


Distance from compression face to point where crack width is being calculated, a

Strain at the level considered, ε1 = (h - x)fs/Es(d - x)

Strain due to stiffening effect in concrete, ε2 = 1.5b(h - x)(a - x)/(3EsAs(d - x))

εm = Average surface strain = ε1 - ε2

Crack Width, w = 3 acr εm/(1+2(acr - Cmin)/(h - x))


MENT NO.
RNALSTP20CDD003

28-Nov-18

R0

0.1 mm

30 N/mm2

500 N/mm2

2.7E+04 N/mm2

2.0E+05 N/mm2

17.79 kN-m

9.33

415 mm

53 mm

180 mm

98.2 mm

95.7 mm

0.86 N/mm2

26.8 N/mm2
475 mm

1.59E-04

6.46E-04

-4.87E-04

-0.114 mm
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W1-4 CRACK WIDTH - FLEXURE & TENSION (IS 3370 Part 2 - 2009, Annexure B)

Horizontal Limiting crack width, w

Max Mx Characteristic cube strength of Concrete, fck

Sx-Max Mx Yield Strength of Steel, fy


Modulus Elasticity of Concrete Ec = 5000 x SQRT( fck )

Modulus Elasticity of Steel, Es

Applied Moment at service condition, M

Applied Tension at service condition, N 57

σcbc = 10 N/mm2 Modular Ratio, m, 280/(3*σcbc) =

Breadth, b (mm) = 1000 Depth, h (mm) = 475

Reinf, Ast mm2 = 00-000+20-090 3489 Clear Cover, CC mm = 50

Reinf, Asc mm2 = 00-000+16-100 2010 Clear Cover, CC mm = 45

Distance between centroid of Ast and Asc, Zs = 475-50-0.5x20-45-0.5x16

Distance - Centroid of Ast to CG of Ast & Asc, Xs = 2010x362/(3489+2010)

Modified Moment M' = M - N * Xs

Modified moment, M' > 0, section is in bending

Effecive Depth, d = 475-50-0.5x20

Cover to the centre of compression steel, d' = 45+0.5x16


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

bxf c bxf c x
A st f st - - A sc f sc = N (d - ) + A sc f sc (d - d ') = M - N X S
2 2 3

f c (d - x) (x - d ')
Ast fst = (m -1) A st A sc f sc = (1.5 m -1) A sc f c
x x

Solve above equations to get the value of fc and x

Depth of NA from Compression face = x

Stress in extreme compression fibre, fc

Stress in Tension reinforcement, fst

= (9.33-1)x4.76x(415-110.05)/110.05

Distance from compression face to point where crack width is being calculated, a

Max spacing of bars, S =

acr = maximum spacing of tensile bar from outer edge of concrete (mm)

= SQRT((0.5x90)^2+(50+0.5x20)^2)-0.5x20

Strain at the level considered, ε1 = (h - x)fs/Es(d - x)

Strain due to stiffening effect in concrete, ε2 = 1.5b(h - x)(a - x)/(3EsAs(d - x))

εm = Average surface strain = ε1 - ε2

Crack Width, w = 3 acr εm/(1+2(acr - Cmin)/(h - x))


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
MENT NO.
NALSTP20CDD003

28-Nov-18

R0

0.1 mm

30 N/mm2

500 N/mm2

2.7E+04 N/mm2

2.0E+05 N/mm2

129.93 kN-m

57.00 kN

9.33

362.0 mm

132.3 mm

122.4 kN-m

415 mm

53 mm
MENT NO.
NALSTP20CDD003

28-Nov-18

R0
MENT NO.
NALSTP20CDD003

28-Nov-18

R0

d ') = M - N X S

110.05 mm

4.76 N/mm2

109.9 N/mm2

475 mm

90 mm

65.0 mm

6.57E-04

3.13E-04

3.45E-04

0.062 mm
MENT NO.
NALSTP20CDD003

28-Nov-18

R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W1-4 CRACK WIDTH - FLEXURE & TENSION (IS 3370 Part 2 - 2009, Annexure B)

Horizontal Limiting crack width, w

Max Sx Characteristic cube strength of Concrete, fck

Mx-Max Sx Yield Strength of Steel, fy


Modulus Elasticity of Concrete Ec = 5000 x SQRT( fck )

Modulus Elasticity of Steel, Es

Applied Moment at service condition, M

Applied Tension at service condition, N 63.65

σcbc = 10 N/mm2 Modular Ratio, m, 280/(3*σcbc) =

Breadth, b (mm) = 1000 Depth, h (mm) = 475

Reinf, Ast mm2 = 00-000+16-100 2010 Clear Cover, CC mm = 45

Reinf, Asc mm2 = 00-000+20-090 3489 Clear Cover, CC mm = 50

Distance between centroid of Ast and Asc, Zs = 475-45-0.5x16-50-0.5x20

Distance - Centroid of Ast to CG of Ast & Asc, Xs = 3489x362/(2010+3489)

Modified Moment M' = M - N * Xs

Modified moment, M' > 0, section is in bending

Effecive Depth, d = 475-45-0.5x16

Cover to the centre of compression steel, d' = 50+0.5x20


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

bxf c bxf c x
A st f st - - A sc f sc = N (d - ) + A sc f sc (d - d ') = M - N X S
2 2 3

f c (d - x) (x - d ')
Ast fst = (m -1) A st A sc f sc = (1.5 m -1) A sc f c
x x

Solve above equations to get the value of fc and x

Depth of NA from Compression face = x

Stress in extreme compression fibre, fc

Stress in Tension reinforcement, fst

= (9.33-1)x1.1x(422-64.32)/64.32

Distance from compression face to point where crack width is being calculated, a

Max spacing of bars, S =

acr = maximum spacing of tensile bar from outer edge of concrete (mm)

= SQRT((0.5x100)^2+(45+0.5x16)^2)-0.5x16

Strain at the level considered, ε1 = (h - x)fs/Es(d - x)

Strain due to stiffening effect in concrete, ε2 = 1.5b(h - x)(a - x)/(3EsAs(d - x))

εm = Average surface strain = ε1 - ε2

Crack Width, w = 3 acr εm/(1+2(acr - Cmin)/(h - x))


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
MENT NO.
NALSTP20CDD003

28-Nov-18

R0

0.1 mm

30 N/mm2

500 N/mm2

2.7E+04 N/mm2

2.0E+05 N/mm2

29.99 kN-m

63.65 kN

9.33

362.0 mm

229.7 mm

15.4 kN-m

422 mm

60 mm
MENT NO.
NALSTP20CDD003

28-Nov-18

R0
MENT NO.
NALSTP20CDD003

28-Nov-18

R0

d ') = M - N X S

64.32 mm

1.10 N/mm2

51.0 N/mm2

475 mm

100 mm

64.9 mm

2.93E-04

5.86E-04

-2.94E-04

-0.052 mm
MENT NO.
NALSTP20CDD003

28-Nov-18

R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

DESIGN OF WALL W1A


NT NO.
LSTP20CDD003

28-Nov-18

R0

A
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W1A-DATA DESIGN OF WALL W1A

DESIGNED THICKNESS
Height from bottom 0.00 1.80 9.50 12.20
Designed Thickness 850 850 600 350
Provided Thickness 850 850 600 350

Length of Wall = 6.25 m

Minimum reinforcement as per clause 8.1.1 of IS 3370 (Part 2) - 2009 0.24 %

Height Thickness Thickness for Temp.


Group Avg Th
From To From To From To Avg. Th
1 0.00 2.00 850 844 847 850 844 847
2 2.00 4.50 844 762 803 844 762 803
3 4.50 7.00 762 681 722 762 681 722
4 7.00 9.50 681 600 641 681 600 641
5 9.50 12.20 600 350 475 600 350 475

Direction and Type of Fill BOW BOF TOW TOF HOF

+Z Water Face Liquid 231.30 231.30 243.50 241.50 10.20

-Z Earth Face Earth 231.30 231.30 243.50 243.00 11.70

Fill k r Pressure Additional Loads, if any

+Z 1.00 10.30 105.06

-Z 0.33 20.00 77.92


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
O.
20CDD003

28-Nov-18

R0
O.
20CDD003

28-Nov-18

R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W1A-1 DESIGN OF WALL W1A GROUP 1 Height from 0.00 to 2.00 m

Grade of Concrete, fck = 30 N/mm2 Grade of Steel, fy = 500 N/mm2

Limiting Moment of Resistance Index = 0.133

+Z Face -Z Face

Clear Cover = Water Face ### Earth Face ###

STAAD Group Analysis Report


Shear Membrane Bending Moment

Plate L/C SQX SQY SX SY (local) SXY Mx My kNm/m


(local) (local) (local) kN/m2 (local) kNm/m
kN/m2 kN/m2 kN/m2 kN/m2
Max Qx 1379 14 FULL2 270.122 19.618 -638.169 -200.651 -121.076 -45.201 254.585

Min Qx 315 13 FULL1-276.397 16.49 -505.698 -187.438 87.204 -39.61 250.95

Max Qy 300 13 FULL1 95.032 534.31 -72.581 -535.399 52.339 13.4 226.023

Min Qy 281 13 FULL1 -10.83 -255.957 -43.883 -108.852 213.977 21.562 206.158

Max Sx 315 14 FULL2 16.421 -6.571 548.18 -290.136 -255.644 3.997 -10.8

Min Sx 1379 14 FULL2 270.122 19.618 -638.169 -200.651 -121.076 -45.201 254.585

Max Sy 1334 18 EMPT -52.033 210.813 10.177 158.254 -117.541 -32.541 -199.299

Min Sy 1369 14 FULL2 -89.664 533.495 -112.06 -637.414 -85.432 8.503 231.975

Max Sxy 1368 13 FULL1 -7.958 -16.912 267.361 -135.676 386.751 1.227 -1.6

Min Sxy 301 14 FULL2 9.043 -23.942 342.667 -77.705 -446.392 0.736 -7.237

Max Mx 325 17 FULL 121.423 53.537 -24.473 -263.302 -46.144 112.768 40.1

Min Mx 318 13 FULL1 -55.25 -94.168 -258.629 -102.692 102.212 -100.02 100.322

Max My 1379 14 FULL2 270.122 19.618 -638.169 -200.651 -121.076 -45.201 254.585

Min My 278 18 EMPT -0.766 238.625 -45.35 -100.795 121.774 -52.062 -331.873

Max Mxy 288 13 FULL1 23.886 136.123 -93.532 -340.099 92.39 14.59 143.777

Min Mxy 1356 14 FULL2 -21.666 137.387 -129.914 -386.865 -137.584 11.148 143.964
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

Results from STADD output

Max Vertical BM in wall creating tension on Water Face Max My 254.59 kN-m/m

Max Horizontal BM in wall creating tension on Water Face Max Mx 112.77 kN-m/m

Tension corresponding to Max Mx Sx-Max Mx 0 N/mm2

Max Vertical BM in wall creating tension on Earth Face Min My 331.87 kN-m/m

Max Horizontal BM in wall creating tension on Earth Face Min Mx 100.02 kN-m/m

Tension corresponding to Min Mx Sx-Min Mx 0 N/mm2

Max Tension in Wall Max Sx 0.548 N/mm2

BM at wall corresponding to Max Sx on Water Face Mx-Max Sx 4 kN-m/m


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

Thickness check:
Required effective thickness SQRT(331.87x1000000x1.5/(0.133x30x1000))

Provided overall thickness

Min Ast for each surface zone (mm2/m) in % = 0.24 = 0.24x250x1000/100

Area of vertical reinforcement required on Water Face

Max My 254.59 kN-m/m

Effective Depth (mm) = 847-50-0.5x25

Mu / bd2 = 254.59x1.5x10^6/(1000x784.5^2)

Refer SP-16 Percentage of reinforcement required, %

Req area of Vertical reinf, Water Face, mm2 = MAX(0.146x784.5x1000/100,600)

Area of horizontal reinforcement required on Water Face

Max Mx 112.77 kN-m/ Corresponding Tension Sx = 0.000 N/mm2


Effective Depth (mm) = 847-50-0.5x12

Mu / bd2 = 112.77x1.5x10^6/(1000x791^2)

Refer SP-16 Percentage of reinforcement required, %

Required area of reinforcement for Mx, mm2 = 0.063x791x1000/100

Factored Tension, kN/m =0

Required area of reinf on each face for Sx, mm2 =0

Req area of Hor reinf, Water Face, mm2 = MAX(498+0,600)

Area of vertical reinforcement required on Earth Face

Min My 331.87 kN-m/m

Effective Depth (mm) = 847-45-0.5x20


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
Mu / bd2 = 331.87x1.5x10^6/(1000x792^2)

Refer SP-16 Percentage of reinforcement required, %

Req area of Vertical reinf, Earth Face, mm2 = MAX(0.189x792x1000/100,600)

Area of horizontal reinforcement required on Earth Face

Min Mx 100.02 kN-m/ Corresponding Tension Sx = 0.000 N/mm2


Effective Depth (mm) = 847-45-0.5x12

Mu / bd2 = 100.02x1.5x10^6/(1000x796^2)

Refer SP-16 Percentage of reinforcement required, %

Required area of reinforcement for Mx, mm2 = 0.055x796x1000/100

Factored Tension, N/m =0

Required area of reinf on each face for Sx, mm2 =0

Req area of Hor reinf, Earth Face, mm2 = MAX(438+0,600)

Ast Required Ast Provided

Vertical Water Face 1145 25-180+20-180 4472

Hor Water Face 600 00-000+12-100 1130

Vertical Earth Face 1497 00-000+20-150 2093

Hor Earth Face 600 00-000+12-100 1130


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

Check for Shear at Junction of Base and Wall

Max Qy, (13 FULL1) = 0.534 Min Qy, (13 FULL1) = -0.256
Factored Shear Stress, N/mm2 = 1.5x0.534

Percentage of Steel provided on Water Face

Thickness of wall
Factor k for thickness of slab (Refer Clause 40.2.1.1 of IS 456)

Factor for enhanced Shear Stress near the support (Refer Clause 40.5.1 of IS 456)

Maximum shear stress in concrete for limit state method of design, tc max
Permissible Shear Stress, N/mm2 (Value from Table 19 of IS 456 * k * Enhancement)

W1A-1 Check for Temperature Reinforcement (As per Annexure A of IS 3370 - 2009, Part 2)

Horizontal Direction

Ast Provided (both faces) = 1130+1130

Percentage of reinforcement provided = 2260/500/1000x100

Max spacing of cracks Smax = (fct/fb) * (f / 2 r) (2/3)x(0.5x(12+12)/2)x(100/0.45)

fct / fb = 2/3 for deformed bars as recommended in Code

Crack Width, Wmax = Smax * (a/2)* (T1 + T2)

889x(0.7/100000/2)x(15+15)

Permissible crack width = 0.1 mm, Hence OK


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
O.
20CDD003

28-Nov-18

R0

ding Moment

Mxy kNm/m

-42.678

56.632

116.498

-18.367

-4.283

-42.678

10.017

-109.363

6.798

-7.387

-24.57

-9.227

-42.678

-1.397

122.545

-113.346
O.
20CDD003

28-Nov-18

R0
O.
20CDD003

28-Nov-18

R0

353 mm

847 mm

600

784.5

0.621

0.146

1145

791.0

0.270

0.063

498

600

792.0
O.
20CDD003

28-Nov-18

R0
0.794

0.189

1497

796.0

0.237

0.055

438

600

% Ast

0.570%

0.143%

0.265%

0.142%
O.
20CDD003

28-Nov-18

R0

0.801

0.570%

847 mm

6.28

3.50

3.266

2260 mm2

0.45

889 mm

0.09 mm
O.
20CDD003

28-Nov-18

R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W1A-1 CRACK WIDTH - FLEXURE (IS 3370 Part 2 - 2009, Annexure B)

Vertical Limiting crack width, w

Max My Characteristic cube strength of Concrete, fck

Yield Strength of Steel, fy

Modulus Elasticity of Concrete Ec = 5000 x SQRT( fck )

Modulus Elasticity of Steel, Es

Applied Moment at service condition, M

σcbc = 10 N/mm2 Modular Ratio, m, 280/(3*σcbc) =

Breadth, b (mm) = 1000 Depth, h (mm) = 847

Reinf, Ast mm2 = 25-180+20-180 4472 Clear Cover, CC mm = 50

Reinf, Asc mm2 = 00-000+20-150 2093 Clear Cover, CC mm = 45

Effecive Depth, d = 847-50-0.5x25

Cover to the centre of compression steel, d' = 45+0.5x20

Max spacing of bars, S =

acr = maximum spacing of tensile bar from outer edge of concrete (mm)

= SQRT((0.5x90)^2+(50+0.5x25)^2)-0.5x25

Depth of NA from Compression face = x

Solve equation = (bx2/2) + (1.5m-1) Asc (x - d') - m Ast (d-x) = 0 to get x. x=

(x - d ') bxf c x
A sc fsc = (1.5 m -1) A sc f c (d - ) + A sc f sc (d - d ') = M
x 2 3
f c (d - x)
Ast f st = (m -1) A st
x Solve these equations to get fc

Stress in extreme compression fibre, fc

Stress in Tension reinforcement, fst = 9.33x2.94x(784.5-201.6)/201.6


Distance from compression face to point where crack width is being calculated, a

Strain at the level considered, ε1 = (h - x)fs/Es(d - x)

Strain due to stiffening effect in concrete, ε2 = 1.5b(h - x)(a - x)/(3EsAs(d - x))

εm = Average surface strain = ε1 - ε2

Crack Width, w = 3 acr εm/(1+2(acr - Cmin)/(h - x))


MENT NO.
RNALSTP20CDD003

28-Nov-18

R0

0.1 mm

30 N/mm2

500 N/mm2

2.7E+04 N/mm2

2.0E+05 N/mm2

254.59 kN-m

9.33

785 mm

55 mm

90 mm

64.5 mm

201.6 mm

2.94 N/mm2

79.3 N/mm2
847 mm

4.39E-04

3.99E-04

3.96E-05

0.007 mm
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W1A-1 CRACK WIDTH - FLEXURE & TENSION (IS 3370 Part 2 - 2009, Annexure B)

Horizontal Limiting crack width, w

Max Mx Characteristic cube strength of Concrete, fck

Sx-Max Mx Yield Strength of Steel, fy


Modulus Elasticity of Concrete Ec = 5000 x SQRT( fck )

Modulus Elasticity of Steel, Es

Applied Moment at service condition, M

Applied Tension at service condition, N 0

σcbc = 10 N/mm2 Modular Ratio, m, 280/(3*σcbc) =

Breadth, b (mm) = 1000 Depth, h (mm) = 847

Reinf, Ast mm2 = 00-000+12-100 1130 Clear Cover, CC mm = 50

Reinf, Asc mm2 = 00-000+12-100 1130 Clear Cover, CC mm = 45

Distance between centroid of Ast and Asc, Zs = 847-50-0.5x12-45-0.5x12

Distance - Centroid of Ast to CG of Ast & Asc, Xs = 1130x740/(1130+1130)

Modified Moment M' = M - N * Xs

Modified moment, M' > 0, section is in bending

Effecive Depth, d = 847-50-0.5x12

Cover to the centre of compression steel, d' = 45+0.5x12


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

bxf c bxf c x
A st f st - - A sc f sc = N (d - ) + A sc f sc (d - d ') = M - N X S
2 2 3

f c (d - x) (x - d ')
Ast fst = (m -1) A st A sc f sc = (1.5 m -1) A sc f c
x x

Solve above equations to get the value of fc and x

Depth of NA from Compression face = x

Stress in extreme compression fibre, fc

Stress in Tension reinforcement, fst

= (9.33-1)x2.46x(791-105.84)/105.84

Distance from compression face to point where crack width is being calculated, a

Max spacing of bars, S =

acr = maximum spacing of tensile bar from outer edge of concrete (mm)

= SQRT((0.5x100)^2+(50+0.5x12)^2)-0.5x12

Strain at the level considered, ε1 = (h - x)fs/Es(d - x)

Strain due to stiffening effect in concrete, ε2 = 1.5b(h - x)(a - x)/(3EsAs(d - x))

εm = Average surface strain = ε1 - ε2

Crack Width, w = 3 acr εm/(1+2(acr - Cmin)/(h - x))


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
MENT NO.
NALSTP20CDD003

28-Nov-18

R0

0.1 mm

30 N/mm2

500 N/mm2

2.7E+04 N/mm2

2.0E+05 N/mm2

112.77 kN-m

1.00 kN

9.33

740.0 mm

370.0 mm

112.4 kN-m

791 mm

51 mm
MENT NO.
NALSTP20CDD003

28-Nov-18

R0
MENT NO.
NALSTP20CDD003

28-Nov-18

R0

') = M - N X S

105.84 mm

2.46 N/mm2

132.7 N/mm2

847 mm

100 mm

69.1 mm

7.17E-04

1.77E-03

-1.06E-03

-0.208 mm
MENT NO.
NALSTP20CDD003

28-Nov-18

R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W1A-1 CRACK WIDTH - FLEXURE & TENSION (IS 3370 Part 2 - 2009, Annexure B)

Horizontal Limiting crack width, w

Max Sx Characteristic cube strength of Concrete, fck

Mx-Max Sx Yield Strength of Steel, fy


Modulus Elasticity of Concrete Ec = 5000 x SQRT( fck )

Modulus Elasticity of Steel, Es

Applied Moment at service condition, M

Applied Tension at service condition, N 464.156

σcbc = 10 N/mm2 Modular Ratio, m, 280/(3*σcbc) =

Breadth, b (mm) = 1000 Depth, h (mm) = 847

Reinf, Ast mm2 = 00-000+12-100 1130 Clear Cover, CC mm = 50

Reinf, Asc mm2 = 00-000+12-100 1130 Clear Cover, CC mm = 45

Distance between centroid of Ast and Asc, Zs = 847-50-0.5x12-45-0.5x12

Distance - Centroid of Ast to CG of Ast & Asc, Xs

= 1130x740/(1130+1130)

Modified Moment M' = M - N * Xs

Modified moment, M' < 0, section in tension


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

Effecive Depth, d = 847-50-0.5x12

Cover to the centre of compression steel, d' = 45+0.5x12

Tension excess tensile face, T'

= (464.16x1130/(1130+1130))+(4x1000/(791-51))

Tension less tensile face, T''

= (464.16x1130/(1130+1130))-(4x1000/(791-51))

Stress in Tension reinforcement, fst = 237.485x1000/1130

Total Concrete Area, Ac = 1000x847+(9.33-1)x(1130+1130)

Direct Tension in Concrete, fct = 464.16x1000/865825.8

Max spacing of bars, S =

acr = maximum spacing of tensile bar from outer edge of concrete (mm)

= SQRT((0.5x100)^2+(50+0.5x12)^2)-0.5x12

Strain at the level considered, ε1 = fs / Es

Strain due to stiffening effect in concrete, ε2 = bD/EsAs


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
εm = Average surface strain = ε1 - ε2

Crack Width, w = 3 acr εm


MENT NO.
NALSTP20CDD003

28-Nov-18

R0

0.1 mm

30 N/mm2

500 N/mm2

2.7E+04 N/mm2

2.0E+05 N/mm2

4.00 kN-m

464.16 kN

9.33

740.0 mm

370.0 mm

-167.7 kN-m
MENT NO.
NALSTP20CDD003

28-Nov-18

R0
MENT NO.
NALSTP20CDD003

28-Nov-18

R0

791 mm

51 mm

237.5 kN

226.7 kN

210.2 N/mm2

8.7E+05 mm2

0.54 N/mm2

100 mm

69.1 mm

1.05E-03

1.87E-03
MENT NO.
NALSTP20CDD003

28-Nov-18

R0
-8.23E-04

-0.171 mm
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W1A-2 DESIGN OF WALL W1A GROUP 2 Height from 2.00 to 4.50 m

Grade of Concrete, fck = 30 N/mm2 Grade of Steel, fy = 500 N/mm2

Limiting Moment of Resistance Index = 0.133

+Z Face -Z Face

Clear Cover = Water Face ### Earth Face ###

STAAD Group Analysis Report


Shear Membrane Bending Moment

Plate L/C SQX SQY SX SY (local) SXY Mx My kNm/m


(local) (local) (local) kN/m2 (local) kNm/m
kN/m2 kN/m2 kN/m2 kN/m2
Max Qx 1404 14 FULL2 319.926 -347.354 -536.914 -480.545 273.609 32.516 228.94

Min Qx 340 13 FULL1-336.081 -357.65 -430.924 -404.036 -229.613 40.917 220.276

Max Qy 352 18 EMPT 100.199 179.032 -26.936 -519.126 28.013 -5.884 -167.041

Min Qy 340 13 FULL1-336.081 -257.65 -430.924 -404.036 -229.613 40.917 220.276

Max Sx 328 14 FULL2 20.389 -0.016 588.028 -276.224 -81.403 4.553 -13.185

Min Sx 1391 14 FULL2 298.081 -97.447 -666.274 -209.616 54.313 -53.141 247.181

Max Sy 352 14 FULL2 10.313 8.057 231.38 8.946 33.933 -3.906 -14.762

Min Sy 352 18 EMPT 100.199 179.032 -26.936 -519.126 28.013 -5.884 -167.041

Max Sxy 1404 14 FULL2 319.926 -347.354 -536.914 -480.545 273.609 32.516 228.94

Min Sxy 340 13 FULL1-336.081 -357.65 -430.924 -404.036 -229.613 40.917 220.276

Max Mx 1431 17 FULL -241.058 89.866 -22.682 -233.785 97.183 160.331 43.37

Min Mx 1431 18 EMPT 143.082 -146.577 -8.142 -74.421 -209.42 -154.188 -59.415

Max My 1391 14 FULL2 298.081 -97.447 -666.274 -209.616 54.313 -53.141 247.181

Min My 340 18 EMPT 176.483 154.025 -160.291 -472.112 -101.025 4.277 -198.487

Max Mxy 1409 14 FULL2-102.646 -18.523 -142.439 -148.278 -46.22 -58.769 11.535

Min Mxy 336 13 FULL1 97.885 -20.346 -61.751 -153.15 152.548 -16.18 14.109
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

Results from STADD output

Max Vertical BM in wall creating tension on Water Face Max My 247.18 kN-m/m

Max Horizontal BM in wall creating tension on Water Face Max Mx 160.33 kN-m/m

Tension corresponding to Max Mx Sx-Max Mx 0 N/mm2

Max Vertical BM in wall creating tension on Earth Face Min My 198.49 kN-m/m

Max Horizontal BM in wall creating tension on Earth Face Min Mx 154.19 kN-m/m

Tension corresponding to Min Mx Sx-Min Mx 0 N/mm2

Max Tension in Wall Max Sx 0.588 N/mm2

BM at wall corresponding to Max Sx on Water Face Mx-Max Sx 4.55 kN-m/m


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

Thickness check:
Required effective thickness SQRT(247.18x1000000x1.5/(0.133x30x1000))

Provided overall thickness

Min Ast for each surface zone (mm2/m) in % = 0.24 = 0.24x250x1000/100

Area of vertical reinforcement required on Water Face

Max My 247.18 kN-m/m

Effective Depth (mm) = 803-50-0.5x25

Mu / bd2 = 247.18x1.5x10^6/(1000x740.5^2)

Refer SP-16 Percentage of reinforcement required, %

Req area of Vertical reinf, Water Face, mm2 = MAX(0.16x740.5x1000/100,600)

Area of horizontal reinforcement required on Water Face

Max Mx 160.33 kN-m/ Corresponding Tension Sx = 0.000 N/mm2


Effective Depth (mm) = 803-50-0.5x16

Mu / bd2 = 160.33x1.5x10^6/(1000x745^2)

Refer SP-16 Percentage of reinforcement required, %

Required area of reinforcement for Mx, mm2 = 0.101x745x1000/100

Factored Tension, kN/m =0

Required area of reinf on each face for Sx, mm2 =0

Req area of Hor reinf, Water Face, mm2 = MAX(752+0,600)

Area of vertical reinforcement required on Earth Face

Min My 198.49 kN-m/m

Effective Depth (mm) = 803-45-0.5x20


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
Mu / bd2 = 198.49x1.5x10^6/(1000x748^2)

Refer SP-16 Percentage of reinforcement required, %

Req area of Vertical reinf, Earth Face, mm2 = MAX(0.125x748x1000/100,600)

Area of horizontal reinforcement required on Earth Face

Min Mx 154.19 kN-m/ Corresponding Tension Sx = 0.000 N/mm2


Effective Depth (mm) = 803-45-0.5x12

Mu / bd2 = 154.19x1.5x10^6/(1000x752^2)

Refer SP-16 Percentage of reinforcement required, %

Required area of reinforcement for Mx, mm2 = 0.096x752x1000/100

Factored Tension, N/m =0

Required area of reinf on each face for Sx, mm2 =0

Req area of Hor reinf, Earth Face, mm2 = MAX(722+0,600)

Ast Required Ast Provided

Vertical Water Face 1185 00-000+25-180 2728

Hor Water Face 752 00-000+16-125 1608

Vertical Earth Face 935 00-000+20-150 2093

Hor Earth Face 722 00-000+12-100 1130


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

Check for Shear at Junction of Base and Wall

Max Qy, (18 EMPTY) = 0.179 Min Qy, (13 FULL1) = -0.258
Factored Shear Stress, N/mm2 = 1.5x0.258

Percentage of Steel provided on Water Face

Thickness of wall
Factor k for thickness of slab (Refer Clause 40.2.1.1 of IS 456)

Factor for enhanced Shear Stress near the support (Refer Clause 40.5.1 of IS 456)

Maximum shear stress in concrete for limit state method of design, tc max
Permissible Shear Stress, N/mm2 (Value from Table 19 of IS 456 * k * Enhancement)

W1A-2 Check for Temperature Reinforcement (As per Annexure A of IS 3370 - 2009, Part 2)

Horizontal Direction

Ast Provided (both faces) = 1608+1130

Percentage of reinforcement provided = 2738/500/1000x100

Max spacing of cracks Smax = (fct/fb) * (f / 2 r) (2/3)x(0.5x(16+12)/2)x(100/0.55)

fct / fb = 2/3 for deformed bars as recommended in Code

Crack Width, Wmax = Smax * (a/2)* (T1 + T2)

848x(0.7/100000/2)x(15+15)

Permissible crack width = 0.1 mm, Hence OK


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
O.
20CDD003

28-Nov-18

R0

ding Moment

Mxy kNm/m

68.289

-54.86

2.04

-54.86

-1.081

18.708

-0.329

2.04

68.289

-54.86

42.106

-48.89

18.708

3.706

97.638

-98.161
O.
20CDD003

28-Nov-18

R0
O.
20CDD003

28-Nov-18

R0

305 mm

803 mm

600

740.5

0.676

0.160

1185

745.0

0.433

0.101

752

752

748.0
O.
20CDD003

28-Nov-18

R0
0.532

0.125

935

752.0

0.409

0.096

722

722

% Ast

0.368%

0.215%

0.281%

0.150%
O.
20CDD003

28-Nov-18

R0

0.387

0.368%

803 mm

3.50

0.440

2738 mm2

0.55

848 mm

0.09 mm
O.
20CDD003

28-Nov-18

R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W1A-2 CRACK WIDTH - FLEXURE (IS 3370 Part 2 - 2009, Annexure B)

Vertical Limiting crack width, w

Max My Characteristic cube strength of Concrete, fck

Yield Strength of Steel, fy

Modulus Elasticity of Concrete Ec = 5000 x SQRT( fck )

Modulus Elasticity of Steel, Es

Applied Moment at service condition, M

σcbc = 10 N/mm2 Modular Ratio, m, 280/(3*σcbc) =

Breadth, b (mm) = 1000 Depth, h (mm) = 803

Reinf, Ast mm2 = 00-000+25-180 2728 Clear Cover, CC mm = 50

Reinf, Asc mm2 = 00-000+20-150 2093 Clear Cover, CC mm = 45

Effecive Depth, d = 803-50-0.5x25

Cover to the centre of compression steel, d' = 45+0.5x20

Max spacing of bars, S =

acr = maximum spacing of tensile bar from outer edge of concrete (mm)

= SQRT((0.5x180)^2+(50+0.5x25)^2)-0.5x25

Depth of NA from Compression face = x

Solve equation = (bx2/2) + (1.5m-1) Asc (x - d') - m Ast (d-x) = 0 to get x. x=

(x - d ') bxf c x
A sc fsc = (1.5 m -1) A sc f c (d - ) + A sc f sc (d - d ') = M
x 2 3
f c (d - x)
Ast f st = (m -1) A st
x Solve these equations to get fc

Stress in extreme compression fibre, fc

Stress in Tension reinforcement, fst = 9.33x3.76x(740.5-155.8)/155.8


Distance from compression face to point where crack width is being calculated, a

Strain at the level considered, ε1 = (h - x)fs/Es(d - x)

Strain due to stiffening effect in concrete, ε2 = 1.5b(h - x)(a - x)/(3EsAs(d - x))

εm = Average surface strain = ε1 - ε2

Crack Width, w = 3 acr εm/(1+2(acr - Cmin)/(h - x))


MENT NO.
RNALSTP20CDD003

28-Nov-18

R0

0.1 mm

30 N/mm2

500 N/mm2

2.7E+04 N/mm2

2.0E+05 N/mm2

247.18 kN-m

9.33

741 mm

55 mm

180 mm

97.1 mm

155.8 mm

3.76 N/mm2

131.7 N/mm2
803 mm

7.29E-04

6.57E-04

7.21E-05

0.018 mm
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W1A-2 CRACK WIDTH - FLEXURE & TENSION (IS 3370 Part 2 - 2009, Annexure B)

Horizontal Limiting crack width, w

Max Mx Characteristic cube strength of Concrete, fck

Sx-Max Mx Yield Strength of Steel, fy


Modulus Elasticity of Concrete Ec = 5000 x SQRT( fck )

Modulus Elasticity of Steel, Es

Applied Moment at service condition, M

Applied Tension at service condition, N 0

σcbc = 10 N/mm2 Modular Ratio, m, 280/(3*σcbc) =

Breadth, b (mm) = 1000 Depth, h (mm) = 803

Reinf, Ast mm2 = 00-000+16-125 1608 Clear Cover, CC mm = 50

Reinf, Asc mm2 = 00-000+12-100 1130 Clear Cover, CC mm = 45

Distance between centroid of Ast and Asc, Zs = 803-50-0.5x16-45-0.5x12

Distance - Centroid of Ast to CG of Ast & Asc, Xs = 1130x694/(1608+1130)

Modified Moment M' = M - N * Xs

Modified moment, M' > 0, section is in bending

Effecive Depth, d = 803-50-0.5x16

Cover to the centre of compression steel, d' = 45+0.5x12


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

bxf c bxf c x
A st f st - - A sc f sc = N (d - ) + A sc f sc (d - d ') = M - N X S
2 2 3
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

f c (d - x) (x - d ')
Ast fst = (m -1) A st A sc f sc = (1.5 m -1) A sc f c
x x

Solve above equations to get the value of fc and x

Depth of NA from Compression face = x

Stress in extreme compression fibre, fc

Stress in Tension reinforcement, fst

= (9.33-1)x3.29x(745-120.82)/120.82

Distance from compression face to point where crack width is being calculated, a

Max spacing of bars, S =

acr = maximum spacing of tensile bar from outer edge of concrete (mm)

= SQRT((0.5x125)^2+(50+0.5x16)^2)-0.5x16

Strain at the level considered, ε1 = (h - x)fs/Es(d - x)

Strain due to stiffening effect in concrete, ε2 = 1.5b(h - x)(a - x)/(3EsAs(d - x))

εm = Average surface strain = ε1 - ε2

Crack Width, w = 3 acr εm/(1+2(acr - Cmin)/(h - x))


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
MENT NO.
NALSTP20CDD003

28-Nov-18

R0

0.1 mm

30 N/mm2

500 N/mm2

2.7E+04 N/mm2

2.0E+05 N/mm2

160.33 kN-m

1.00 kN

9.33

694.0 mm

286.4 mm

160.0 kN-m

745 mm

51 mm
MENT NO.
NALSTP20CDD003

28-Nov-18

R0

d ') = M - N X S
MENT NO.
NALSTP20CDD003

28-Nov-18

R0

120.82 mm

3.29 N/mm2

141.6 N/mm2

803 mm

125 mm

77.3 mm

7.74E-04

1.16E-03

-3.85E-04

-0.083 mm
MENT NO.
NALSTP20CDD003

28-Nov-18

R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W1A-2 CRACK WIDTH - FLEXURE & TENSION (IS 3370 Part 2 - 2009, Annexure B)

Horizontal Limiting crack width, w

Max Sx Characteristic cube strength of Concrete, fck

Mx-Max Sx Yield Strength of Steel, fy


Modulus Elasticity of Concrete Ec = 5000 x SQRT( fck )

Modulus Elasticity of Steel, Es

Applied Moment at service condition, M

Applied Tension at service condition, N 472.164

σcbc = 10 N/mm2 Modular Ratio, m, 280/(3*σcbc) =

Breadth, b (mm) = 1000 Depth, h (mm) = 803

Reinf, Ast mm2 = 00-000+16-125 1608 Clear Cover, CC mm = 50

Reinf, Asc mm2 = 00-000+12-100 1130 Clear Cover, CC mm = 45

Distance between centroid of Ast and Asc, Zs = 803-50-0.5x16-45-0.5x12

Distance - Centroid of Ast to CG of Ast & Asc, Xs

= 1130x694/(1608+1130)

Modified Moment M' = M - N * Xs

Modified moment, M' < 0, section in tension


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

Effecive Depth, d = 803-50-0.5x16

Cover to the centre of compression steel, d' = 45+0.5x12

Tension excess tensile face, T'

= (472.16x1608/(1608+1130))+(4.55x1000/(745-51))

Tension less tensile face, T''

= (472.16x1130/(1608+1130))-(4.55x1000/(745-51))

Stress in Tension reinforcement, fst = 283.851x1000/1608

Total Concrete Area, Ac = 1000x803+(9.33-1)x(1608+1130)

Direct Tension in Concrete, fct = 472.16x1000/825807.5

Max spacing of bars, S =

acr = maximum spacing of tensile bar from outer edge of concrete (mm)

= SQRT((0.5x125)^2+(50+0.5x16)^2)-0.5x16

Strain at the level considered, ε1 = fs / Es

Strain due to stiffening effect in concrete, ε2 = bD/EsAs


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
εm = Average surface strain = ε1 - ε2

Crack Width, w = 3 acr εm


MENT NO.
NALSTP20CDD003

28-Nov-18

R0

0.1 mm

30 N/mm2

500 N/mm2

2.7E+04 N/mm2

2.0E+05 N/mm2

4.55 kN-m

472.16 kN

9.33

694.0 mm

286.4 mm

-130.7 kN-m
MENT NO.
NALSTP20CDD003

28-Nov-18

R0
MENT NO.
NALSTP20CDD003

28-Nov-18

R0

745 mm

51 mm

283.9 kN

188.3 kN

176.5 N/mm2

8.3E+05 mm2

0.57 N/mm2

125 mm

77.3 mm

8.83E-04

1.47E-03
MENT NO.
NALSTP20CDD003

28-Nov-18

R0
-5.84E-04

-0.135 mm
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W1A-3 DESIGN OF WALL W1A GROUP 3 Height from 4.50 to 7.00 m

Grade of Concrete, fck = 30 N/mm2 Grade of Steel, fy = 500 N/mm2

Limiting Moment of Resistance Index = 0.133

+Z Face -Z Face

Clear Cover = Water Face ### Earth Face ###

STAAD Group Analysis Report


Shear Membrane Bending Moment

Plate L/C SQX SQY SX SY (local) SXY Mx My kNm/m


(local) (local) (local) kN/m2 (local) kNm/m
kN/m2 kN/m2 kN/m2 kN/m2
Max Qx 1491 18 EMPT 551.956 -3.053 31.051 -238.757 -235.019 -226.793 -290.439

Min Qx 454 18 EMPT -549.741 5.827 21.191 -247.795 140.375 -219.198 -353.505

Max Qy 1455 17 FULL -296.534 99.77 -18.952 -219.83 113.299 184.663 69.695

Min Qy 1467 18 EMPT 341.565 -250.673 26.464 -124.779 -253.875 -227.502 -190.041

Max Sx 395 14 FULL2 16.629 1.366 102.445 -150.494 42.945 19.669 -7.382

Min Sx 1448 14 FULL2 -48.31 -55.798 -107.391 -228.529 121.765 -117.26 -27.656

Max Sy 391 14 FULL2 9.223 0.806 80.411 -80.627 -6.738 3.044 -15.486

Min Sy 1453 14 FULL2 18.006 -129.361 -42.795 -362.357 81.993 -68.638 -49.603

Max Sxy 402 18 EMPT -168.806 -181.096 -19.917 -88.238 178.807 -179.379 -105.141

Min Sxy 1479 18 EMPT 484.023 -197.238 42.163 -169.565 -258.583 -233.171 -257.487

Max Mx 1467 17 FULL -338.074 88.608 -19.162 -204.754 119.341 187.18 88.293

Min Mx 1479 18 EMPT 484.023 -197.238 42.163 -169.565 -258.583 -233.171 -257.487

Max My 441 17 FULL 378.827 23.795 -20.424 -175.15 -70.953 176.412 118.552

Min My 454 18 EMPT -549.741 5.827 21.191 -247.795 140.375 -219.198 -353.505

Max Mxy 400 18 EMPT -149.673 -85.893 -37.731 -119.352 123.182 -48.968 -103.266

Min Mxy 1446 18 EMPT 130.93 -43.531 13.908 -116.104 -156.222 -5.184 -81.727
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

Results from STADD output

Max Vertical BM in wall creating tension on Water Face Max My 118.55 kN-m/m

Max Horizontal BM in wall creating tension on Water Face Max Mx 187.18 kN-m/m

Tension corresponding to Max Mx Sx-Max Mx 0 N/mm2

Max Vertical BM in wall creating tension on Earth Face Min My 353.51 kN-m/m

Max Horizontal BM in wall creating tension on Earth Face Min Mx 233.17 kN-m/m

Tension corresponding to Min Mx Sx-Min Mx 0.042 N/mm2

Max Tension in Wall Max Sx 0.102 N/mm2

BM at wall corresponding to Max Sx on Water Face Mx-Max Sx 19.67 kN-m/m


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

Thickness check:
Required effective thickness SQRT(353.51x1000000x1.5/(0.133x30x1000))

Provided overall thickness

Min Ast for each surface zone (mm2/m) in % = 0.24 = 0.24x250x1000/100

Area of vertical reinforcement required on Water Face

Max My 118.55 kN-m/m

Effective Depth (mm) = 722-50-0.5x25

Mu / bd2 = 118.55x1.5x10^6/(1000x659.5^2)

Refer SP-16 Percentage of reinforcement required, %

Req area of Vertical reinf, Water Face, mm2 = MAX(0.096x659.5x1000/100,600)

Area of horizontal reinforcement required on Water Face

Max Mx 187.18 kN-m/ Corresponding Tension Sx = 0.000 N/mm2


Effective Depth (mm) = 722-50-0.5x16

Mu / bd2 = 187.18x1.5x10^6/(1000x664^2)

Refer SP-16 Percentage of reinforcement required, %

Required area of reinforcement for Mx, mm2 = 0.15x664x1000/100

Factored Tension, kN/m =0

Required area of reinf on each face for Sx, mm2 =0

Req area of Hor reinf, Water Face, mm2 = MAX(996+0,600)

Area of vertical reinforcement required on Earth Face

Min My 353.51 kN-m/m

Effective Depth (mm) = 722-45-0.5x20


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
Mu / bd2 = 353.51x1.5x10^6/(1000x667^2)

Refer SP-16 Percentage of reinforcement required, %

Req area of Vertical reinf, Earth Face, mm2 = MAX(0.288x667x1000/100,600)

Area of horizontal reinforcement required on Earth Face

Min Mx 233.17 kN-m/ Corresponding Tension Sx = 0.042 N/mm2


Effective Depth (mm) = 722-45-0.5x16

Mu / bd2 = 233.17x1.5x10^6/(1000x669^2)

Refer SP-16 Percentage of reinforcement required, %

Required area of reinforcement for Mx, mm2 = 0.185x669x1000/100

Factored Tension, N/m = 0.042x722x1.5

Required area of reinf on each face for Sx, mm2 = 0.5x45.5x1000/(0.8x500)

Req area of Hor reinf, Earth Face, mm2 = MAX(1238+57,600)

Ast Required Ast Provided

Vertical Water Face 633 00-000+25-180 2728

Hor Water Face 996 00-000+16-090 2233

Vertical Earth Face 1921 00-000+20-150 2093

Hor Earth Face 1295 00-000+16-090 2233


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

Check for Shear at Junction of Base and Wall

Max Qy, (17 FULL) = 0.100 Min Qy, (18 EMPTY) = -0.251
Factored Shear Stress, N/mm2 = 1.5x0.251

Percentage of Steel provided on Water Face

Thickness of wall
Factor k for thickness of slab (Refer Clause 40.2.1.1 of IS 456)

Factor for enhanced Shear Stress near the support (Refer Clause 40.5.1 of IS 456)

Maximum shear stress in concrete for limit state method of design, tc max
Permissible Shear Stress, N/mm2 (Value from Table 19 of IS 456 * k * Enhancement)

W1A-3 Check for Temperature Reinforcement (As per Annexure A of IS 3370 - 2009, Part 2)

Horizontal Direction

Ast Provided (both faces) = 2233+2233

Percentage of reinforcement provided = 4466/500/1000x100

Max spacing of cracks Smax = (fct/fb) * (f / 2 r) (2/3)x(0.5x(16+16)/2)x(100/0.89)

fct / fb = 2/3 for deformed bars as recommended in Code

Crack Width, Wmax = Smax * (a/2)* (T1 + T2)

599x(0.7/100000/2)x(15+15)

Permissible crack width = 0.1 mm, Hence OK


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
O.
20CDD003

28-Nov-18

R0

ding Moment

Mxy kNm/m

-3.891

15.241

36.524

-56.119

10.454

75.813

1.593

17.742

71.326

-41.408

30.567

-41.408

-15.599

15.241

94.54

-84.703
O.
20CDD003

28-Nov-18

R0
O.
20CDD003

28-Nov-18

R0

365 mm

722 mm

600

659.5

0.409

0.096

633

664.0

0.637

0.150

996

996

667.0
O.
20CDD003

28-Nov-18

R0
1.192

0.288

1921

669.0

0.781

0.185

1238

45.5

57

1295

% Ast

0.414%

0.335%

0.315%

0.334%
O.
20CDD003

28-Nov-18

R0

0.377

0.414%

722 mm

3.50

0.460

4466 mm2

0.89

599 mm

0.06 mm
O.
20CDD003

28-Nov-18

R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W1A-3 CRACK WIDTH - FLEXURE (IS 3370 Part 2 - 2009, Annexure B)

Vertical Limiting crack width, w

Max My Characteristic cube strength of Concrete, fck

Yield Strength of Steel, fy

Modulus Elasticity of Concrete Ec = 5000 x SQRT( fck )

Modulus Elasticity of Steel, Es

Applied Moment at service condition, M

σcbc = 10 N/mm2 Modular Ratio, m, 280/(3*σcbc) =

Breadth, b (mm) = 1000 Depth, h (mm) = 722

Reinf, Ast mm2 = 00-000+25-180 2728 Clear Cover, CC mm = 50

Reinf, Asc mm2 = 00-000+20-150 2093 Clear Cover, CC mm = 45

Effecive Depth, d = 722-50-0.5x25

Cover to the centre of compression steel, d' = 45+0.5x20

Max spacing of bars, S =

acr = maximum spacing of tensile bar from outer edge of concrete (mm)

= SQRT((0.5x180)^2+(50+0.5x25)^2)-0.5x25

Depth of NA from Compression face = x

Solve equation = (bx2/2) + (1.5m-1) Asc (x - d') - m Ast (d-x) = 0 to get x. x=

(x - d ') bxf c x
A sc fsc = (1.5 m -1) A sc f c (d - ) + A sc f sc (d - d ') = M
x 2 3
f c (d - x)
Ast f st = (m -1) A st
x Solve these equations to get fc

Stress in extreme compression fibre, fc

Stress in Tension reinforcement, fst = 9.33x2.17x(659.5-145.7)/145.7


Distance from compression face to point where crack width is being calculated, a

Strain at the level considered, ε1 = (h - x)fs/Es(d - x)

Strain due to stiffening effect in concrete, ε2 = 1.5b(h - x)(a - x)/(3EsAs(d - x))

εm = Average surface strain = ε1 - ε2

Crack Width, w = 3 acr εm/(1+2(acr - Cmin)/(h - x))


MENT NO.
RNALSTP20CDD003

28-Nov-18

R0

0.1 mm

30 N/mm2

500 N/mm2

2.7E+04 N/mm2

2.0E+05 N/mm2

118.55 kN-m

9.33

660 mm

55 mm

180 mm

97.1 mm

145.7 mm

2.17 N/mm2

71.4 N/mm2
722 mm

4.00E-04

5.92E-04

-1.92E-04

-0.048 mm
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W1A-3 CRACK WIDTH - FLEXURE & TENSION (IS 3370 Part 2 - 2009, Annexure B)

Horizontal Limiting crack width, w

Max Mx Characteristic cube strength of Concrete, fck

Sx-Max Mx Yield Strength of Steel, fy


Modulus Elasticity of Concrete Ec = 5000 x SQRT( fck )

Modulus Elasticity of Steel, Es

Applied Moment at service condition, M

Applied Tension at service condition, N 0

σcbc = 10 N/mm2 Modular Ratio, m, 280/(3*σcbc) =

Breadth, b (mm) = 1000 Depth, h (mm) = 722

Reinf, Ast mm2 = 00-000+16-090 2233 Clear Cover, CC mm = 50

Reinf, Asc mm2 = 00-000+16-090 2233 Clear Cover, CC mm = 45

Distance between centroid of Ast and Asc, Zs = 722-50-0.5x16-45-0.5x16

Distance - Centroid of Ast to CG of Ast & Asc, Xs = 2233x611/(2233+2233)

Modified Moment M' = M - N * Xs

Modified moment, M' > 0, section is in bending

Effecive Depth, d = 722-50-0.5x16

Cover to the centre of compression steel, d' = 45+0.5x16


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

bxf c bxf c x
A st f st - - A sc f sc = N (d - ) + A sc f sc (d - d ') = M - N X S
2 2 3
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

f c (d - x) (x - d ')
Ast fst = (m -1) A st A sc f sc = (1.5 m -1) A sc f c
x x

Solve above equations to get the value of fc and x

Depth of NA from Compression face = x

Stress in extreme compression fibre, fc

Stress in Tension reinforcement, fst

= (9.33-1)x3.87x(664-125.53)/125.53

Distance from compression face to point where crack width is being calculated, a

Max spacing of bars, S =

acr = maximum spacing of tensile bar from outer edge of concrete (mm)

= SQRT((0.5x90)^2+(50+0.5x16)^2)-0.5x16

Strain at the level considered, ε1 = (h - x)fs/Es(d - x)

Strain due to stiffening effect in concrete, ε2 = 1.5b(h - x)(a - x)/(3EsAs(d - x))

εm = Average surface strain = ε1 - ε2

Crack Width, w = 3 acr εm/(1+2(acr - Cmin)/(h - x))


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
MENT NO.
NALSTP20CDD003

28-Nov-18

R0

0.1 mm

30 N/mm2

500 N/mm2

2.7E+04 N/mm2

2.0E+05 N/mm2

187.18 kN-m

1.00 kN

9.33

611.0 mm

305.5 mm

186.9 kN-m

664 mm

53 mm
MENT NO.
NALSTP20CDD003

28-Nov-18

R0

d ') = M - N X S
MENT NO.
NALSTP20CDD003

28-Nov-18

R0

125.53 mm

3.87 N/mm2

138.3 N/mm2

722 mm

90 mm

65.4 mm

7.66E-04

7.40E-04

2.62E-05

0.005 mm
MENT NO.
NALSTP20CDD003

28-Nov-18

R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W1A-3 CRACK WIDTH - FLEXURE & TENSION (IS 3370 Part 2 - 2009, Annexure B)

Horizontal Limiting crack width, w

Max Sx Characteristic cube strength of Concrete, fck

Mx-Max Sx Yield Strength of Steel, fy


Modulus Elasticity of Concrete Ec = 5000 x SQRT( fck )

Modulus Elasticity of Steel, Es

Applied Moment at service condition, M

Applied Tension at service condition, N 73.644

σcbc = 10 N/mm2 Modular Ratio, m, 280/(3*σcbc) =

Breadth, b (mm) = 1000 Depth, h (mm) = 722

Reinf, Ast mm2 = 00-000+16-090 2233 Clear Cover, CC mm = 50

Reinf, Asc mm2 = 00-000+16-090 2233 Clear Cover, CC mm = 45

Distance between centroid of Ast and Asc, Zs = 722-50-0.5x16-45-0.5x16

Distance - Centroid of Ast to CG of Ast & Asc, Xs

= 2233x611/(2233+2233)

Modified Moment M' = M - N * Xs

Modified moment, M' < 0, section in tension


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

Effecive Depth, d = 722-50-0.5x16

Cover to the centre of compression steel, d' = 45+0.5x16

Tension excess tensile face, T'

= (73.64x2233/(2233+2233))+(19.67x1000/(664-53))

Tension less tensile face, T''

= (73.64x2233/(2233+2233))-(19.67x1000/(664-53))

Stress in Tension reinforcement, fst = 69.013x1000/2233

Total Concrete Area, Ac = 1000x722+(9.33-1)x(2233+2233)

Direct Tension in Concrete, fct = 73.64x1000/759201.8

Max spacing of bars, S =

acr = maximum spacing of tensile bar from outer edge of concrete (mm)

= SQRT((0.5x90)^2+(50+0.5x16)^2)-0.5x16

Strain at the level considered, ε1 = fs / Es


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
Strain due to stiffening effect in concrete, ε2 = bD/EsAs

εm = Average surface strain = ε1 - ε2

Crack Width, w = 3 acr εm


MENT NO.
NALSTP20CDD003

28-Nov-18

R0

0.1 mm

30 N/mm2

500 N/mm2

2.7E+04 N/mm2

2.0E+05 N/mm2

19.67 kN-m

73.64 kN

9.33

611.0 mm

305.5 mm

-2.8 kN-m
MENT NO.
NALSTP20CDD003

28-Nov-18

R0
MENT NO.
NALSTP20CDD003

28-Nov-18

R0

664 mm

53 mm

69.0 kN

4.6 kN

30.9 N/mm2

7.6E+05 mm2

0.10 N/mm2

90 mm

65.4 mm

1.55E-04
MENT NO.
NALSTP20CDD003

28-Nov-18

R0
8.08E-04

-6.54E-04

-0.128 mm
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W1A-4 DESIGN OF WALL W1A GROUP 4 Height from 7.00 to 9.50 m

Grade of Concrete, fck = 30 N/mm2 Grade of Steel, fy = 500 N/mm2

Limiting Moment of Resistance Index = 0.133

+Z Face -Z Face

Clear Cover = Water Face ### Earth Face ###

STAAD Group Analysis Report


Shear Membrane Bending Moment

Plate L/C SQX SQY SX SY (local) SXY Mx My kNm/m


(local) (local) (local) kN/m2 (local) kNm/m
kN/m2 kN/m2 kN/m2 kN/m2
Max Qx 1503 18 EMPT 445.591 168.053 41.961 -279.198 -221.163 -211.242 -252.903

Min Qx 467 18 EMPT -445.005 185.55 30.947 -286.634 121.972 -204.56 -314.695

Max Qy 480 18 EMPT -249.616 250.002 33.68 -314.116 104.176 -181.658 -228.104

Min Qy 480 17 FULL 150.388 -179.664 -10.948 -98.636 -46.884 122.466 0.353

Max Sx 1561 14 FULL2 4.724 11.159 158.312 -192.697 24.947 -84.287 -74.885

Min Sx 1561 18 EMPT 19.764 -4.765 -60.383 -130.764 -97.792 72.328 -22.839

Max Sy 480 17 FULL 150.388 -179.664 -10.948 -98.636 -46.884 122.466 0.353

Min Sy 480 18 EMPT -249.616 250.002 33.68 -314.116 104.176 -181.658 -228.104

Max Sxy 467 18 EMPT -445.005 185.55 30.947 -286.634 121.972 -204.56 -314.695

Min Sxy 1503 18 EMPT 445.591 168.053 41.961 -279.198 -221.163 -211.242 -252.903

Max Mx 1503 17 FULL -285.419 -149.266 -11.081 -124.322 102.854 146.313 59.504

Min Mx 1503 18 EMPT 445.591 168.053 41.961 -279.198 -221.163 -211.242 -252.903

Max My 467 17 FULL 275.791 -171.117 -12.226 -117.252 -53.309 144.03 63.504

Min My 467 18 EMPT -445.005 185.55 30.947 -286.634 121.972 -204.56 -314.695

Max Mxy 467 14 FULL2 43.363 -66.125 -3.003 -162.732 66.933 79.556 -6.739

Min Mxy 480 18 EMPT -249.616 250.002 33.68 -314.116 104.176 -181.658 -228.104
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

Results from STADD output

Max Vertical BM in wall creating tension on Water Face Max My 63.50 kN-m/m

Max Horizontal BM in wall creating tension on Water Face Max Mx 146.31 kN-m/m

Tension corresponding to Max Mx Sx-Max Mx 0 N/mm2

Max Vertical BM in wall creating tension on Earth Face Min My 314.70 kN-m/m

Max Horizontal BM in wall creating tension on Earth Face Min Mx 211.24 kN-m/m

Tension corresponding to Min Mx Sx-Min Mx 0.042 N/mm2

Max Tension in Wall Max Sx 0.158 N/mm2

BM at wall corresponding to Max Sx on Earth Face Mx-Max Sx 84.29 kN-m/m


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

Thickness check:
Required effective thickness SQRT(314.7x1000000x1.5/(0.133x30x1000))

Provided overall thickness

Min Ast for each surface zone (mm2/m) in % = 0.24 = 0.24x250x1000/100

Area of vertical reinforcement required on Water Face

Max My 63.50 kN-m/m

Effective Depth (mm) = 641-50-0.5x25

Mu / bd2 = 63.5x1.5x10^6/(1000x578.5^2)

Refer SP-16 Percentage of reinforcement required, %

Req area of Vertical reinf, Water Face, mm2 = MAX(0.066x578.5x1000/100,600)

Area of horizontal reinforcement required on Water Face

Max Mx 146.31 kN-m/ Corresponding Tension Sx = 0.000 N/mm2


Effective Depth (mm) = 641-50-0.5x20

Mu / bd2 = 146.31x1.5x10^6/(1000x581^2)

Refer SP-16 Percentage of reinforcement required, %

Required area of reinforcement for Mx, mm2 = 0.153x581x1000/100

Factored Tension, kN/m =0

Required area of reinf on each face for Sx, mm2 =0

Req area of Hor reinf, Water Face, mm2 = MAX(889+0,600)

Area of vertical reinforcement required on Earth Face

Min My 314.70 kN-m/m

Effective Depth (mm) = 641-45-0.5x20


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
Mu / bd2 = 314.7x1.5x10^6/(1000x586^2)

Refer SP-16 Percentage of reinforcement required, %

Req area of Vertical reinf, Earth Face, mm2 = MAX(0.335x586x1000/100,600)

Area of horizontal reinforcement required on Earth Face

Min Mx 211.24 kN-m/ Corresponding Tension Sx = 0.042 N/mm2


Effective Depth (mm) = 641-45-0.5x16

Mu / bd2 = 211.24x1.5x10^6/(1000x588^2)

Refer SP-16 Percentage of reinforcement required, %

Required area of reinforcement for Mx, mm2 = 0.219x588x1000/100

Factored Tension, N/m = 0.042x641x1.5

Required area of reinf on each face for Sx, mm2 = 0.5x40.4x1000/(0.8x500)

Req area of Hor reinf, Earth Face, mm2 = MAX(1288+51,600)

Ast Required Ast Provided

Vertical Water Face 600 00-000+25-180 2728

Hor Water Face 889 00-000+20-100 3140

Vertical Earth Face 1963 00-000+20-150 2093

Hor Earth Face 1339 00-000+16-125 1608


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

Check for Shear at Junction of Base and Wall

Max Qy, (18 EMPTY) = 0.250 Min Qy, (17 FULL) = -0.180
Factored Shear Stress, N/mm2 = 1.5x0.25

Percentage of Steel provided on Water Face

Thickness of wall
Factor k for thickness of slab (Refer Clause 40.2.1.1 of IS 456)

Factor for enhanced Shear Stress near the support (Refer Clause 40.5.1 of IS 456)

Maximum shear stress in concrete for limit state method of design, tc max
Permissible Shear Stress, N/mm2 (Value from Table 19 of IS 456 * k * Enhancement)

W1A-4 Check for Temperature Reinforcement (As per Annexure A of IS 3370 - 2009, Part 2)

Horizontal Direction

Ast Provided (both faces) = 3140+1608

Percentage of reinforcement provided = 4748/500/1000x100

Max spacing of cracks Smax = (fct/fb) * (f / 2 r) (2/3)x(0.5x(20+16)/2)x(100/0.95)

fct / fb = 2/3 for deformed bars as recommended in Code

Crack Width, Wmax = Smax * (a/2)* (T1 + T2)

632x(0.7/100000/2)x(15+15)

Permissible crack width = 0.1 mm, Hence OK


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
O.
20CDD003

28-Nov-18

R0

ding Moment

Mxy kNm/m

31.832

-31.714

-47.847

39.422

5.186

28.087

39.422

-47.847

-31.714

31.832

-22.558

31.832

35.205

-31.714

47.561

-47.847
O.
20CDD003

28-Nov-18

R0
O.
20CDD003

28-Nov-18

R0

344 mm

641 mm

600

578.5

0.285

0.066

600

581.0

0.650

0.153

889

889

586.0
O.
20CDD003

28-Nov-18

R0
1.375

0.335

1963

588.0

0.916

0.219

1288

40.4

51

1339

% Ast

0.472%

0.536%

0.360%

0.273%
O.
20CDD003

28-Nov-18

R0

0.375

0.472%

641 mm

3.50

0.480

4748 mm2

0.95

632 mm

0.07 mm
O.
20CDD003

28-Nov-18

R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W1A-4 CRACK WIDTH - FLEXURE (IS 3370 Part 2 - 2009, Annexure B)

Vertical Limiting crack width, w

Max My Characteristic cube strength of Concrete, fck

Yield Strength of Steel, fy

Modulus Elasticity of Concrete Ec = 5000 x SQRT( fck )

Modulus Elasticity of Steel, Es

Applied Moment at service condition, M

σcbc = 10 N/mm2 Modular Ratio, m, 280/(3*σcbc) =

Breadth, b (mm) = 1000 Depth, h (mm) = 641

Reinf, Ast mm2 = 00-000+25-180 2728 Clear Cover, CC mm = 50

Reinf, Asc mm2 = 00-000+20-150 2093 Clear Cover, CC mm = 45

Effecive Depth, d = 641-50-0.5x25

Cover to the centre of compression steel, d' = 45+0.5x20

Max spacing of bars, S =

acr = maximum spacing of tensile bar from outer edge of concrete (mm)

= SQRT((0.5x180)^2+(50+0.5x25)^2)-0.5x25

Depth of NA from Compression face = x

Solve equation = (bx2/2) + (1.5m-1) Asc (x - d') - m Ast (d-x) = 0 to get x. x=

(x - d ') bxf c x
A sc fsc = (1.5 m -1) A sc f c (d - ) + A sc f sc (d - d ') = M
x 2 3
f c (d - x)
Ast f st = (m -1) A st
x Solve these equations to get fc

Stress in extreme compression fibre, fc

Stress in Tension reinforcement, fst = 9.33x1.43x(578.5-135)/135


Distance from compression face to point where crack width is being calculated, a

Strain at the level considered, ε1 = (h - x)fs/Es(d - x)

Strain due to stiffening effect in concrete, ε2 = 1.5b(h - x)(a - x)/(3EsAs(d - x))

εm = Average surface strain = ε1 - ε2

Crack Width, w = 3 acr εm/(1+2(acr - Cmin)/(h - x))


MENT NO.
RNALSTP20CDD003

28-Nov-18

R0

0.1 mm

30 N/mm2

500 N/mm2

2.7E+04 N/mm2

2.0E+05 N/mm2

63.50 kN-m

9.33

579 mm

55 mm

180 mm

97.1 mm

135.0 mm

1.43 N/mm2

43.8 N/mm2
641 mm

2.50E-04

5.29E-04

-2.79E-04

-0.069 mm
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W1A-4 CRACK WIDTH - FLEXURE & TENSION (IS 3370 Part 2 - 2009, Annexure B)

Horizontal Limiting crack width, w

Max Mx Characteristic cube strength of Concrete, fck

Sx-Max Mx Yield Strength of Steel, fy


Modulus Elasticity of Concrete Ec = 5000 x SQRT( fck )

Modulus Elasticity of Steel, Es

Applied Moment at service condition, M

Applied Tension at service condition, N 0

σcbc = 10 N/mm2 Modular Ratio, m, 280/(3*σcbc) =

Breadth, b (mm) = 1000 Depth, h (mm) = 641

Reinf, Ast mm2 = 00-000+20-100 3140 Clear Cover, CC mm = 50

Reinf, Asc mm2 = 00-000+16-125 1608 Clear Cover, CC mm = 45

Distance between centroid of Ast and Asc, Zs = 641-50-0.5x20-45-0.5x16

Distance - Centroid of Ast to CG of Ast & Asc, Xs = 1608x528/(3140+1608)

Modified Moment M' = M - N * Xs

Modified moment, M' > 0, section is in bending

Effecive Depth, d = 641-50-0.5x20

Cover to the centre of compression steel, d' = 45+0.5x16


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

bxf c bxf c x
A st f st - - A sc f sc = N (d - ) + A sc f sc (d - d ') = M - N X S
2 2 3

f c (d - x) (x - d ')
Ast fst = (m -1) A st A sc f sc = (1.5 m -1) A sc f c
x x

Solve above equations to get the value of fc and x

Depth of NA from Compression face = x

Stress in extreme compression fibre, fc

Stress in Tension reinforcement, fst

= (9.33-1)x3.31x(581-139.33)/139.33

Distance from compression face to point where crack width is being calculated, a

Max spacing of bars, S =

acr = maximum spacing of tensile bar from outer edge of concrete (mm)

= SQRT((0.5x100)^2+(50+0.5x20)^2)-0.5x20

Strain at the level considered, ε1 = (h - x)fs/Es(d - x)

Strain due to stiffening effect in concrete, ε2 = 1.5b(h - x)(a - x)/(3EsAs(d - x))

εm = Average surface strain = ε1 - ε2

Crack Width, w = 3 acr εm/(1+2(acr - Cmin)/(h - x))


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
MENT NO.
NALSTP20CDD003

28-Nov-18

R0

0.1 mm

30 N/mm2

500 N/mm2

2.7E+04 N/mm2

2.0E+05 N/mm2

146.31 kN-m

1.00 kN

9.33

528.0 mm

178.8 mm

146.1 kN-m

581 mm

53 mm
MENT NO.
NALSTP20CDD003

28-Nov-18

R0
MENT NO.
NALSTP20CDD003

28-Nov-18

R0

d ') = M - N X S

139.33 mm

3.31 N/mm2

87.4 N/mm2

641 mm

100 mm

68.1 mm

4.96E-04

4.54E-04

4.27E-05

0.008 mm
MENT NO.
NALSTP20CDD003

28-Nov-18

R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W1A-4 CRACK WIDTH - FLEXURE & TENSION (IS 3370 Part 2 - 2009, Annexure B)

Horizontal Limiting crack width, w

Max Sx Characteristic cube strength of Concrete, fck

Mx-Max Sx Yield Strength of Steel, fy


Modulus Elasticity of Concrete Ec = 5000 x SQRT( fck )

Modulus Elasticity of Steel, Es

Applied Moment at service condition, M

Applied Tension at service condition, N 101.278

σcbc = 10 N/mm2 Modular Ratio, m, 280/(3*σcbc) =

Breadth, b (mm) = 1000 Depth, h (mm) = 641

Reinf, Ast mm2 = 00-000+16-125 1608 Clear Cover, CC mm = 45

Reinf, Asc mm2 = 00-000+20-100 3140 Clear Cover, CC mm = 50

Distance between centroid of Ast and Asc, Zs = 641-45-0.5x16-50-0.5x20

Distance - Centroid of Ast to CG of Ast & Asc, Xs = 3140x528/(1608+3140)

Modified Moment M' = M - N * Xs

Modified moment, M' > 0, section is in bending

Effecive Depth, d = 641-45-0.5x16

Cover to the centre of compression steel, d' = 50+0.5x20


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

bxf c bxf c x
A st f st - - A sc f sc = N (d - ) + A sc f sc (d - d ') = M - N X S
2 2 3

f c (d - x) (x - d ')
Ast fst = (m -1) A st A sc f sc = (1.5 m -1) A sc f c
x x

Solve above equations to get the value of fc and x

Depth of NA from Compression face = x

Stress in extreme compression fibre, fc

Stress in Tension reinforcement, fst

= (9.33-1)x2x(588-73.06)/73.06

Distance from compression face to point where crack width is being calculated, a

Max spacing of bars, S =

acr = maximum spacing of tensile bar from outer edge of concrete (mm)

= SQRT((0.5x125)^2+(45+0.5x16)^2)-0.5x16

Strain at the level considered, ε1 = (h - x)fs/Es(d - x)

Strain due to stiffening effect in concrete, ε2 = 1.5b(h - x)(a - x)/(3EsAs(d - x))

εm = Average surface strain = ε1 - ε2

Crack Width, w = 3 acr εm/(1+2(acr - Cmin)/(h - x))


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
MENT NO.
NALSTP20CDD003

28-Nov-18

R0

0.1 mm

30 N/mm2

500 N/mm2

2.7E+04 N/mm2

2.0E+05 N/mm2

84.29 kN-m

101.28 kN

9.33

528.0 mm

349.2 mm

48.9 kN-m

588 mm

60 mm
MENT NO.
NALSTP20CDD003

28-Nov-18

R0
MENT NO.
NALSTP20CDD003

28-Nov-18

R0

d ') = M - N X S

73.06 mm

2.00 N/mm2

117.4 N/mm2

641 mm

125 mm

73.9 mm

6.48E-04

9.74E-04

-3.26E-04

-0.066 mm
MENT NO.
NALSTP20CDD003

28-Nov-18

R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W1A-5 DESIGN OF WALL W1A GROUP 5 Height from 9.50 to 12.20 m

Grade of Concrete, fck = 30 N/mm2 Grade of Steel, fy = 500 N/mm2

Limiting Moment of Resistance Index = 0.133

+Z Face -Z Face

Clear Cover = Water Face ### Earth Face ###

STAAD Group Analysis Report


Shear Membrane Bending Moment

Plate L/C SQX SQY SX SY (local) SXY Mx My kNm/m


(local) (local) (local) kN/m2 (local) kNm/m
kN/m2 kN/m2 kN/m2 kN/m2
Max Qx 598 13 FULL1 504.981 110.946 -54.887 -200.858 -123.303 31.204 -72.371

Min Qx 1628 14 FULL2-440.323 87.717 150.62 -180.701 114.157 14.273 -66.966

Max Qy 590 13 FULL1 256.425 186.072 133.772 -31.645 -13.266 -24.76 -10.254

Min Qy 1633 18 EMPT 86.124 -108.705 -257.622 -276.8 -201.741 18.984 -68.307

Max Sx 596 18 EMPT 127.366 60.198 276.066 -34.914 3.349 -19.871 -9.372

Min Sx 1633 18 EMPT 86.124 -108.705 -257.622 -276.8 -201.741 18.984 -68.307

Max Sy 597 13 FULL1 322.265 182.391 36.502 -29.87 -13.289 -5.612 -9.938

Min Sy 1633 18 EMPT 86.124 -108.705 -257.622 -276.8 -201.741 18.984 -68.307

Max Sxy 586 18 EMPT -171.307 -73.776 -66.526 -251.751 182.452 24.508 -73.427

Min Sxy 1633 18 EMPT 86.124 -108.705 -257.622 -276.8 -201.741 18.984 -68.307

Max Mx 522 18 EMPT 7.797 -10.037 26.167 -148.115 68.757 81.177 -50.937

Min Mx 521 13 FULL1 -0.298 10.161 93.017 -164.808 -7.133 -92.15 -95.853

Max My 595 18 EMPT 36.171 58.556 269.033 -37.369 7.351 -17.749 -7.244

Min My 523 13 FULL1 10.265 28.063 74.307 -152.114 -23.618 -87.617 -98.211

Max Mxy 592 17 FULL -361.42 15.022 -138.812 -226.169 143.37 6.697 -74.701

Min Mxy 598 14 FULL2 323.943 -23.479 -99.595 -238.332 -154.234 10.699 -75.372
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

Results from STADD output

Max Vertical BM in wall creating tension on Water Face Max My 0.00 kN-m/m

Max Horizontal BM in wall creating tension on Water Face Max Mx 81.18 kN-m/m

Tension corresponding to Max Mx Sx-Max Mx 0.026 N/mm2

Max Vertical BM in wall creating tension on Earth Face Min My 98.21 kN-m/m

Max Horizontal BM in wall creating tension on Earth Face Min Mx 92.15 kN-m/m

Tension corresponding to Min Mx Sx-Min Mx 0.093 N/mm2

Max Tension in Wall Max Sx 0.276 N/mm2

BM at wall corresponding to Max Sx on Earth Face Mx-Max Sx 19.87 kN-m/m


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

Thickness check:
Required effective thickness SQRT(98.21x1000000x1.5/(0.133x30x1000))

Provided overall thickness

Min Ast for each surface zone (mm2/m) in % = 0.24 = 0.24x237.5x1000/100

Area of vertical reinforcement required on Water Face

Max My 0.00 kN-m/m

Effective Depth (mm) = 475-50-0.5x25

Mu / bd2 =0

Refer SP-16 Percentage of reinforcement required, %

Req area of Vertical reinf, Water Face, mm2 = MAX(0x412.5x1000/100,570)

Area of horizontal reinforcement required on Water Face

Max Mx 81.18 kN-m/ Corresponding Tension Sx = 0.026 N/mm2


Effective Depth (mm) = 475-50-0.5x12

Mu / bd2 = 81.18x1.5x10^6/(1000x419^2)

Refer SP-16 Percentage of reinforcement required, %

Required area of reinforcement for Mx, mm2 = 0.164x419x1000/100

Factored Tension, kN/m = 0.026x475x1.5

Required area of reinf on each face for Sx, mm2 = 0.5x18.5x1000/(0.8x500)

Req area of Hor reinf, Water Face, mm2 = MAX(687+23,570)

Area of vertical reinforcement required on Earth Face

Min My 98.21 kN-m/m

Effective Depth (mm) = 475-45-0.5x20


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
Mu / bd2 = 98.21x1.5x10^6/(1000x420^2)

Refer SP-16 Percentage of reinforcement required, %

Req area of Vertical reinf, Earth Face, mm2 = MAX(0.199x420x1000/100,570)

Area of horizontal reinforcement required on Earth Face

Min Mx 92.15 kN-m/ Corresponding Tension Sx = 0.093 N/mm2


Effective Depth (mm) = 475-45-0.5x16

Mu / bd2 = 92.15x1.5x10^6/(1000x422^2)

Refer SP-16 Percentage of reinforcement required, %

Required area of reinforcement for Mx, mm2 = 0.184x422x1000/100

Factored Tension, N/m = 0.093x475x1.5

Required area of reinf on each face for Sx, mm2 = 0.5x66.3x1000/(0.8x500)

Req area of Hor reinf, Earth Face, mm2 = MAX(776+83,570)

Ast Required Ast Provided

Vertical Water Face 570 00-000+25-180 2728

Hor Water Face 710 00-000+12-125 904

Vertical Earth Face 836 00-000+20-150 2093

Hor Earth Face 859 00-000+16-125 1608


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
Check for Shear at Junction of Base and Wall

Max Qy, (13 FULL1) = 0.186 Min Qy, (18 EMPTY) = -0.109
Factored Shear Stress, N/mm2 = 1.5x0.186

Percentage of Steel provided on Water Face

Thickness of wall
Factor k for thickness of slab (Refer Clause 40.2.1.1 of IS 456)

Factor for enhanced Shear Stress near the support (Refer Clause 40.5.1 of IS 456)

Maximum shear stress in concrete for limit state method of design, tc max
Permissible Shear Stress, N/mm2 (Value from Table 19 of IS 456 * k * Enhancement)

W1A-5 Check for Temperature Reinforcement (As per Annexure A of IS 3370 - 2009, Part 2)

Horizontal Direction

Ast Provided (both faces) = 904+1608

Percentage of reinforcement provided = 2512/475/1000x100

Max spacing of cracks Smax = (fct/fb) * (f / 2 r) (2/3)x(0.5x(12+16)/2)x(100/0.53)

fct / fb = 2/3 for deformed bars as recommended in Code

Crack Width, Wmax = Smax * (a/2)* (T1 + T2)

881x(0.7/100000/2)x(15+15)

Permissible crack width = 0.1 mm, Hence OK


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
O.
20CDD003

28-Nov-18

R0

ding Moment

Mxy kNm/m

-48.313

42.197

-18.229

-36.938

-15.792

-36.938

-23.903

-36.938

42.807

-36.938

-36.643

-4.781

-6.464

-5.148

52.468

-55.141
O.
20CDD003

28-Nov-18

R0
O.
20CDD003

28-Nov-18

R0

192 mm

475 mm

570

412.5

0.000

0.000

570

419.0

0.694

0.164

687

18.5

23

710

420.0
O.
20CDD003

28-Nov-18

R0
0.835

0.199

836

422.0

0.776

0.184

776

66.3

83

859

% Ast

0.661%

0.215%

0.500%

0.381%
O.
20CDD003

28-Nov-18

R0

0.279

0.661%

475 mm

3.50

0.560

2512 mm2

0.53

881 mm

0.09 mm
O.
20CDD003

28-Nov-18

R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W1A-5 CRACK WIDTH - FLEXURE (IS 3370 Part 2 - 2009, Annexure B)

Vertical Limiting crack width, w

Max My Characteristic cube strength of Concrete, fck

Yield Strength of Steel, fy

Modulus Elasticity of Concrete Ec = 5000 x SQRT( fck )

Modulus Elasticity of Steel, Es

Applied Moment at service condition, M

σcbc = 10 N/mm2 Modular Ratio, m, 280/(3*σcbc) =

Breadth, b (mm) = 1000 Depth, h (mm) = 475

Reinf, Ast mm2 = 00-000+25-180 2728 Clear Cover, CC mm = 50

Reinf, Asc mm2 = 00-000+20-150 2093 Clear Cover, CC mm = 45

Effecive Depth, d = 475-50-0.5x25

Cover to the centre of compression steel, d' = 45+0.5x20

Max spacing of bars, S =

acr = maximum spacing of tensile bar from outer edge of concrete (mm)

= SQRT((0.5x180)^2+(50+0.5x25)^2)-0.5x25

Depth of NA from Compression face = x

Solve equation = (bx2/2) + (1.5m-1) Asc (x - d') - m Ast (d-x) = 0 to get x. x=

(x - d ') bxf c x
A sc fsc = (1.5 m -1) A sc f c (d - ) + A sc f sc (d - d ') = M
x 2 3
f c (d - x)
Ast f st = (m -1) A st
x Solve these equations to get fc

Stress in extreme compression fibre, fc

Stress in Tension reinforcement, fst =0


Distance from compression face to point where crack width is being calculated, a

Strain at the level considered, ε1 = (h - x)fs/Es(d - x)

Strain due to stiffening effect in concrete, ε2 = 1.5b(h - x)(a - x)/(3EsAs(d - x))

εm = Average surface strain = ε1 - ε2

Crack Width, w = 3 acr εm/(1+2(acr - Cmin)/(h - x))


MENT NO.
RNALSTP20CDD003

28-Nov-18

R0

0.1 mm

30 N/mm2

500 N/mm2

2.7E+04 N/mm2

2.0E+05 N/mm2

0.00 kN-m

9.33

413 mm

55 mm

180 mm

97.1 mm

110.9 mm

0.00 N/mm2

0.0 N/mm2
475 mm

0.00E+00

4.03E-04

-4.03E-04

-0.093 mm
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W1A-5 CRACK WIDTH - FLEXURE & TENSION (IS 3370 Part 2 - 2009, Annexure B)

Horizontal Limiting crack width, w

Max Mx Characteristic cube strength of Concrete, fck

Sx-Max Mx Yield Strength of Steel, fy


Modulus Elasticity of Concrete Ec = 5000 x SQRT( fck )

Modulus Elasticity of Steel, Es

Applied Moment at service condition, M

Applied Tension at service condition, N 12.35

σcbc = 10 N/mm2 Modular Ratio, m, 280/(3*σcbc) =

Breadth, b (mm) = 1000 Depth, h (mm) = 475

Reinf, Ast mm2 = 00-000+12-125 904 Clear Cover, CC mm = 50

Reinf, Asc mm2 = 00-000+16-125 1608 Clear Cover, CC mm = 45

Distance between centroid of Ast and Asc, Zs = 475-50-0.5x12-45-0.5x16

Distance - Centroid of Ast to CG of Ast & Asc, Xs = 1608x366/(904+1608)

Modified Moment M' = M - N * Xs

Modified moment, M' > 0, section is in bending

Effecive Depth, d = 475-50-0.5x12

Cover to the centre of compression steel, d' = 45+0.5x16


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

bxf c bxf c x
A st f st - - A sc f sc = N (d - ) + A sc f sc (d - d ') = M - N X S
2 2 3

f c (d - x) (x - d ')
Ast fst = (m -1) A st A sc f sc = (1.5 m -1) A sc f c
x x

Solve above equations to get the value of fc and x

Depth of NA from Compression face = x

Stress in extreme compression fibre, fc

Stress in Tension reinforcement, fst

= (9.33-1)x5.29x(419-66.56)/66.56

Distance from compression face to point where crack width is being calculated, a

Max spacing of bars, S =

acr = maximum spacing of tensile bar from outer edge of concrete (mm)

= SQRT((0.5x125)^2+(50+0.5x12)^2)-0.5x12

Strain at the level considered, ε1 = (h - x)fs/Es(d - x)

Strain due to stiffening effect in concrete, ε2 = 1.5b(h - x)(a - x)/(3EsAs(d - x))

εm = Average surface strain = ε1 - ε2

Crack Width, w = 3 acr εm/(1+2(acr - Cmin)/(h - x))


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
MENT NO.
NALSTP20CDD003

28-Nov-18

R0

0.1 mm

30 N/mm2

500 N/mm2

2.7E+04 N/mm2

2.0E+05 N/mm2

81.18 kN-m

12.35 kN

9.33

366.0 mm

234.3 mm

78.3 kN-m

419 mm

53 mm
MENT NO.
NALSTP20CDD003

28-Nov-18

R0
MENT NO.
NALSTP20CDD003

28-Nov-18

R0

d ') = M - N X S

66.56 mm

5.29 N/mm2

233.3 N/mm2

475 mm

125 mm

77.9 mm

1.35E-03

1.31E-03

4.30E-05

0.009 mm
MENT NO.
NALSTP20CDD003

28-Nov-18

R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W1A-5 CRACK WIDTH - FLEXURE & TENSION (IS 3370 Part 2 - 2009, Annexure B)

Horizontal Limiting crack width, w

Max Sx Characteristic cube strength of Concrete, fck

Mx-Max Sx Yield Strength of Steel, fy


Modulus Elasticity of Concrete Ec = 5000 x SQRT( fck )

Modulus Elasticity of Steel, Es

Applied Moment at service condition, M

Applied Tension at service condition, N 131.1

σcbc = 10 N/mm2 Modular Ratio, m, 280/(3*σcbc) =

Breadth, b (mm) = 1000 Depth, h (mm) = 475

Reinf, Ast mm2 = 00-000+16-125 1608 Clear Cover, CC mm = 45

Reinf, Asc mm2 = 00-000+12-125 904 Clear Cover, CC mm = 50

Distance between centroid of Ast and Asc, Zs = 475-45-0.5x16-50-0.5x12

Distance - Centroid of Ast to CG of Ast & Asc, Xs = 904x366/(1608+904)

Modified Moment M' = M - N * Xs

Modified moment, M' > 0, section is in bending

Effecive Depth, d = 475-45-0.5x16

Cover to the centre of compression steel, d' = 50+0.5x12


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

bxf c bxf c x
A st f st - - A sc f sc = N (d - ) + A sc f sc (d - d ') = M - N X S
2 2 3

f c (d - x) (x - d ')
Ast fst = (m -1) A st A sc f sc = (1.5 m -1) A sc f c
x x

Solve above equations to get the value of fc and x

Depth of NA from Compression face = x

Stress in extreme compression fibre, fc

Stress in Tension reinforcement, fst

= (9.33-1)x0.82x(422-31.55)/31.55

Distance from compression face to point where crack width is being calculated, a

Max spacing of bars, S =

acr = maximum spacing of tensile bar from outer edge of concrete (mm)

= SQRT((0.5x125)^2+(45+0.5x16)^2)-0.5x16

Strain at the level considered, ε1 = (h - x)fs/Es(d - x)

Strain due to stiffening effect in concrete, ε2 = 1.5b(h - x)(a - x)/(3EsAs(d - x))

εm = Average surface strain = ε1 - ε2

Crack Width, w = 3 acr εm/(1+2(acr - Cmin)/(h - x))


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
MENT NO.
NALSTP20CDD003

28-Nov-18

R0

0.1 mm

30 N/mm2

500 N/mm2

2.7E+04 N/mm2

2.0E+05 N/mm2

19.87 kN-m

131.10 kN

9.33

366.0 mm

131.7 mm

2.6 kN-m

422 mm

56 mm
MENT NO.
NALSTP20CDD003

28-Nov-18

R0
MENT NO.
NALSTP20CDD003

28-Nov-18

R0

d ') = M - N X S

31.55 mm

0.82 N/mm2

84.5 N/mm2

475 mm

125 mm

73.9 mm

4.80E-04

7.83E-04

-3.03E-04

-0.059 mm
MENT NO.
NALSTP20CDD003

28-Nov-18

R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

DESIGN OF WALL W1B


NT NO.
LSTP20CDD003

28-Nov-18

R0

B
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W1B-DATA DESIGN OF WALL W1B

DESIGNED THICKNESS
Height from bottom 0.00 7.50 10.40
Designed Thickness 850 600 350
Provided Thickness 850 600 350

Length of Wall = 9.25 m

Minimum reinforcement as per clause 8.1.1 of IS 3370 (Part 2) - 2009 0.24 %

Height Thickness Thickness for Temp.


Group Avg Th
From To From To From To Avg. Th
1 0.00 2.50 850 767 808 850 767 808
2 2.50 5.00 767 683 725 767 683 725
3 5.00 7.50 683 600 642 683 600 642
4 7.50 10.40 600 350 475 600 350 475

Direction and Type of Fill BOW BOF TOW TOF HOF

+Z Water Face Liquid 233.10 233.10 243.50 241.50 8.40

-Z Earth Face Earth 233.10 233.10 243.50 243.00 9.90

Fill k r Pressure Additional Loads, if any

+Z 1.00 10.30 86.52

-Z 0.33 20.00 65.93


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
O.
20CDD003

28-Nov-18

R0
O.
20CDD003

28-Nov-18

R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W1B-1 DESIGN OF WALL W1B GROUP 1 Height from 0.00 to 2.50 m

Grade of Concrete, fck = 30 N/mm2 Grade of Steel, fy = 500 N/mm2

Limiting Moment of Resistance Index = 0.133

+Z Face -Z Face

Clear Cover = Water Face ### Earth Face ###

STAAD Group Analysis Report


Shear Membrane Bending Moment

Plate L/C SQX SQY SX SY (local) SXY Mx My kNm/m


(local) (local) (local) kN/m2 (local) kNm/m
kN/m2 kN/m2 kN/m2 kN/m2
Max Qx 931 17 FULL 390.275 331.257 -76.244 -219.147 44.364 91.891 168.698

Min Qx 978 17 FULL -153.783 -43.687 174.86 -175.646 122.273 100.255 3.881

Max Qy 932 17 FULL 2.171 344.886 -29.523 -239.934 56.796 58.062 171.341

Min Qy 911 17 FULL -6.745 -489.49 -39.939 -160.353 146.644 21.998 130.452

Max Sx 931 18 EMPT -53.187 -219.637 401.348 -330.751 -99.311 -47.449 -211.331

Min Sx 931 14 FULL2 29.631 -25.475 -334.195 -249.496 -11.967 -0.981 -46.499

Max Sy 936 18 EMPT -51.345 -69.941 156.939 40.617 -299.251 -21.453 -54.402

Min Sy 913 18 EMPT 4.854 119.51 -103.181 -569.579 -800.679 -28.475 -167.78

Max Sxy 913 14 FULL2 -6.212 -50.085 -29.811 -243.707 512.604 -19.024 -111.818

Min Sxy 912 18 EMPT 6.656 12.559 -79.655 -482.055 -812.294 -30.671 -180.475

Max Mx 978 17 FULL -153.783 -43.687 174.86 -175.646 122.273 100.255 3.881

Min Mx 988 17 FULL 6.244 96.039 28.99 -192.894 61.507 -77.126 -37.066

Max My 904 17 FULL 1.279 236.116 -32.655 -196.29 66.706 20.243 176.062

Min My 903 18 EMPT 2.516 -263.8 -36.926 -217.691 -170.554 -59.783 -362.628

Max Mxy 932 13 FULL1 -3.656 277.559 85.115 -248.571 102.148 45.873 129.585

Min Mxy 918 17 FULL -18.574 125.482 -16.087 -161.696 104.991 7.554 65.962
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

Results from STADD output

Max Vertical BM in wall creating tension on Water Face Max My 176.06 kN-m/m

Max Horizontal BM in wall creating tension on Water Face Max Mx 100.26 kN-m/m

Tension corresponding to Max Mx Sx-Max Mx 0.175 N/mm2

Max Vertical BM in wall creating tension on Earth Face Min My 362.63 kN-m/m

Max Horizontal BM in wall creating tension on Earth Face Min Mx 77.13 kN-m/m

Tension corresponding to Min Mx Sx-Min Mx 0.029 N/mm2

Max Tension in Wall Max Sx 0.401 N/mm2

BM at wall corresponding to Max Sx on Earth Face Mx-Max Sx 47.45 kN-m/m


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

Thickness check:
Required effective thickness SQRT(362.63x1000000x1.5/(0.133x30x1000))

Provided overall thickness

Min Ast for each surface zone (mm2/m) in % = 0.24 = 0.24x250x1000/100

Area of vertical reinforcement required on Water Face

Max My 176.06 kN-m/m

Effective Depth (mm) = 808-50-0.5x16

Mu / bd2 = 176.06x1.5x10^6/(1000x750^2)

Refer SP-16 Percentage of reinforcement required, %

Req area of Vertical reinf, Water Face, mm2 = MAX(0.11x750x1000/100,600)

Area of horizontal reinforcement required on Water Face

Max Mx 100.26 kN-m/ Corresponding Tension Sx = 0.175 N/mm2


Effective Depth (mm) = 808-50-0.5x16

Mu / bd2 = 100.26x1.5x10^6/(1000x750^2)

Refer SP-16 Percentage of reinforcement required, %

Required area of reinforcement for Mx, mm2 = 0.062x750x1000/100

Factored Tension, kN/m = 0.175x808x1.5

Required area of reinf on each face for Sx, mm2 = 0.5x212.1x1000/(0.8x500)

Req area of Hor reinf, Water Face, mm2 = MAX(465+265,600)

Area of vertical reinforcement required on Earth Face

Min My 362.63 kN-m/m

Effective Depth (mm) = 808-45-0.5x16


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
Mu / bd2 = 362.63x1.5x10^6/(1000x755^2)

Refer SP-16 Percentage of reinforcement required, %

Req area of Vertical reinf, Earth Face, mm2 = MAX(0.228x755x1000/100,600)

Area of horizontal reinforcement required on Earth Face

Min Mx 77.13 kN-m/ Corresponding Tension Sx = 0.029 N/mm2


Effective Depth (mm) = 808-45-0.5x16

Mu / bd2 = 77.13x1.5x10^6/(1000x755^2)

Refer SP-16 Percentage of reinforcement required, %

Required area of reinforcement for Mx, mm2 = 0.047x755x1000/100

Factored Tension, N/m = 0.029x808x1.5

Required area of reinf on each face for Sx, mm2 = 0.5x35.1x1000/(0.8x500)

Req area of Hor reinf, Earth Face, mm2 = MAX(355+44,600)

Ast Required Ast Provided

Vertical Water Face 825 16-180+16-180 2233

Hor Water Face 730 00-000+16-125 1608

Vertical Earth Face 1721 16-180+12-180 1744

Hor Earth Face 600 00-000+16-150 1340


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

Check for Shear at Junction of Base and Wall

Max Qy, (17 FULL) = 0.345 Min Qy, (17 FULL) = -0.489
Factored Shear Stress, N/mm2 = 1.5x0.489

Percentage of Steel provided on Water Face

Thickness of wall
Factor k for thickness of slab (Refer Clause 40.2.1.1 of IS 456)

Factor for enhanced Shear Stress near the support (Refer Clause 40.5.1 of IS 456)

Maximum shear stress in concrete for limit state method of design, tc max
Permissible Shear Stress, N/mm2 (Value from Table 19 of IS 456 * k * Enhancement)

W1B-1 Check for Temperature Reinforcement (As per Annexure A of IS 3370 - 2009, Part 2)

Horizontal Direction

Ast Provided (both faces) = 1608+1340

Percentage of reinforcement provided = 2948/500/1000x100

Max spacing of cracks Smax = (fct/fb) * (f / 2 r) (2/3)x(0.5x(16+16)/2)x(100/0.59)

fct / fb = 2/3 for deformed bars as recommended in Code

Crack Width, Wmax = Smax * (a/2)* (T1 + T2)

904x(0.7/100000/2)x(15+15)

Permissible crack width = 0.1 mm, Hence OK


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
O.
20CDD003

28-Nov-18

R0

ding Moment

Mxy kNm/m

86.945

-50.124

87.344

25.974

-24.919

13.324

30.25

12.529

1.588

10.916

-50.124

-3.646

5.978

12.62

87.781

-82.156
O.
20CDD003

28-Nov-18

R0
O.
20CDD003

28-Nov-18

R0

369 mm

808 mm

600

750.0

0.469

0.110

825

750.0

0.267

0.062

465

212.1

265

730

755.0
O.
20CDD003

28-Nov-18

R0
0.954

0.228

1721

755.0

0.203

0.047

355

35.1

44

600

% Ast

0.298%

0.213%

0.233%

0.177%
O.
20CDD003

28-Nov-18

R0

0.734

0.298%

808 mm

3.50

2.400

2948 mm2

0.59

904 mm

0.09 mm
O.
20CDD003

28-Nov-18

R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W1B-1 CRACK WIDTH - FLEXURE (IS 3370 Part 2 - 2009, Annexure B)

Vertical Limiting crack width, w

Max My Characteristic cube strength of Concrete, fck

Yield Strength of Steel, fy

Modulus Elasticity of Concrete Ec = 5000 x SQRT( fck )

Modulus Elasticity of Steel, Es

Applied Moment at service condition, M

σcbc = 10 N/mm2 Modular Ratio, m, 280/(3*σcbc) =

Breadth, b (mm) = 1000 Depth, h (mm) = 808

Reinf, Ast mm2 = 16-180+16-180 2233 Clear Cover, CC mm = 50

Reinf, Asc mm2 = 16-180+12-180 1744 Clear Cover, CC mm = 45

Effecive Depth, d = 808-50-0.5x16

Cover to the centre of compression steel, d' = 45+0.5x16

Max spacing of bars, S =

acr = maximum spacing of tensile bar from outer edge of concrete (mm)

= SQRT((0.5x90)^2+(50+0.5x16)^2)-0.5x16

Depth of NA from Compression face = x

Solve equation = (bx2/2) + (1.5m-1) Asc (x - d') - m Ast (d-x) = 0 to get x. x=

(x - d ') bxf c x
A sc fsc = (1.5 m -1) A sc f c (d - ) + A sc f sc (d - d ') = M
x 2 3
f c (d - x)
Ast f st = (m -1) A st
x Solve these equations to get fc

Stress in extreme compression fibre, fc

Stress in Tension reinforcement, fst = 9.33x2.89x(750-145)/145


Distance from compression face to point where crack width is being calculated, a

Strain at the level considered, ε1 = (h - x)fs/Es(d - x)

Strain due to stiffening effect in concrete, ε2 = 1.5b(h - x)(a - x)/(3EsAs(d - x))

εm = Average surface strain = ε1 - ε2

Crack Width, w = 3 acr εm/(1+2(acr - Cmin)/(h - x))


MENT NO.
RNALSTP20CDD003

28-Nov-18

R0

0.1 mm

30 N/mm2

500 N/mm2

2.7E+04 N/mm2

2.0E+05 N/mm2

176.06 kN-m

9.33

750 mm

53 mm

90 mm

65.4 mm

145.0 mm

2.89 N/mm2

112.5 N/mm2
808 mm

6.16E-04

8.13E-04

-1.97E-04

-0.037 mm
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W1B-1 CRACK WIDTH - FLEXURE & TENSION (IS 3370 Part 2 - 2009, Annexure B)

Horizontal Limiting crack width, w

Max Mx Characteristic cube strength of Concrete, fck

Sx-Max Mx Yield Strength of Steel, fy


Modulus Elasticity of Concrete Ec = 5000 x SQRT( fck )

Modulus Elasticity of Steel, Es

Applied Moment at service condition, M

Applied Tension at service condition, N 141.4

σcbc = 10 N/mm2 Modular Ratio, m, 280/(3*σcbc) =

Breadth, b (mm) = 1000 Depth, h (mm) = 808

Reinf, Ast mm2 = 00-000+16-125 1608 Clear Cover, CC mm = 50

Reinf, Asc mm2 = 00-000+16-150 1340 Clear Cover, CC mm = 45

Distance between centroid of Ast and Asc, Zs = 808-50-0.5x16-45-0.5x16

Distance - Centroid of Ast to CG of Ast & Asc, Xs = 1340x697/(1608+1340)

Modified Moment M' = M - N * Xs

Modified moment, M' > 0, section is in bending

Effecive Depth, d = 808-50-0.5x16

Cover to the centre of compression steel, d' = 45+0.5x16


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

bxf c bxf c x
A st f st - - A sc f sc = N (d - ) + A sc f sc (d - d ') = M - N X S
2 2 3
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

f c (d - x) (x - d ')
Ast fst = (m -1) A st A sc f sc = (1.5 m -1) A sc f c
x x

Solve above equations to get the value of fc and x

Depth of NA from Compression face = x

Stress in extreme compression fibre, fc

Stress in Tension reinforcement, fst

= (9.33-1)x1.81x(750-74.88)/74.88

Distance from compression face to point where crack width is being calculated, a

Max spacing of bars, S =

acr = maximum spacing of tensile bar from outer edge of concrete (mm)

= SQRT((0.5x125)^2+(50+0.5x16)^2)-0.5x16

Strain at the level considered, ε1 = (h - x)fs/Es(d - x)

Strain due to stiffening effect in concrete, ε2 = 1.5b(h - x)(a - x)/(3EsAs(d - x))

εm = Average surface strain = ε1 - ε2

Crack Width, w = 3 acr εm/(1+2(acr - Cmin)/(h - x))


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
MENT NO.
NALSTP20CDD003

28-Nov-18

R0

0.1 mm

30 N/mm2

500 N/mm2

2.7E+04 N/mm2

2.0E+05 N/mm2

100.26 kN-m

141.40 kN

9.33

697.0 mm

316.8 mm

55.5 kN-m

750 mm

53 mm
MENT NO.
NALSTP20CDD003

28-Nov-18

R0

d ') = M - N X S
MENT NO.
NALSTP20CDD003

28-Nov-18

R0

74.88 mm

1.81 N/mm2

135.9 N/mm2

808 mm

125 mm

77.3 mm

7.38E-04

1.24E-03

-5.00E-04

-0.108 mm
MENT NO.
NALSTP20CDD003

28-Nov-18

R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W1B-1 CRACK WIDTH - FLEXURE & TENSION (IS 3370 Part 2 - 2009, Annexure B)

Horizontal Limiting crack width, w

Max Sx Characteristic cube strength of Concrete, fck

Mx-Max Sx Yield Strength of Steel, fy


Modulus Elasticity of Concrete Ec = 5000 x SQRT( fck )

Modulus Elasticity of Steel, Es

Applied Moment at service condition, M

Applied Tension at service condition, N 324.008

σcbc = 10 N/mm2 Modular Ratio, m, 280/(3*σcbc) =

Breadth, b (mm) = 1000 Depth, h (mm) = 808

Reinf, Ast mm2 = 00-000+16-150 1340 Clear Cover, CC mm = 45

Reinf, Asc mm2 = 00-000+16-125 1608 Clear Cover, CC mm = 50

Distance between centroid of Ast and Asc, Zs = 808-45-0.5x16-50-0.5x16

Distance - Centroid of Ast to CG of Ast & Asc, Xs

= 1608x697/(1340+1608)

Modified Moment M' = M - N * Xs

Modified moment, M' < 0, section in tension


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

Effecive Depth, d = 808-45-0.5x16

Cover to the centre of compression steel, d' = 50+0.5x16

Tension excess tensile face, T'

= (324.01x1340/(1340+1608))+(47.45x1000/(755-58))

Tension less tensile face, T''

= (324.01x1608/(1340+1608))-(47.45x1000/(755-58))

Stress in Tension reinforcement, fst = 215.355x1000/1340

Total Concrete Area, Ac = 1000x808+(9.33-1)x(1340+1608)

Direct Tension in Concrete, fct = 324.01x1000/832556.8

Max spacing of bars, S =

acr = maximum spacing of tensile bar from outer edge of concrete (mm)

= SQRT((0.5x150)^2+(45+0.5x16)^2)-0.5x16

Strain at the level considered, ε1 = fs / Es

Strain due to stiffening effect in concrete, ε2 = bD/EsAs


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
εm = Average surface strain = ε1 - ε2

Crack Width, w = 3 acr εm


MENT NO.
NALSTP20CDD003

28-Nov-18

R0

0.1 mm

30 N/mm2

500 N/mm2

2.7E+04 N/mm2

2.0E+05 N/mm2

47.45 kN-m

324.01 kN

9.33

697.0 mm

380.2 mm

-75.7 kN-m
MENT NO.
NALSTP20CDD003

28-Nov-18

R0
MENT NO.
NALSTP20CDD003

28-Nov-18

R0

755 mm

58 mm

215.4 kN

108.7 kN

160.7 N/mm2

8.3E+05 mm2

0.39 N/mm2

150 mm

83.8 mm

8.04E-04

1.37E-03
MENT NO.
NALSTP20CDD003

28-Nov-18

R0
-5.67E-04

-0.143 mm
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W1B-2 DESIGN OF WALL W1B GROUP 2 Height from 2.50 to 5.00 m

Grade of Concrete, fck = 30 N/mm2 Grade of Steel, fy = 500 N/mm2

Limiting Moment of Resistance Index = 0.133

+Z Face -Z Face

Clear Cover = Water Face ### Earth Face ###

STAAD Group Analysis Report


Shear Membrane Bending Moment

Plate L/C SQX SQY SX SY (local) SXY Mx My kNm/m


(local) (local) (local) kN/m2 (local) kNm/m
kN/m2 kN/m2 kN/m2 kN/m2
Max Qx 1081 13 FULL1 193.094 -18.144 120.106 -200.948 -60.733 104.704 5.35

Min Qx 1062 17 FULL -214.066 -31.578 260.251 -82.529 30.535 134.909 10.358

Max Qy 1010 17 FULL 18.713 73.913 33.786 -189.712 48.988 -87.472 -55.565

Min Qy 1010 18 EMPT -3.314 -109.199 51.4 -219.288 -197.076 36.678 -19.113

Max Sx 1062 13 FULL1-212.417 -30.923 261.108 -89.069 23.261 131.775 9.685

Min Sx 1083 18 EMPT 154.535 34.601 -173.922 -118.464 -144.805 -90.468 -7.725

Max Sy 999 19 SERVI -111.228 -19.406 163.13 7.654 -148.649 59.52 -1.313

Min Sy 1018 18 EMPT -50.692 12.997 119.061 -307.674 -144.652 -32.289 -7.986

Max Sxy 1017 16 FULL4 15.125 -4.706 -117.29 -186.077 145.161 22.288 7.743

Min Sxy 1001 18 EMPT 41.354 -32.989 -6.225 -119.002 -270.147 -10.834 -5.034

Max Mx 1062 17 FULL -214.066 -31.578 260.251 -82.529 30.535 134.909 10.358

Min Mx 1072 13 FULL1 4.606 12.699 130.208 -168.171 -5.031 -106.92 -80.785

Max My 1093 18 EMPT -2.137 -30.949 51.737 -177.771 -173.829 75.486 44.163

Min My 1072 13 FULL1 4.606 12.699 130.208 -168.171 -5.031 -106.92 -80.785

Max Mxy 1001 18 EMPT 41.354 -32.989 -6.225 -119.002 -270.147 -10.834 -5.034

Min Mxy 1002 17 FULL -96.357 19.959 138.913 -179.642 103.282 -14.788 -34.346
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

Results from STADD output

Max Vertical BM in wall creating tension on Water Face Max My 44.16 kN-m/m

Max Horizontal BM in wall creating tension on Water Face Max Mx 134.91 kN-m/m

Tension corresponding to Max Mx Sx-Max Mx 0.26 N/mm2

Max Vertical BM in wall creating tension on Earth Face Min My 80.79 kN-m/m

Max Horizontal BM in wall creating tension on Earth Face Min Mx 106.92 kN-m/m

Tension corresponding to Min Mx Sx-Min Mx 0.13 N/mm2

Max Tension in Wall Max Sx 0.261 N/mm2

BM at wall corresponding to Max Sx on Water Face Mx-Max Sx 131.78 kN-m/m


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

Thickness check:
Required effective thickness SQRT(134.91x1000000x1.5/(0.133x30x1000))

Provided overall thickness

Min Ast for each surface zone (mm2/m) in % = 0.24 = 0.24x250x1000/100

Area of vertical reinforcement required on Water Face

Max My 44.16 kN-m/m

Effective Depth (mm) = 725-50-0.5x16

Mu / bd2 = 44.16x1.5x10^6/(1000x667^2)

Refer SP-16 Percentage of reinforcement required, %

Req area of Vertical reinf, Water Face, mm2 = MAX(0.034x667x1000/100,600)

Area of horizontal reinforcement required on Water Face

Max Mx 134.91 kN-m/ Corresponding Tension Sx = 0.260 N/mm2


Effective Depth (mm) = 725-50-0.5x16

Mu / bd2 = 134.91x1.5x10^6/(1000x667^2)

Refer SP-16 Percentage of reinforcement required, %

Required area of reinforcement for Mx, mm2 = 0.107x667x1000/100

Factored Tension, kN/m = 0.26x725x1.5

Required area of reinf on each face for Sx, mm2 = 0.5x282.8x1000/(0.8x500)

Req area of Hor reinf, Water Face, mm2 = MAX(714+354,600)

Area of vertical reinforcement required on Earth Face

Min My 80.79 kN-m/m

Effective Depth (mm) = 725-45-0.5x16


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
Mu / bd2 = 80.79x1.5x10^6/(1000x672^2)

Refer SP-16 Percentage of reinforcement required, %

Req area of Vertical reinf, Earth Face, mm2 = MAX(0.062x672x1000/100,600)

Area of horizontal reinforcement required on Earth Face

Min Mx 106.92 kN-m/ Corresponding Tension Sx = 0.130 N/mm2


Effective Depth (mm) = 725-45-0.5x12

Mu / bd2 = 106.92x1.5x10^6/(1000x674^2)

Refer SP-16 Percentage of reinforcement required, %

Required area of reinforcement for Mx, mm2 = 0.082x674x1000/100

Factored Tension, N/m = 0.13x725x1.5

Required area of reinf on each face for Sx, mm2 = 0.5x141.4x1000/(0.8x500)

Req area of Hor reinf, Earth Face, mm2 = MAX(553+177,600)

Ast Required Ast Provided

Vertical Water Face 600 00-000+16-180 1117

Hor Water Face 1068 00-000+16-100 2010

Vertical Earth Face 600 00-000+16-180 1117

Hor Earth Face 730 00-000+12-125 904


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

Check for Shear at Junction of Base and Wall

Max Qy, (17 FULL) = 0.074 Min Qy, (18 EMPTY) = -0.109
Factored Shear Stress, N/mm2 = 1.5x0.109

Percentage of Steel provided on Water Face

Thickness of wall
Factor k for thickness of slab (Refer Clause 40.2.1.1 of IS 456)

Factor for enhanced Shear Stress near the support (Refer Clause 40.5.1 of IS 456)

Maximum shear stress in concrete for limit state method of design, tc max
Permissible Shear Stress, N/mm2 (Value from Table 19 of IS 456 * k * Enhancement)

W1B-2 Check for Temperature Reinforcement (As per Annexure A of IS 3370 - 2009, Part 2)

Horizontal Direction

Ast Provided (both faces) = 2010+904

Percentage of reinforcement provided = 2914/500/1000x100

Max spacing of cracks Smax = (fct/fb) * (f / 2 r) (2/3)x(0.5x(16+12)/2)x(100/0.58)

fct / fb = 2/3 for deformed bars as recommended in Code

Crack Width, Wmax = Smax * (a/2)* (T1 + T2)

805x(0.7/100000/2)x(15+15)

Permissible crack width = 0.1 mm, Hence OK


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
O.
20CDD003

28-Nov-18

R0

ding Moment

Mxy kNm/m

22.875

-22.526

4.969

-8.265

-19.061

27.219

-0.467

-36.97

-5.698

58.091

-22.526

-2.337

1.374

-2.337

58.091

-64.424
O.
20CDD003

28-Nov-18

R0
O.
20CDD003

28-Nov-18

R0

225 mm

725 mm

600

667.0

0.149

0.034

600

667.0

0.455

0.107

714

282.8

354

1068

672.0
O.
20CDD003

28-Nov-18

R0
0.268

0.062

600

674.0

0.353

0.082

553

141.4

177

730

% Ast

0.167%

0.299%

0.167%

0.134%
O.
20CDD003

28-Nov-18

R0

0.164

0.167%

725 mm

3.50

0.310

2914 mm2

0.58

805 mm

0.08 mm
O.
20CDD003

28-Nov-18

R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W1B-2 CRACK WIDTH - FLEXURE (IS 3370 Part 2 - 2009, Annexure B)

Vertical Limiting crack width, w

Max My Characteristic cube strength of Concrete, fck

Yield Strength of Steel, fy

Modulus Elasticity of Concrete Ec = 5000 x SQRT( fck )

Modulus Elasticity of Steel, Es

Applied Moment at service condition, M

σcbc = 10 N/mm2 Modular Ratio, m, 280/(3*σcbc) =

Breadth, b (mm) = 1000 Depth, h (mm) = 725

Reinf, Ast mm2 = 00-000+16-180 1117 Clear Cover, CC mm = 50

Reinf, Asc mm2 = 00-000+16-180 1117 Clear Cover, CC mm = 45

Effecive Depth, d = 725-50-0.5x16

Cover to the centre of compression steel, d' = 45+0.5x16

Max spacing of bars, S =

acr = maximum spacing of tensile bar from outer edge of concrete (mm)

= SQRT((0.5x180)^2+(50+0.5x16)^2)-0.5x16

Depth of NA from Compression face = x

Solve equation = (bx2/2) + (1.5m-1) Asc (x - d') - m Ast (d-x) = 0 to get x. x=

(x - d ') bxf c x
A sc fsc = (1.5 m -1) A sc f c (d - ) + A sc f sc (d - d ') = M
x 2 3
f c (d - x)
Ast f st = (m -1) A st
x Solve these equations to get fc

Stress in extreme compression fibre, fc

Stress in Tension reinforcement, fst = 9.33x1.21x(667-101.8)/101.8


Distance from compression face to point where crack width is being calculated, a

Strain at the level considered, ε1 = (h - x)fs/Es(d - x)

Strain due to stiffening effect in concrete, ε2 = 1.5b(h - x)(a - x)/(3EsAs(d - x))

εm = Average surface strain = ε1 - ε2

Crack Width, w = 3 acr εm/(1+2(acr - Cmin)/(h - x))


MENT NO.
RNALSTP20CDD003

28-Nov-18

R0

0.1 mm

30 N/mm2

500 N/mm2

2.7E+04 N/mm2

2.0E+05 N/mm2

44.16 kN-m

9.33

667 mm

53 mm

180 mm

99.1 mm

101.8 mm

1.21 N/mm2

62.7 N/mm2
725 mm

3.46E-04

1.54E-03

-1.19E-03

-0.306 mm
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W1B-2 CRACK WIDTH - FLEXURE & TENSION (IS 3370 Part 2 - 2009, Annexure B)

Horizontal Limiting crack width, w

Max Mx Characteristic cube strength of Concrete, fck

Sx-Max Mx Yield Strength of Steel, fy


Modulus Elasticity of Concrete Ec = 5000 x SQRT( fck )

Modulus Elasticity of Steel, Es

Applied Moment at service condition, M

Applied Tension at service condition, N 188.5

σcbc = 10 N/mm2 Modular Ratio, m, 280/(3*σcbc) =

Breadth, b (mm) = 1000 Depth, h (mm) = 725

Reinf, Ast mm2 = 00-000+16-100 2010 Clear Cover, CC mm = 50

Reinf, Asc mm2 = 00-000+12-125 904 Clear Cover, CC mm = 45

Distance between centroid of Ast and Asc, Zs = 725-50-0.5x16-45-0.5x12

Distance - Centroid of Ast to CG of Ast & Asc, Xs = 904x616/(2010+904)

Modified Moment M' = M - N * Xs

Modified moment, M' > 0, section is in bending

Effecive Depth, d = 725-50-0.5x16

Cover to the centre of compression steel, d' = 45+0.5x12


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

bxf c bxf c x
A st f st - - A sc f sc = N (d - ) + A sc f sc (d - d ') = M - N X S
2 2 3
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

f c (d - x) (x - d ')
Ast fst = (m -1) A st A sc f sc = (1.5 m -1) A sc f c
x x

Solve above equations to get the value of fc and x

Depth of NA from Compression face = x

Stress in extreme compression fibre, fc

Stress in Tension reinforcement, fst

= (9.33-1)x3.15x(667-88.73)/88.73

Distance from compression face to point where crack width is being calculated, a

Max spacing of bars, S =

acr = maximum spacing of tensile bar from outer edge of concrete (mm)

= SQRT((0.5x100)^2+(50+0.5x16)^2)-0.5x16

Strain at the level considered, ε1 = (h - x)fs/Es(d - x)

Strain due to stiffening effect in concrete, ε2 = 1.5b(h - x)(a - x)/(3EsAs(d - x))

εm = Average surface strain = ε1 - ε2

Crack Width, w = 3 acr εm/(1+2(acr - Cmin)/(h - x))


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
MENT NO.
NALSTP20CDD003

28-Nov-18

R0

0.1 mm

30 N/mm2

500 N/mm2

2.7E+04 N/mm2

2.0E+05 N/mm2

134.91 kN-m

188.50 kN

9.33

616.0 mm

191.1 mm

98.9 kN-m

667 mm

51 mm
MENT NO.
NALSTP20CDD003

28-Nov-18

R0

d ') = M - N X S
MENT NO.
NALSTP20CDD003

28-Nov-18

R0

88.73 mm

3.15 N/mm2

171.0 N/mm2

725 mm

100 mm

68.6 mm

9.41E-04

8.71E-04

7.00E-05

0.014 mm
MENT NO.
NALSTP20CDD003

28-Nov-18

R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W1B-2 CRACK WIDTH - FLEXURE & TENSION (IS 3370 Part 2 - 2009, Annexure B)

Horizontal Limiting crack width, w

Max Sx Characteristic cube strength of Concrete, fck

Mx-Max Sx Yield Strength of Steel, fy


Modulus Elasticity of Concrete Ec = 5000 x SQRT( fck )

Modulus Elasticity of Steel, Es

Applied Moment at service condition, M

Applied Tension at service condition, N 189.225

σcbc = 10 N/mm2 Modular Ratio, m, 280/(3*σcbc) =

Breadth, b (mm) = 1000 Depth, h (mm) = 725

Reinf, Ast mm2 = 00-000+16-100 2010 Clear Cover, CC mm = 50

Reinf, Asc mm2 = 00-000+12-125 904 Clear Cover, CC mm = 45

Distance between centroid of Ast and Asc, Zs = 725-50-0.5x16-45-0.5x12

Distance - Centroid of Ast to CG of Ast & Asc, Xs = 904x616/(2010+904)

Modified Moment M' = M - N * Xs

Modified moment, M' > 0, section is in bending

Effecive Depth, d = 725-50-0.5x16

Cover to the centre of compression steel, d' = 45+0.5x12


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

bxf c bxf c x
A st f st - - A sc f sc = N (d - ) + A sc f sc (d - d ') = M - N X S
2 2 3

f c (d - x) (x - d ')
Ast fst = (m -1) A st A sc f sc = (1.5 m -1) A sc f c
x x

Solve above equations to get the value of fc and x

Depth of NA from Compression face = x

Stress in extreme compression fibre, fc

Stress in Tension reinforcement, fst

= (9.33-1)x3.08x(667-87.88)/87.88

Distance from compression face to point where crack width is being calculated, a

Max spacing of bars, S =

acr = maximum spacing of tensile bar from outer edge of concrete (mm)

= SQRT((0.5x100)^2+(50+0.5x16)^2)-0.5x16

Strain at the level considered, ε1 = (h - x)fs/Es(d - x)

Strain due to stiffening effect in concrete, ε2 = 1.5b(h - x)(a - x)/(3EsAs(d - x))

εm = Average surface strain = ε1 - ε2

Crack Width, w = 3 acr εm/(1+2(acr - Cmin)/(h - x))


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
MENT NO.
NALSTP20CDD003

28-Nov-18

R0

0.1 mm

30 N/mm2

500 N/mm2

2.7E+04 N/mm2

2.0E+05 N/mm2

131.78 kN-m

189.23 kN

9.33

616.0 mm

191.1 mm

95.6 kN-m

667 mm

51 mm
MENT NO.
NALSTP20CDD003

28-Nov-18

R0
MENT NO.
NALSTP20CDD003

28-Nov-18

R0

d ') = M - N X S

87.88 mm

3.08 N/mm2

169.1 N/mm2

725 mm

100 mm

68.6 mm

9.30E-04

8.72E-04

5.82E-05

0.011 mm
MENT NO.
NALSTP20CDD003

28-Nov-18

R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W1B-3 DESIGN OF WALL W1B GROUP 3 Height from 5.00 to 7.50 m

Grade of Concrete, fck = 30 N/mm2 Grade of Steel, fy = 500 N/mm2

Limiting Moment of Resistance Index = 0.133

+Z Face -Z Face

Clear Cover = Water Face ### Earth Face ###

STAAD Group Analysis Report


Shear Membrane Bending Moment

Plate L/C SQX SQY SX SY (local) SXY Mx My kNm/m


(local) (local) (local) kN/m2 (local) kNm/m
kN/m2 kN/m2 kN/m2 kN/m2
Max Qx 1123 13 FULL1 180.387 -7.623 130.622 -197.949 -45.976 99.573 7.126

Min Qx 1104 17 FULL -199.244 -15.58 236.327 -68.449 5.171 130.85 13.757

Max Qy 1104 18 EMPT 159.352 29.647 -177.526 -130.075 -126.655 -94.837 -9.438

Min Qy 1196 13 FULL1 -23.068 -30.459 139.189 -141.506 -21.775 -74.542 -30.135

Max Sx 1207 19 SERVI -23.759 14.643 286.715 -143.319 -72.871 -20.174 -2.081

Min Sx 1104 18 EMPT 159.352 29.647 -177.526 -130.075 -126.655 -94.837 -9.438

Max Sy 1104 19 SERVI -36.828 13.902 54.757 -57.572 -114.465 32.733 4.232

Min Sy 1123 19 SERVI 18.879 13.668 186.389 -212.524 -102.146 3.154 -0.75

Max Sxy 1120 16 FULL4 7.836 3.656 -125.983 -161.46 80.599 8.219 5.13

Min Sxy 1109 18 EMPT 56.349 -7.442 -48.845 -125.938 -168.309 49.162 33.894

Max Mx 1104 17 FULL -199.244 -15.58 236.327 -68.449 5.171 130.85 13.757

Min Mx 1114 13 FULL1 3.722 -11.371 139.066 -161.607 -17.201 -104.042 -70.164

Max My 1114 18 EMPT -2.603 -18.587 53.958 -168.56 -162.478 79.194 45.86

Min My 1114 13 FULL1 3.722 -11.371 139.066 -161.607 -17.201 -104.042 -70.164

Max Mxy 1107 18 EMPT 89.077 5.197 -101.646 -109.678 -163.266 11.392 20.48

Min Mxy 1120 18 EMPT -81.449 3.242 144.29 -187.463 -140.638 18.004 22.553
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

Results from STADD output

Max Vertical BM in wall creating tension on Water Face Max My 45.86 kN-m/m

Max Horizontal BM in wall creating tension on Water Face Max Mx 130.85 kN-m/m

Tension corresponding to Max Mx Sx-Max Mx 0.236 N/mm2

Max Vertical BM in wall creating tension on Earth Face Min My 70.16 kN-m/m

Max Horizontal BM in wall creating tension on Earth Face Min Mx 104.04 kN-m/m

Tension corresponding to Min Mx Sx-Min Mx 0.139 N/mm2

Max Tension in Wall Max Sx 0.287 N/mm2

BM at wall corresponding to Max Sx on Earth Face Mx-Max Sx 20.17 kN-m/m


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

Thickness check:
Required effective thickness SQRT(130.85x1000000x1.5/(0.133x30x1000))

Provided overall thickness

Min Ast for each surface zone (mm2/m) in % = 0.24 = 0.24x250x1000/100

Area of vertical reinforcement required on Water Face

Max My 45.86 kN-m/m

Effective Depth (mm) = 642-50-0.5x16

Mu / bd2 = 45.86x1.5x10^6/(1000x584^2)

Refer SP-16 Percentage of reinforcement required, %

Req area of Vertical reinf, Water Face, mm2 = MAX(0.047x584x1000/100,600)

Area of horizontal reinforcement required on Water Face

Max Mx 130.85 kN-m/ Corresponding Tension Sx = 0.236 N/mm2


Effective Depth (mm) = 642-50-0.5x16

Mu / bd2 = 130.85x1.5x10^6/(1000x584^2)

Refer SP-16 Percentage of reinforcement required, %

Required area of reinforcement for Mx, mm2 = 0.135x584x1000/100

Factored Tension, kN/m = 0.236x642x1.5

Required area of reinf on each face for Sx, mm2 = 0.5x227.3x1000/(0.8x500)

Req area of Hor reinf, Water Face, mm2 = MAX(788+284,600)

Area of vertical reinforcement required on Earth Face

Min My 70.16 kN-m/m

Effective Depth (mm) = 642-45-0.5x16


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
Mu / bd2 = 70.16x1.5x10^6/(1000x589^2)

Refer SP-16 Percentage of reinforcement required, %

Req area of Vertical reinf, Earth Face, mm2 = MAX(0.071x589x1000/100,600)

Area of horizontal reinforcement required on Earth Face

Min Mx 104.04 kN-m/ Corresponding Tension Sx = 0.139 N/mm2


Effective Depth (mm) = 642-45-0.5x20

Mu / bd2 = 104.04x1.5x10^6/(1000x587^2)

Refer SP-16 Percentage of reinforcement required, %

Required area of reinforcement for Mx, mm2 = 0.106x587x1000/100

Factored Tension, N/m = 0.139x642x1.5

Required area of reinf on each face for Sx, mm2 = 0.5x133.9x1000/(0.8x500)

Req area of Hor reinf, Earth Face, mm2 = MAX(622+167,600)

Ast Required Ast Provided

Vertical Water Face 600 00-000+16-180 1117

Hor Water Face 1072 00-000+16-100 2010

Vertical Earth Face 600 00-000+16-180 1117

Hor Earth Face 789 00-000+20-125 2512


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

Check for Shear at Junction of Base and Wall

Max Qy, (18 EMPTY) = 0.030 Min Qy, (13 FULL1) = -0.030
Factored Shear Stress, N/mm2 = 1.5x0.03

Percentage of Steel provided on Water Face

Thickness of wall
Factor k for thickness of slab (Refer Clause 40.2.1.1 of IS 456)

Factor for enhanced Shear Stress near the support (Refer Clause 40.5.1 of IS 456)

Maximum shear stress in concrete for limit state method of design, tc max
Permissible Shear Stress, N/mm2 (Value from Table 19 of IS 456 * k * Enhancement)

W1B-3 Check for Temperature Reinforcement (As per Annexure A of IS 3370 - 2009, Part 2)

Horizontal Direction

Ast Provided (both faces) = 2010+2512

Percentage of reinforcement provided = 4522/500/1000x100

Max spacing of cracks Smax = (fct/fb) * (f / 2 r) (2/3)x(0.5x(16+20)/2)x(100/0.9)

fct / fb = 2/3 for deformed bars as recommended in Code

Crack Width, Wmax = Smax * (a/2)* (T1 + T2)

667x(0.7/100000/2)x(15+15)

Permissible crack width = 0.1 mm, Hence OK


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
O.
20CDD003

28-Nov-18

R0

ding Moment

Mxy kNm/m

10.085

-11.274

22.69

-3.439

-7.081

22.69

9.793

-7.399

-2.917

30.803

-11.274

-3.08

1.502

-3.08

34.612

-24.593
O.
20CDD003

28-Nov-18

R0
O.
20CDD003

28-Nov-18

R0

222 mm

642 mm

600

584.0

0.202

0.047

600

584.0

0.575

0.135

788

227.3

284

1072

589.0
O.
20CDD003

28-Nov-18

R0
0.303

0.071

600

587.0

0.453

0.106

622

133.9

167

789

% Ast

0.191%

0.341%

0.191%

0.428%
O.
20CDD003

28-Nov-18

R0

0.045

0.191%

642 mm

3.50

0.330

4522 mm2

0.90

667 mm

0.07 mm
O.
20CDD003

28-Nov-18

R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W1B-3 CRACK WIDTH - FLEXURE (IS 3370 Part 2 - 2009, Annexure B)

Vertical Limiting crack width, w

Max My Characteristic cube strength of Concrete, fck

Yield Strength of Steel, fy

Modulus Elasticity of Concrete Ec = 5000 x SQRT( fck )

Modulus Elasticity of Steel, Es

Applied Moment at service condition, M

σcbc = 10 N/mm2 Modular Ratio, m, 280/(3*σcbc) =

Breadth, b (mm) = 1000 Depth, h (mm) = 642

Reinf, Ast mm2 = 00-000+16-180 1117 Clear Cover, CC mm = 50

Reinf, Asc mm2 = 00-000+16-180 1117 Clear Cover, CC mm = 45

Effecive Depth, d = 642-50-0.5x16

Cover to the centre of compression steel, d' = 45+0.5x16

Max spacing of bars, S =

acr = maximum spacing of tensile bar from outer edge of concrete (mm)

= SQRT((0.5x180)^2+(50+0.5x16)^2)-0.5x16

Depth of NA from Compression face = x

Solve equation = (bx2/2) + (1.5m-1) Asc (x - d') - m Ast (d-x) = 0 to get x. x=

(x - d ') bxf c x
A sc fsc = (1.5 m -1) A sc f c (d - ) + A sc f sc (d - d ') = M
x 2 3
f c (d - x)
Ast f st = (m -1) A st
x Solve these equations to get fc

Stress in extreme compression fibre, fc

Stress in Tension reinforcement, fst = 9.33x1.55x(584-94.8)/94.8


Distance from compression face to point where crack width is being calculated, a

Strain at the level considered, ε1 = (h - x)fs/Es(d - x)

Strain due to stiffening effect in concrete, ε2 = 1.5b(h - x)(a - x)/(3EsAs(d - x))

εm = Average surface strain = ε1 - ε2

Crack Width, w = 3 acr εm/(1+2(acr - Cmin)/(h - x))


MENT NO.
RNALSTP20CDD003

28-Nov-18

R0

0.1 mm

30 N/mm2

500 N/mm2

2.7E+04 N/mm2

2.0E+05 N/mm2

45.86 kN-m

9.33

584 mm

53 mm

180 mm

99.1 mm

94.8 mm

1.55 N/mm2

74.6 N/mm2
642 mm

4.17E-04

1.37E-03

-9.53E-04

-0.240 mm
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W1B-3 CRACK WIDTH - FLEXURE & TENSION (IS 3370 Part 2 - 2009, Annexure B)

Horizontal Limiting crack width, w

Max Mx Characteristic cube strength of Concrete, fck

Sx-Max Mx Yield Strength of Steel, fy


Modulus Elasticity of Concrete Ec = 5000 x SQRT( fck )

Modulus Elasticity of Steel, Es

Applied Moment at service condition, M

Applied Tension at service condition, N 151.512

σcbc = 10 N/mm2 Modular Ratio, m, 280/(3*σcbc) =

Breadth, b (mm) = 1000 Depth, h (mm) = 642

Reinf, Ast mm2 = 00-000+16-100 2010 Clear Cover, CC mm = 50

Reinf, Asc mm2 = 00-000+20-125 2512 Clear Cover, CC mm = 45

Distance between centroid of Ast and Asc, Zs = 642-50-0.5x16-45-0.5x20

Distance - Centroid of Ast to CG of Ast & Asc, Xs = 2512x529/(2010+2512)

Modified Moment M' = M - N * Xs

Modified moment, M' > 0, section is in bending

Effecive Depth, d = 642-50-0.5x16

Cover to the centre of compression steel, d' = 45+0.5x20


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

bxf c bxf c x
A st f st - - A sc f sc = N (d - ) + A sc f sc (d - d ') = M - N X S
2 2 3
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

f c (d - x) (x - d ')
Ast fst = (m -1) A st A sc f sc = (1.5 m -1) A sc f c
x x

Solve above equations to get the value of fc and x

Depth of NA from Compression face = x

Stress in extreme compression fibre, fc

Stress in Tension reinforcement, fst

= (9.33-1)x3.02x(584-82.24)/82.24

Distance from compression face to point where crack width is being calculated, a

Max spacing of bars, S =

acr = maximum spacing of tensile bar from outer edge of concrete (mm)

= SQRT((0.5x100)^2+(50+0.5x16)^2)-0.5x16

Strain at the level considered, ε1 = (h - x)fs/Es(d - x)

Strain due to stiffening effect in concrete, ε2 = 1.5b(h - x)(a - x)/(3EsAs(d - x))

εm = Average surface strain = ε1 - ε2

Crack Width, w = 3 acr εm/(1+2(acr - Cmin)/(h - x))


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
MENT NO.
NALSTP20CDD003

28-Nov-18

R0

0.1 mm

30 N/mm2

500 N/mm2

2.7E+04 N/mm2

2.0E+05 N/mm2

130.85 kN-m

151.51 kN

9.33

529.0 mm

293.9 mm

86.3 kN-m

584 mm

55 mm
MENT NO.
NALSTP20CDD003

28-Nov-18

R0

d ') = M - N X S
MENT NO.
NALSTP20CDD003

28-Nov-18

R0

82.24 mm

3.02 N/mm2

153.5 N/mm2

642 mm

100 mm

68.6 mm

8.56E-04

7.77E-04

7.94E-05

0.015 mm
MENT NO.
NALSTP20CDD003

28-Nov-18

R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W1B-3 CRACK WIDTH - FLEXURE & TENSION (IS 3370 Part 2 - 2009, Annexure B)

Horizontal Limiting crack width, w

Max Sx Characteristic cube strength of Concrete, fck

Mx-Max Sx Yield Strength of Steel, fy


Modulus Elasticity of Concrete Ec = 5000 x SQRT( fck )

Modulus Elasticity of Steel, Es

Applied Moment at service condition, M

Applied Tension at service condition, N 184.254

σcbc = 10 N/mm2 Modular Ratio, m, 280/(3*σcbc) =

Breadth, b (mm) = 1000 Depth, h (mm) = 642

Reinf, Ast mm2 = 00-000+20-125 2512 Clear Cover, CC mm = 45

Reinf, Asc mm2 = 00-000+16-100 2010 Clear Cover, CC mm = 50

Distance between centroid of Ast and Asc, Zs = 642-45-0.5x20-50-0.5x16

Distance - Centroid of Ast to CG of Ast & Asc, Xs

= 2010x529/(2512+2010)

Modified Moment M' = M - N * Xs

Modified moment, M' < 0, section in tension


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

Effecive Depth, d = 642-45-0.5x20

Cover to the centre of compression steel, d' = 50+0.5x16

Tension excess tensile face, T'

= (184.25x2512/(2512+2010))+(20.17x1000/(587-58))

Tension less tensile face, T''

= (184.25x2010/(2512+2010))-(20.17x1000/(587-58))

Stress in Tension reinforcement, fst = 140.481x1000/2512

Total Concrete Area, Ac = 1000x642+(9.33-1)x(2512+2010)

Direct Tension in Concrete, fct = 184.25x1000/679668.3

Max spacing of bars, S =

acr = maximum spacing of tensile bar from outer edge of concrete (mm)

= SQRT((0.5x125)^2+(45+0.5x20)^2)-0.5x20

Strain at the level considered, ε1 = fs / Es

Strain due to stiffening effect in concrete, ε2 = bD/EsAs


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
εm = Average surface strain = ε1 - ε2

Crack Width, w = 3 acr εm


MENT NO.
NALSTP20CDD003

28-Nov-18

R0

0.1 mm

30 N/mm2

500 N/mm2

2.7E+04 N/mm2

2.0E+05 N/mm2

20.17 kN-m

184.25 kN

9.33

529.0 mm

235.1 mm

-23.1 kN-m
MENT NO.
NALSTP20CDD003

28-Nov-18

R0
MENT NO.
NALSTP20CDD003

28-Nov-18

R0

587 mm

58 mm

140.5 kN

43.8 kN

55.9 N/mm2

6.8E+05 mm2

0.27 N/mm2

125 mm

73.3 mm

2.80E-04

7.10E-04
MENT NO.
NALSTP20CDD003

28-Nov-18

R0
-4.30E-04

-0.095 mm
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W1B-4 DESIGN OF WALL W1B GROUP 4 Height from 7.50 to 10.40 m

Grade of Concrete, fck = 30 N/mm2 Grade of Steel, fy = 500 N/mm2

Limiting Moment of Resistance Index = 0.133

+Z Face -Z Face

Clear Cover = Water Face ### Earth Face ###

STAAD Group Analysis Report


Shear Membrane Bending Moment

Plate L/C SQX SQY SX SY (local) SXY Mx My kNm/m


(local) (local) (local) kN/m2 (local) kNm/m
kN/m2 kN/m2 kN/m2 kN/m2
Max Qx 1209 18 EMPT 132.445 3.203 -130.521 -129.869 -56.953 -81.314 -11.552

Min Qx 1228 18 EMPT -119.41 15.636 227.606 -107.454 -64.496 -74.652 -8.073

Max Qy 1333 17 FULL -14.446 30.347 269.807 -62.575 -7.694 8.542 -3.667

Min Qy 1314 19 SERVI 17.83 -31.285 15.242 -69.115 -3.504 -3.754 0.553

Max Sx 1333 19 SERVI -58.32 26.404 442.287 -49.363 -17.474 -18.702 -7.088

Min Sx 1324 16 FULL4 -21.334 -2.275 -204.801 -334.988 -172.626 2.216 -4.714

Max Sy 1333 19 SERVI -58.32 26.404 442.287 -49.363 -17.474 -18.702 -7.088

Min Sy 1324 19 SERVI -27.536 1.704 52.931 -361.198 -204.732 5.119 -4.558

Max Sxy 1323 14 FULL2 24.573 -2.246 -71.584 -226.776 111.847 2.224 -3.797

Min Sxy 1324 19 SERVI -27.536 1.704 52.931 -361.198 -204.732 5.119 -4.558

Max Mx 1209 17 FULL -109.361 9.836 108.927 -85.648 -26.353 84.547 13.248

Min Mx 1209 18 EMPT 132.445 3.203 -130.521 -129.869 -56.953 -81.314 -11.552

Max My 1219 18 EMPT -3.146 12.255 80.765 -145.855 -91.175 68.908 22.562

Min My 1219 13 FULL1 0.871 -26.863 138.883 -149.532 -39.564 -68.206 -22.832

Max Mxy 1213 18 EMPT 71.596 11.795 -58.31 -85.607 -59.209 23.448 11.091

Min Mxy 1225 19 SERVI -18.592 -2.957 263.602 -123.53 -88.055 -7.099 1.053
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

Results from STADD output

Max Vertical BM in wall creating tension on Water Face Max My 22.56 kN-m/m

Max Horizontal BM in wall creating tension on Water Face Max Mx 84.55 kN-m/m

Tension corresponding to Max Mx Sx-Max Mx 0.109 N/mm2

Max Vertical BM in wall creating tension on Earth Face Min My 22.83 kN-m/m

Max Horizontal BM in wall creating tension on Earth Face Min Mx 81.31 kN-m/m

Tension corresponding to Min Mx Sx-Min Mx 0 N/mm2

Max Tension in Wall Max Sx 0.442 N/mm2

BM at wall corresponding to Max Sx on Earth Face Mx-Max Sx 18.7 kN-m/m


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

Thickness check:
Required effective thickness SQRT(84.55x1000000x1.5/(0.133x30x1000))

Provided overall thickness

Min Ast for each surface zone (mm2/m) in % = 0.24 = 0.24x237.5x1000/100

Area of vertical reinforcement required on Water Face

Max My 22.56 kN-m/m

Effective Depth (mm) = 475-50-0.5x16

Mu / bd2 = 22.56x1.5x10^6/(1000x417^2)

Refer SP-16 Percentage of reinforcement required, %

Req area of Vertical reinf, Water Face, mm2 = MAX(0.045x417x1000/100,570)

Area of horizontal reinforcement required on Water Face

Max Mx 84.55 kN-m/ Corresponding Tension Sx = 0.109 N/mm2


Effective Depth (mm) = 475-50-0.5x16

Mu / bd2 = 84.55x1.5x10^6/(1000x417^2)

Refer SP-16 Percentage of reinforcement required, %

Required area of reinforcement for Mx, mm2 = 0.173x417x1000/100

Factored Tension, kN/m = 0.109x475x1.5

Required area of reinf on each face for Sx, mm2 = 0.5x77.7x1000/(0.8x500)

Req area of Hor reinf, Water Face, mm2 = MAX(721+97,570)

Area of vertical reinforcement required on Earth Face

Min My 22.83 kN-m/m

Effective Depth (mm) = 475-45-0.5x16


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
Mu / bd2 = 22.83x1.5x10^6/(1000x422^2)

Refer SP-16 Percentage of reinforcement required, %

Req area of Vertical reinf, Earth Face, mm2 = MAX(0.044x422x1000/100,570)

Area of horizontal reinforcement required on Earth Face

Min Mx 81.31 kN-m/ Corresponding Tension Sx = 0.000 N/mm2


Effective Depth (mm) = 475-45-0.5x16

Mu / bd2 = 81.31x1.5x10^6/(1000x422^2)

Refer SP-16 Percentage of reinforcement required, %

Required area of reinforcement for Mx, mm2 = 0.162x422x1000/100

Factored Tension, N/m =0

Required area of reinf on each face for Sx, mm2 =0

Req area of Hor reinf, Earth Face, mm2 = MAX(684+0,570)

Ast Required Ast Provided

Vertical Water Face 570 00-000+16-180 1117

Hor Water Face 818 00-000+16-100 2010

Vertical Earth Face 570 00-000+16-180 1117

Hor Earth Face 684 00-000+16-100 2010


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

Check for Shear at Junction of Base and Wall

Max Qy, (17 FULL) = 0.030 Min Qy, (19 SERVICE) = -0.031
Factored Shear Stress, N/mm2 = 1.5x0.031

Percentage of Steel provided on Water Face

Thickness of wall
Factor k for thickness of slab (Refer Clause 40.2.1.1 of IS 456)

Factor for enhanced Shear Stress near the support (Refer Clause 40.5.1 of IS 456)

Maximum shear stress in concrete for limit state method of design, tc max
Permissible Shear Stress, N/mm2 (Value from Table 19 of IS 456 * k * Enhancement)

W1B-4 Check for Temperature Reinforcement (As per Annexure A of IS 3370 - 2009, Part 2)

Horizontal Direction

Ast Provided (both faces) = 2010+2010

Percentage of reinforcement provided = 4020/475/1000x100

Max spacing of cracks Smax = (fct/fb) * (f / 2 r) (2/3)x(0.5x(16+16)/2)x(100/0.85)

fct / fb = 2/3 for deformed bars as recommended in Code

Crack Width, Wmax = Smax * (a/2)* (T1 + T2)

627x(0.7/100000/2)x(15+15)

Permissible crack width = 0.1 mm, Hence OK


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
O.
20CDD003

28-Nov-18

R0

ding Moment

Mxy kNm/m

8.17

1.821

0.729

1.253

2.753

-3.11

2.753

-3.844

3.049

-3.844

1.066

8.17

1.272

-2.923

12.76

-13.096
O.
20CDD003

28-Nov-18

R0
O.
20CDD003

28-Nov-18

R0

178 mm

475 mm

570

417.0

0.195

0.045

570

417.0

0.729

0.173

721

77.7

97

818

422.0
O.
20CDD003

28-Nov-18

R0
0.192

0.044

570

422.0

0.685

0.162

684

684

% Ast

0.268%

0.476%

0.268%

0.476%
O.
20CDD003

28-Nov-18

R0

0.047

0.268%

475 mm

3.50

0.380

4020 mm2

0.85

627 mm

0.07 mm
O.
20CDD003

28-Nov-18

R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W1B-4 CRACK WIDTH - FLEXURE (IS 3370 Part 2 - 2009, Annexure B)

Vertical Limiting crack width, w

Max My Characteristic cube strength of Concrete, fck

Yield Strength of Steel, fy

Modulus Elasticity of Concrete Ec = 5000 x SQRT( fck )

Modulus Elasticity of Steel, Es

Applied Moment at service condition, M

σcbc = 10 N/mm2 Modular Ratio, m, 280/(3*σcbc) =

Breadth, b (mm) = 1000 Depth, h (mm) = 475

Reinf, Ast mm2 = 00-000+16-180 1117 Clear Cover, CC mm = 50

Reinf, Asc mm2 = 00-000+16-180 1117 Clear Cover, CC mm = 45

Effecive Depth, d = 475-50-0.5x16

Cover to the centre of compression steel, d' = 45+0.5x16

Max spacing of bars, S =

acr = maximum spacing of tensile bar from outer edge of concrete (mm)

= SQRT((0.5x180)^2+(50+0.5x16)^2)-0.5x16

Depth of NA from Compression face = x

Solve equation = (bx2/2) + (1.5m-1) Asc (x - d') - m Ast (d-x) = 0 to get x. x=

(x - d ') bxf c x
A sc fsc = (1.5 m -1) A sc f c (d - ) + A sc f sc (d - d ') = M
x 2 3
f c (d - x)
Ast f st = (m -1) A st
x Solve these equations to get fc

Stress in extreme compression fibre, fc

Stress in Tension reinforcement, fst = 9.33x1.31x(417-79.2)/79.2


Distance from compression face to point where crack width is being calculated, a

Strain at the level considered, ε1 = (h - x)fs/Es(d - x)

Strain due to stiffening effect in concrete, ε2 = 1.5b(h - x)(a - x)/(3EsAs(d - x))

εm = Average surface strain = ε1 - ε2

Crack Width, w = 3 acr εm/(1+2(acr - Cmin)/(h - x))


MENT NO.
RNALSTP20CDD003

28-Nov-18

R0

0.1 mm

30 N/mm2

500 N/mm2

2.7E+04 N/mm2

2.0E+05 N/mm2

22.56 kN-m

9.33

417 mm

53 mm

180 mm

99.1 mm

79.2 mm

1.31 N/mm2

52.1 N/mm2
475 mm

3.05E-04

1.04E-03

-7.33E-04

-0.174 mm
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W1B-4 CRACK WIDTH - FLEXURE & TENSION (IS 3370 Part 2 - 2009, Annexure B)

Horizontal Limiting crack width, w

Max Mx Characteristic cube strength of Concrete, fck

Sx-Max Mx Yield Strength of Steel, fy


Modulus Elasticity of Concrete Ec = 5000 x SQRT( fck )

Modulus Elasticity of Steel, Es

Applied Moment at service condition, M

Applied Tension at service condition, N 51.775

σcbc = 10 N/mm2 Modular Ratio, m, 280/(3*σcbc) =

Breadth, b (mm) = 1000 Depth, h (mm) = 475

Reinf, Ast mm2 = 00-000+16-100 2010 Clear Cover, CC mm = 50

Reinf, Asc mm2 = 00-000+16-100 2010 Clear Cover, CC mm = 45

Distance between centroid of Ast and Asc, Zs = 475-50-0.5x16-45-0.5x16

Distance - Centroid of Ast to CG of Ast & Asc, Xs = 2010x364/(2010+2010)

Modified Moment M' = M - N * Xs

Modified moment, M' > 0, section is in bending

Effecive Depth, d = 475-50-0.5x16

Cover to the centre of compression steel, d' = 45+0.5x16


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

bxf c bxf c x
A st f st - - A sc f sc = N (d - ) + A sc f sc (d - d ') = M - N X S
2 2 3

f c (d - x) (x - d ')
Ast fst = (m -1) A st A sc f sc = (1.5 m -1) A sc f c
x x

Solve above equations to get the value of fc and x

Depth of NA from Compression face = x

Stress in extreme compression fibre, fc

Stress in Tension reinforcement, fst

= (9.33-1)x3.76x(417-84.57)/84.57

Distance from compression face to point where crack width is being calculated, a

Max spacing of bars, S =

acr = maximum spacing of tensile bar from outer edge of concrete (mm)

= SQRT((0.5x100)^2+(50+0.5x16)^2)-0.5x16

Strain at the level considered, ε1 = (h - x)fs/Es(d - x)

Strain due to stiffening effect in concrete, ε2 = 1.5b(h - x)(a - x)/(3EsAs(d - x))

εm = Average surface strain = ε1 - ε2

Crack Width, w = 3 acr εm/(1+2(acr - Cmin)/(h - x))


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
MENT NO.
NALSTP20CDD003

28-Nov-18

R0

0.1 mm

30 N/mm2

500 N/mm2

2.7E+04 N/mm2

2.0E+05 N/mm2

84.55 kN-m

51.78 kN

9.33

364.0 mm

182.0 mm

75.1 kN-m

417 mm

53 mm
MENT NO.
NALSTP20CDD003

28-Nov-18

R0

d ') = M - N X S

84.57 mm

3.76 N/mm2

123.1 N/mm2

475 mm

100 mm

68.6 mm

7.23E-04

5.70E-04

1.53E-04

0.029 mm
MENT NO.
NALSTP20CDD003

28-Nov-18

R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W1B-4 CRACK WIDTH - FLEXURE & TENSION (IS 3370 Part 2 - 2009, Annexure B)

Horizontal Limiting crack width, w

Max Sx Characteristic cube strength of Concrete, fck

Mx-Max Sx Yield Strength of Steel, fy


Modulus Elasticity of Concrete Ec = 5000 x SQRT( fck )

Modulus Elasticity of Steel, Es

Applied Moment at service condition, M

Applied Tension at service condition, N 209.95

σcbc = 10 N/mm2 Modular Ratio, m, 280/(3*σcbc) =

Breadth, b (mm) = 1000 Depth, h (mm) = 475

Reinf, Ast mm2 = 00-000+16-100 2010 Clear Cover, CC mm = 45

Reinf, Asc mm2 = 00-000+16-100 2010 Clear Cover, CC mm = 50

Distance between centroid of Ast and Asc, Zs = 475-45-0.5x16-50-0.5x16

Distance - Centroid of Ast to CG of Ast & Asc, Xs

= 2010x364/(2010+2010)

Modified Moment M' = M - N * Xs

Modified moment, M' < 0, section in tension


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

Effecive Depth, d = 475-45-0.5x16

Cover to the centre of compression steel, d' = 50+0.5x16

Tension excess tensile face, T'

= (209.95x2010/(2010+2010))+(18.7x1000/(422-58))

Tension less tensile face, T''

= (209.95x2010/(2010+2010))-(18.7x1000/(422-58))

Stress in Tension reinforcement, fst = 156.349x1000/2010

Total Concrete Area, Ac = 1000x475+(9.33-1)x(2010+2010)

Direct Tension in Concrete, fct = 209.95x1000/508486.6

Max spacing of bars, S =

acr = maximum spacing of tensile bar from outer edge of concrete (mm)

= SQRT((0.5x100)^2+(45+0.5x16)^2)-0.5x16

Strain at the level considered, ε1 = fs / Es


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
Strain due to stiffening effect in concrete, ε2 = bD/EsAs

εm = Average surface strain = ε1 - ε2

Crack Width, w = 3 acr εm


MENT NO.
NALSTP20CDD003

28-Nov-18

R0

0.1 mm

30 N/mm2

500 N/mm2

2.7E+04 N/mm2

2.0E+05 N/mm2

18.70 kN-m

209.95 kN

9.33

364.0 mm

182.0 mm

-19.5 kN-m
MENT NO.
NALSTP20CDD003

28-Nov-18

R0
MENT NO.
NALSTP20CDD003

28-Nov-18

R0

422 mm

58 mm

156.3 kN

53.6 kN

77.8 N/mm2

5.1E+05 mm2

0.41 N/mm2

100 mm

64.9 mm

3.89E-04
MENT NO.
NALSTP20CDD003

28-Nov-18

R0
5.91E-04

-2.02E-04

-0.039 mm
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

DESIGN OF WALL W2
NT NO.
LSTP20CDD003

28-Nov-18

R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W2-DATA DESIGN OF WALL W2

DESIGNED THICKNESS
Height from bottom 0.00 7.50 10.40
Designed Thickness 850 600 350
Provided Thickness 850 600 350

Length of Wall = 11.50 m

Minimum reinforcement as per clause 8.1.1 of IS 3370 (Part 2) - 2009 0.24 %

Height Thickness Thickness for Temp.


Group Avg Th
From To From To From To Avg. Th
1 0.00 2.50 850 767 808 850 767 808
2 2.50 5.00 767 683 725 767 683 725
3 5.00 7.50 683 600 642 683 600 642
4 7.50 10.40 600 350 475 600 350 475

Direction and Type of Fill BOW BOF TOW TOF HOF

+Z Water Face Liquid 233.10 233.10 243.50 241.50 8.40

-Z Earth Face Earth 233.10 233.10 243.50 243.00 9.90

Fill k r Pressure Additional Loads, if any

+Z 1.00 10.30 86.52

-Z 0.33 20.00 65.93


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
O.
20CDD003

28-Nov-18

R0
O.
20CDD003

28-Nov-18

R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W2-1 DESIGN OF WALL W2 GROUP 1 Height from 0.00 to 2.50 m

Grade of Concrete, fck = 30 N/mm2 Grade of Steel, fy = 500 N/mm2

Limiting Moment of Resistance Index = 0.133

+Z Face -Z Face

Clear Cover = Water Face ### Earth Face ###

STAAD Group Analysis Report


Shear Membrane Bending Moment

Plate L/C SQX SQY SX SY (local) SXY Mx My kNm/m


(local) (local) (local) kN/m2 (local) kNm/m
kN/m2 kN/m2 kN/m2 kN/m2
Max Qx 1742 17 FULL 152.294 -42.043 186.618 -182.134 -33.842 101.478 2.643

Min Qx 1723 17 FULL -152.855 -47.475 174.309 -232.083 36.113 110.577 3.594

Max Qy 1645 13 FULL1 0.069 250.891 -21.987 -227.275 10.682 21.229 171.781

Min Qy 1645 18 EMPT 1.365 -278.214 -33.18 -217.304 -10.826 -61.555 -363.518

Max Sx 1698 19 SERVI 129.64 -89.447 206.589 36.24 -8.305 35.53 -39.998

Min Sx 1657 17 FULL -62.206 80.127 -138.999 -283.254 93.248 58.718 68.15

Max Sy 1679 18 EMPT -48.123 -59.12 127.933 86.324 -91.731 -31.783 -52.446

Min Sy 1679 17 FULL -73.498 14.569 -15.863 -291.413 91.282 74.868 27.366

Max Sxy 1657 13 FULL1 -58.427 85.074 -137.124 -281.299 93.895 59.342 71.624

Min Sxy 1676 13 FULL1 50.517 68.78 -93.786 -232.633 -107.569 52.311 63.1

Max Mx 1723 13 FULL1-148.468 -46.505 178.192 -212.435 40.343 110.864 3.938

Min Mx 1733 17 FULL 3.914 93.675 106.379 -232.017 7.297 -73.13 -51.9

Max My 1645 13 FULL1 0.069 250.891 -21.987 -227.275 10.682 21.229 171.781

Min My 1645 18 EMPT 1.365 -278.214 -33.18 -217.304 -10.826 -61.555 -363.518

Max Mxy 1652 19 SERVI 29.108 -62.795 26.733 -163.367 -92.791 -22.889 -130.716

Min Mxy 1637 19 SERVI -36.527 -53.642 13.638 -222.773 33.95 -20.684 -115.463
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

Results from STADD output

Max Vertical BM in wall creating tension on Water Face Max My 171.78 kN-m/m

Max Horizontal BM in wall creating tension on Water Face Max Mx 110.86 kN-m/m

Tension corresponding to Max Mx Sx-Max Mx 0.178 N/mm2

Max Vertical BM in wall creating tension on Earth Face Min My 363.52 kN-m/m

Max Horizontal BM in wall creating tension on Earth Face Min Mx 73.13 kN-m/m

Tension corresponding to Min Mx Sx-Min Mx 0.106 N/mm2

Max Tension in Wall Max Sx 0.207 N/mm2

BM at wall corresponding to Max Sx on Water Face Mx-Max Sx 35.53 kN-m/m


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

Thickness check:
Required effective thickness SQRT(363.52x1000000x1.5/(0.133x30x1000))

Provided overall thickness

Min Ast for each surface zone (mm2/m) in % = 0.24 = 0.24x250x1000/100

Area of vertical reinforcement required on Water Face

Max My 171.78 kN-m/m

Effective Depth (mm) = 808-50-0.5x16

Mu / bd2 = 171.78x1.5x10^6/(1000x750^2)

Refer SP-16 Percentage of reinforcement required, %

Req area of Vertical reinf, Water Face, mm2 = MAX(0.107x750x1000/100,600)

Area of horizontal reinforcement required on Water Face

Max Mx 110.86 kN-m/ Corresponding Tension Sx = 0.178 N/mm2


Effective Depth (mm) = 808-50-0.5x12

Mu / bd2 = 110.86x1.5x10^6/(1000x752^2)

Refer SP-16 Percentage of reinforcement required, %

Required area of reinforcement for Mx, mm2 = 0.068x752x1000/100

Factored Tension, kN/m = 0.178x808x1.5

Required area of reinf on each face for Sx, mm2 = 0.5x215.7x1000/(0.8x500)

Req area of Hor reinf, Water Face, mm2 = MAX(511+270,600)

Area of vertical reinforcement required on Earth Face

Min My 363.52 kN-m/m

Effective Depth (mm) = 808-45-0.5x16


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
Mu / bd2 = 363.52x1.5x10^6/(1000x755^2)

Refer SP-16 Percentage of reinforcement required, %

Req area of Vertical reinf, Earth Face, mm2 = MAX(0.229x755x1000/100,600)

Area of horizontal reinforcement required on Earth Face

Min Mx 73.13 kN-m/ Corresponding Tension Sx = 0.106 N/mm2


Effective Depth (mm) = 808-45-0.5x12

Mu / bd2 = 73.13x1.5x10^6/(1000x757^2)

Refer SP-16 Percentage of reinforcement required, %

Required area of reinforcement for Mx, mm2 = 0.044x757x1000/100

Factored Tension, N/m = 0.106x808x1.5

Required area of reinf on each face for Sx, mm2 = 0.5x128.5x1000/(0.8x500)

Req area of Hor reinf, Earth Face, mm2 = MAX(333+161,600)

Ast Required Ast Provided

Vertical Water Face 803 00-000+16-180 1117

Hor Water Face 781 00-000+12-100 1130

Vertical Earth Face 1729 16-180+12-180 1744

Hor Earth Face 600 00-000+12-100 1130


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

Check for Shear at Junction of Base and Wall

Max Qy, (13 FULL1) = 0.251 Min Qy, (18 EMPTY) = -0.278
Factored Shear Stress, N/mm2 = 1.5x0.278

Percentage of Steel provided on Water Face

Thickness of wall
Factor k for thickness of slab (Refer Clause 40.2.1.1 of IS 456)

Factor for enhanced Shear Stress near the support (Refer Clause 40.5.1 of IS 456)

Maximum shear stress in concrete for limit state method of design, tc max
Permissible Shear Stress, N/mm2 (Value from Table 19 of IS 456 * k * Enhancement)

W2-1 Check for Temperature Reinforcement (As per Annexure A of IS 3370 - 2009, Part 2)

Horizontal Direction

Ast Provided (both faces) = 1130+1130

Percentage of reinforcement provided = 2260/500/1000x100

Max spacing of cracks Smax = (fct/fb) * (f / 2 r) (2/3)x(0.5x(12+12)/2)x(100/0.45)

fct / fb = 2/3 for deformed bars as recommended in Code

Crack Width, Wmax = Smax * (a/2)* (T1 + T2)

889x(0.7/100000/2)x(15+15)

Permissible crack width = 0.1 mm, Hence OK


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
O.
20CDD003

28-Nov-18

R0

ding Moment

Mxy kNm/m

34.265

-29.589

7.139

0.811

28.905

-38.49

-4.048

-35.796

-33.312

42.436

-27.159

4.358

7.139

0.811

68.367

-75.843
O.
20CDD003

28-Nov-18

R0
O.
20CDD003

28-Nov-18

R0

370 mm

808 mm

600

750.0

0.458

0.107

803

752.0

0.294

0.068

511

215.7

270

781

755.0
O.
20CDD003

28-Nov-18

R0
0.957

0.229

1729

757.0

0.191

0.044

333

128.5

161

600

% Ast

0.149%

0.150%

0.232%

0.149%
O.
20CDD003

28-Nov-18

R0

0.417

0.149%

808 mm

3.50

1.740

2260 mm2

0.45

889 mm

0.09 mm
O.
20CDD003

28-Nov-18

R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W2-1 CRACK WIDTH - FLEXURE (IS 3370 Part 2 - 2009, Annexure B)

Vertical Limiting crack width, w

Max My Characteristic cube strength of Concrete, fck

Yield Strength of Steel, fy

Modulus Elasticity of Concrete Ec = 5000 x SQRT( fck )

Modulus Elasticity of Steel, Es

Applied Moment at service condition, M

σcbc = 10 N/mm2 Modular Ratio, m, 280/(3*σcbc) =

Breadth, b (mm) = 1000 Depth, h (mm) = 808

Reinf, Ast mm2 = 00-000+16-180 1117 Clear Cover, CC mm = 50

Reinf, Asc mm2 = 16-180+12-180 1744 Clear Cover, CC mm = 45

Effecive Depth, d = 808-50-0.5x16

Cover to the centre of compression steel, d' = 45+0.5x16

Max spacing of bars, S =

acr = maximum spacing of tensile bar from outer edge of concrete (mm)

= SQRT((0.5x180)^2+(50+0.5x16)^2)-0.5x16

Depth of NA from Compression face = x

Solve equation = (bx2/2) + (1.5m-1) Asc (x - d') - m Ast (d-x) = 0 to get x. x=

(x - d ') bxf c x
A sc fsc = (1.5 m -1) A sc f c (d - ) + A sc f sc (d - d ') = M
x 2 3
f c (d - x)
Ast f st = (m -1) A st
x Solve these equations to get fc

Stress in extreme compression fibre, fc

Stress in Tension reinforcement, fst = 9.33x3.78x(750-105.2)/105.2


Distance from compression face to point where crack width is being calculated, a

Strain at the level considered, ε1 = (h - x)fs/Es(d - x)

Strain due to stiffening effect in concrete, ε2 = 1.5b(h - x)(a - x)/(3EsAs(d - x))

εm = Average surface strain = ε1 - ε2

Crack Width, w = 3 acr εm/(1+2(acr - Cmin)/(h - x))


MENT NO.
RNALSTP20CDD003

28-Nov-18

R0

0.1 mm

30 N/mm2

500 N/mm2

2.7E+04 N/mm2

2.0E+05 N/mm2

171.78 kN-m

9.33

750 mm

53 mm

180 mm

99.1 mm

105.2 mm

3.78 N/mm2

216.2 N/mm2
808 mm

1.18E-03

1.71E-03

-5.36E-04

-0.140 mm
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W2-1 CRACK WIDTH - FLEXURE & TENSION (IS 3370 Part 2 - 2009, Annexure B)

Horizontal Limiting crack width, w

Max Mx Characteristic cube strength of Concrete, fck

Sx-Max Mx Yield Strength of Steel, fy


Modulus Elasticity of Concrete Ec = 5000 x SQRT( fck )

Modulus Elasticity of Steel, Es

Applied Moment at service condition, M

Applied Tension at service condition, N 143.824

σcbc = 10 N/mm2 Modular Ratio, m, 280/(3*σcbc) =

Breadth, b (mm) = 1000 Depth, h (mm) = 808

Reinf, Ast mm2 = 00-000+12-100 1130 Clear Cover, CC mm = 50

Reinf, Asc mm2 = 00-000+12-100 1130 Clear Cover, CC mm = 45

Distance between centroid of Ast and Asc, Zs = 808-50-0.5x12-45-0.5x12

Distance - Centroid of Ast to CG of Ast & Asc, Xs = 1130x701/(1130+1130)

Modified Moment M' = M - N * Xs

Modified moment, M' > 0, section is in bending

Effecive Depth, d = 808-50-0.5x12

Cover to the centre of compression steel, d' = 45+0.5x12


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

bxf c bxf c x
A st f st - - A sc f sc = N (d - ) + A sc f sc (d - d ') = M - N X S
2 2 3

f c (d - x) (x - d ')
Ast fst = (m -1) A st A sc f sc = (1.5 m -1) A sc f c
x x

Solve above equations to get the value of fc and x

Depth of NA from Compression face = x

Stress in extreme compression fibre, fc

Stress in Tension reinforcement, fst

= (9.33-1)x2.3x(752-65.6)/65.6

Distance from compression face to point where crack width is being calculated, a

Max spacing of bars, S =

acr = maximum spacing of tensile bar from outer edge of concrete (mm)

= SQRT((0.5x100)^2+(50+0.5x12)^2)-0.5x12

Strain at the level considered, ε1 = (h - x)fs/Es(d - x)

Strain due to stiffening effect in concrete, ε2 = 1.5b(h - x)(a - x)/(3EsAs(d - x))

εm = Average surface strain = ε1 - ε2

Crack Width, w = 3 acr εm/(1+2(acr - Cmin)/(h - x))


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
MENT NO.
NALSTP20CDD003

28-Nov-18

R0

0.1 mm

30 N/mm2

500 N/mm2

2.7E+04 N/mm2

2.0E+05 N/mm2

110.86 kN-m

143.82 kN

9.33

701.0 mm

350.5 mm

60.5 kN-m

752 mm

51 mm
MENT NO.
NALSTP20CDD003

28-Nov-18

R0
MENT NO.
NALSTP20CDD003

28-Nov-18

R0

d ') = M - N X S

65.60 mm

2.30 N/mm2

200.5 N/mm2

808 mm

100 mm

69.1 mm

1.08E-03

1.78E-03

-6.92E-04

-0.137 mm
MENT NO.
NALSTP20CDD003

28-Nov-18

R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W2-1 CRACK WIDTH - FLEXURE & TENSION (IS 3370 Part 2 - 2009, Annexure B)

Horizontal Limiting crack width, w

Max Sx Characteristic cube strength of Concrete, fck

Mx-Max Sx Yield Strength of Steel, fy


Modulus Elasticity of Concrete Ec = 5000 x SQRT( fck )

Modulus Elasticity of Steel, Es

Applied Moment at service condition, M

Applied Tension at service condition, N 167.256

σcbc = 10 N/mm2 Modular Ratio, m, 280/(3*σcbc) =

Breadth, b (mm) = 1000 Depth, h (mm) = 808

Reinf, Ast mm2 = 00-000+12-100 1130 Clear Cover, CC mm = 50

Reinf, Asc mm2 = 00-000+12-100 1130 Clear Cover, CC mm = 45

Distance between centroid of Ast and Asc, Zs = 808-50-0.5x12-45-0.5x12

Distance - Centroid of Ast to CG of Ast & Asc, Xs

= 1130x701/(1130+1130)

Modified Moment M' = M - N * Xs

Modified moment, M' < 0, section in tension


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

Effecive Depth, d = 808-50-0.5x12

Cover to the centre of compression steel, d' = 45+0.5x12

Tension excess tensile face, T'

= (167.26x1130/(1130+1130))+(35.53x1000/(752-51))

Tension less tensile face, T''

= (167.26x1130/(1130+1130))-(35.53x1000/(752-51))

Stress in Tension reinforcement, fst = 134.315x1000/1130

Total Concrete Area, Ac = 1000x808+(9.33-1)x(1130+1130)

Direct Tension in Concrete, fct = 167.26x1000/826825.8

Max spacing of bars, S =

acr = maximum spacing of tensile bar from outer edge of concrete (mm)

= SQRT((0.5x100)^2+(50+0.5x12)^2)-0.5x12

Strain at the level considered, ε1 = fs / Es


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
Strain due to stiffening effect in concrete, ε2 = bD/EsAs

εm = Average surface strain = ε1 - ε2

Crack Width, w = 3 acr εm


MENT NO.
NALSTP20CDD003

28-Nov-18

R0

0.1 mm

30 N/mm2

500 N/mm2

2.7E+04 N/mm2

2.0E+05 N/mm2

35.53 kN-m

167.26 kN

9.33

701.0 mm

350.5 mm

-23.1 kN-m
MENT NO.
NALSTP20CDD003

28-Nov-18

R0
MENT NO.
NALSTP20CDD003

28-Nov-18

R0

752 mm

51 mm

134.3 kN

32.9 kN

118.9 N/mm2

8.3E+05 mm2

0.20 N/mm2

100 mm

69.1 mm

5.94E-04
MENT NO.
NALSTP20CDD003

28-Nov-18

R0
1.79E-03

-1.19E-03

-0.247 mm
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W2-2 DESIGN OF WALL W2 GROUP 2 Height from 2.50 to 5.00 m

Grade of Concrete, fck = 30 N/mm2 Grade of Steel, fy = 500 N/mm2

Limiting Moment of Resistance Index = 0.133

+Z Face -Z Face

Clear Cover = Water Face ### Earth Face ###

STAAD Group Analysis Report


Shear Membrane Bending Moment

Plate L/C SQX SQY SX SY (local) SXY Mx My kNm/m


(local) (local) (local) kN/m2 (local) kNm/m
kN/m2 kN/m2 kN/m2 kN/m2
Max Qx 1830 17 FULL 211.353 -31.568 275.337 -85.519 39.162 136.064 9.432

Min Qx 1811 17 FULL -219.717 -38.507 291.211 -106.924 -39.294 152.795 12.62

Max Qy 1755 13 FULL1 4.483 68.526 133.539 -219.157 12.046 -83.719 -66.53

Min Qy 1755 18 EMPT 0.504 -106.133 -44.183 -174.117 -9.956 25.504 -14.127

Max Sx 1811 13 FULL1-218.384 -39.341 297.336 -80.31 -29.118 153.815 12.68

Min Sx 1852 18 EMPT -148.918 34.395 -206.52 -107.212 -57.661 -92.938 -6.82

Max Sy 1745 18 EMPT 72.54 40.041 -81.065 23.563 -48.5 -72.982 -8.015

Min Sy 1753 17 FULL -19.086 63.285 135.822 -232.381 14.239 -82.085 -69.149

Max Sxy 1852 17 FULL 206.226 -23.595 267.25 -75.119 47.638 135.357 11.553

Min Sxy 1747 18 EMPT 43.925 -19.445 -42.677 -69.478 -82.715 -31.126 -2.752

Max Mx 1833 13 FULL1-215.362 -30.235 294.93 -62.641 -36.468 154.297 15.375

Min Mx 1833 18 EMPT 159.295 50.678 -201.468 -64.531 19.837 -129.727 -11.277

Max My 1842 18 EMPT 10.325 -26.085 -121.682 -111.702 -24.359 59.122 46.146

Min My 1799 17 FULL 5.593 22.872 178.367 -219.04 8.71 -99.242 -84.42

Max Mxy 1761 13 FULL1 93.11 20.272 165.652 -191.974 -27.037 -13.029 -35.636

Min Mxy 1748 17 FULL -99.032 14.205 166.209 -222.421 36.816 -6.196 -37.337
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

Results from STADD output

Max Vertical BM in wall creating tension on Water Face Max My 46.15 kN-m/m

Max Horizontal BM in wall creating tension on Water Face Max Mx 154.30 kN-m/m

Tension corresponding to Max Mx Sx-Max Mx 0.295 N/mm2

Max Vertical BM in wall creating tension on Earth Face Min My 84.42 kN-m/m

Max Horizontal BM in wall creating tension on Earth Face Min Mx 129.73 kN-m/m

Tension corresponding to Min Mx Sx-Min Mx 0 N/mm2

Max Tension in Wall Max Sx 0.297 N/mm2

BM at wall corresponding to Max Sx on Water Face Mx-Max Sx 153.82 kN-m/m


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

Thickness check:
Required effective thickness SQRT(154.3x1000000x1.5/(0.133x30x1000))

Provided overall thickness

Min Ast for each surface zone (mm2/m) in % = 0.24 = 0.24x250x1000/100

Area of vertical reinforcement required on Water Face

Max My 46.15 kN-m/m

Effective Depth (mm) = 725-50-0.5x16

Mu / bd2 = 46.15x1.5x10^6/(1000x667^2)

Refer SP-16 Percentage of reinforcement required, %

Req area of Vertical reinf, Water Face, mm2 = MAX(0.036x667x1000/100,600)

Area of horizontal reinforcement required on Water Face

Max Mx 154.30 kN-m/ Corresponding Tension Sx = 0.295 N/mm2


Effective Depth (mm) = 725-50-0.5x16

Mu / bd2 = 154.3x1.5x10^6/(1000x667^2)

Refer SP-16 Percentage of reinforcement required, %

Required area of reinforcement for Mx, mm2 = 0.122x667x1000/100

Factored Tension, kN/m = 0.295x725x1.5

Required area of reinf on each face for Sx, mm2 = 0.5x320.8x1000/(0.8x500)

Req area of Hor reinf, Water Face, mm2 = MAX(814+401,600)

Area of vertical reinforcement required on Earth Face

Min My 84.42 kN-m/m

Effective Depth (mm) = 725-45-0.5x16


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
Mu / bd2 = 84.42x1.5x10^6/(1000x672^2)

Refer SP-16 Percentage of reinforcement required, %

Req area of Vertical reinf, Earth Face, mm2 = MAX(0.065x672x1000/100,600)

Area of horizontal reinforcement required on Earth Face

Min Mx 129.73 kN-m/ Corresponding Tension Sx = 0.000 N/mm2


Effective Depth (mm) = 725-45-0.5x16

Mu / bd2 = 129.73x1.5x10^6/(1000x672^2)

Refer SP-16 Percentage of reinforcement required, %

Required area of reinforcement for Mx, mm2 = 0.101x672x1000/100

Factored Tension, N/m =0

Required area of reinf on each face for Sx, mm2 =0

Req area of Hor reinf, Earth Face, mm2 = MAX(679+0,600)

Ast Required Ast Provided

Vertical Water Face 600 00-000+16-180 1117

Hor Water Face 1215 00-000+16-150 1340

Vertical Earth Face 600 00-000+16-180 1117

Hor Earth Face 679 00-000+16-150 1340


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

Check for Shear at Junction of Base and Wall

Max Qy, (13 FULL1) = 0.069 Min Qy, (18 EMPTY) = -0.106
Factored Shear Stress, N/mm2 = 1.5x0.106

Percentage of Steel provided on Water Face

Thickness of wall
Factor k for thickness of slab (Refer Clause 40.2.1.1 of IS 456)

Factor for enhanced Shear Stress near the support (Refer Clause 40.5.1 of IS 456)

Maximum shear stress in concrete for limit state method of design, tc max
Permissible Shear Stress, N/mm2 (Value from Table 19 of IS 456 * k * Enhancement)

W2-2 Check for Temperature Reinforcement (As per Annexure A of IS 3370 - 2009, Part 2)

Horizontal Direction

Ast Provided (both faces) = 1340+1340

Percentage of reinforcement provided = 2680/500/1000x100

Max spacing of cracks Smax = (fct/fb) * (f / 2 r) (2/3)x(0.5x(16+16)/2)x(100/0.54)

fct / fb = 2/3 for deformed bars as recommended in Code

Crack Width, Wmax = Smax * (a/2)* (T1 + T2)

988x(0.7/100000/2)x(15+15)

Permissible crack width = 0.1 mm, Hence OK


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
O.
20CDD003

28-Nov-18

R0

ding Moment

Mxy kNm/m

8.337

-4.611

5.102

-0.844

-4.51

-11.779

9.761

-18.08

2.951

32.707

-0.079

-4.749

7.153

2.268

50.992

-49.082
O.
20CDD003

28-Nov-18

R0
O.
20CDD003

28-Nov-18

R0

241 mm

725 mm

600

667.0

0.156

0.036

600

667.0

0.520

0.122

814

320.8

401

1215

672.0
O.
20CDD003

28-Nov-18

R0
0.280

0.065

600

672.0

0.431

0.101

679

679

% Ast

0.167%

0.199%

0.167%

0.199%
O.
20CDD003

28-Nov-18

R0

0.159

0.167%

725 mm

3.50

0.310

2680 mm2

0.54

988 mm

0.10 mm
O.
20CDD003

28-Nov-18

R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W2-2 CRACK WIDTH - FLEXURE (IS 3370 Part 2 - 2009, Annexure B)

Vertical Limiting crack width, w

Max My Characteristic cube strength of Concrete, fck

Yield Strength of Steel, fy

Modulus Elasticity of Concrete Ec = 5000 x SQRT( fck )

Modulus Elasticity of Steel, Es

Applied Moment at service condition, M

σcbc = 10 N/mm2 Modular Ratio, m, 280/(3*σcbc) =

Breadth, b (mm) = 1000 Depth, h (mm) = 725

Reinf, Ast mm2 = 00-000+16-180 1117 Clear Cover, CC mm = 50

Reinf, Asc mm2 = 00-000+16-180 1117 Clear Cover, CC mm = 45

Effecive Depth, d = 725-50-0.5x16

Cover to the centre of compression steel, d' = 45+0.5x16

Max spacing of bars, S =

acr = maximum spacing of tensile bar from outer edge of concrete (mm)

= SQRT((0.5x180)^2+(50+0.5x16)^2)-0.5x16

Depth of NA from Compression face = x

Solve equation = (bx2/2) + (1.5m-1) Asc (x - d') - m Ast (d-x) = 0 to get x. x=

(x - d ') bxf c x
A sc fsc = (1.5 m -1) A sc f c (d - ) + A sc f sc (d - d ') = M
x 2 3
f c (d - x)
Ast f st = (m -1) A st
x Solve these equations to get fc

Stress in extreme compression fibre, fc

Stress in Tension reinforcement, fst = 9.33x1.26x(667-101.8)/101.8


Distance from compression face to point where crack width is being calculated, a

Strain at the level considered, ε1 = (h - x)fs/Es(d - x)

Strain due to stiffening effect in concrete, ε2 = 1.5b(h - x)(a - x)/(3EsAs(d - x))

εm = Average surface strain = ε1 - ε2

Crack Width, w = 3 acr εm/(1+2(acr - Cmin)/(h - x))


MENT NO.
RNALSTP20CDD003

28-Nov-18

R0

0.1 mm

30 N/mm2

500 N/mm2

2.7E+04 N/mm2

2.0E+05 N/mm2

46.15 kN-m

9.33

667 mm

53 mm

180 mm

99.1 mm

101.8 mm

1.26 N/mm2

65.3 N/mm2
725 mm

3.60E-04

1.54E-03

-1.18E-03

-0.303 mm
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W2-2 CRACK WIDTH - FLEXURE & TENSION (IS 3370 Part 2 - 2009, Annexure B)

Horizontal Limiting crack width, w

Max Mx Characteristic cube strength of Concrete, fck

Sx-Max Mx Yield Strength of Steel, fy


Modulus Elasticity of Concrete Ec = 5000 x SQRT( fck )

Modulus Elasticity of Steel, Es

Applied Moment at service condition, M

Applied Tension at service condition, N 213.875

σcbc = 10 N/mm2 Modular Ratio, m, 280/(3*σcbc) =

Breadth, b (mm) = 1000 Depth, h (mm) = 725

Reinf, Ast mm2 = 00-000+16-150 1340 Clear Cover, CC mm = 50

Reinf, Asc mm2 = 00-000+16-150 1340 Clear Cover, CC mm = 45

Distance between centroid of Ast and Asc, Zs = 725-50-0.5x16-45-0.5x16

Distance - Centroid of Ast to CG of Ast & Asc, Xs = 1340x614/(1340+1340)

Modified Moment M' = M - N * Xs

Modified moment, M' > 0, section is in bending

Effecive Depth, d = 725-50-0.5x16

Cover to the centre of compression steel, d' = 45+0.5x16


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

bxf c bxf c x
A st f st - - A sc f sc = N (d - ) + A sc f sc (d - d ') = M - N X S
2 2 3

f c (d - x) (x - d ')
Ast fst = (m -1) A st A sc f sc = (1.5 m -1) A sc f c
x x

Solve above equations to get the value of fc and x

Depth of NA from Compression face = x

Stress in extreme compression fibre, fc

Stress in Tension reinforcement, fst

= (9.33-1)x3.62x(667-68.58)/68.58

Distance from compression face to point where crack width is being calculated, a

Max spacing of bars, S =

acr = maximum spacing of tensile bar from outer edge of concrete (mm)

= SQRT((0.5x150)^2+(50+0.5x16)^2)-0.5x16

Strain at the level considered, ε1 = (h - x)fs/Es(d - x)

Strain due to stiffening effect in concrete, ε2 = 1.5b(h - x)(a - x)/(3EsAs(d - x))

εm = Average surface strain = ε1 - ε2

Crack Width, w = 3 acr εm/(1+2(acr - Cmin)/(h - x))


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
MENT NO.
NALSTP20CDD003

28-Nov-18

R0

0.1 mm

30 N/mm2

500 N/mm2

2.7E+04 N/mm2

2.0E+05 N/mm2

154.30 kN-m

213.88 kN

9.33

614.0 mm

307.0 mm

88.6 kN-m

667 mm

53 mm
MENT NO.
NALSTP20CDD003

28-Nov-18

R0
MENT NO.
NALSTP20CDD003

28-Nov-18

R0

d ') = M - N X S

68.58 mm

3.62 N/mm2

263.1 N/mm2

725 mm

150 mm

86.8 mm

1.44E-03

1.34E-03

9.98E-05

0.023 mm
MENT NO.
NALSTP20CDD003

28-Nov-18

R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W2-2 CRACK WIDTH - FLEXURE & TENSION (IS 3370 Part 2 - 2009, Annexure B)

Horizontal Limiting crack width, w

Max Sx Characteristic cube strength of Concrete, fck

Mx-Max Sx Yield Strength of Steel, fy


Modulus Elasticity of Concrete Ec = 5000 x SQRT( fck )

Modulus Elasticity of Steel, Es

Applied Moment at service condition, M

Applied Tension at service condition, N 215.325

σcbc = 10 N/mm2 Modular Ratio, m, 280/(3*σcbc) =

Breadth, b (mm) = 1000 Depth, h (mm) = 725

Reinf, Ast mm2 = 00-000+16-150 1340 Clear Cover, CC mm = 50

Reinf, Asc mm2 = 00-000+16-150 1340 Clear Cover, CC mm = 45

Distance between centroid of Ast and Asc, Zs = 725-50-0.5x16-45-0.5x16

Distance - Centroid of Ast to CG of Ast & Asc, Xs = 1340x614/(1340+1340)

Modified Moment M' = M - N * Xs

Modified moment, M' > 0, section is in bending

Effecive Depth, d = 725-50-0.5x16

Cover to the centre of compression steel, d' = 45+0.5x16


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

bxf c bxf c x
A st f st - - A sc f sc = N (d - ) + A sc f sc (d - d ') = M - N X S
2 2 3

f c (d - x) (x - d ')
Ast fst = (m -1) A st A sc f sc = (1.5 m -1) A sc f c
x x

Solve above equations to get the value of fc and x

Depth of NA from Compression face = x

Stress in extreme compression fibre, fc

Stress in Tension reinforcement, fst

= (9.33-1)x3.6x(667-68.27)/68.27

Distance from compression face to point where crack width is being calculated, a

Max spacing of bars, S =

acr = maximum spacing of tensile bar from outer edge of concrete (mm)

= SQRT((0.5x150)^2+(50+0.5x16)^2)-0.5x16

Strain at the level considered, ε1 = (h - x)fs/Es(d - x)

Strain due to stiffening effect in concrete, ε2 = 1.5b(h - x)(a - x)/(3EsAs(d - x))

εm = Average surface strain = ε1 - ε2

Crack Width, w = 3 acr εm/(1+2(acr - Cmin)/(h - x))


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
MENT NO.
NALSTP20CDD003

28-Nov-18

R0

0.1 mm

30 N/mm2

500 N/mm2

2.7E+04 N/mm2

2.0E+05 N/mm2

153.82 kN-m

215.33 kN

9.33

614.0 mm

307.0 mm

87.7 kN-m

667 mm

53 mm
MENT NO.
NALSTP20CDD003

28-Nov-18

R0
MENT NO.
NALSTP20CDD003

28-Nov-18

R0

d ') = M - N X S

68.27 mm

3.60 N/mm2

263.0 N/mm2

725 mm

150 mm

86.8 mm

1.44E-03

1.34E-03

9.84E-05

0.023 mm
MENT NO.
NALSTP20CDD003

28-Nov-18

R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W2-3 DESIGN OF WALL W2 GROUP 3 Height from 5.00 to 7.50 m

Grade of Concrete, fck = 30 N/mm2 Grade of Steel, fy = 500 N/mm2

Limiting Moment of Resistance Index = 0.133

+Z Face -Z Face

Clear Cover = Water Face ### Earth Face ###

STAAD Group Analysis Report


Shear Membrane Bending Moment

Plate L/C SQX SQY SX SY (local) SXY Mx My kNm/m


(local) (local) (local) kN/m2 (local) kNm/m
kN/m2 kN/m2 kN/m2 kN/m2
Max Qx 1874 17 FULL 196.033 -16.005 252.478 -69.116 53.303 131.936 13.166

Min Qx 1855 17 FULL -207.06 -20.192 279.865 -74.026 -52.964 150.253 17.036

Max Qy 1855 18 EMPT 165.285 47.509 -208.129 -76.054 29.604 -137.84 -13.364

Min Qy 1930 17 FULL -9.181 -33.308 196.707 -139.162 -10.47 -77.155 -39.508

Max Sx 1855 13 FULL1-206.861 -20.909 285.301 -50.12 -40.925 151.454 17.423

Min Sx 1874 18 EMPT -153.603 29.738 -211.96 -119.974 -63.773 -97.273 -8.461

Max Sy 1921 13 FULL1-159.449 5.206 229.575 -35.989 -41.566 126.107 19.224

Min Sy 1862 17 FULL -42.41 -19.27 220.339 -193.63 -12.633 -82.581 -63.352

Max Sxy 1938 17 FULL 111.566 -17.153 186.365 -95.219 69.053 32.401 -3.851

Min Sxy 1946 17 FULL -89.049 -18.516 208.643 -120.459 -66.773 13.472 -7.079

Max Mx 1855 13 FULL1-206.861 -20.909 285.301 -50.12 -40.925 151.454 17.423

Min Mx 1943 18 EMPT 158.425 35.835 -200.138 -87.009 42.461 -149.611 -17.651

Max My 1864 18 EMPT 11.467 -13.453 -141.158 -97.926 -25.695 62.275 47.088

Min My 1865 17 FULL 5.76 -17.752 207.258 -187.732 7.374 -96.609 -69.694

Max Mxy 1860 18 EMPT 62.647 2.773 -154.806 -85.485 -30.239 22.57 35.293

Min Mxy 1871 18 EMPT -83.378 6.622 -186.988 -77.235 -20.856 5.639 21.762
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

Results from STADD output

Max Vertical BM in wall creating tension on Water Face Max My 47.09 kN-m/m

Max Horizontal BM in wall creating tension on Water Face Max Mx 151.45 kN-m/m

Tension corresponding to Max Mx Sx-Max Mx 0.285 N/mm2

Max Vertical BM in wall creating tension on Earth Face Min My 69.69 kN-m/m

Max Horizontal BM in wall creating tension on Earth Face Min Mx 149.61 kN-m/m

Tension corresponding to Min Mx Sx-Min Mx 0 N/mm2

Max Tension in Wall Max Sx 0.285 N/mm2

BM at wall corresponding to Max Sx on Water Face Mx-Max Sx 151.45 kN-m/m


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

Thickness check:
Required effective thickness SQRT(151.45x1000000x1.5/(0.133x30x1000))

Provided overall thickness

Min Ast for each surface zone (mm2/m) in % = 0.24 = 0.24x250x1000/100

Area of vertical reinforcement required on Water Face

Max My 47.09 kN-m/m

Effective Depth (mm) = 642-50-0.5x16

Mu / bd2 = 47.09x1.5x10^6/(1000x584^2)

Refer SP-16 Percentage of reinforcement required, %

Req area of Vertical reinf, Water Face, mm2 = MAX(0.048x584x1000/100,600)

Area of horizontal reinforcement required on Water Face

Max Mx 151.45 kN-m/ Corresponding Tension Sx = 0.285 N/mm2


Effective Depth (mm) = 642-50-0.5x16

Mu / bd2 = 151.45x1.5x10^6/(1000x584^2)

Refer SP-16 Percentage of reinforcement required, %

Required area of reinforcement for Mx, mm2 = 0.157x584x1000/100

Factored Tension, kN/m = 0.285x642x1.5

Required area of reinf on each face for Sx, mm2 = 0.5x274.5x1000/(0.8x500)

Req area of Hor reinf, Water Face, mm2 = MAX(917+343,600)

Area of vertical reinforcement required on Earth Face

Min My 69.69 kN-m/m

Effective Depth (mm) = 642-45-0.5x16

Mu / bd2 = 69.69x1.5x10^6/(1000x589^2)
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
Refer SP-16 Percentage of reinforcement required, %

Req area of Vertical reinf, Earth Face, mm2 = MAX(0.07x589x1000/100,600)

Area of horizontal reinforcement required on Earth Face

Min Mx 149.61 kN-m/ Corresponding Tension Sx = 0.000 N/mm2


Effective Depth (mm) = 642-45-0.5x12

Mu / bd2 = 149.61x1.5x10^6/(1000x591^2)

Refer SP-16 Percentage of reinforcement required, %

Required area of reinforcement for Mx, mm2 = 0.152x591x1000/100

Factored Tension, N/m =0

Required area of reinf on each face for Sx, mm2 =0

Req area of Hor reinf, Earth Face, mm2 = MAX(898+0,600)

Ast Required Ast Provided

Vertical Water Face 600 00-000+16-180 1117

Hor Water Face 1260 00-000+16-125 1608

Vertical Earth Face 600 00-000+16-180 1117

Hor Earth Face 898 00-000+12-100 1130


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

Check for Shear at Junction of Base and Wall

Max Qy, (18 EMPTY) = 0.048 Min Qy, (17 FULL) = -0.033
Factored Shear Stress, N/mm2 = 1.5x0.048

Percentage of Steel provided on Water Face

Thickness of wall
Factor k for thickness of slab (Refer Clause 40.2.1.1 of IS 456)

Factor for enhanced Shear Stress near the support (Refer Clause 40.5.1 of IS 456)

Maximum shear stress in concrete for limit state method of design, tc max
Permissible Shear Stress, N/mm2 (Value from Table 19 of IS 456 * k * Enhancement)

W2-3 Check for Temperature Reinforcement (As per Annexure A of IS 3370 - 2009, Part 2)

Horizontal Direction

Ast Provided (both faces) = 1608+1130

Percentage of reinforcement provided = 2738/500/1000x100

Max spacing of cracks Smax = (fct/fb) * (f / 2 r) (2/3)x(0.5x(16+12)/2)x(100/0.55)

fct / fb = 2/3 for deformed bars as recommended in Code

Crack Width, Wmax = Smax * (a/2)* (T1 + T2)

848x(0.7/100000/2)x(15+15)

Permissible crack width = 0.1 mm, Hence OK


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
O.
20CDD003

28-Nov-18

R0

ding Moment

Mxy kNm/m

-1.499

4.043

-8.65

-1.178

3.384

-8.046

8.045

-7.581

-7.208

8.793

3.384

-18.163

6.732

0.241

20.993

-20.725
O.
20CDD003

28-Nov-18

R0
O.
20CDD003

28-Nov-18

R0

239 mm

642 mm

600

584.0

0.207

0.048

600

584.0

0.666

0.157

917

274.5

343

1260

589.0

0.301
O.
20CDD003

28-Nov-18

R0
0.070

600

591.0

0.643

0.152

898

898

% Ast

0.191%

0.273%

0.191%

0.191%
O.
20CDD003

28-Nov-18

R0

0.072

0.191%

642 mm

3.50

0.330

2738 mm2

0.55

848 mm

0.09 mm
O.
20CDD003

28-Nov-18

R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W2-3 CRACK WIDTH - FLEXURE (IS 3370 Part 2 - 2009, Annexure B)

Vertical Limiting crack width, w

Max My Characteristic cube strength of Concrete, fck

Yield Strength of Steel, fy

Modulus Elasticity of Concrete Ec = 5000 x SQRT( fck )

Modulus Elasticity of Steel, Es

Applied Moment at service condition, M

σcbc = 10 N/mm2 Modular Ratio, m, 280/(3*σcbc) =

Breadth, b (mm) = 1000 Depth, h (mm) = 642

Reinf, Ast mm2 = 00-000+16-180 1117 Clear Cover, CC mm = 50

Reinf, Asc mm2 = 00-000+16-180 1117 Clear Cover, CC mm = 45

Effecive Depth, d = 642-50-0.5x16

Cover to the centre of compression steel, d' = 45+0.5x16

Max spacing of bars, S =

acr = maximum spacing of tensile bar from outer edge of concrete (mm)

= SQRT((0.5x180)^2+(50+0.5x16)^2)-0.5x16

Depth of NA from Compression face = x

Solve equation = (bx2/2) + (1.5m-1) Asc (x - d') - m Ast (d-x) = 0 to get x. x=

(x - d ') bxf c x
A sc fsc = (1.5 m -1) A sc f c (d - ) + A sc f sc (d - d ') = M
x 2 3
f c (d - x)
Ast f st = (m -1) A st
x Solve these equations to get fc

Stress in extreme compression fibre, fc

Stress in Tension reinforcement, fst = 9.33x1.59x(584-94.8)/94.8


Distance from compression face to point where crack width is being calculated, a

Strain at the level considered, ε1 = (h - x)fs/Es(d - x)

Strain due to stiffening effect in concrete, ε2 = 1.5b(h - x)(a - x)/(3EsAs(d - x))

εm = Average surface strain = ε1 - ε2

Crack Width, w = 3 acr εm/(1+2(acr - Cmin)/(h - x))


MENT NO.
RNALSTP20CDD003

28-Nov-18

R0

0.1 mm

30 N/mm2

500 N/mm2

2.7E+04 N/mm2

2.0E+05 N/mm2

47.09 kN-m

9.33

584 mm

53 mm

180 mm

99.1 mm

94.8 mm

1.59 N/mm2

76.6 N/mm2
642 mm

4.28E-04

1.37E-03

-9.42E-04

-0.237 mm
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W2-3 CRACK WIDTH - FLEXURE & TENSION (IS 3370 Part 2 - 2009, Annexure B)

Horizontal Limiting crack width, w

Max Mx Characteristic cube strength of Concrete, fck

Sx-Max Mx Yield Strength of Steel, fy


Modulus Elasticity of Concrete Ec = 5000 x SQRT( fck )

Modulus Elasticity of Steel, Es

Applied Moment at service condition, M

Applied Tension at service condition, N 182.97

σcbc = 10 N/mm2 Modular Ratio, m, 280/(3*σcbc) =

Breadth, b (mm) = 1000 Depth, h (mm) = 642

Reinf, Ast mm2 = 00-000+16-125 1608 Clear Cover, CC mm = 50

Reinf, Asc mm2 = 00-000+12-100 1130 Clear Cover, CC mm = 45

Distance between centroid of Ast and Asc, Zs = 642-50-0.5x16-45-0.5x12

Distance - Centroid of Ast to CG of Ast & Asc, Xs = 1130x533/(1608+1130)

Modified Moment M' = M - N * Xs

Modified moment, M' > 0, section is in bending

Effecive Depth, d = 642-50-0.5x16

Cover to the centre of compression steel, d' = 45+0.5x12


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

bxf c bxf c x
A st f st - - A sc f sc = N (d - ) + A sc f sc (d - d ') = M - N X S
2 2 3
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

f c (d - x) (x - d ')
Ast fst = (m -1) A st A sc f sc = (1.5 m -1) A sc f c
x x

Solve above equations to get the value of fc and x

Depth of NA from Compression face = x

Stress in extreme compression fibre, fc

Stress in Tension reinforcement, fst

= (9.33-1)x4.48x(584-79.05)/79.05

Distance from compression face to point where crack width is being calculated, a

Max spacing of bars, S =

acr = maximum spacing of tensile bar from outer edge of concrete (mm)

= SQRT((0.5x125)^2+(50+0.5x16)^2)-0.5x16

Strain at the level considered, ε1 = (h - x)fs/Es(d - x)

Strain due to stiffening effect in concrete, ε2 = 1.5b(h - x)(a - x)/(3EsAs(d - x))

εm = Average surface strain = ε1 - ε2

Crack Width, w = 3 acr εm/(1+2(acr - Cmin)/(h - x))


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
MENT NO.
NALSTP20CDD003

28-Nov-18

R0

0.1 mm

30 N/mm2

500 N/mm2

2.7E+04 N/mm2

2.0E+05 N/mm2

151.45 kN-m

182.97 kN

9.33

533.0 mm

220.0 mm

111.2 kN-m

584 mm

51 mm
MENT NO.
NALSTP20CDD003

28-Nov-18

R0

d ') = M - N X S
MENT NO.
NALSTP20CDD003

28-Nov-18

R0

79.05 mm

4.48 N/mm2

238.4 N/mm2

642 mm

125 mm

77.3 mm

1.33E-03

9.76E-04

3.53E-04

0.075 mm
MENT NO.
NALSTP20CDD003

28-Nov-18

R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W2-3 CRACK WIDTH - FLEXURE & TENSION (IS 3370 Part 2 - 2009, Annexure B)

Horizontal Limiting crack width, w

Max Sx Characteristic cube strength of Concrete, fck

Mx-Max Sx Yield Strength of Steel, fy


Modulus Elasticity of Concrete Ec = 5000 x SQRT( fck )

Modulus Elasticity of Steel, Es

Applied Moment at service condition, M

Applied Tension at service condition, N 182.97

σcbc = 10 N/mm2 Modular Ratio, m, 280/(3*σcbc) =

Breadth, b (mm) = 1000 Depth, h (mm) = 642

Reinf, Ast mm2 = 00-000+16-125 1608 Clear Cover, CC mm = 50

Reinf, Asc mm2 = 00-000+12-100 1130 Clear Cover, CC mm = 45

Distance between centroid of Ast and Asc, Zs = 642-50-0.5x16-45-0.5x12

Distance - Centroid of Ast to CG of Ast & Asc, Xs = 1130x533/(1608+1130)

Modified Moment M' = M - N * Xs

Modified moment, M' > 0, section is in bending

Effecive Depth, d = 642-50-0.5x16

Cover to the centre of compression steel, d' = 45+0.5x12


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

bxf c bxf c x
A st f st - - A sc f sc = N (d - ) + A sc f sc (d - d ') = M - N X S
2 2 3
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

f c (d - x) (x - d ')
Ast fst = (m -1) A st A sc f sc = (1.5 m -1) A sc f c
x x

Solve above equations to get the value of fc and x

Depth of NA from Compression face = x

Stress in extreme compression fibre, fc

Stress in Tension reinforcement, fst

= (9.33-1)x4.48x(584-79.05)/79.05

Distance from compression face to point where crack width is being calculated, a

Max spacing of bars, S =

acr = maximum spacing of tensile bar from outer edge of concrete (mm)

= SQRT((0.5x125)^2+(50+0.5x16)^2)-0.5x16

Strain at the level considered, ε1 = (h - x)fs/Es(d - x)

Strain due to stiffening effect in concrete, ε2 = 1.5b(h - x)(a - x)/(3EsAs(d - x))

εm = Average surface strain = ε1 - ε2

Crack Width, w = 3 acr εm/(1+2(acr - Cmin)/(h - x))


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
MENT NO.
NALSTP20CDD003

28-Nov-18

R0

0.1 mm

30 N/mm2

500 N/mm2

2.7E+04 N/mm2

2.0E+05 N/mm2

151.45 kN-m

182.97 kN

9.33

533.0 mm

220.0 mm

111.2 kN-m

584 mm

51 mm
MENT NO.
NALSTP20CDD003

28-Nov-18

R0

d ') = M - N X S
MENT NO.
NALSTP20CDD003

28-Nov-18

R0

79.05 mm

4.48 N/mm2

238.4 N/mm2

642 mm

125 mm

77.3 mm

1.33E-03

9.76E-04

3.53E-04

0.075 mm
MENT NO.
NALSTP20CDD003

28-Nov-18

R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W2-4 DESIGN OF WALL W2 GROUP 4 Height from 7.50 to 10.40 m

Grade of Concrete, fck = 30 N/mm2 Grade of Steel, fy = 500 N/mm2

Limiting Moment of Resistance Index = 0.133

+Z Face -Z Face

Clear Cover = Water Face ### Earth Face ###

STAAD Group Analysis Report


Shear Membrane Bending Moment

Plate L/C SQX SQY SX SY (local) SXY Mx My kNm/m


(local) (local) (local) kN/m2 (local) kNm/m
kN/m2 kN/m2 kN/m2 kN/m2
Max Qx 1965 18 EMPT 146.63 33.843 -191.53 -87.442 45.878 -140.238 -16.654

Min Qx 1984 18 EMPT -123.617 4.597 -177.399 -126.203 -53.743 -83.439 -10.578

Max Qy 2031 13 FULL1 -24.63 42.831 166.308 -175.232 -54.307 33.742 5.848

Min Qy 2079 14 FULL2 -65.14 -58.163 -109.627 -200.253 -78.539 7.168 -4.727

Max Sx 1967 17 FULL -84.804 -6.533 188.825 -104.791 -69.048 37.204 1.928

Min Sx 2075 18 EMPT 58.59 -7.785 -706.627 -27.309 -198.258 -57.619 -2.099

Max Sy 2078 18 EMPT 61.324 1.905 -346.149 85.729 -20.513 -15.717 -0.295

Min Sy 2053 18 EMPT 110.898 15.618 -226.949 -345.028 -241.054 -73.73 -8.697

Max Sxy 2072 16 FULL4 3.279 1.925 -70.553 -132.667 112.871 -0.44 0.935

Min Sxy 2053 17 FULL 6.861 36.71 -1.351 -334.121 -276.581 19.9 1.356

Max Mx 1965 13 FULL1 -111.151 21.596 179.565 -41.992 -32.558 94.949 16.477

Min Mx 1965 18 EMPT 146.63 33.843 -191.53 -87.442 45.878 -140.238 -16.654

Max My 1975 18 EMPT 2.5 15.101 -209.43 -44.242 -30.726 54.986 22.617

Min My 1974 17 FULL -8.335 -30.877 173.657 -98.543 -16.234 -58.69 -20.816

Max Mxy 1969 19 SERVI 14.756 -4.191 -32.86 -93.413 -42.167 -8.925 2.385

Min Mxy 1965 18 EMPT 146.63 33.843 -191.53 -87.442 45.878 -140.238 -16.654
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

Results from STADD output

Max Vertical BM in wall creating tension on Water Face Max My 22.62 kN-m/m

Max Horizontal BM in wall creating tension on Water Face Max Mx 94.95 kN-m/m

Tension corresponding to Max Mx Sx-Max Mx 0.18 N/mm2

Max Vertical BM in wall creating tension on Earth Face Min My 20.82 kN-m/m

Max Horizontal BM in wall creating tension on Earth Face Min Mx 140.24 kN-m/m

Tension corresponding to Min Mx Sx-Min Mx 0 N/mm2

Max Tension in Wall Max Sx 0.189 N/mm2

BM at wall corresponding to Max Sx on Water Face Mx-Max Sx 37.2 kN-m/m


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

Thickness check:
Required effective thickness SQRT(140.24x1000000x1.5/(0.133x30x1000))

Provided overall thickness

Min Ast for each surface zone (mm2/m) in % = 0.24 = 0.24x237.5x1000/100

Area of vertical reinforcement required on Water Face

Max My 22.62 kN-m/m

Effective Depth (mm) = 475-50-0.5x16

Mu / bd2 = 22.62x1.5x10^6/(1000x417^2)

Refer SP-16 Percentage of reinforcement required, %

Req area of Vertical reinf, Water Face, mm2 = MAX(0.045x417x1000/100,570)

Area of horizontal reinforcement required on Water Face

Max Mx 94.95 kN-m/ Corresponding Tension Sx = 0.180 N/mm2


Effective Depth (mm) = 475-50-0.5x16

Mu / bd2 = 94.95x1.5x10^6/(1000x417^2)

Refer SP-16 Percentage of reinforcement required, %

Required area of reinforcement for Mx, mm2 = 0.195x417x1000/100

Factored Tension, kN/m = 0.18x475x1.5

Required area of reinf on each face for Sx, mm2 = 0.5x128.3x1000/(0.8x500)

Req area of Hor reinf, Water Face, mm2 = MAX(813+160,570)

Area of vertical reinforcement required on Earth Face

Min My 20.82 kN-m/m

Effective Depth (mm) = 475-45-0.5x16


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
Mu / bd2 = 20.82x1.5x10^6/(1000x422^2)

Refer SP-16 Percentage of reinforcement required, %

Req area of Vertical reinf, Earth Face, mm2 = MAX(0.041x422x1000/100,570)

Area of horizontal reinforcement required on Earth Face

Min Mx 140.24 kN-m/ Corresponding Tension Sx = 0.000 N/mm2


Effective Depth (mm) = 475-45-0.5x16

Mu / bd2 = 140.24x1.5x10^6/(1000x422^2)

Refer SP-16 Percentage of reinforcement required, %

Required area of reinforcement for Mx, mm2 = 0.285x422x1000/100

Factored Tension, N/m =0

Required area of reinf on each face for Sx, mm2 =0

Req area of Hor reinf, Earth Face, mm2 = MAX(1203+0,570)

Ast Required Ast Provided

Vertical Water Face 570 00-000+16-180 1117

Hor Water Face 973 00-000+16-125 1608

Vertical Earth Face 570 00-000+16-180 1117

Hor Earth Face 1203 00-000+16-125 1608


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

Check for Shear at Junction of Base and Wall

Max Qy, (13 FULL1) = 0.043 Min Qy, (14 FULL2) = -0.058
Factored Shear Stress, N/mm2 = 1.5x0.058

Percentage of Steel provided on Water Face

Thickness of wall
Factor k for thickness of slab (Refer Clause 40.2.1.1 of IS 456)

Factor for enhanced Shear Stress near the support (Refer Clause 40.5.1 of IS 456)

Maximum shear stress in concrete for limit state method of design, tc max
Permissible Shear Stress, N/mm2 (Value from Table 19 of IS 456 * k * Enhancement)

W2-4 Check for Temperature Reinforcement (As per Annexure A of IS 3370 - 2009, Part 2)

Horizontal Direction

Ast Provided (both faces) = 1608+1608

Percentage of reinforcement provided = 3216/475/1000x100

Max spacing of cracks Smax = (fct/fb) * (f / 2 r) (2/3)x(0.5x(16+16)/2)x(100/0.68)

fct / fb = 2/3 for deformed bars as recommended in Code

Crack Width, Wmax = Smax * (a/2)* (T1 + T2)

784x(0.7/100000/2)x(15+15)

Permissible crack width = 0.1 mm, Hence OK


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
O.
20CDD003

28-Nov-18

R0

ding Moment

Mxy kNm/m

-17.636

1.82

4.172

-2.735

11.107

-5.005

1.28

-9.606

-0.133

5.659

6.826

-17.636

2.605

-1.132

11.74

-17.636
O.
20CDD003

28-Nov-18

R0
O.
20CDD003

28-Nov-18

R0

230 mm

475 mm

570

417.0

0.195

0.045

570

417.0

0.819

0.195

813

128.3

160

973

422.0
O.
20CDD003

28-Nov-18

R0
0.175

0.041

570

422.0

1.181

0.285

1203

1203

% Ast

0.268%

0.381%

0.268%

0.381%
O.
20CDD003

28-Nov-18

R0

0.087

0.268%

475 mm

3.50

0.380

3216 mm2

0.68

784 mm

0.08 mm
O.
20CDD003

28-Nov-18

R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W2-4 CRACK WIDTH - FLEXURE (IS 3370 Part 2 - 2009, Annexure B)

Vertical Limiting crack width, w

Max My Characteristic cube strength of Concrete, fck

Yield Strength of Steel, fy

Modulus Elasticity of Concrete Ec = 5000 x SQRT( fck )

Modulus Elasticity of Steel, Es

Applied Moment at service condition, M

σcbc = 10 N/mm2 Modular Ratio, m, 280/(3*σcbc) =

Breadth, b (mm) = 1000 Depth, h (mm) = 475

Reinf, Ast mm2 = 00-000+16-180 1117 Clear Cover, CC mm = 50

Reinf, Asc mm2 = 00-000+16-180 1117 Clear Cover, CC mm = 45

Effecive Depth, d = 475-50-0.5x16

Cover to the centre of compression steel, d' = 45+0.5x16

Max spacing of bars, S =

acr = maximum spacing of tensile bar from outer edge of concrete (mm)

= SQRT((0.5x180)^2+(50+0.5x16)^2)-0.5x16

Depth of NA from Compression face = x

Solve equation = (bx2/2) + (1.5m-1) Asc (x - d') - m Ast (d-x) = 0 to get x. x=

(x - d ') bxf c x
A sc fsc = (1.5 m -1) A sc f c (d - ) + A sc f sc (d - d ') = M
x 2 3
f c (d - x)
Ast f st = (m -1) A st
x Solve these equations to get fc

Stress in extreme compression fibre, fc

Stress in Tension reinforcement, fst = 9.33x1.31x(417-79.2)/79.2


Distance from compression face to point where crack width is being calculated, a

Strain at the level considered, ε1 = (h - x)fs/Es(d - x)

Strain due to stiffening effect in concrete, ε2 = 1.5b(h - x)(a - x)/(3EsAs(d - x))

εm = Average surface strain = ε1 - ε2

Crack Width, w = 3 acr εm/(1+2(acr - Cmin)/(h - x))


MENT NO.
RNALSTP20CDD003

28-Nov-18

R0

0.1 mm

30 N/mm2

500 N/mm2

2.7E+04 N/mm2

2.0E+05 N/mm2

22.62 kN-m

9.33

417 mm

53 mm

180 mm

99.1 mm

79.2 mm

1.31 N/mm2

52.1 N/mm2
475 mm

3.05E-04

1.04E-03

-7.33E-04

-0.174 mm
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W2-4 CRACK WIDTH - FLEXURE & TENSION (IS 3370 Part 2 - 2009, Annexure B)

Horizontal Limiting crack width, w

Max Mx Characteristic cube strength of Concrete, fck

Sx-Max Mx Yield Strength of Steel, fy


Modulus Elasticity of Concrete Ec = 5000 x SQRT( fck )

Modulus Elasticity of Steel, Es

Applied Moment at service condition, M

Applied Tension at service condition, N 85.5

σcbc = 10 N/mm2 Modular Ratio, m, 280/(3*σcbc) =

Breadth, b (mm) = 1000 Depth, h (mm) = 475

Reinf, Ast mm2 = 00-000+16-125 1608 Clear Cover, CC mm = 50

Reinf, Asc mm2 = 00-000+16-125 1608 Clear Cover, CC mm = 45

Distance between centroid of Ast and Asc, Zs = 475-50-0.5x16-45-0.5x16

Distance - Centroid of Ast to CG of Ast & Asc, Xs = 1608x364/(1608+1608)

Modified Moment M' = M - N * Xs

Modified moment, M' > 0, section is in bending

Effecive Depth, d = 475-50-0.5x16

Cover to the centre of compression steel, d' = 45+0.5x16


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

bxf c bxf c x
A st f st - - A sc f sc = N (d - ) + A sc f sc (d - d ') = M - N X S
2 2 3

f c (d - x) (x - d ')
Ast fst = (m -1) A st A sc f sc = (1.5 m -1) A sc f c
x x

Solve above equations to get the value of fc and x

Depth of NA from Compression face = x

Stress in extreme compression fibre, fc

Stress in Tension reinforcement, fst

= (9.33-1)x4.72x(417-74.6)/74.6

Distance from compression face to point where crack width is being calculated, a

Max spacing of bars, S =

acr = maximum spacing of tensile bar from outer edge of concrete (mm)

= SQRT((0.5x125)^2+(50+0.5x16)^2)-0.5x16

Strain at the level considered, ε1 = (h - x)fs/Es(d - x)

Strain due to stiffening effect in concrete, ε2 = 1.5b(h - x)(a - x)/(3EsAs(d - x))

εm = Average surface strain = ε1 - ε2

Crack Width, w = 3 acr εm/(1+2(acr - Cmin)/(h - x))


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
MENT NO.
NALSTP20CDD003

28-Nov-18

R0

0.1 mm

30 N/mm2

500 N/mm2

2.7E+04 N/mm2

2.0E+05 N/mm2

94.95 kN-m

85.50 kN

9.33

364.0 mm

182.0 mm

79.4 kN-m

417 mm

53 mm
MENT NO.
NALSTP20CDD003

28-Nov-18

R0
MENT NO.
NALSTP20CDD003

28-Nov-18

R0

d ') = M - N X S

74.60 mm

4.72 N/mm2

180.5 N/mm2

475 mm

125 mm

77.3 mm

1.06E-03

7.28E-04

3.27E-04

0.067 mm
MENT NO.
NALSTP20CDD003

28-Nov-18

R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W2-4 CRACK WIDTH - FLEXURE & TENSION (IS 3370 Part 2 - 2009, Annexure B)

Horizontal Limiting crack width, w

Max Sx Characteristic cube strength of Concrete, fck

Mx-Max Sx Yield Strength of Steel, fy


Modulus Elasticity of Concrete Ec = 5000 x SQRT( fck )

Modulus Elasticity of Steel, Es

Applied Moment at service condition, M

Applied Tension at service condition, N 89.775

σcbc = 10 N/mm2 Modular Ratio, m, 280/(3*σcbc) =

Breadth, b (mm) = 1000 Depth, h (mm) = 475

Reinf, Ast mm2 = 00-000+16-125 1608 Clear Cover, CC mm = 50

Reinf, Asc mm2 = 00-000+16-125 1608 Clear Cover, CC mm = 45

Distance between centroid of Ast and Asc, Zs = 475-50-0.5x16-45-0.5x16

Distance - Centroid of Ast to CG of Ast & Asc, Xs = 1608x364/(1608+1608)

Modified Moment M' = M - N * Xs

Modified moment, M' > 0, section is in bending

Effecive Depth, d = 475-50-0.5x16

Cover to the centre of compression steel, d' = 45+0.5x16


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

bxf c bxf c x
A st f st - - A sc f sc = N (d - ) + A sc f sc (d - d ') = M - N X S
2 2 3

f c (d - x) (x - d ')
Ast fst = (m -1) A st A sc f sc = (1.5 m -1) A sc f c
x x

Solve above equations to get the value of fc and x

Depth of NA from Compression face = x

Stress in extreme compression fibre, fc

Stress in Tension reinforcement, fst

= (9.33-1)x1.72x(417-57.91)/57.91

Distance from compression face to point where crack width is being calculated, a

Max spacing of bars, S =

acr = maximum spacing of tensile bar from outer edge of concrete (mm)

= SQRT((0.5x125)^2+(50+0.5x16)^2)-0.5x16

Strain at the level considered, ε1 = (h - x)fs/Es(d - x)

Strain due to stiffening effect in concrete, ε2 = 1.5b(h - x)(a - x)/(3EsAs(d - x))

εm = Average surface strain = ε1 - ε2

Crack Width, w = 3 acr εm/(1+2(acr - Cmin)/(h - x))


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
MENT NO.
NALSTP20CDD003

28-Nov-18

R0

0.1 mm

30 N/mm2

500 N/mm2

2.7E+04 N/mm2

2.0E+05 N/mm2

37.20 kN-m

89.78 kN

9.33

364.0 mm

182.0 mm

20.9 kN-m

417 mm

53 mm
MENT NO.
NALSTP20CDD003

28-Nov-18

R0
MENT NO.
NALSTP20CDD003

28-Nov-18

R0

d ') = M - N X S

57.91 mm

1.72 N/mm2

88.8 N/mm2

475 mm

125 mm

77.3 mm

5.16E-04

7.53E-04

-2.37E-04

-0.049 mm
MENT NO.
NALSTP20CDD003

28-Nov-18

R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

DESIGN OF WALL W5A


NT NO.
LSTP20CDD003

28-Nov-18

R0

A
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W5A-DATA DESIGN OF WALL W5A

DESIGNED THICKNESS
Height from bottom 0.00 8.80
Designed Thickness 400 300
Provided Thickness 400 300

Length of Wall = 9.50 m

Minimum reinforcement as per clause 8.1.1 of IS 3370 (Part 2) - 2009 0.24 %

Height Thickness Thickness for Temp.


Group Avg Th
From To From To From To Avg. Th
1 0.00 2.50 400 372 386 400 372 386
2 2.50 5.00 372 343 357 372 343 357
3 5.00 7.50 343 315 329 343 315 329
4 7.50 8.80 315 300 307 315 300 307

Direction and Type of Fill BOW BOF TOW TOF HOF

+Z Water Face Liquid 234.70 234.70 243.50 241.50 6.80

-Z Earth Face Earth 234.70 234.70 243.50 243.00 8.30

Fill k r Pressure Additional Loads, if any

+Z 1.00 10.30 70.04

-Z 0.33 20.00 55.28


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
O.
20CDD003

28-Nov-18

R0
O.
20CDD003

28-Nov-18

R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W5A-1 DESIGN OF WALL W5A GROUP 1 Height from 0.00 to 2.50 m

Grade of Concrete, fck = 30 N/mm2 Grade of Steel, fy = 500 N/mm2

Limiting Moment of Resistance Index = 0.133

+Z Face -Z Face

Clear Cover = Water Face ### Earth Face ###

STAAD Group Analysis Report


Shear Membrane Bending Moment

Plate L/C SQX SQY SX SY (local) SXY Mx My kNm/m


(local) (local) (local) kN/m2 (local) kNm/m
kN/m2 kN/m2 kN/m2 kN/m2
Max Qx 3377 18 EMPT 359.931 -259.196 -187.971 -89.572 59.299 -13.274 -66.518

Min Qx 3377 17 FULL -387.463 269.08 323.714 -319.48 -89.95 12.264 46.611

Max Qy 3353 18 EMPT 212.041 600.079 242.376 26.712 187.492 -71.038 -112.279

Min Qy 3374 18 EMPT 202.035 -701.167 149.85 -527.057 150.698 -78.534 -120.924

Max Sx 3377 17 FULL -387.463 269.08 323.714 -319.48 -89.95 12.264 46.611

Min Sx 3311 15 FULL3 -1.776 -30.742 -264.815 -530.342 80.821 8.971 5.375

Max Sy 3310 18 EMPT 35.465 -219.605 250.249 597.241 135.689 -5.299 -26.486

Min Sy 3310 15 FULL3 22.613 138.227 -176.022 -558.554 -154.706 7.998 17.651

Max Sxy 3346 18 EMPT 47.441 17.676 -37.024 20.916 296.69 -8.83 -0.956

Min Sxy 3305 15 FULL3 2.178 128.709 -32.376 -223.675 -313.865 2.512 16.42

Max Mx 3353 17 FULL -166.207 -372.277 -36.145 -486.718 -49.904 62.8 81.561

Min Mx 3374 18 EMPT 202.035 -701.167 149.85 -527.057 150.698 -78.534 -120.924

Max My 3353 17 FULL -166.207 -372.277 -36.145 -486.718 -49.904 62.8 81.561

Min My 3374 18 EMPT 202.035 -701.167 149.85 -527.057 150.698 -78.534 -120.924

Max Mxy 3342 17 FULL 63.969 32.57 131.027 -251.405 -30.381 -2.399 2.48

Min Mxy 3364 18 EMPT -152.542 70.102 -100.591 -36.994 -66.04 -12.642 -14.521
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

Results from STADD output

Max Vertical BM in wall creating tension on Water Face Max My 81.56 kN-m/m

Max Horizontal BM in wall creating tension on Water Face Max Mx 62.80 kN-m/m

Tension corresponding to Max Mx Sx-Max Mx 0 N/mm2

Max Vertical BM in wall creating tension on Earth Face Min My 120.92 kN-m/m

Max Horizontal BM in wall creating tension on Earth Face Min Mx 78.53 kN-m/m

Tension corresponding to Min Mx Sx-Min Mx 0.15 N/mm2

Max Tension in Wall Max Sx 0.324 N/mm2

BM at wall corresponding to Max Sx on Water Face Mx-Max Sx 12.26 kN-m/m


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

Thickness check:
Required effective thickness SQRT(120.92x1000000x1.5/(0.133x30x1000))

Provided overall thickness

Min Ast for each surface zone (mm2/m) in % = 0.24 = 0.24x193x1000/100

Area of vertical reinforcement required on Water Face

Max My 81.56 kN-m/m

Effective Depth (mm) = 386-50-0.5x16

Mu / bd2 = 81.56x1.5x10^6/(1000x328^2)

Refer SP-16 Percentage of reinforcement required, %

Req area of Vertical reinf, Water Face, mm2 = MAX(0.274x328x1000/100,463)

Area of horizontal reinforcement required on Water Face

Max Mx 62.80 kN-m/ Corresponding Tension Sx = 0.000 N/mm2


Effective Depth (mm) = 386-50-0.5x12

Mu / bd2 = 62.8x1.5x10^6/(1000x330^2)

Refer SP-16 Percentage of reinforcement required, %

Required area of reinforcement for Mx, mm2 = 0.206x330x1000/100

Factored Tension, kN/m =0

Required area of reinf on each face for Sx, mm2 =0

Req area of Hor reinf, Water Face, mm2 = MAX(680+0,463)

Area of vertical reinforcement required on Earth Face

Min My 120.92 kN-m/m

Effective Depth (mm) = 386-45-0.5x16


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
Mu / bd2 = 120.92x1.5x10^6/(1000x333^2)

Refer SP-16 Percentage of reinforcement required, %

Req area of Vertical reinf, Earth Face, mm2 = MAX(0.403x333x1000/100,463)

Area of horizontal reinforcement required on Earth Face

Min Mx 78.53 kN-m/ Corresponding Tension Sx = 0.150 N/mm2


Effective Depth (mm) = 386-45-0.5x12

Mu / bd2 = 78.53x1.5x10^6/(1000x335^2)

Refer SP-16 Percentage of reinforcement required, %

Required area of reinforcement for Mx, mm2 = 0.252x335x1000/100

Factored Tension, N/m = 0.15x386x1.5

Required area of reinf on each face for Sx, mm2 = 0.5x86.9x1000/(0.8x500)

Req area of Hor reinf, Earth Face, mm2 = MAX(844+109,463)

Ast Required Ast Provided

Vertical Water Face 899 16-180+12-180 1744

Hor Water Face 680 00-000+12-125 904

Vertical Earth Face 1342 16-180+12-180 1744

Hor Earth Face 953 00-000+12-100 1130


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

Check for Shear at Junction of Base and Wall

Max Qy, (18 EMPTY) = 0.600 Min Qy, (18 EMPTY) = -0.701
Factored Shear Stress, N/mm2 = 1.5x0.701

Percentage of Steel provided on Water Face

Thickness of wall
Factor k for thickness of slab (Refer Clause 40.2.1.1 of IS 456)

Factor for enhanced Shear Stress near the support (Refer Clause 40.5.1 of IS 456)

Maximum shear stress in concrete for limit state method of design, tc max
Permissible Shear Stress, N/mm2 (Value from Table 19 of IS 456 * k * Enhancement)

W5A-1 Check for Temperature Reinforcement (As per Annexure A of IS 3370 - 2009, Part 2)

Horizontal Direction

Ast Provided (both faces) = 904+1130

Percentage of reinforcement provided = 2034/386/1000x100

Max spacing of cracks Smax = (fct/fb) * (f / 2 r) (2/3)x(0.5x(12+12)/2)x(100/0.53)

fct / fb = 2/3 for deformed bars as recommended in Code

Crack Width, Wmax = Smax * (a/2)* (T1 + T2)

755x(0.7/100000/2)x(15+15)

Permissible crack width = 0.1 mm, Hence OK


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
O.
20CDD003

28-Nov-18

R0

ding Moment

Mxy kNm/m

-3.32

4.256

2.845

3.545

4.256

-3.773

1.408

1.365

-2.522

-4.111

-0.54

3.545

-0.54

3.545

28.298

-27.13
O.
20CDD003

28-Nov-18

R0
O.
20CDD003

28-Nov-18

R0

213 mm

386 mm

463

328.0

1.137

0.274

899

330.0

0.865

0.206

680

680

333.0
O.
20CDD003

28-Nov-18

R0
1.636

0.403

1342

335.0

1.050

0.252

844

86.9

109

953

% Ast

0.532%

0.271%

0.528%

0.337%
O.
20CDD003

28-Nov-18

R0

1.052

0.532%

386 mm

2.62

3.50

1.336

2034 mm2

0.53

755 mm

0.08 mm
O.
20CDD003

28-Nov-18

R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W5A-1 CRACK WIDTH - FLEXURE (IS 3370 Part 2 - 2009, Annexure B)

Vertical Limiting crack width, w

Max My Characteristic cube strength of Concrete, fck

Yield Strength of Steel, fy

Modulus Elasticity of Concrete Ec = 5000 x SQRT( fck )

Modulus Elasticity of Steel, Es

Applied Moment at service condition, M

σcbc = 10 N/mm2 Modular Ratio, m, 280/(3*σcbc) =

Breadth, b (mm) = 1000 Depth, h (mm) = 386

Reinf, Ast mm2 = 16-180+12-180 1744 Clear Cover, CC mm = 50

Reinf, Asc mm2 = 16-180+12-180 1744 Clear Cover, CC mm = 45

Effecive Depth, d = 386-50-0.5x16

Cover to the centre of compression steel, d' = 45+0.5x16

Max spacing of bars, S =

acr = maximum spacing of tensile bar from outer edge of concrete (mm)

= SQRT((0.5x90)^2+(50+0.5x16)^2)-0.5x16

Depth of NA from Compression face = x

Solve equation = (bx2/2) + (1.5m-1) Asc (x - d') - m Ast (d-x) = 0 to get x. x=

(x - d ') bxf c x
A sc fsc = (1.5 m -1) A sc f c (d - ) + A sc f sc (d - d ') = M
x 2 3
f c (d - x)
Ast f st = (m -1) A st
x Solve these equations to get fc

Stress in extreme compression fibre, fc

Stress in Tension reinforcement, fst = 9.33x5.62x(328-81.9)/81.9


Distance from compression face to point where crack width is being calculated, a

Strain at the level considered, ε1 = (h - x)fs/Es(d - x)

Strain due to stiffening effect in concrete, ε2 = 1.5b(h - x)(a - x)/(3EsAs(d - x))

εm = Average surface strain = ε1 - ε2

Crack Width, w = 3 acr εm/(1+2(acr - Cmin)/(h - x))


MENT NO.
RNALSTP20CDD003

28-Nov-18

R0

0.1 mm

30 N/mm2

500 N/mm2

2.7E+04 N/mm2

2.0E+05 N/mm2

81.56 kN-m

9.33

328 mm

53 mm

90 mm

65.4 mm

81.9 mm

5.62 N/mm2

157.6 N/mm2
386 mm

9.73E-04

5.39E-04

4.35E-04

0.077 mm
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W5A-1 CRACK WIDTH - FLEXURE & TENSION (IS 3370 Part 2 - 2009, Annexure B)

Horizontal Limiting crack width, w

Max Mx Characteristic cube strength of Concrete, fck

Sx-Max Mx Yield Strength of Steel, fy


Modulus Elasticity of Concrete Ec = 5000 x SQRT( fck )

Modulus Elasticity of Steel, Es

Applied Moment at service condition, M

Applied Tension at service condition, N 0

σcbc = 10 N/mm2 Modular Ratio, m, 280/(3*σcbc) =

Breadth, b (mm) = 1000 Depth, h (mm) = 386

Reinf, Ast mm2 = 00-000+12-125 904 Clear Cover, CC mm = 50

Reinf, Asc mm2 = 00-000+12-100 1130 Clear Cover, CC mm = 45

Distance between centroid of Ast and Asc, Zs = 386-50-0.5x12-45-0.5x12

Distance - Centroid of Ast to CG of Ast & Asc, Xs = 1130x279/(904+1130)

Modified Moment M' = M - N * Xs

Modified moment, M' > 0, section is in bending

Effecive Depth, d = 386-50-0.5x12

Cover to the centre of compression steel, d' = 45+0.5x12


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

bxf c bxf c x
A st f st - - A sc f sc = N (d - ) + A sc f sc (d - d ') = M - N X S
2 2 3

f c (d - x) (x - d ')
Ast fst = (m -1) A st A sc f sc = (1.5 m -1) A sc f c
x x

Solve above equations to get the value of fc and x

Depth of NA from Compression face = x

Stress in extreme compression fibre, fc

Stress in Tension reinforcement, fst

= (9.33-1)x6.12x(330-61.1)/61.1

Distance from compression face to point where crack width is being calculated, a

Max spacing of bars, S =

acr = maximum spacing of tensile bar from outer edge of concrete (mm)

= SQRT((0.5x125)^2+(50+0.5x12)^2)-0.5x12

Strain at the level considered, ε1 = (h - x)fs/Es(d - x)

Strain due to stiffening effect in concrete, ε2 = 1.5b(h - x)(a - x)/(3EsAs(d - x))

εm = Average surface strain = ε1 - ε2

Crack Width, w = 3 acr εm/(1+2(acr - Cmin)/(h - x))


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
MENT NO.
NALSTP20CDD003

28-Nov-18

R0

0.1 mm

30 N/mm2

500 N/mm2

2.7E+04 N/mm2

2.0E+05 N/mm2

62.80 kN-m

1.00 kN

9.33

279.0 mm

155.0 mm

62.6 kN-m

330 mm

51 mm
MENT NO.
NALSTP20CDD003

28-Nov-18

R0

d ') = M - N X S

61.10 mm

6.12 N/mm2

224.4 N/mm2

386 mm

125 mm

77.9 mm

1.36E-03

1.09E-03

2.70E-04

0.054 mm
MENT NO.
NALSTP20CDD003

28-Nov-18

R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W5A-1 CRACK WIDTH - FLEXURE & TENSION (IS 3370 Part 2 - 2009, Annexure B)

Horizontal Limiting crack width, w

Max Sx Characteristic cube strength of Concrete, fck

Mx-Max Sx Yield Strength of Steel, fy


Modulus Elasticity of Concrete Ec = 5000 x SQRT( fck )

Modulus Elasticity of Steel, Es

Applied Moment at service condition, M

Applied Tension at service condition, N 125.064

σcbc = 10 N/mm2 Modular Ratio, m, 280/(3*σcbc) =

Breadth, b (mm) = 1000 Depth, h (mm) = 386

Reinf, Ast mm2 = 00-000+12-125 904 Clear Cover, CC mm = 50

Reinf, Asc mm2 = 00-000+12-100 1130 Clear Cover, CC mm = 45

Distance between centroid of Ast and Asc, Zs = 386-50-0.5x12-45-0.5x12

Distance - Centroid of Ast to CG of Ast & Asc, Xs

= 1130x279/(904+1130)

Modified Moment M' = M - N * Xs

Modified moment, M' < 0, section in tension


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

Effecive Depth, d = 386-50-0.5x12

Cover to the centre of compression steel, d' = 45+0.5x12

Tension excess tensile face, T'

= (125.06x904/(904+1130))+(12.26x1000/(330-51))

Tension less tensile face, T''

= (125.06x1130/(904+1130))-(12.26x1000/(330-51))

Stress in Tension reinforcement, fst = 99.525x1000/904

Total Concrete Area, Ac = 1000x386+(9.33-1)x(904+1130)

Direct Tension in Concrete, fct = 125.06x1000/402943.2

Max spacing of bars, S =

acr = maximum spacing of tensile bar from outer edge of concrete (mm)

= SQRT((0.5x125)^2+(50+0.5x12)^2)-0.5x12

Strain at the level considered, ε1 = fs / Es

Strain due to stiffening effect in concrete, ε2 = bD/EsAs


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
εm = Average surface strain = ε1 - ε2

Crack Width, w = 3 acr εm


MENT NO.
NALSTP20CDD003

28-Nov-18

R0

0.1 mm

30 N/mm2

500 N/mm2

2.7E+04 N/mm2

2.0E+05 N/mm2

12.26 kN-m

125.06 kN

9.33

279.0 mm

155.0 mm

-7.1 kN-m
MENT NO.
NALSTP20CDD003

28-Nov-18

R0
MENT NO.
NALSTP20CDD003

28-Nov-18

R0

330 mm

51 mm

99.5 kN

25.5 kN

110.1 N/mm2

4.0E+05 mm2

0.31 N/mm2

125 mm

77.9 mm

5.50E-04

9.49E-04
MENT NO.
NALSTP20CDD003

28-Nov-18

R0
-3.98E-04

-0.093 mm
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W5A-2 DESIGN OF WALL W5A GROUP 2 Height from 2.50 to 5.00 m

Grade of Concrete, fck = 30 N/mm2 Grade of Steel, fy = 500 N/mm2

Limiting Moment of Resistance Index = 0.133

+Z Face -Z Face

Clear Cover = Water Face ### Earth Face ###

STAAD Group Analysis Report


Shear Membrane Bending Moment

Plate L/C SQX SQY SX SY (local) SXY Mx My kNm/m


(local) (local) (local) kN/m2 (local) kNm/m
kN/m2 kN/m2 kN/m2 kN/m2
Max Qx 3450 15 FULL3 237.587 -27.669 226.026 -114.858 -40.063 66.198 8.035

Min Qx 3471 18 EMPT -218.695 21.696 -103.395 -136.716 -119.944 -58.15 -6.593

Max Qy 3395 17 FULL 45.285 263.259 157.763 -227.958 -59.439 37.584 17.24

Min Qy 3395 18 EMPT -46.81 -253.55 43.238 -343.938 27.708 -48.434 -40.73

Max Sx 3415 17 FULL 215.057 7.991 297.958 -10.753 -47.346 50.111 7.781

Min Sx 3436 18 EMPT -147.512 -22.145 -240.09 -95.294 60.862 -34.846 -5.568

Max Sy 3415 19 SERVI 58.687 -6.846 63.026 46.695 -1.098 15.574 2.914

Min Sy 3395 18 EMPT -46.81 -383.553 43.238 -343.938 27.708 -48.434 -40.73

Max Sxy 3409 18 EMPT 143.872 46.868 -69.842 -101.697 263.014 -32.433 -3.689

Min Sxy 3408 18 EMPT -109.427 41.173 -53.795 -102.966 -165.361 -41.522 -4.366

Max Mx 3471 17 FULL 233.734 -12.407 277.643 -93.945 53.14 69.334 8.929

Min Mx 3492 18 EMPT -215.231 10.602 -105.286 -133.783 -109.436 -58.541 -7.064

Max My 3480 18 EMPT 7.257 -56.415 -95.307 -141.927 -9.548 17.112 48.934

Min My 3481 17 FULL -18.799 14.287 239.08 -231.439 -39.17 -17.285 -41.824

Max Mxy 3407 17 FULL 114.32 58.119 201.639 -148.826 45.312 41.129 -0.629

Min Mxy 3407 18 EMPT -103.593 -35.869 -76.479 -75.863 -131.874 -26.365 0.353
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

Results from STADD output

Max Vertical BM in wall creating tension on Water Face Max My 48.93 kN-m/m

Max Horizontal BM in wall creating tension on Water Face Max Mx 69.33 kN-m/m

Tension corresponding to Max Mx Sx-Max Mx 0.278 N/mm2

Max Vertical BM in wall creating tension on Earth Face Min My 41.82 kN-m/m

Max Horizontal BM in wall creating tension on Earth Face Min Mx 58.54 kN-m/m

Tension corresponding to Min Mx Sx-Min Mx 0 N/mm2

Max Tension in Wall Max Sx 0.298 N/mm2

BM at wall corresponding to Max Sx on Water Face Mx-Max Sx 50.11 kN-m/m

Thickness check:
Required effective thickness SQRT(69.33x1000000x1.5/(0.133x30x1000))

Provided overall thickness

Min Ast for each surface zone (mm2/m) in % = 0.24 = 0.24x178.5x1000/100

Area of vertical reinforcement required on Water Face

Max My 48.93 kN-m/m

Effective Depth (mm) = 357-50-0.5x16

Mu / bd2 = 48.93x1.5x10^6/(1000x299^2)

Refer SP-16 Percentage of reinforcement required, %

Req area of Vertical reinf, Water Face, mm2 = MAX(0.195x299x1000/100,428)

Area of horizontal reinforcement required on Water Face

Max Mx 69.33 kN-m/ Corresponding Tension Sx = 0.278 N/mm2


Effective Depth (mm) = 357-50-0.5x16

Mu / bd2 = 69.33x1.5x10^6/(1000x299^2)
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
Refer SP-16 Percentage of reinforcement required, %

Required area of reinforcement for Mx, mm2 = 0.281x299x1000/100

Factored Tension, kN/m = 0.278x357x1.5

Required area of reinf on each face for Sx, mm2 = 0.5x148.9x1000/(0.8x500)

Req area of Hor reinf, Water Face, mm2 = MAX(840+186,428)

Area of vertical reinforcement required on Earth Face

Min My 41.82 kN-m/m

Effective Depth (mm) = 357-45-0.5x12

Mu / bd2 = 41.82x1.5x10^6/(1000x306^2)

Refer SP-16 Percentage of reinforcement required, %

Req area of Vertical reinf, Earth Face, mm2 = MAX(0.158x306x1000/100,428)

Area of horizontal reinforcement required on Earth Face

Min Mx 58.54 kN-m/ Corresponding Tension Sx = 0.000 N/mm2


Effective Depth (mm) = 357-45-0.5x12

Mu / bd2 = 58.54x1.5x10^6/(1000x306^2)

Refer SP-16 Percentage of reinforcement required, %

Required area of reinforcement for Mx, mm2 = 0.224x306x1000/100

Factored Tension, N/m =0

Required area of reinf on each face for Sx, mm2 =0

Req area of Hor reinf, Earth Face, mm2 = MAX(685+0,428)

Ast Required Ast Provided

Vertical Water Face 583 00-000+16-180 1117

Hor Water Face 1026 00-000+16-090 2233


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
Vertical Earth Face 483 00-000+12-180 628

Hor Earth Face 685 00-000+12-150 753

Check for Shear at Junction of Base and Wall

Max Qy, (17 FULL) = 0.263 Min Qy, (18 EMPTY) = -0.254
Factored Shear Stress, N/mm2 = 1.5x0.263

Percentage of Steel provided on Water Face

Thickness of wall
Factor k for thickness of slab (Refer Clause 40.2.1.1 of IS 456)

Factor for enhanced Shear Stress near the support (Refer Clause 40.5.1 of IS 456)

Maximum shear stress in concrete for limit state method of design, tc max
Permissible Shear Stress, N/mm2 (Value from Table 19 of IS 456 * k * Enhancement)

W5A-2 Check for Temperature Reinforcement (As per Annexure A of IS 3370 - 2009, Part 2)

Horizontal Direction

Ast Provided (both faces) = 2233+753

Percentage of reinforcement provided = 2986/357/1000x100

Max spacing of cracks Smax = (fct/fb) * (f / 2 r) (2/3)x(0.5x(16+12)/2)x(100/0.84)

fct / fb = 2/3 for deformed bars as recommended in Code

Crack Width, Wmax = Smax * (a/2)* (T1 + T2)

556x(0.7/100000/2)x(15+15)
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

Permissible crack width = 0.1 mm, Hence OK


O.
20CDD003

28-Nov-18

R0

ding Moment

Mxy kNm/m

3.972

-8.292

-10.485

7.464

-2.771

4.025

1.252

7.464

-9.268

-19.073

3.514

-4.834

-1.671

4.407

18.471

-23.388
O.
20CDD003

28-Nov-18

R0

161 mm

357 mm

428

299.0

0.821

0.195

583

299.0

1.163
O.
20CDD003

28-Nov-18

R0
0.281

840

148.9

186

1026

306.0

0.670

0.158

483

306.0

0.938

0.224

685

685

% Ast

0.374%

0.730%
O.
20CDD003

28-Nov-18

R0
0.210%

0.246%

0.395

0.374%

357 mm

3.50

0.440

2986 mm2

0.84

556 mm

0.06 mm
O.
20CDD003

28-Nov-18

R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W5A-2 CRACK WIDTH - FLEXURE (IS 3370 Part 2 - 2009, Annexure B)

Vertical Limiting crack width, w

Max My Characteristic cube strength of Concrete, fck

Yield Strength of Steel, fy

Modulus Elasticity of Concrete Ec = 5000 x SQRT( fck )

Modulus Elasticity of Steel, Es

Applied Moment at service condition, M

σcbc = 10 N/mm2 Modular Ratio, m, 280/(3*σcbc) =

Breadth, b (mm) = 1000 Depth, h (mm) = 357

Reinf, Ast mm2 = 00-000+16-180 1117 Clear Cover, CC mm = 50

Reinf, Asc mm2 = 00-000+12-180 628 Clear Cover, CC mm = 45

Effecive Depth, d = 357-50-0.5x16

Cover to the centre of compression steel, d' = 45+0.5x12

Max spacing of bars, S =

acr = maximum spacing of tensile bar from outer edge of concrete (mm)

= SQRT((0.5x180)^2+(50+0.5x16)^2)-0.5x16

Depth of NA from Compression face = x

Solve equation = (bx2/2) + (1.5m-1) Asc (x - d') - m Ast (d-x) = 0 to get x. x=

(x - d ') bxf c x
A sc fsc = (1.5 m -1) A sc f c (d - ) + A sc f sc (d - d ') = M
x 2 3
f c (d - x)
Ast f st = (m -1) A st
x Solve these equations to get fc

Stress in extreme compression fibre, fc

Stress in Tension reinforcement, fst = 9.33x4.98x(299-67.5)/67.5


Distance from compression face to point where crack width is being calculated, a

Strain at the level considered, ε1 = (h - x)fs/Es(d - x)

Strain due to stiffening effect in concrete, ε2 = 1.5b(h - x)(a - x)/(3EsAs(d - x))

εm = Average surface strain = ε1 - ε2

Crack Width, w = 3 acr εm/(1+2(acr - Cmin)/(h - x))


MENT NO.
RNALSTP20CDD003

28-Nov-18

R0

0.1 mm

30 N/mm2

500 N/mm2

2.7E+04 N/mm2

2.0E+05 N/mm2

48.93 kN-m

9.33

299 mm

51 mm

180 mm

99.1 mm

67.5 mm

4.98 N/mm2

159.4 N/mm2
357 mm

9.96E-04

8.10E-04

1.86E-04

0.041 mm
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W5A-2 CRACK WIDTH - FLEXURE & TENSION (IS 3370 Part 2 - 2009, Annexure B)

Horizontal Limiting crack width, w

Max Mx Characteristic cube strength of Concrete, fck

Sx-Max Mx Yield Strength of Steel, fy


Modulus Elasticity of Concrete Ec = 5000 x SQRT( fck )

Modulus Elasticity of Steel, Es

Applied Moment at service condition, M

Applied Tension at service condition, N 99.246

σcbc = 10 N/mm2 Modular Ratio, m, 280/(3*σcbc) =

Breadth, b (mm) = 1000 Depth, h (mm) = 357

Reinf, Ast mm2 = 00-000+16-090 2233 Clear Cover, CC mm = 50

Reinf, Asc mm2 = 00-000+12-150 753 Clear Cover, CC mm = 45

Distance between centroid of Ast and Asc, Zs = 357-50-0.5x16-45-0.5x12

Distance - Centroid of Ast to CG of Ast & Asc, Xs = 753x248/(2233+753)

Modified Moment M' = M - N * Xs

Modified moment, M' > 0, section is in bending

Effecive Depth, d = 357-50-0.5x16

Cover to the centre of compression steel, d' = 45+0.5x12


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

bxf c bxf c x
A st f st - - A sc f sc = N (d - ) + A sc f sc (d - d ') = M - N X S
2 2 3

f c (d - x) (x - d ')
Ast fst = (m -1) A st A sc f sc = (1.5 m -1) A sc f c
x x

Solve above equations to get the value of fc and x

Depth of NA from Compression face = x

Stress in extreme compression fibre, fc

Stress in Tension reinforcement, fst

= (9.33-1)x5.82x(299-73.66)/73.66

Distance from compression face to point where crack width is being calculated, a

Max spacing of bars, S =

acr = maximum spacing of tensile bar from outer edge of concrete (mm)

= SQRT((0.5x90)^2+(50+0.5x16)^2)-0.5x16

Strain at the level considered, ε1 = (h - x)fs/Es(d - x)

Strain due to stiffening effect in concrete, ε2 = 1.5b(h - x)(a - x)/(3EsAs(d - x))

εm = Average surface strain = ε1 - ε2

Crack Width, w = 3 acr εm/(1+2(acr - Cmin)/(h - x))


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
MENT NO.
NALSTP20CDD003

28-Nov-18

R0

0.1 mm

30 N/mm2

500 N/mm2

2.7E+04 N/mm2

2.0E+05 N/mm2

69.33 kN-m

99.25 kN

9.33

248.0 mm

62.5 mm

63.1 kN-m

299 mm

51 mm
MENT NO.
NALSTP20CDD003

28-Nov-18

R0
MENT NO.
NALSTP20CDD003

28-Nov-18

R0

d ') = M - N X S

73.66 mm

5.82 N/mm2

148.3 N/mm2

357 mm

90 mm

65.4 mm

9.32E-04

3.99E-04

5.34E-04

0.094 mm
MENT NO.
NALSTP20CDD003

28-Nov-18

R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W5A-2 CRACK WIDTH - FLEXURE & TENSION (IS 3370 Part 2 - 2009, Annexure B)

Horizontal Limiting crack width, w

Max Sx Characteristic cube strength of Concrete, fck

Mx-Max Sx Yield Strength of Steel, fy


Modulus Elasticity of Concrete Ec = 5000 x SQRT( fck )

Modulus Elasticity of Steel, Es

Applied Moment at service condition, M

Applied Tension at service condition, N 106.386

σcbc = 10 N/mm2 Modular Ratio, m, 280/(3*σcbc) =

Breadth, b (mm) = 1000 Depth, h (mm) = 357

Reinf, Ast mm2 = 00-000+16-090 2233 Clear Cover, CC mm = 50

Reinf, Asc mm2 = 00-000+12-150 753 Clear Cover, CC mm = 45

Distance between centroid of Ast and Asc, Zs = 357-50-0.5x16-45-0.5x12

Distance - Centroid of Ast to CG of Ast & Asc, Xs = 753x248/(2233+753)

Modified Moment M' = M - N * Xs

Modified moment, M' > 0, section is in bending

Effecive Depth, d = 357-50-0.5x16

Cover to the centre of compression steel, d' = 45+0.5x12


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

bxf c bxf c x
A st f st - - A sc f sc = N (d - ) + A sc f sc (d - d ') = M - N X S
2 2 3

f c (d - x) (x - d ')
Ast fst = (m -1) A st A sc f sc = (1.5 m -1) A sc f c
x x

Solve above equations to get the value of fc and x

Depth of NA from Compression face = x

Stress in extreme compression fibre, fc

Stress in Tension reinforcement, fst

= (9.33-1)x4.28x(299-69.04)/69.04

Distance from compression face to point where crack width is being calculated, a

Max spacing of bars, S =

acr = maximum spacing of tensile bar from outer edge of concrete (mm)

= SQRT((0.5x90)^2+(50+0.5x16)^2)-0.5x16

Strain at the level considered, ε1 = (h - x)fs/Es(d - x)

Strain due to stiffening effect in concrete, ε2 = 1.5b(h - x)(a - x)/(3EsAs(d - x))

εm = Average surface strain = ε1 - ε2

Crack Width, w = 3 acr εm/(1+2(acr - Cmin)/(h - x))


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
MENT NO.
NALSTP20CDD003

28-Nov-18

R0

0.1 mm

30 N/mm2

500 N/mm2

2.7E+04 N/mm2

2.0E+05 N/mm2

50.11 kN-m

106.39 kN

9.33

248.0 mm

62.5 mm

43.5 kN-m

299 mm

51 mm
MENT NO.
NALSTP20CDD003

28-Nov-18

R0
MENT NO.
NALSTP20CDD003

28-Nov-18

R0

d ') = M - N X S

69.04 mm

4.28 N/mm2

118.8 N/mm2

357 mm

90 mm

65.4 mm

7.44E-04

4.04E-04

3.40E-04

0.060 mm
MENT NO.
NALSTP20CDD003

28-Nov-18

R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W5A-3 DESIGN OF WALL W5A GROUP 3 Height from 5.00 to 7.50 m

Grade of Concrete, fck = 30 N/mm2 Grade of Steel, fy = 500 N/mm2

Limiting Moment of Resistance Index = 0.133

+Z Face -Z Face

Clear Cover = Water Face ### Earth Face ###

STAAD Group Analysis Report


Shear Membrane Bending Moment

Plate L/C SQX SQY SX SY (local) SXY Mx My kNm/m


(local) (local) (local) kN/m2 (local) kNm/m
kN/m2 kN/m2 kN/m2 kN/m2
Max Qx 3513 17 FULL 188.964 18.923 258.745 -80.433 69.354 61.01 8.934

Min Qx 3513 18 EMPT -203.78 0.787 -102.27 -127.167 -99.82 -57.277 -7.2

Max Qy 3587 18 EMPT -4.071 68.377 -112.451 -134.233 -31.541 15.754 32.91

Min Qy 3566 17 FULL -1.415 -46.515 232.816 -171.81 -29.341 -17.032 -21.005

Max Sx 3513 17 FULL 188.964 18.923 258.745 -80.433 69.354 61.01 8.934

Min Sx 3520 18 EMPT -93.851 -15.516 -188.179 -126.974 48.041 -29.288 -5.616

Max Sy 3520 15 FULL3 91.633 18.747 157.259 9.765 -8.945 25.727 4.771

Min Sy 3502 17 FULL -14.295 -12.425 238.575 -215.577 -37.606 -19.693 -38.98

Max Sxy 3519 16 FULL4 2.763 0.434 21.029 -101.454 144.585 1.558 0.236

Min Sxy 3513 18 EMPT -203.78 0.787 -102.27 -127.167 -99.82 -57.277 -7.2

Max Mx 3513 17 FULL 188.964 18.923 258.745 -80.433 69.354 61.01 8.934

Min Mx 3513 18 EMPT -203.78 0.787 -102.27 -127.167 -99.82 -57.277 -7.2

Max My 3502 18 EMPT 5.358 -17.736 -103.869 -125.553 -13.609 23.309 51.181

Min My 3502 17 FULL -14.295 -12.425 238.575 -215.577 -37.606 -19.693 -38.98

Max Mxy 3595 18 EMPT -88.91 11.673 -69.879 -42.375 -62.301 -9.514 3.036

Min Mxy 3594 15 FULL3 46.367 -10.006 128.39 -50.427 43.734 -0.684 -1.185
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

Results from STADD output

Max Vertical BM in wall creating tension on Water Face Max My 51.18 kN-m/m

Max Horizontal BM in wall creating tension on Water Face Max Mx 61.01 kN-m/m

Tension corresponding to Max Mx Sx-Max Mx 0.259 N/mm2

Max Vertical BM in wall creating tension on Earth Face Min My 38.98 kN-m/m

Max Horizontal BM in wall creating tension on Earth Face Min Mx 57.28 kN-m/m

Tension corresponding to Min Mx Sx-Min Mx 0 N/mm2

Max Tension in Wall Max Sx 0.259 N/mm2

BM at wall corresponding to Max Sx on Water Face Mx-Max Sx 61.01 kN-m/m

Thickness check:
Required effective thickness SQRT(61.01x1000000x1.5/(0.133x30x1000))

Provided overall thickness

Min Ast for each surface zone (mm2/m) in % = 0.24 = 0.24x164.5x1000/100

Area of vertical reinforcement required on Water Face

Max My 51.18 kN-m/m

Effective Depth (mm) = 329-50-0.5x16

Mu / bd2 = 51.18x1.5x10^6/(1000x271^2)

Refer SP-16 Percentage of reinforcement required, %

Req area of Vertical reinf, Water Face, mm2 = MAX(0.251x271x1000/100,395)

Area of horizontal reinforcement required on Water Face

Max Mx 61.01 kN-m/ Corresponding Tension Sx = 0.259 N/mm2


Effective Depth (mm) = 329-50-0.5x16

Mu / bd2 = 61.01x1.5x10^6/(1000x271^2)
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
Refer SP-16 Percentage of reinforcement required, %

Required area of reinforcement for Mx, mm2 = 0.302x271x1000/100

Factored Tension, kN/m = 0.259x329x1.5

Required area of reinf on each face for Sx, mm2 = 0.5x127.8x1000/(0.8x500)

Req area of Hor reinf, Water Face, mm2 = MAX(818+160,395)

Area of vertical reinforcement required on Earth Face

Min My 38.98 kN-m/m

Effective Depth (mm) = 329-45-0.5x12

Mu / bd2 = 38.98x1.5x10^6/(1000x278^2)

Refer SP-16 Percentage of reinforcement required, %

Req area of Vertical reinf, Earth Face, mm2 = MAX(0.179x278x1000/100,395)

Area of horizontal reinforcement required on Earth Face

Min Mx 57.28 kN-m/ Corresponding Tension Sx = 0.000 N/mm2


Effective Depth (mm) = 329-45-0.5x12

Mu / bd2 = 57.28x1.5x10^6/(1000x278^2)

Refer SP-16 Percentage of reinforcement required, %

Required area of reinforcement for Mx, mm2 = 0.268x278x1000/100

Factored Tension, N/m =0

Required area of reinf on each face for Sx, mm2 =0

Req area of Hor reinf, Earth Face, mm2 = MAX(745+0,395)

Ast Required Ast Provided

Vertical Water Face 680 00-000+16-180 1117

Hor Water Face 978 00-000+16-090 2233


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
Vertical Earth Face 498 00-000+12-180 628

Hor Earth Face 745 00-000+12-150 753

Check for Shear at Junction of Base and Wall

Max Qy, (18 EMPTY) = 0.068 Min Qy, (17 FULL) = -0.047
Factored Shear Stress, N/mm2 = 1.5x0.068

Percentage of Steel provided on Water Face

Thickness of wall
Factor k for thickness of slab (Refer Clause 40.2.1.1 of IS 456)

Factor for enhanced Shear Stress near the support (Refer Clause 40.5.1 of IS 456)

Maximum shear stress in concrete for limit state method of design, tc max
Permissible Shear Stress, N/mm2 (Value from Table 19 of IS 456 * k * Enhancement)

W5A-3 Check for Temperature Reinforcement (As per Annexure A of IS 3370 - 2009, Part 2)

Horizontal Direction

Ast Provided (both faces) = 2233+753

Percentage of reinforcement provided = 2986/329/1000x100

Max spacing of cracks Smax = (fct/fb) * (f / 2 r) (2/3)x(0.5x(16+12)/2)x(100/0.91)

fct / fb = 2/3 for deformed bars as recommended in Code

Crack Width, Wmax = Smax * (a/2)* (T1 + T2)

513x(0.7/100000/2)x(15+15)
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

Permissible crack width = 0.1 mm, Hence OK


O.
20CDD003

28-Nov-18

R0

ding Moment

Mxy kNm/m

-0.581

-1.724

0.035

1.748

-0.581

1.006

-0.811

3.767

-0.075

-1.724

-0.581

-1.724

-5.284

3.767

8.387

-9.418
O.
20CDD003

28-Nov-18

R0

151 mm

329 mm

395

271.0

1.045

0.251

680

271.0

1.246
O.
20CDD003

28-Nov-18

R0
0.302

818

127.8

160

978

278.0

0.757

0.179

498

278.0

1.112

0.268

745

745

% Ast

0.412%

0.803%
O.
20CDD003

28-Nov-18

R0
0.232%

0.271%

0.102

0.412%

329 mm

3.50

0.460

2986 mm2

0.91

513 mm

0.05 mm
O.
20CDD003

28-Nov-18

R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W5A-3 CRACK WIDTH - FLEXURE (IS 3370 Part 2 - 2009, Annexure B)

Vertical Limiting crack width, w

Max My Characteristic cube strength of Concrete, fck

Yield Strength of Steel, fy

Modulus Elasticity of Concrete Ec = 5000 x SQRT( fck )

Modulus Elasticity of Steel, Es

Applied Moment at service condition, M

σcbc = 10 N/mm2 Modular Ratio, m, 280/(3*σcbc) =

Breadth, b (mm) = 1000 Depth, h (mm) = 329

Reinf, Ast mm2 = 00-000+16-180 1117 Clear Cover, CC mm = 50

Reinf, Asc mm2 = 00-000+12-180 628 Clear Cover, CC mm = 45

Effecive Depth, d = 329-50-0.5x16

Cover to the centre of compression steel, d' = 45+0.5x12

Max spacing of bars, S =

acr = maximum spacing of tensile bar from outer edge of concrete (mm)

= SQRT((0.5x180)^2+(50+0.5x16)^2)-0.5x16

Depth of NA from Compression face = x

Solve equation = (bx2/2) + (1.5m-1) Asc (x - d') - m Ast (d-x) = 0 to get x. x=

(x - d ') bxf c x
A sc fsc = (1.5 m -1) A sc f c (d - ) + A sc f sc (d - d ') = M
x 2 3
f c (d - x)
Ast f st = (m -1) A st
x Solve these equations to get fc

Stress in extreme compression fibre, fc

Stress in Tension reinforcement, fst = 9.33x6.13x(271-64)/64


Distance from compression face to point where crack width is being calculated, a

Strain at the level considered, ε1 = (h - x)fs/Es(d - x)

Strain due to stiffening effect in concrete, ε2 = 1.5b(h - x)(a - x)/(3EsAs(d - x))

εm = Average surface strain = ε1 - ε2

Crack Width, w = 3 acr εm/(1+2(acr - Cmin)/(h - x))


MENT NO.
RNALSTP20CDD003

28-Nov-18

R0

0.1 mm

30 N/mm2

500 N/mm2

2.7E+04 N/mm2

2.0E+05 N/mm2

51.18 kN-m

9.33

271 mm

51 mm

180 mm

99.1 mm

64.0 mm

6.13 N/mm2

185.0 N/mm2
329 mm

1.18E-03

7.59E-04

4.25E-04

0.092 mm
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W5A-3 CRACK WIDTH - FLEXURE & TENSION (IS 3370 Part 2 - 2009, Annexure B)

Horizontal Limiting crack width, w

Max Mx Characteristic cube strength of Concrete, fck

Sx-Max Mx Yield Strength of Steel, fy


Modulus Elasticity of Concrete Ec = 5000 x SQRT( fck )

Modulus Elasticity of Steel, Es

Applied Moment at service condition, M

Applied Tension at service condition, N 85.211

σcbc = 10 N/mm2 Modular Ratio, m, 280/(3*σcbc) =

Breadth, b (mm) = 1000 Depth, h (mm) = 329

Reinf, Ast mm2 = 00-000+16-090 2233 Clear Cover, CC mm = 50

Reinf, Asc mm2 = 00-000+12-150 753 Clear Cover, CC mm = 45

Distance between centroid of Ast and Asc, Zs = 329-50-0.5x16-45-0.5x12

Distance - Centroid of Ast to CG of Ast & Asc, Xs = 753x220/(2233+753)

Modified Moment M' = M - N * Xs

Modified moment, M' > 0, section is in bending

Effecive Depth, d = 329-50-0.5x16

Cover to the centre of compression steel, d' = 45+0.5x12


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

bxf c bxf c x
A st f st - - A sc f sc = N (d - ) + A sc f sc (d - d ') = M - N X S
2 2 3

f c (d - x) (x - d ')
Ast fst = (m -1) A st A sc f sc = (1.5 m -1) A sc f c
x x

Solve above equations to get the value of fc and x

Depth of NA from Compression face = x

Stress in extreme compression fibre, fc

Stress in Tension reinforcement, fst

= (9.33-1)x6x(271-70.96)/70.96

Distance from compression face to point where crack width is being calculated, a

Max spacing of bars, S =

acr = maximum spacing of tensile bar from outer edge of concrete (mm)

= SQRT((0.5x90)^2+(50+0.5x16)^2)-0.5x16

Strain at the level considered, ε1 = (h - x)fs/Es(d - x)

Strain due to stiffening effect in concrete, ε2 = 1.5b(h - x)(a - x)/(3EsAs(d - x))

εm = Average surface strain = ε1 - ε2

Crack Width, w = 3 acr εm/(1+2(acr - Cmin)/(h - x))


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
MENT NO.
NALSTP20CDD003

28-Nov-18

R0

0.1 mm

30 N/mm2

500 N/mm2

2.7E+04 N/mm2

2.0E+05 N/mm2

61.01 kN-m

85.21 kN

9.33

220.0 mm

55.5 mm

56.3 kN-m

271 mm

51 mm
MENT NO.
NALSTP20CDD003

28-Nov-18

R0
MENT NO.
NALSTP20CDD003

28-Nov-18

R0

d ') = M - N X S

70.96 mm

6.00 N/mm2

140.9 N/mm2

329 mm

90 mm

65.4 mm

9.09E-04

3.73E-04

5.36E-04

0.094 mm
MENT NO.
NALSTP20CDD003

28-Nov-18

R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W5A-3 CRACK WIDTH - FLEXURE & TENSION (IS 3370 Part 2 - 2009, Annexure B)

Horizontal Limiting crack width, w

Max Sx Characteristic cube strength of Concrete, fck

Mx-Max Sx Yield Strength of Steel, fy


Modulus Elasticity of Concrete Ec = 5000 x SQRT( fck )

Modulus Elasticity of Steel, Es

Applied Moment at service condition, M

Applied Tension at service condition, N 85.211

σcbc = 10 N/mm2 Modular Ratio, m, 280/(3*σcbc) =

Breadth, b (mm) = 1000 Depth, h (mm) = 329

Reinf, Ast mm2 = 00-000+16-090 2233 Clear Cover, CC mm = 50

Reinf, Asc mm2 = 00-000+12-150 753 Clear Cover, CC mm = 45

Distance between centroid of Ast and Asc, Zs = 329-50-0.5x16-45-0.5x12

Distance - Centroid of Ast to CG of Ast & Asc, Xs = 753x220/(2233+753)

Modified Moment M' = M - N * Xs

Modified moment, M' > 0, section is in bending

Effecive Depth, d = 329-50-0.5x16

Cover to the centre of compression steel, d' = 45+0.5x12


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

bxf c bxf c x
A st f st - - A sc f sc = N (d - ) + A sc f sc (d - d ') = M - N X S
2 2 3

f c (d - x) (x - d ')
Ast fst = (m -1) A st A sc f sc = (1.5 m -1) A sc f c
x x

Solve above equations to get the value of fc and x

Depth of NA from Compression face = x

Stress in extreme compression fibre, fc

Stress in Tension reinforcement, fst

= (9.33-1)x6x(271-70.96)/70.96

Distance from compression face to point where crack width is being calculated, a

Max spacing of bars, S =

acr = maximum spacing of tensile bar from outer edge of concrete (mm)

= SQRT((0.5x90)^2+(50+0.5x16)^2)-0.5x16

Strain at the level considered, ε1 = (h - x)fs/Es(d - x)

Strain due to stiffening effect in concrete, ε2 = 1.5b(h - x)(a - x)/(3EsAs(d - x))

εm = Average surface strain = ε1 - ε2

Crack Width, w = 3 acr εm/(1+2(acr - Cmin)/(h - x))


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
MENT NO.
NALSTP20CDD003

28-Nov-18

R0

0.1 mm

30 N/mm2

500 N/mm2

2.7E+04 N/mm2

2.0E+05 N/mm2

61.01 kN-m

85.21 kN

9.33

220.0 mm

55.5 mm

56.3 kN-m

271 mm

51 mm
MENT NO.
NALSTP20CDD003

28-Nov-18

R0
MENT NO.
NALSTP20CDD003

28-Nov-18

R0

d ') = M - N X S

70.96 mm

6.00 N/mm2

140.9 N/mm2

329 mm

90 mm

65.4 mm

9.09E-04

3.73E-04

5.36E-04

0.094 mm
MENT NO.
NALSTP20CDD003

28-Nov-18

R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W5A-4 DESIGN OF WALL W5A GROUP 4 Height from 7.50 to 8.80 m

Grade of Concrete, fck = 30 N/mm2 Grade of Steel, fy = 500 N/mm2

Limiting Moment of Resistance Index = 0.133

+Z Face -Z Face

Clear Cover = Water Face ### Earth Face ###

STAAD Group Analysis Report


Shear Membrane Bending Moment

Plate L/C SQX SQY SX SY (local) SXY Mx My kNm/m


(local) (local) (local) kN/m2 (local) kNm/m
kN/m2 kN/m2 kN/m2 kN/m2
Max Qx 3650 18 EMPT 310.278 218.792 -265.362 -292.008 -166.786 -17.271 13.908

Min Qx 3649 18 EMPT -334.255 219.191 -262.31 -295.138 151.313 -16.682 13.974

Max Qy 3649 18 EMPT -334.255 219.191 -262.31 -295.138 151.313 -16.682 13.974

Min Qy 3649 17 FULL 162.472 -103.509 113.786 -294.586 149.932 5.428 -6.443

Max Sx 3653 17 FULL -51.014 -7.99 254.727 -7.456 3.318 -10.277 -0.473

Min Sx 3650 18 EMPT 310.278 218.792 -265.362 -292.008 -166.786 -17.271 13.908

Max Sy 3661 17 FULL 22.867 4.548 114.183 5.313 33.382 -3.867 -0.672

Min Sy 3650 16 FULL4 -36.082 -24.838 54.732 -301.296 -174.757 3.999 -1.578

Max Sxy 3649 15 FULL3 137.332 -92.356 81.607 -301.246 157.481 6.64 -5.7

Min Sxy 3650 16 FULL4 -36.082 -24.838 54.732 -301.296 -174.757 3.999 -1.578

Max Mx 3618 17 FULL 45.329 35.501 156.084 -25.533 51.589 24.47 3.839

Min Mx 3618 18 EMPT -95.696 -27.681 -16.721 -60.5 -41.428 -35.172 -5.03

Max My 3607 18 EMPT -17.743 87.333 -118.978 -164.268 4.422 8.836 26.488

Min My 3607 17 FULL 4.363 -46.515 228.199 -182.613 -7.346 -8.076 -11.745

Max Mxy 3651 18 EMPT 206.242 33.799 -151.777 -12.887 -19.55 4.241 2.148

Min Mxy 3627 18 EMPT -5.346 67.648 -188.683 -120.839 59.19 9.056 15.707
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

Results from STADD output

Max Vertical BM in wall creating tension on Water Face Max My 26.49 kN-m/m

Max Horizontal BM in wall creating tension on Water Face Max Mx 24.47 kN-m/m

Tension corresponding to Max Mx Sx-Max Mx 0.156 N/mm2

Max Vertical BM in wall creating tension on Earth Face Min My 11.75 kN-m/m

Max Horizontal BM in wall creating tension on Earth Face Min Mx 35.17 kN-m/m

Tension corresponding to Min Mx Sx-Min Mx 0 N/mm2

Max Tension in Wall Max Sx 0.255 N/mm2

BM at wall corresponding to Max Sx on Earth Face Mx-Max Sx 10.28 kN-m/m

Thickness check:
Required effective thickness SQRT(35.17x1000000x1.5/(0.133x30x1000))

Provided overall thickness

Min Ast for each surface zone (mm2/m) in % = 0.24 = 0.24x153.5x1000/100

Area of vertical reinforcement required on Water Face

Max My 26.49 kN-m/m

Effective Depth (mm) = 307-50-0.5x16

Mu / bd2 = 26.49x1.5x10^6/(1000x249^2)

Refer SP-16 Percentage of reinforcement required, %

Req area of Vertical reinf, Water Face, mm2 = MAX(0.151x249x1000/100,368)

Area of horizontal reinforcement required on Water Face

Max Mx 24.47 kN-m/ Corresponding Tension Sx = 0.156 N/mm2


Effective Depth (mm) = 307-50-0.5x12

Mu / bd2 = 24.47x1.5x10^6/(1000x251^2)
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
Refer SP-16 Percentage of reinforcement required, %

Required area of reinforcement for Mx, mm2 = 0.137x251x1000/100

Factored Tension, kN/m = 0.156x307x1.5

Required area of reinf on each face for Sx, mm2 = 0.5x71.8x1000/(0.8x500)

Req area of Hor reinf, Water Face, mm2 = MAX(344+90,368)

Area of vertical reinforcement required on Earth Face

Min My 11.75 kN-m/m

Effective Depth (mm) = 307-45-0.5x12

Mu / bd2 = 11.75x1.5x10^6/(1000x256^2)

Refer SP-16 Percentage of reinforcement required, %

Req area of Vertical reinf, Earth Face, mm2 = MAX(0.063x256x1000/100,368)

Area of horizontal reinforcement required on Earth Face

Min Mx 35.17 kN-m/ Corresponding Tension Sx = 0.000 N/mm2


Effective Depth (mm) = 307-45-0.5x12

Mu / bd2 = 35.17x1.5x10^6/(1000x256^2)

Refer SP-16 Percentage of reinforcement required, %

Required area of reinforcement for Mx, mm2 = 0.191x256x1000/100

Factored Tension, N/m =0

Required area of reinf on each face for Sx, mm2 =0

Req area of Hor reinf, Earth Face, mm2 = MAX(489+0,368)

Ast Required Ast Provided

Vertical Water Face 376 00-000+16-180 1117

Hor Water Face 434 00-000+12-150 753


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
Vertical Earth Face 368 00-000+12-180 628

Hor Earth Face 489 00-000+12-150 753

Check for Shear at Junction of Base and Wall

Max Qy, (18 EMPTY) = 0.219 Min Qy, (17 FULL) = -0.104
Factored Shear Stress, N/mm2 = 1.5x0.219

Percentage of Steel provided on Water Face

Thickness of wall
Factor k for thickness of slab (Refer Clause 40.2.1.1 of IS 456)

Factor for enhanced Shear Stress near the support (Refer Clause 40.5.1 of IS 456)

Maximum shear stress in concrete for limit state method of design, tc max
Permissible Shear Stress, N/mm2 (Value from Table 19 of IS 456 * k * Enhancement)

W5A-4 Check for Temperature Reinforcement (As per Annexure A of IS 3370 - 2009, Part 2)

Horizontal Direction

Ast Provided (both faces) = 753+753

Percentage of reinforcement provided = 1506/307/1000x100

Max spacing of cracks Smax = (fct/fb) * (f / 2 r) (2/3)x(0.5x(12+12)/2)x(100/0.49)

fct / fb = 2/3 for deformed bars as recommended in Code

Crack Width, Wmax = Smax * (a/2)* (T1 + T2)

816x(0.7/100000/2)x(15+15)
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

Permissible crack width = 0.1 mm, Hence OK


O.
20CDD003

28-Nov-18

R0

ding Moment

Mxy kNm/m

11.122

-12.825

-12.825

6.832

-5.505

11.122

-0.668

-1.773

5.964

-1.773

-3.637

6.637

-4.642

3.401

12.59

-14.525
O.
20CDD003

28-Nov-18

R0

115 mm

307 mm

368

249.0

0.641

0.151

376

251.0

0.583
O.
20CDD003

28-Nov-18

R0
0.137

344

71.8

90

434

256.0

0.269

0.063

368

256.0

0.805

0.191

489

489

% Ast

0.449%

0.294%
O.
20CDD003

28-Nov-18

R0
0.250%

0.294%

0.329

0.449%

307 mm

3.50

0.470

1506 mm2

0.49

816 mm

0.09 mm
O.
20CDD003

28-Nov-18

R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W5A-4 CRACK WIDTH - FLEXURE (IS 3370 Part 2 - 2009, Annexure B)

Vertical Limiting crack width, w

Max My Characteristic cube strength of Concrete, fck

Yield Strength of Steel, fy

Modulus Elasticity of Concrete Ec = 5000 x SQRT( fck )

Modulus Elasticity of Steel, Es

Applied Moment at service condition, M

σcbc = 10 N/mm2 Modular Ratio, m, 280/(3*σcbc) =

Breadth, b (mm) = 1000 Depth, h (mm) = 307

Reinf, Ast mm2 = 00-000+16-180 1117 Clear Cover, CC mm = 50

Reinf, Asc mm2 = 00-000+12-180 628 Clear Cover, CC mm = 45

Effecive Depth, d = 307-50-0.5x16

Cover to the centre of compression steel, d' = 45+0.5x12

Max spacing of bars, S =

acr = maximum spacing of tensile bar from outer edge of concrete (mm)

= SQRT((0.5x180)^2+(50+0.5x16)^2)-0.5x16

Depth of NA from Compression face = x

Solve equation = (bx2/2) + (1.5m-1) Asc (x - d') - m Ast (d-x) = 0 to get x. x=

(x - d ') bxf c x
A sc fsc = (1.5 m -1) A sc f c (d - ) + A sc f sc (d - d ') = M
x 2 3
f c (d - x)
Ast f st = (m -1) A st
x Solve these equations to get fc

Stress in extreme compression fibre, fc

Stress in Tension reinforcement, fst = 9.33x3.65x(249-61.2)/61.2


Distance from compression face to point where crack width is being calculated, a

Strain at the level considered, ε1 = (h - x)fs/Es(d - x)

Strain due to stiffening effect in concrete, ε2 = 1.5b(h - x)(a - x)/(3EsAs(d - x))

εm = Average surface strain = ε1 - ε2

Crack Width, w = 3 acr εm/(1+2(acr - Cmin)/(h - x))


MENT NO.
RNALSTP20CDD003

28-Nov-18

R0

0.1 mm

30 N/mm2

500 N/mm2

2.7E+04 N/mm2

2.0E+05 N/mm2

26.49 kN-m

9.33

249 mm

51 mm

180 mm

99.1 mm

61.2 mm

3.65 N/mm2

104.5 N/mm2
307 mm

6.84E-04

7.20E-04

-3.62E-05

-0.008 mm
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W5A-4 CRACK WIDTH - FLEXURE & TENSION (IS 3370 Part 2 - 2009, Annexure B)

Horizontal Limiting crack width, w

Max Mx Characteristic cube strength of Concrete, fck

Sx-Max Mx Yield Strength of Steel, fy


Modulus Elasticity of Concrete Ec = 5000 x SQRT( fck )

Modulus Elasticity of Steel, Es

Applied Moment at service condition, M

Applied Tension at service condition, N 47.892

σcbc = 10 N/mm2 Modular Ratio, m, 280/(3*σcbc) =

Breadth, b (mm) = 1000 Depth, h (mm) = 307

Reinf, Ast mm2 = 00-000+12-150 753 Clear Cover, CC mm = 50

Reinf, Asc mm2 = 00-000+12-150 753 Clear Cover, CC mm = 45

Distance between centroid of Ast and Asc, Zs = 307-50-0.5x12-45-0.5x12

Distance - Centroid of Ast to CG of Ast & Asc, Xs = 753x200/(753+753)

Modified Moment M' = M - N * Xs

Modified moment, M' > 0, section is in bending

Effecive Depth, d = 307-50-0.5x12

Cover to the centre of compression steel, d' = 45+0.5x12


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

bxf c bxf c x
A st f st - - A sc f sc = N (d - ) + A sc f sc (d - d ') = M - N X S
2 2 3

f c (d - x) (x - d ')
Ast fst = (m -1) A st A sc f sc = (1.5 m -1) A sc f c
x x

Solve above equations to get the value of fc and x

Depth of NA from Compression face = x

Stress in extreme compression fibre, fc

Stress in Tension reinforcement, fst

= (9.33-1)x4.23x(251-42.59)/42.59

Distance from compression face to point where crack width is being calculated, a

Max spacing of bars, S =

acr = maximum spacing of tensile bar from outer edge of concrete (mm)

= SQRT((0.5x150)^2+(50+0.5x12)^2)-0.5x12

Strain at the level considered, ε1 = (h - x)fs/Es(d - x)

Strain due to stiffening effect in concrete, ε2 = 1.5b(h - x)(a - x)/(3EsAs(d - x))

εm = Average surface strain = ε1 - ε2

Crack Width, w = 3 acr εm/(1+2(acr - Cmin)/(h - x))


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
MENT NO.
NALSTP20CDD003

28-Nov-18

R0

0.1 mm

30 N/mm2

500 N/mm2

2.7E+04 N/mm2

2.0E+05 N/mm2

24.47 kN-m

47.89 kN

9.33

200.0 mm

100.0 mm

19.7 kN-m

251 mm

51 mm
MENT NO.
NALSTP20CDD003

28-Nov-18

R0
MENT NO.
NALSTP20CDD003

28-Nov-18

R0

d ') = M - N X S

42.59 mm

4.23 N/mm2

172.4 N/mm2

307 mm

150 mm

87.6 mm

1.09E-03

1.11E-03

-2.00E-05

-0.004 mm
MENT NO.
NALSTP20CDD003

28-Nov-18

R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W5A-4 CRACK WIDTH - FLEXURE & TENSION (IS 3370 Part 2 - 2009, Annexure B)

Horizontal Limiting crack width, w

Max Sx Characteristic cube strength of Concrete, fck

Mx-Max Sx Yield Strength of Steel, fy


Modulus Elasticity of Concrete Ec = 5000 x SQRT( fck )

Modulus Elasticity of Steel, Es

Applied Moment at service condition, M

Applied Tension at service condition, N 78.285

σcbc = 10 N/mm2 Modular Ratio, m, 280/(3*σcbc) =

Breadth, b (mm) = 1000 Depth, h (mm) = 307

Reinf, Ast mm2 = 00-000+12-150 753 Clear Cover, CC mm = 45

Reinf, Asc mm2 = 00-000+12-150 753 Clear Cover, CC mm = 50

Distance between centroid of Ast and Asc, Zs = 307-45-0.5x12-50-0.5x12

Distance - Centroid of Ast to CG of Ast & Asc, Xs = 753x200/(753+753)

Modified Moment M' = M - N * Xs

Modified moment, M' > 0, section is in bending

Effecive Depth, d = 307-45-0.5x12

Cover to the centre of compression steel, d' = 50+0.5x12


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

bxf c bxf c x
A st f st - - A sc f sc = N (d - ) + A sc f sc (d - d ') = M - N X S
2 2 3

f c (d - x) (x - d ')
Ast fst = (m -1) A st A sc f sc = (1.5 m -1) A sc f c
x x

Solve above equations to get the value of fc and x

Depth of NA from Compression face = x

Stress in extreme compression fibre, fc

Stress in Tension reinforcement, fst

= (9.33-1)x1.66x(256-27.92)/27.92

Distance from compression face to point where crack width is being calculated, a

Max spacing of bars, S =

acr = maximum spacing of tensile bar from outer edge of concrete (mm)

= SQRT((0.5x150)^2+(45+0.5x12)^2)-0.5x12

Strain at the level considered, ε1 = (h - x)fs/Es(d - x)

Strain due to stiffening effect in concrete, ε2 = 1.5b(h - x)(a - x)/(3EsAs(d - x))

εm = Average surface strain = ε1 - ε2

Crack Width, w = 3 acr εm/(1+2(acr - Cmin)/(h - x))


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
MENT NO.
NALSTP20CDD003

28-Nov-18

R0

0.1 mm

30 N/mm2

500 N/mm2

2.7E+04 N/mm2

2.0E+05 N/mm2

10.28 kN-m

78.29 kN

9.33

200.0 mm

100.0 mm

2.5 kN-m

256 mm

56 mm
MENT NO.
NALSTP20CDD003

28-Nov-18

R0
MENT NO.
NALSTP20CDD003

28-Nov-18

R0

d ') = M - N X S

27.92 mm

1.66 N/mm2

113.0 N/mm2

307 mm

150 mm

84.7 mm

6.91E-04

1.13E-03

-4.43E-04

-0.088 mm
MENT NO.
NALSTP20CDD003

28-Nov-18

R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

DESIGN OF WALL W6
NT NO.
LSTP20CDD003

28-Nov-18

R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W6-DATA DESIGN OF WALL W6

DESIGNED THICKNESS
Height from bottom 0.00 4.90
Designed Thickness 400 300
Provided Thickness 400 300

Length of Wall = 7.60 m

Minimum reinforcement as per clause 8.1.1 of IS 3370 (Part 2) - 2009 0.24 %

Height Thickness Thickness for Temp.


Group Avg Th
From To From To From To Avg. Th
1 0.00 2.50 400 349 374 400 349 374
2 2.50 4.90 349 300 324 349 300 324

Direction and Type of Fill BOW BOF TOW TOF HOF

+Z Water Face Liquid 233.10 233.10 238.00 238.00 4.90

-Z Water Face Liquid 233.10 233.10 238.00 238.00 4.90

Fill k r Pressure Additional Loads, if any

+Z 1.00 10.30 50.47

-Z 1.00 10.30 50.47


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
O.
20CDD003

28-Nov-18

R0
O.
20CDD003

28-Nov-18

R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W6-1 DESIGN OF WALL W6 GROUP 1 Height from 0.00 to 2.50 m

Grade of Concrete, fck = 30 N/mm2 Grade of Steel, fy = 500 N/mm2

Limiting Moment of Resistance Index = 0.133

+Z Face -Z Face

Clear Cover = Water Face ### Water Face ###

STAAD Group Analysis Report


Shear Membrane Bending Moment

Plate L/C SQX SQY SX SY (local) SXY Mx My kNm/m


(local) (local) (local) kN/m2 (local) kNm/m
kN/m2 kN/m2 kN/m2 kN/m2
Max Qx 3742 13 FULL1 170.067 68.47 295.991 -97.596 -329.947 50.572 7.646

Min Qx 3742 14 FULL2-168.982 -58.674 231.65 -94.834 -333.733 -50.643 -7.619

Max Qy 3668 14 FULL2 35.449 362.804 319.634 39.82 -457.905 -19.577 -81.42

Min Qy 3668 13 FULL1 -38.886 -362.971 325.33 44.555 -498.676 19.865 81.617

Max Sx 3728 17 FULL -0.286 0.44 1238.14 194.74 -336.564 0.112 -0.063

Min Sx 3728 18 EMPT 0.129 0.108 -564.907 -632.031 969.348 -0.673 -0.122

Max Sy 3668 17 FULL -0.192 2.469 578.902 418.533 -831.185 -0.118 -0.759

Min Sy 3668 18 EMPT 4.084 1.33 -136.299 -1054.262 426.006 -0.608 -0.703

Max Sxy 3728 18 EMPT 0.129 0.108 -564.907 -632.031 969.348 -0.673 -0.122

Min Sxy 3668 17 FULL -0.192 2.469 578.902 418.533 -831.185 -0.118 -0.759

Max Mx 3742 13 FULL1 170.067 68.47 295.991 -97.596 -329.947 50.572 7.646

Min Mx 3742 14 FULL2-168.982 -58.674 231.65 -94.834 -333.733 -50.643 -7.619

Max My 3673 13 FULL1 0.173 -261.178 41.447 -260.204 -290.434 13.979 89.514

Min My 3673 14 FULL2 0.116 261.248 43.809 -255.198 -259.64 -13.954 -89.3

Max Mxy 3709 14 FULL2 -18.136 52.422 229.474 -154.1 -324.436 -1.224 -4.554

Min Mxy 3709 13 FULL1 17.728 -53.682 247.17 -185.158 -324.191 1.319 4.831
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

Results from STADD output

Max Vertical BM in wall creating tension on Water Face Max My 89.51 kN-m/m

Max Horizontal BM in wall creating tension on Water Face Max Mx 50.57 kN-m/m

Tension corresponding to Max Mx Sx-Max Mx 0.296 N/mm2

Max Vertical BM in wall creating tension on Water Face Min My 89.30 kN-m/m

Max Horizontal BM in wall creating tension on Water Face Min Mx 50.64 kN-m/m

Tension corresponding to Min Mx Sx-Min Mx 0.232 N/mm2

Max Tension in Wall Max Sx 1.238 N/mm2

BM at wall corresponding to Max Sx on Water Face Mx-Max Sx 0.11 kN-m/m

Thickness check:
Required effective thickness SQRT(89.51x1000000x1.5/(0.133x30x1000))

Provided overall thickness

Min Ast for each surface zone (mm2/m) in % = 0.24 = 0.24x187x1000/100

Area of vertical reinforcement required on Water Face

Max My 89.51 kN-m/m

Effective Depth (mm) = 374-50-0.5x16

Mu / bd2 = 89.51x1.5x10^6/(1000x316^2)

Refer SP-16 Percentage of reinforcement required, %

Req area of Vertical reinf, Water Face, mm2 = MAX(0.327x316x1000/100,449)

Area of horizontal reinforcement required on Water Face

Max Mx 50.57 kN-m/ Corresponding Tension Sx = 0.296 N/mm2


Effective Depth (mm) = 374-50-0.5x16

Mu / bd2 = 50.57x1.5x10^6/(1000x316^2)
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
Refer SP-16 Percentage of reinforcement required, %

Required area of reinforcement for Mx, mm2 = 0.18x316x1000/100

Factored Tension, kN/m = 0.296x374x1.5

Required area of reinf on each face for Sx, mm2 = 0.5x166.1x1000/(0.8x500)

Req area of Hor reinf, Water Face, mm2 = MAX(569+208,449)

Area of vertical reinforcement required on Water Face

Min My 89.30 kN-m/m

Effective Depth (mm) = 374-45-0.5x16

Mu / bd2 = 89.3x1.5x10^6/(1000x321^2)

Refer SP-16 Percentage of reinforcement required, %

Req area of Vertical reinf, Water Face, mm2 = MAX(0.316x321x1000/100,449)


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
Area of horizontal reinforcement required on Water Face

Min Mx 50.64 kN-m/ Corresponding Tension Sx = 0.232 N/mm2


Effective Depth (mm) = 374-45-0.5x16

Mu / bd2 = 50.64x1.5x10^6/(1000x321^2)

Refer SP-16 Percentage of reinforcement required, %

Required area of reinforcement for Mx, mm2 = 0.175x321x1000/100

Factored Tension, N/m = 0.232x374x1.5

Required area of reinf on each face for Sx, mm2 = 0.5x130.2x1000/(0.8x500)

Req area of Hor reinf, Water Face, mm2 = MAX(562+163,449)

Ast Required Ast Provided

Vertical Water Face 1033 16-180+16-180 2233

Hor Water Face 777 00-000+16-180 1117

Vertical Water Face 1014 16-180+16-180 2233

Hor Water Face 725 00-000+16-180 1117

Check for Shear at Junction of Base and Wall

Max Qy, (14 FULL2) = 0.363 Min Qy, (13 FULL1) = -0.363
Factored Shear Stress, N/mm2 = 1.5x0.363

Percentage of Steel provided on Water Face

Thickness of wall
Factor k for thickness of slab (Refer Clause 40.2.1.1 of IS 456)

Factor for enhanced Shear Stress near the support (Refer Clause 40.5.1 of IS 456)

Maximum shear stress in concrete for limit state method of design, tc max
Permissible Shear Stress, N/mm2 (Value from Table 19 of IS 456 * k * Enhancement)
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W6-1 Check for Temperature Reinforcement (As per Annexure A of IS 3370 - 2009, Part 2)

Horizontal Direction

Ast Provided (both faces) = 1117+1117

Percentage of reinforcement provided = 2234/374/1000x100

Max spacing of cracks Smax = (fct/fb) * (f / 2 r) (2/3)x(0.5x(16+16)/2)x(100/0.6)

fct / fb = 2/3 for deformed bars as recommended in Code

Crack Width, Wmax = Smax * (a/2)* (T1 + T2)

889x(0.7/100000/2)x(15+15)

Permissible crack width = 0.1 mm, Hence OK


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
O.
20CDD003

28-Nov-18

R0

ding Moment

Mxy kNm/m

-5.342

4.985

-7.07

6.915

-0.109

-0.068

-0.127

0.301

-0.068

-0.127

-5.342

4.985

-5.945

5.756

22.624

-22.878
O.
20CDD003

28-Nov-18

R0

183 mm

374 mm

449

316.0

1.345

0.327

1033

316.0

0.760
O.
20CDD003

28-Nov-18

R0
0.180

569

166.1

208

777

321.0

1.300

0.316

1014
O.
20CDD003

28-Nov-18

R0

321.0

0.737

0.175

562

130.2

163

725

% Ast

0.707%

0.348%

0.707%

0.348%

0.545

0.707%

374 mm

2.53

3.50

1.442
O.
20CDD003

28-Nov-18

R0
O.
20CDD003

28-Nov-18

R0

2234 mm2

0.60

889 mm

0.09 mm
O.
20CDD003

28-Nov-18

R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W6-1 CRACK WIDTH - FLEXURE (IS 3370 Part 2 - 2009, Annexure B)

Vertical Limiting crack width, w

Max My Characteristic cube strength of Concrete, fck

Yield Strength of Steel, fy

Modulus Elasticity of Concrete Ec = 5000 x SQRT( fck )

Modulus Elasticity of Steel, Es

Applied Moment at service condition, M

σcbc = 10 N/mm2 Modular Ratio, m, 280/(3*σcbc) =

Breadth, b (mm) = 1000 Depth, h (mm) = 374

Reinf, Ast mm2 = 16-180+16-180 2233 Clear Cover, CC mm = 50

Reinf, Asc mm2 = 16-180+16-180 2233 Clear Cover, CC mm = 50

Effecive Depth, d = 374-50-0.5x16

Cover to the centre of compression steel, d' = 50+0.5x16

Max spacing of bars, S =

acr = maximum spacing of tensile bar from outer edge of concrete (mm)

= SQRT((0.5x90)^2+(50+0.5x16)^2)-0.5x16

Depth of NA from Compression face = x

Solve equation = (bx2/2) + (1.5m-1) Asc (x - d') - m Ast (d-x) = 0 to get x. x=

(x - d ') bxf c x
A sc fsc = (1.5 m -1) A sc f c (d - ) + A sc f sc (d - d ') = M
x 2 3
f c (d - x)
Ast f st = (m -1) A st
x Solve these equations to get fc

Stress in extreme compression fibre, fc

Stress in Tension reinforcement, fst = 9.33x5.9x(316-88.1)/88.1


Distance from compression face to point where crack width is being calculated, a

Strain at the level considered, ε1 = (h - x)fs/Es(d - x)

Strain due to stiffening effect in concrete, ε2 = 1.5b(h - x)(a - x)/(3EsAs(d - x))

εm = Average surface strain = ε1 - ε2

Crack Width, w = 3 acr εm/(1+2(acr - Cmin)/(h - x))


MENT NO.
RNALSTP20CDD003

28-Nov-18

R0

0.1 mm

30 N/mm2

500 N/mm2

2.7E+04 N/mm2

2.0E+05 N/mm2

89.51 kN-m

9.33

316 mm

58 mm

90 mm

65.4 mm

88.1 mm

5.90 N/mm2

142.4 N/mm2
374 mm

8.93E-04

4.02E-04

4.92E-04

0.087 mm
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W6-1 CRACK WIDTH - FLEXURE & TENSION (IS 3370 Part 2 - 2009, Annexure B)

Horizontal Limiting crack width, w

Max Mx Characteristic cube strength of Concrete, fck

Sx-Max Mx Yield Strength of Steel, fy


Modulus Elasticity of Concrete Ec = 5000 x SQRT( fck )

Modulus Elasticity of Steel, Es

Applied Moment at service condition, M

Applied Tension at service condition, N 110.704

σcbc = 10 N/mm2 Modular Ratio, m, 280/(3*σcbc) =

Breadth, b (mm) = 1000 Depth, h (mm) = 374

Reinf, Ast mm2 = 00-000+16-180 1117 Clear Cover, CC mm = 50

Reinf, Asc mm2 = 00-000+16-180 1117 Clear Cover, CC mm = 50

Distance between centroid of Ast and Asc, Zs = 374-50-0.5x16-50-0.5x16

Distance - Centroid of Ast to CG of Ast & Asc, Xs = 1117x258/(1117+1117)

Modified Moment M' = M - N * Xs

Modified moment, M' > 0, section is in bending

Effecive Depth, d = 374-50-0.5x16

Cover to the centre of compression steel, d' = 50+0.5x16


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

bxf c bxf c x
A st f st - - A sc f sc = N (d - ) + A sc f sc (d - d ') = M - N X S
2 2 3

f c (d - x) (x - d ')
Ast fst = (m -1) A st A sc f sc = (1.5 m -1) A sc f c
x x

Solve above equations to get the value of fc and x

Depth of NA from Compression face = x

Stress in extreme compression fibre, fc

Stress in Tension reinforcement, fst

= (9.33-1)x4.92x(316-52.21)/52.21

Distance from compression face to point where crack width is being calculated, a

Max spacing of bars, S =

acr = maximum spacing of tensile bar from outer edge of concrete (mm)

= SQRT((0.5x180)^2+(50+0.5x16)^2)-0.5x16

Strain at the level considered, ε1 = (h - x)fs/Es(d - x)

Strain due to stiffening effect in concrete, ε2 = 1.5b(h - x)(a - x)/(3EsAs(d - x))

εm = Average surface strain = ε1 - ε2

Crack Width, w = 3 acr εm/(1+2(acr - Cmin)/(h - x))


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
MENT NO.
NALSTP20CDD003

28-Nov-18

R0

0.1 mm

30 N/mm2

500 N/mm2

2.7E+04 N/mm2

2.0E+05 N/mm2

50.57 kN-m

110.70 kN

9.33

258.0 mm

129.0 mm

36.3 kN-m

316 mm

58 mm
MENT NO.
NALSTP20CDD003

28-Nov-18

R0
MENT NO.
NALSTP20CDD003

28-Nov-18

R0

d ') = M - N X S

52.21 mm

4.92 N/mm2

207.1 N/mm2

374 mm

180 mm

99.1 mm

1.26E-03

8.79E-04

3.84E-04

0.088 mm
MENT NO.
NALSTP20CDD003

28-Nov-18

R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W6-1 CRACK WIDTH - FLEXURE & TENSION (IS 3370 Part 2 - 2009, Annexure B)

Horizontal Limiting crack width, w

Max Sx Characteristic cube strength of Concrete, fck

Mx-Max Sx Yield Strength of Steel, fy


Modulus Elasticity of Concrete Ec = 5000 x SQRT( fck )

Modulus Elasticity of Steel, Es

Applied Moment at service condition, M

Applied Tension at service condition, N 463.012

σcbc = 10 N/mm2 Modular Ratio, m, 280/(3*σcbc) =

Breadth, b (mm) = 1000 Depth, h (mm) = 374

Reinf, Ast mm2 = 00-000+16-180 1117 Clear Cover, CC mm = 50

Reinf, Asc mm2 = 00-000+16-180 1117 Clear Cover, CC mm = 50

Distance between centroid of Ast and Asc, Zs = 374-50-0.5x16-50-0.5x16

Distance - Centroid of Ast to CG of Ast & Asc, Xs

= 1117x258/(1117+1117)

Modified Moment M' = M - N * Xs

Modified moment, M' < 0, section in tension


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

Effecive Depth, d = 374-50-0.5x16

Cover to the centre of compression steel, d' = 50+0.5x16

Tension excess tensile face, T'

= (463.01x1117/(1117+1117))+(0.11x1000/(316-58))

Tension less tensile face, T''

= (463.01x1117/(1117+1117))-(0.11x1000/(316-58))

Stress in Tension reinforcement, fst = 231.931x1000/1117

Total Concrete Area, Ac = 1000x374+(9.33-1)x(1117+1117)

Direct Tension in Concrete, fct = 463.01x1000/392609.2

Max spacing of bars, S =

acr = maximum spacing of tensile bar from outer edge of concrete (mm)

= SQRT((0.5x180)^2+(50+0.5x16)^2)-0.5x16

Strain at the level considered, ε1 = fs / Es

Strain due to stiffening effect in concrete, ε2 = bD/EsAs


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
εm = Average surface strain = ε1 - ε2

Crack Width, w = 3 acr εm


MENT NO.
NALSTP20CDD003

28-Nov-18

R0

0.1 mm

30 N/mm2

500 N/mm2

2.7E+04 N/mm2

2.0E+05 N/mm2

0.11 kN-m

463.01 kN

9.33

258.0 mm

129.0 mm

-59.6 kN-m
MENT NO.
NALSTP20CDD003

28-Nov-18

R0
MENT NO.
NALSTP20CDD003

28-Nov-18

R0

316 mm

58 mm

231.9 kN

231.1 kN

207.6 N/mm2

3.9E+05 mm2

1.18 N/mm2

180 mm

99.1 mm

1.04E-03

8.37E-04
MENT NO.
NALSTP20CDD003

28-Nov-18

R0
2.01E-04

0.060 mm
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W6-2 DESIGN OF WALL W6 GROUP 2 Height from 2.50 to 4.90 m

Grade of Concrete, fck = 30 N/mm2 Grade of Steel, fy = 500 N/mm2

Limiting Moment of Resistance Index = 0.133

+Z Face -Z Face

Clear Cover = Water Face ### Water Face ###

STAAD Group Analysis Report


Shear Membrane Bending Moment

Plate L/C SQX SQY SX SY (local) SXY Mx My kNm/m


(local) (local) (local) kN/m2 (local) kNm/m
kN/m2 kN/m2 kN/m2 kN/m2
Max Qx 3817 13 FULL1 179.092 -13.313 144.748 -143.683 -169.227 60.49 6.705

Min Qx 3817 14 FULL2-183.664 18.521 732.379 2.358 23.001 -63.432 -7.041

Max Qy 3757 13 FULL1 177.901 54.732 297.265 -114.777 -314.217 56.893 8.909

Min Qy 3757 14 FULL2-176.108 -45.309 228.873 -103.158 -300.132 -57.053 -8.855

Max Sx 3803 17 FULL 0.262 -0.03 2046.49 0.303 -50.172 0.19 0.009

Min Sx 3817 15 FULL3 -1.628 2.794 -1349.46 -405.481 -513.871 -1.35 -0.13

Max Sy 3743 17 FULL -0.283 0.339 1400.93 152.549 -315.85 0.143 -0.015

Min Sy 3743 18 EMPT 0.182 -0.029 -755.431 -510.65 946.067 -0.641 -0.089

Max Sxy 3743 18 EMPT 0.182 -0.029 -755.431 -510.65 946.067 -0.641 -0.089

Min Sxy 3817 18 EMPT 5.873 3.295 -1292.83 -481.089 -569.177 -0.213 -0.061

Max Mx 3802 13 FULL1 170.677 18.218 270.992 -144.009 -215.085 61.959 10.021

Min Mx 3802 14 FULL2-174.761 -11.787 419.479 -60.583 -88.517 -63.882 -10.297

Max My 3745 14 FULL2 5.622 29.762 747.706 -64.638 -59.195 23.444 15.696

Min My 3745 13 FULL1 -5.769 -29.863 724.266 -67.869 -85.814 -23.324 -15.575

Max Mxy 3753 14 FULL2 -57.66 -0.888 456.894 -77.279 -244.781 6.551 8.766

Min Mxy 3753 13 FULL1 57.308 0.107 436.305 -123.607 -291.847 -6.775 -8.637
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

Results from STADD output

Max Vertical BM in wall creating tension on Water Face Max My 15.70 kN-m/m

Max Horizontal BM in wall creating tension on Water Face Max Mx 61.96 kN-m/m

Tension corresponding to Max Mx Sx-Max Mx 0.271 N/mm2

Max Vertical BM in wall creating tension on Water Face Min My 15.58 kN-m/m

Max Horizontal BM in wall creating tension on Water Face Min Mx 63.88 kN-m/m

Tension corresponding to Min Mx Sx-Min Mx 0.419 N/mm2

Max Tension in Wall Max Sx 2.046 N/mm2

BM at wall corresponding to Max Sx on Water Face Mx-Max Sx 0.19 kN-m/m

Thickness check:
Required effective thickness SQRT(63.88x1000000x1.5/(0.133x30x1000))

Provided overall thickness

Min Ast for each surface zone (mm2/m) in % = 0.24 = 0.24x162x1000/100

Area of vertical reinforcement required on Water Face

Max My 15.70 kN-m/m

Effective Depth (mm) = 324-50-0.5x16

Mu / bd2 = 15.7x1.5x10^6/(1000x266^2)

Refer SP-16 Percentage of reinforcement required, %

Req area of Vertical reinf, Water Face, mm2 = MAX(0.078x266x1000/100,389)

Area of horizontal reinforcement required on Water Face

Max Mx 61.96 kN-m/ Corresponding Tension Sx = 0.271 N/mm2


Effective Depth (mm) = 324-50-0.5x20

Mu / bd2 = 61.96x1.5x10^6/(1000x264^2)
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
Refer SP-16 Percentage of reinforcement required, %

Required area of reinforcement for Mx, mm2 = 0.324x264x1000/100

Factored Tension, kN/m = 0.271x324x1.5

Required area of reinf on each face for Sx, mm2 = 0.5x131.7x1000/(0.8x500)

Req area of Hor reinf, Water Face, mm2 = MAX(855+165,389)

Area of vertical reinforcement required on Water Face

Min My 15.58 kN-m/m

Effective Depth (mm) = 324-45-0.5x16

Mu / bd2 = 15.58x1.5x10^6/(1000x271^2)

Refer SP-16 Percentage of reinforcement required, %

Req area of Vertical reinf, Water Face, mm2 = MAX(0.074x271x1000/100,389)


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
Area of horizontal reinforcement required on Water Face

Min Mx 63.88 kN-m/ Corresponding Tension Sx = 0.419 N/mm2


Effective Depth (mm) = 324-45-0.5x16

Mu / bd2 = 63.88x1.5x10^6/(1000x271^2)

Refer SP-16 Percentage of reinforcement required, %

Required area of reinforcement for Mx, mm2 = 0.317x271x1000/100

Factored Tension, N/m = 0.419x324x1.5

Required area of reinf on each face for Sx, mm2 = 0.5x203.6x1000/(0.8x500)

Req area of Hor reinf, Water Face, mm2 = MAX(859+255,389)

Ast Required Ast Provided

Vertical Water Face 389 00-000+16-180 1117

Hor Water Face 1020 00-000+20-100 3140

Vertical Water Face 389 00-000+16-180 1117

Hor Water Face 1114 00-000+20-100 1340

Check for Shear at Junction of Base and Wall

Max Qy, (13 FULL1) = 0.055 Min Qy, (14 FULL2) = -0.045
Factored Shear Stress, N/mm2 = 1.5x0.055

Percentage of Steel provided on Water Face

Thickness of wall
Factor k for thickness of slab (Refer Clause 40.2.1.1 of IS 456)

Factor for enhanced Shear Stress near the support (Refer Clause 40.5.1 of IS 456)

Maximum shear stress in concrete for limit state method of design, tc max
Permissible Shear Stress, N/mm2 (Value from Table 19 of IS 456 * k * Enhancement)
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W6-2 Check for Temperature Reinforcement (As per Annexure A of IS 3370 - 2009, Part 2)

Horizontal Direction

Ast Provided (both faces) = 3140+1340

Percentage of reinforcement provided = 4480/324/1000x100

Max spacing of cracks Smax = (fct/fb) * (f / 2 r) (2/3)x(0.5x(20+16)/2)x(100/1.38)

fct / fb = 2/3 for deformed bars as recommended in Code

Crack Width, Wmax = Smax * (a/2)* (T1 + T2)

435x(0.7/100000/2)x(15+15)

Permissible crack width = 0.1 mm, Hence OK


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
O.
20CDD003

28-Nov-18

R0

ding Moment

Mxy kNm/m

-0.19

-0.538

-4.087

3.607

-0.061

-0.004

-0.106

-0.107

-0.107

-0.26

-2.231

1.444

-7.894

7.813

17.934

-18.089
O.
20CDD003

28-Nov-18

R0

155 mm

324 mm

389

266.0

0.333

0.078

389

264.0

1.334
O.
20CDD003

28-Nov-18

R0
0.324

855

131.7

165

1020

271.0

0.318

0.074

389
O.
20CDD003

28-Nov-18

R0

271.0

1.305

0.317

859

203.6

255

1114

% Ast

0.420%

1.159%

0.423%

0.494%

0.083

0.420%

324 mm

3.50

0.460
O.
20CDD003

28-Nov-18

R0
O.
20CDD003

28-Nov-18

R0

4480 mm2

1.38

435 mm

0.05 mm
O.
20CDD003

28-Nov-18

R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W6-2 CRACK WIDTH - FLEXURE (IS 3370 Part 2 - 2009, Annexure B)

Vertical Limiting crack width, w

Max My Characteristic cube strength of Concrete, fck

Yield Strength of Steel, fy

Modulus Elasticity of Concrete Ec = 5000 x SQRT( fck )

Modulus Elasticity of Steel, Es

Applied Moment at service condition, M

σcbc = 10 N/mm2 Modular Ratio, m, 280/(3*σcbc) =

Breadth, b (mm) = 1000 Depth, h (mm) = 324

Reinf, Ast mm2 = 00-000+16-180 1117 Clear Cover, CC mm = 50

Reinf, Asc mm2 = 00-000+16-180 1117 Clear Cover, CC mm = 50

Effecive Depth, d = 324-50-0.5x16

Cover to the centre of compression steel, d' = 50+0.5x16

Max spacing of bars, S =

acr = maximum spacing of tensile bar from outer edge of concrete (mm)

= SQRT((0.5x180)^2+(50+0.5x16)^2)-0.5x16

Depth of NA from Compression face = x

Solve equation = (bx2/2) + (1.5m-1) Asc (x - d') - m Ast (d-x) = 0 to get x. x=

(x - d ') bxf c x
A sc fsc = (1.5 m -1) A sc f c (d - ) + A sc f sc (d - d ') = M
x 2 3
f c (d - x)
Ast f st = (m -1) A st
x Solve these equations to get fc

Stress in extreme compression fibre, fc

Stress in Tension reinforcement, fst = 9.33x1.95x(266-63.7)/63.7


Distance from compression face to point where crack width is being calculated, a

Strain at the level considered, ε1 = (h - x)fs/Es(d - x)

Strain due to stiffening effect in concrete, ε2 = 1.5b(h - x)(a - x)/(3EsAs(d - x))

εm = Average surface strain = ε1 - ε2

Crack Width, w = 3 acr εm/(1+2(acr - Cmin)/(h - x))


MENT NO.
RNALSTP20CDD003

28-Nov-18

R0

0.1 mm

30 N/mm2

500 N/mm2

2.7E+04 N/mm2

2.0E+05 N/mm2

15.70 kN-m

9.33

266 mm

58 mm

180 mm

99.1 mm

63.7 mm

1.95 N/mm2

57.8 N/mm2
324 mm

3.72E-04

7.50E-04

-3.78E-04

-0.082 mm
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W6-2 CRACK WIDTH - FLEXURE & TENSION (IS 3370 Part 2 - 2009, Annexure B)

Horizontal Limiting crack width, w

Max Mx Characteristic cube strength of Concrete, fck

Sx-Max Mx Yield Strength of Steel, fy


Modulus Elasticity of Concrete Ec = 5000 x SQRT( fck )

Modulus Elasticity of Steel, Es

Applied Moment at service condition, M

Applied Tension at service condition, N 87.804

σcbc = 10 N/mm2 Modular Ratio, m, 280/(3*σcbc) =

Breadth, b (mm) = 1000 Depth, h (mm) = 324

Reinf, Ast mm2 = 00-000+20-100 3140 Clear Cover, CC mm = 50

Reinf, Asc mm2 = 00-000+20-100 3140 Clear Cover, CC mm = 50

Distance between centroid of Ast and Asc, Zs = 324-50-0.5x20-50-0.5x20

Distance - Centroid of Ast to CG of Ast & Asc, Xs = 3140x204/(3140+3140)

Modified Moment M' = M - N * Xs

Modified moment, M' > 0, section is in bending

Effecive Depth, d = 324-50-0.5x20

Cover to the centre of compression steel, d' = 50+0.5x20


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

bxf c bxf c x
A st f st - - A sc f sc = N (d - ) + A sc f sc (d - d ') = M - N X S
2 2 3

f c (d - x) (x - d ')
Ast fst = (m -1) A st A sc f sc = (1.5 m -1) A sc f c
x x

Solve above equations to get the value of fc and x

Depth of NA from Compression face = x

Stress in extreme compression fibre, fc

Stress in Tension reinforcement, fst

= (9.33-1)x4.89x(264-76.08)/76.08

Distance from compression face to point where crack width is being calculated, a

Max spacing of bars, S =

acr = maximum spacing of tensile bar from outer edge of concrete (mm)

= SQRT((0.5x100)^2+(50+0.5x20)^2)-0.5x20

Strain at the level considered, ε1 = (h - x)fs/Es(d - x)

Strain due to stiffening effect in concrete, ε2 = 1.5b(h - x)(a - x)/(3EsAs(d - x))

εm = Average surface strain = ε1 - ε2

Crack Width, w = 3 acr εm/(1+2(acr - Cmin)/(h - x))


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
MENT NO.
NALSTP20CDD003

28-Nov-18

R0

0.1 mm

30 N/mm2

500 N/mm2

2.7E+04 N/mm2

2.0E+05 N/mm2

61.96 kN-m

87.80 kN

9.33

204.0 mm

102.0 mm

53.0 kN-m

264 mm

60 mm
MENT NO.
NALSTP20CDD003

28-Nov-18

R0

d ') = M - N X S

76.08 mm

4.89 N/mm2

100.6 N/mm2

324 mm

100 mm

68.1 mm

6.64E-04

2.60E-04

4.03E-04

0.072 mm
MENT NO.
NALSTP20CDD003

28-Nov-18

R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W6-2 CRACK WIDTH - FLEXURE & TENSION (IS 3370 Part 2 - 2009, Annexure B)

Horizontal Limiting crack width, w

Max Sx Characteristic cube strength of Concrete, fck

Mx-Max Sx Yield Strength of Steel, fy


Modulus Elasticity of Concrete Ec = 5000 x SQRT( fck )

Modulus Elasticity of Steel, Es

Applied Moment at service condition, M

Applied Tension at service condition, N 662.904

σcbc = 10 N/mm2 Modular Ratio, m, 280/(3*σcbc) =

Breadth, b (mm) = 1000 Depth, h (mm) = 324

Reinf, Ast mm2 = 00-000+20-100 3140 Clear Cover, CC mm = 50

Reinf, Asc mm2 = 00-000+20-100 3140 Clear Cover, CC mm = 50

Distance between centroid of Ast and Asc, Zs = 324-50-0.5x20-50-0.5x20

Distance - Centroid of Ast to CG of Ast & Asc, Xs

= 3140x204/(3140+3140)

Modified Moment M' = M - N * Xs

Modified moment, M' < 0, section in tension


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

Effecive Depth, d = 324-50-0.5x20

Cover to the centre of compression steel, d' = 50+0.5x20

Tension excess tensile face, T'

= (662.9x3140/(3140+3140))+(0.19x1000/(264-60))

Tension less tensile face, T''

= (662.9x3140/(3140+3140))-(0.19x1000/(264-60))

Stress in Tension reinforcement, fst = 332.381x1000/3140

Total Concrete Area, Ac = 1000x324+(9.33-1)x(3140+3140)

Direct Tension in Concrete, fct = 662.9x1000/376312.4

Max spacing of bars, S =

acr = maximum spacing of tensile bar from outer edge of concrete (mm)

= SQRT((0.5x100)^2+(50+0.5x20)^2)-0.5x20

Strain at the level considered, ε1 = fs / Es

Strain due to stiffening effect in concrete, ε2 = bD/EsAs


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
εm = Average surface strain = ε1 - ε2

Crack Width, w = 3 acr εm


MENT NO.
NALSTP20CDD003

28-Nov-18

R0

0.1 mm

30 N/mm2

500 N/mm2

2.7E+04 N/mm2

2.0E+05 N/mm2

0.19 kN-m

662.90 kN

9.33

204.0 mm

102.0 mm

-67.4 kN-m
MENT NO.
NALSTP20CDD003

28-Nov-18

R0
MENT NO.
NALSTP20CDD003

28-Nov-18

R0

264 mm

60 mm

332.4 kN

330.5 kN

105.9 N/mm2

3.8E+05 mm2

1.76 N/mm2

100 mm

68.1 mm

5.29E-04

2.58E-04
MENT NO.
NALSTP20CDD003

28-Nov-18

R0
2.71E-04

0.055 mm
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

DESIGN OF WALL W6A


NT NO.
LSTP20CDD003

28-Nov-18

R0

A
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W6A-DATA DESIGN OF WALL W6A

DESIGNED THICKNESS
Height from bottom 0.00 1.80 6.70
Designed Thickness 400 400 300
Provided Thickness 400 400 300

Length of Wall = 7.60 m

Minimum reinforcement as per clause 8.1.1 of IS 3370 (Part 2) - 2009 0.24 %

Height Thickness Thickness for Temp.


Group Avg Th
From To From To From To Avg. Th
1 0.00 2.00 400 396 398 400 396 398
2 2.00 4.50 396 345 370 396 345 370
3 4.50 6.70 345 300 322 345 300 322

Direction and Type of Fill BOW BOF TOW TOF HOF

+Z Water Face Liquid 231.30 231.30 238.00 238.00 6.70

-Z Water Face Liquid 231.30 231.30 238.00 238.00 6.70

Fill k r Pressure Additional Loads, if any

+Z 1.00 10.30 69.01

-Z 1.00 10.30 69.01


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
O.
20CDD003

28-Nov-18

R0
O.
20CDD003

28-Nov-18

R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W6A-1 DESIGN OF WALL W6A GROUP 1 Height from 0.00 to 2.00 m

Grade of Concrete, fck = 30 N/mm2 Grade of Steel, fy = 500 N/mm2

Limiting Moment of Resistance Index = 0.133

+Z Face -Z Face

Clear Cover = Water Face ### Water Face ###

STAAD Group Analysis Report


Shear Membrane Bending Moment

Plate L/C SQX SQY SX SY (local) SXY Mx My kNm/m


(local) (local) (local) kN/m2 (local) kNm/m
kN/m2 kN/m2 kN/m2 kN/m2
Max Qx 3845 13 FULL1 326.265 409.11 1316.88 10.331 735.6 22.334 37.552

Min Qx 3845 14 FULL2-317.255 -393.996 1289.77 7.514 759.309 -21.248 -36.593

Max Qy 3845 13 FULL1 326.265 409.11 1316.88 10.331 735.6 22.334 37.552

Min Qy 3845 14 FULL2-317.255 -393.996 1289.77 7.514 759.309 -21.248 -36.593

Max Sx 3845 19 SERVI -10.01 -15.994 2116.034 -346.657 1671.708 -1.513 -1.249

Min Sx 3845 15 FULL3 1.822 4.987 -162.237 -853.404 435.799 0.141 0.403

Max Sy 3845 17 FULL 1.175 0.911 2099.45 387.633 802.727 0.15 -0.114

Min Sy 3845 18 EMPT -11.32 -16.842 357.304 -1118.411 1391.029 -1.749 -1.152

Max Sxy 3845 19 SERVI -10.01 -15.994 2116.034 -346.657 1671.708 -1.513 -1.249

Min Sxy 3840 17 FULL -1.41 0.856 672.137 -54.629 -175.343 0.379 0.062

Max Mx 3845 13 FULL1 326.265 409.11 1316.88 10.331 735.6 22.334 37.552

Min Mx 3845 14 FULL2-317.255 -393.996 1289.77 7.514 759.309 -21.248 -36.593

Max My 3845 13 FULL1 326.265 409.11 1316.88 10.331 735.6 22.334 37.552

Min My 3845 14 FULL2-317.255 -393.996 1289.77 7.514 759.309 -21.248 -36.593

Max Mxy 3841 13 FULL1 -56.384 9.166 420.802 -109.953 96.932 -5.114 -0.336

Min Mxy 3841 14 FULL2 56.124 -8.008 401.621 -98.7 128.684 5.06 0.521
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

Results from STADD output

Max Vertical BM in wall creating tension on Water Face Max My 37.55 kN-m/m

Max Horizontal BM in wall creating tension on Water Face Max Mx 22.33 kN-m/m

Tension corresponding to Max Mx Sx-Max Mx 1.317 N/mm2

Max Vertical BM in wall creating tension on Water Face Min My 36.59 kN-m/m

Max Horizontal BM in wall creating tension on Water Face Min Mx 21.25 kN-m/m

Tension corresponding to Min Mx Sx-Min Mx 1.29 N/mm2

Max Tension in Wall Max Sx 2.116 N/mm2

BM at wall corresponding to Max Sx on Water Face Mx-Max Sx 1.51 kN-m/m

Thickness check:
Required effective thickness SQRT(37.55x1000000x1.5/(0.133x30x1000))

Provided overall thickness

Min Ast for each surface zone (mm2/m) in % = 0.24 = 0.24x199x1000/100

Area of vertical reinforcement required on Water Face

Max My 37.55 kN-m/m

Effective Depth (mm) = 398-50-0.5x16

Mu / bd2 = 37.55x1.5x10^6/(1000x340^2)

Refer SP-16 Percentage of reinforcement required, %

Req area of Vertical reinf, Water Face, mm2 = MAX(0.114x340x1000/100,478)

Area of horizontal reinforcement required on Water Face

Max Mx 22.33 kN-m/ Corresponding Tension Sx = 1.317 N/mm2


Effective Depth (mm) = 398-50-0.5x20

Mu / bd2 = 22.33x1.5x10^6/(1000x338^2)
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
Refer SP-16 Percentage of reinforcement required, %

Required area of reinforcement for Mx, mm2 = 0.068x338x1000/100

Factored Tension, kN/m = 1.317x398x1.5

Required area of reinf on each face for Sx, mm2 = 0.5x786.2x1000/(0.8x500)

Req area of Hor reinf, Water Face, mm2 = MAX(230+983,478)

Area of vertical reinforcement required on Water Face

Min My 36.59 kN-m/m

Effective Depth (mm) = 398-45-0.5x16

Mu / bd2 = 36.59x1.5x10^6/(1000x345^2)

Refer SP-16 Percentage of reinforcement required, %

Req area of Vertical reinf, Water Face, mm2 = MAX(0.108x345x1000/100,478)


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
Area of horizontal reinforcement required on Water Face

Min Mx 21.25 kN-m/ Corresponding Tension Sx = 1.290 N/mm2


Effective Depth (mm) = 398-45-0.5x20

Mu / bd2 = 21.25x1.5x10^6/(1000x343^2)

Refer SP-16 Percentage of reinforcement required, %

Required area of reinforcement for Mx, mm2 = 0.063x343x1000/100

Factored Tension, N/m = 1.29x398x1.5

Required area of reinf on each face for Sx, mm2 = 0.5x770.1x1000/(0.8x500)

Req area of Hor reinf, Water Face, mm2 = MAX(216+963,478)

Ast Required Ast Provided

Vertical Water Face 478 16-180+16-180 2233

Hor Water Face 1213 00-000+20-120 2617

Vertical Water Face 478 16-180+16-180 2233

Hor Water Face 1179 00-000+20-120 2617

Check for Shear at Junction of Base and Wall

Max Qy, (13 FULL1) = 0.409 Min Qy, (14 FULL2) = -0.394
Factored Shear Stress, N/mm2 = 1.5x0.409

Percentage of Steel provided on Water Face

Thickness of wall
Factor k for thickness of slab (Refer Clause 40.2.1.1 of IS 456)

Factor for enhanced Shear Stress near the support (Refer Clause 40.5.1 of IS 456)

Maximum shear stress in concrete for limit state method of design, tc max
Permissible Shear Stress, N/mm2 (Value from Table 19 of IS 456 * k * Enhancement)
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W6A-1 Check for Temperature Reinforcement (As per Annexure A of IS 3370 - 2009, Part 2)

Horizontal Direction

Ast Provided (both faces) = 2617+2617

Percentage of reinforcement provided = 5234/398/1000x100

Max spacing of cracks Smax = (fct/fb) * (f / 2 r) (2/3)x(0.5x(20+20)/2)x(100/1.32)

fct / fb = 2/3 for deformed bars as recommended in Code

Crack Width, Wmax = Smax * (a/2)* (T1 + T2)

505x(0.7/100000/2)x(15+15)

Permissible crack width = 0.1 mm, Hence OK


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
O.
20CDD003

28-Nov-18

R0

ding Moment

Mxy kNm/m

-2.226

2.52

-2.226

2.52

0.002

0.088

0.188

-0.167

0.002

-0.373

-2.226

2.52

-2.226

2.52

10.267

-10.632
O.
20CDD003

28-Nov-18

R0

119 mm

398 mm

478

340.0

0.487

0.114

478

338.0

0.293
O.
20CDD003

28-Nov-18

R0
0.068

230

786.2

983

1213

345.0

0.461

0.108

478
O.
20CDD003

28-Nov-18

R0

343.0

0.271

0.063

216

770.1

963

1179

% Ast

0.657%

0.759%

0.661%

0.763%

0.614

0.657%

398 mm

2.7

3.50

1.512
O.
20CDD003

28-Nov-18

R0
O.
20CDD003

28-Nov-18

R0

5234 mm2

1.32

505 mm

0.05 mm
O.
20CDD003

28-Nov-18

R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W6A-1 CRACK WIDTH - FLEXURE (IS 3370 Part 2 - 2009, Annexure B)

Vertical Limiting crack width, w

Max My Characteristic cube strength of Concrete, fck

Yield Strength of Steel, fy

Modulus Elasticity of Concrete Ec = 5000 x SQRT( fck )

Modulus Elasticity of Steel, Es

Applied Moment at service condition, M

σcbc = 10 N/mm2 Modular Ratio, m, 280/(3*σcbc) =

Breadth, b (mm) = 1000 Depth, h (mm) = 398

Reinf, Ast mm2 = 16-180+16-180 2233 Clear Cover, CC mm = 50

Reinf, Asc mm2 = 16-180+16-180 2233 Clear Cover, CC mm = 50

Effecive Depth, d = 398-50-0.5x16

Cover to the centre of compression steel, d' = 50+0.5x16

Max spacing of bars, S =

acr = maximum spacing of tensile bar from outer edge of concrete (mm)

= SQRT((0.5x90)^2+(50+0.5x16)^2)-0.5x16

Depth of NA from Compression face = x

Solve equation = (bx2/2) + (1.5m-1) Asc (x - d') - m Ast (d-x) = 0 to get x. x=

(x - d ') bxf c x
A sc fsc = (1.5 m -1) A sc f c (d - ) + A sc f sc (d - d ') = M
x 2 3
f c (d - x)
Ast f st = (m -1) A st
x Solve these equations to get fc

Stress in extreme compression fibre, fc

Stress in Tension reinforcement, fst = 9.33x2.19x(340-91.6)/91.6


Distance from compression face to point where crack width is being calculated, a

Strain at the level considered, ε1 = (h - x)fs/Es(d - x)

Strain due to stiffening effect in concrete, ε2 = 1.5b(h - x)(a - x)/(3EsAs(d - x))

εm = Average surface strain = ε1 - ε2

Crack Width, w = 3 acr εm/(1+2(acr - Cmin)/(h - x))


MENT NO.
RNALSTP20CDD003

28-Nov-18

R0

0.1 mm

30 N/mm2

500 N/mm2

2.7E+04 N/mm2

2.0E+05 N/mm2

37.55 kN-m

9.33

340 mm

58 mm

90 mm

65.4 mm

91.6 mm

2.19 N/mm2

55.4 N/mm2
398 mm

3.42E-04

4.23E-04

-8.14E-05

-0.015 mm
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W6A-1 CRACK WIDTH - FLEXURE & TENSION (IS 3370 Part 2 - 2009, Annexure B)

Horizontal Limiting crack width, w

Max Mx Characteristic cube strength of Concrete, fck

Sx-Max Mx Yield Strength of Steel, fy


Modulus Elasticity of Concrete Ec = 5000 x SQRT( fck )

Modulus Elasticity of Steel, Es

Applied Moment at service condition, M

Applied Tension at service condition, N 524.166

σcbc = 10 N/mm2 Modular Ratio, m, 280/(3*σcbc) =

Breadth, b (mm) = 1000 Depth, h (mm) = 398

Reinf, Ast mm2 = 00-000+20-120 2617 Clear Cover, CC mm = 50

Reinf, Asc mm2 = 00-000+20-120 2617 Clear Cover, CC mm = 50

Distance between centroid of Ast and Asc, Zs = 398-50-0.5x20-50-0.5x20

Distance - Centroid of Ast to CG of Ast & Asc, Xs

= 2617x278/(2617+2617)

Modified Moment M' = M - N * Xs

Modified moment, M' < 0, section in tension


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

Effecive Depth, d = 398-50-0.5x20

Cover to the centre of compression steel, d' = 50+0.5x20

Tension excess tensile face, T'

= (524.17x2617/(2617+2617))+(22.33x1000/(338-60))

Tension less tensile face, T''

= (524.17x2617/(2617+2617))-(22.33x1000/(338-60))

Stress in Tension reinforcement, fst = 342.409x1000/2617

Total Concrete Area, Ac = 1000x398+(9.33-1)x(2617+2617)

Direct Tension in Concrete, fct = 524.17x1000/441599.2

Max spacing of bars, S =

acr = maximum spacing of tensile bar from outer edge of concrete (mm)

= SQRT((0.5x120)^2+(50+0.5x20)^2)-0.5x20

Strain at the level considered, ε1 = fs / Es

Strain due to stiffening effect in concrete, ε2 = bD/EsAs


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
εm = Average surface strain = ε1 - ε2

Crack Width, w = 3 acr εm


MENT NO.
NALSTP20CDD003

28-Nov-18

R0

0.1 mm

30 N/mm2

500 N/mm2

2.7E+04 N/mm2

2.0E+05 N/mm2

22.33 kN-m

524.17 kN

9.33

278.0 mm

139.0 mm

-50.5 kN-m
MENT NO.
NALSTP20CDD003

28-Nov-18

R0
MENT NO.
NALSTP20CDD003

28-Nov-18

R0

338 mm

60 mm

342.4 kN

181.8 kN

130.8 N/mm2

4.4E+05 mm2

1.19 N/mm2

120 mm

74.9 mm

6.54E-04

3.80E-04
MENT NO.
NALSTP20CDD003

28-Nov-18

R0
2.74E-04

0.062 mm
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W6A-1 CRACK WIDTH - FLEXURE & TENSION (IS 3370 Part 2 - 2009, Annexure B)

Horizontal Limiting crack width, w

Max Sx Characteristic cube strength of Concrete, fck

Mx-Max Sx Yield Strength of Steel, fy


Modulus Elasticity of Concrete Ec = 5000 x SQRT( fck )

Modulus Elasticity of Steel, Es

Applied Moment at service condition, M

Applied Tension at service condition, N 842.168

σcbc = 10 N/mm2 Modular Ratio, m, 280/(3*σcbc) =

Breadth, b (mm) = 1000 Depth, h (mm) = 398

Reinf, Ast mm2 = 00-000+20-120 2617 Clear Cover, CC mm = 50

Reinf, Asc mm2 = 00-000+20-120 2617 Clear Cover, CC mm = 50

Distance between centroid of Ast and Asc, Zs = 398-50-0.5x20-50-0.5x20

Distance - Centroid of Ast to CG of Ast & Asc, Xs

= 2617x278/(2617+2617)

Modified Moment M' = M - N * Xs

Modified moment, M' < 0, section in tension


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

Effecive Depth, d = 398-50-0.5x20

Cover to the centre of compression steel, d' = 50+0.5x20

Tension excess tensile face, T'

= (842.17x2617/(2617+2617))+(1.51x1000/(338-60))

Tension less tensile face, T''

= (842.17x2617/(2617+2617))-(1.51x1000/(338-60))

Stress in Tension reinforcement, fst = 426.517x1000/2617

Total Concrete Area, Ac = 1000x398+(9.33-1)x(2617+2617)

Direct Tension in Concrete, fct = 842.17x1000/441599.2

Max spacing of bars, S =

acr = maximum spacing of tensile bar from outer edge of concrete (mm)

= SQRT((0.5x120)^2+(50+0.5x20)^2)-0.5x20

Strain at the level considered, ε1 = fs / Es

Strain due to stiffening effect in concrete, ε2 = bD/EsAs


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
εm = Average surface strain = ε1 - ε2

Crack Width, w = 3 acr εm


MENT NO.
NALSTP20CDD003

28-Nov-18

R0

0.1 mm

30 N/mm2

500 N/mm2

2.7E+04 N/mm2

2.0E+05 N/mm2

1.51 kN-m

842.17 kN

9.33

278.0 mm

139.0 mm

-115.6 kN-m
MENT NO.
NALSTP20CDD003

28-Nov-18

R0
MENT NO.
NALSTP20CDD003

28-Nov-18

R0

338 mm

60 mm

426.5 kN

415.7 kN

163.0 N/mm2

4.4E+05 mm2

1.91 N/mm2

120 mm

74.9 mm

8.15E-04

3.80E-04
MENT NO.
NALSTP20CDD003

28-Nov-18

R0
4.35E-04

0.098 mm
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W6A-2 DESIGN OF WALL W6A GROUP 2 Height from 2.00 to 4.50 m

Grade of Concrete, fck = 30 N/mm2 Grade of Steel, fy = 500 N/mm2

Limiting Moment of Resistance Index = 0.133

+Z Face -Z Face

Clear Cover = Water Face ### Water Face ###

STAAD Group Analysis Report


Shear Membrane Bending Moment

Plate L/C SQX SQY SX SY (local) SXY Mx My kNm/m


(local) (local) (local) kN/m2 (local) kNm/m
kN/m2 kN/m2 kN/m2 kN/m2
Max Qx 3852 13 FULL1 464.515 -350.575 1518.24 69.176 -503.733 22.656 57.489

Min Qx 3852 14 FULL2-457.517 343.661 1487.21 64.015 -455.174 -21.569 -56.722

Max Qy 3852 14 FULL2-457.517 343.661 1487.21 64.015 -455.174 -21.569 -56.722

Min Qy 3852 13 FULL1 464.515 -350.575 1518.24 69.176 -503.733 22.656 57.489

Max Sx 3852 17 FULL -1.235 0.249 2409.75 546.741 -1061.942 0.119 -0.408

Min Sx 3879 18 EMPT -0.356 -0.089 -619.924 -777.183 1233.493 -0.719 -0.033

Max Sy 3852 17 FULL -1.235 0.249 2409.75 546.741 -1061.942 0.119 -0.408

Min Sy 3852 18 EMPT -10.665 10.1 276.422 -1319.158 1038.676 -1.822 -1.14

Max Sxy 3878 18 EMPT -0.613 -0.44 -604.914 -832.324 1296.076 -0.666 0.011

Min Sxy 3852 17 FULL -1.235 0.249 2409.75 546.741 -1061.942 0.119 -0.408

Max Mx 3875 13 FULL1-172.163 46.268 741.341 -19.644 -102.601 43.225 6.041

Min Mx 3875 14 FULL2 172.18 -46.18 730.691 -23.681 -80.01 -42.971 -5.88

Max My 3852 13 FULL1 464.515 -350.575 1518.24 69.176 -503.733 22.656 57.489

Min My 3852 14 FULL2-457.517 343.661 1487.21 64.015 -455.174 -21.569 -56.722

Max Mxy 3865 13 FULL1 17.6 -61.449 699.827 50.572 -196.806 -12.49 1.371

Min Mxy 3865 14 FULL2 -17.378 60.848 692.551 50.203 -159.498 12.854 -1.12
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

Results from STADD output

Max Vertical BM in wall creating tension on Water Face Max My 57.49 kN-m/m

Max Horizontal BM in wall creating tension on Water Face Max Mx 43.23 kN-m/m

Tension corresponding to Max Mx Sx-Max Mx 0.741 N/mm2

Max Vertical BM in wall creating tension on Water Face Min My 56.72 kN-m/m

Max Horizontal BM in wall creating tension on Water Face Min Mx 42.97 kN-m/m

Tension corresponding to Min Mx Sx-Min Mx 0.731 N/mm2

Max Tension in Wall Max Sx 2.41 N/mm2

BM at wall corresponding to Max Sx on Water Face Mx-Max Sx 0.12 kN-m/m

Thickness check:
Required effective thickness SQRT(57.49x1000000x1.5/(0.133x30x1000))

Provided overall thickness

Min Ast for each surface zone (mm2/m) in % = 0.24 = 0.24x185x1000/100

Area of vertical reinforcement required on Water Face

Max My 57.49 kN-m/m

Effective Depth (mm) = 370-50-0.5x16

Mu / bd2 = 57.49x1.5x10^6/(1000x312^2)

Refer SP-16 Percentage of reinforcement required, %

Req area of Vertical reinf, Water Face, mm2 = MAX(0.211x312x1000/100,444)

Area of horizontal reinforcement required on Water Face

Max Mx 43.23 kN-m/ Corresponding Tension Sx = 0.741 N/mm2


Effective Depth (mm) = 370-50-0.5x20

Mu / bd2 = 43.23x1.5x10^6/(1000x310^2)
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
Refer SP-16 Percentage of reinforcement required, %

Required area of reinforcement for Mx, mm2 = 0.159x310x1000/100

Factored Tension, kN/m = 0.741x370x1.5

Required area of reinf on each face for Sx, mm2 = 0.5x411.3x1000/(0.8x500)

Req area of Hor reinf, Water Face, mm2 = MAX(493+514,444)

Area of vertical reinforcement required on Water Face

Min My 56.72 kN-m/m

Effective Depth (mm) = 370-45-0.5x16

Mu / bd2 = 56.72x1.5x10^6/(1000x317^2)

Refer SP-16 Percentage of reinforcement required, %

Req area of Vertical reinf, Water Face, mm2 = MAX(0.202x317x1000/100,444)


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
Area of horizontal reinforcement required on Water Face

Min Mx 42.97 kN-m/ Corresponding Tension Sx = 0.731 N/mm2


Effective Depth (mm) = 370-45-0.5x20

Mu / bd2 = 42.97x1.5x10^6/(1000x315^2)

Refer SP-16 Percentage of reinforcement required, %

Required area of reinforcement for Mx, mm2 = 0.153x315x1000/100

Factored Tension, N/m = 0.731x370x1.5

Required area of reinf on each face for Sx, mm2 = 0.5x405.7x1000/(0.8x500)

Req area of Hor reinf, Water Face, mm2 = MAX(482+507,444)

Ast Required Ast Provided

Vertical Water Face 658 16-180+16-180 2233

Hor Water Face 1007 00-000+20-100 3140

Vertical Water Face 640 16-180+16-180 2233

Hor Water Face 989 00-000+20-100 3140

Check for Shear at Junction of Base and Wall

Max Qy, (14 FULL2) = 0.344 Min Qy, (13 FULL1) = -0.351
Factored Shear Stress, N/mm2 = 1.5x0.351

Percentage of Steel provided on Water Face

Thickness of wall
Factor k for thickness of slab (Refer Clause 40.2.1.1 of IS 456)

Factor for enhanced Shear Stress near the support (Refer Clause 40.5.1 of IS 456)

Maximum shear stress in concrete for limit state method of design, tc max
Permissible Shear Stress, N/mm2 (Value from Table 19 of IS 456 * k * Enhancement)
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W6A-2 Check for Temperature Reinforcement (As per Annexure A of IS 3370 - 2009, Part 2)

Horizontal Direction

Ast Provided (both faces) = 3140+3140

Percentage of reinforcement provided = 6280/370/1000x100

Max spacing of cracks Smax = (fct/fb) * (f / 2 r) (2/3)x(0.5x(20+20)/2)x(100/1.7)

fct / fb = 2/3 for deformed bars as recommended in Code

Crack Width, Wmax = Smax * (a/2)* (T1 + T2)

392x(0.7/100000/2)x(15+15)

Permissible crack width = 0.1 mm, Hence OK


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
O.
20CDD003

28-Nov-18

R0

ding Moment

Mxy kNm/m

5.157

-5.171

-5.171

5.157

0.01

-0.026

0.01

0.211

0.035

0.01

5.985

-6.115

5.157

-5.171

23.271

-23.303
O.
20CDD003

28-Nov-18

R0

147 mm

370 mm

444

312.0

0.886

0.211

658

310.0

0.675
O.
20CDD003

28-Nov-18

R0
0.159

493

411.3

514

1007

317.0

0.847

0.202

640
O.
20CDD003

28-Nov-18

R0

315.0

0.650

0.153

482

405.7

507

989

% Ast

0.716%

0.991%

0.720%

0.997%

0.527

0.716%

370 mm

3.50

0.580
O.
20CDD003

28-Nov-18

R0
O.
20CDD003

28-Nov-18

R0

6280 mm2

1.70

392 mm

0.04 mm
O.
20CDD003

28-Nov-18

R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W6A-2 CRACK WIDTH - FLEXURE (IS 3370 Part 2 - 2009, Annexure B)

Vertical Limiting crack width, w

Max My Characteristic cube strength of Concrete, fck

Yield Strength of Steel, fy

Modulus Elasticity of Concrete Ec = 5000 x SQRT( fck )

Modulus Elasticity of Steel, Es

Applied Moment at service condition, M

σcbc = 10 N/mm2 Modular Ratio, m, 280/(3*σcbc) =

Breadth, b (mm) = 1000 Depth, h (mm) = 370

Reinf, Ast mm2 = 16-180+16-180 2233 Clear Cover, CC mm = 50

Reinf, Asc mm2 = 16-180+16-180 2233 Clear Cover, CC mm = 50

Effecive Depth, d = 370-50-0.5x16

Cover to the centre of compression steel, d' = 50+0.5x16

Max spacing of bars, S =

acr = maximum spacing of tensile bar from outer edge of concrete (mm)

= SQRT((0.5x90)^2+(50+0.5x16)^2)-0.5x16

Depth of NA from Compression face = x

Solve equation = (bx2/2) + (1.5m-1) Asc (x - d') - m Ast (d-x) = 0 to get x. x=

(x - d ') bxf c x
A sc fsc = (1.5 m -1) A sc f c (d - ) + A sc f sc (d - d ') = M
x 2 3
f c (d - x)
Ast f st = (m -1) A st
x Solve these equations to get fc

Stress in extreme compression fibre, fc

Stress in Tension reinforcement, fst = 9.33x3.87x(312-87.4)/87.4


Distance from compression face to point where crack width is being calculated, a

Strain at the level considered, ε1 = (h - x)fs/Es(d - x)

Strain due to stiffening effect in concrete, ε2 = 1.5b(h - x)(a - x)/(3EsAs(d - x))

εm = Average surface strain = ε1 - ε2

Crack Width, w = 3 acr εm/(1+2(acr - Cmin)/(h - x))


MENT NO.
RNALSTP20CDD003

28-Nov-18

R0

0.1 mm

30 N/mm2

500 N/mm2

2.7E+04 N/mm2

2.0E+05 N/mm2

57.49 kN-m

9.33

312 mm

58 mm

90 mm

65.4 mm

87.4 mm

3.87 N/mm2

92.8 N/mm2
370 mm

5.84E-04

3.98E-04

1.86E-04

0.033 mm
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W6A-2 CRACK WIDTH - FLEXURE & TENSION (IS 3370 Part 2 - 2009, Annexure B)

Horizontal Limiting crack width, w

Max Mx Characteristic cube strength of Concrete, fck

Sx-Max Mx Yield Strength of Steel, fy


Modulus Elasticity of Concrete Ec = 5000 x SQRT( fck )

Modulus Elasticity of Steel, Es

Applied Moment at service condition, M

Applied Tension at service condition, N 274.17

σcbc = 10 N/mm2 Modular Ratio, m, 280/(3*σcbc) =

Breadth, b (mm) = 1000 Depth, h (mm) = 370

Reinf, Ast mm2 = 00-000+20-100 3140 Clear Cover, CC mm = 50

Reinf, Asc mm2 = 00-000+20-100 3140 Clear Cover, CC mm = 50

Distance between centroid of Ast and Asc, Zs = 370-50-0.5x20-50-0.5x20

Distance - Centroid of Ast to CG of Ast & Asc, Xs = 3140x250/(3140+3140)

Modified Moment M' = M - N * Xs

Modified moment, M' > 0, section is in bending

Effecive Depth, d = 370-50-0.5x20

Cover to the centre of compression steel, d' = 50+0.5x20


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

bxf c bxf c x
A st f st - - A sc f sc = N (d - ) + A sc f sc (d - d ') = M - N X S
2 2 3

f c (d - x) (x - d ')
Ast fst = (m -1) A st A sc f sc = (1.5 m -1) A sc f c
x x

Solve above equations to get the value of fc and x

Depth of NA from Compression face = x

Stress in extreme compression fibre, fc

Stress in Tension reinforcement, fst

= (9.33-1)x2.08x(310-47.49)/47.49

Distance from compression face to point where crack width is being calculated, a

Max spacing of bars, S =

acr = maximum spacing of tensile bar from outer edge of concrete (mm)

= SQRT((0.5x100)^2+(50+0.5x20)^2)-0.5x20

Strain at the level considered, ε1 = (h - x)fs/Es(d - x)

Strain due to stiffening effect in concrete, ε2 = 1.5b(h - x)(a - x)/(3EsAs(d - x))

εm = Average surface strain = ε1 - ε2

Crack Width, w = 3 acr εm/(1+2(acr - Cmin)/(h - x))


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
MENT NO.
NALSTP20CDD003

28-Nov-18

R0

0.1 mm

30 N/mm2

500 N/mm2

2.7E+04 N/mm2

2.0E+05 N/mm2

43.23 kN-m

274.17 kN

9.33

250.0 mm

125.0 mm

9.0 kN-m

310 mm

60 mm
MENT NO.
NALSTP20CDD003

28-Nov-18

R0

d ') = M - N X S

47.49 mm

2.08 N/mm2

95.8 N/mm2

370 mm

100 mm

68.1 mm

5.88E-04

3.15E-04

2.73E-04

0.050 mm
MENT NO.
NALSTP20CDD003

28-Nov-18

R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W6A-2 CRACK WIDTH - FLEXURE & TENSION (IS 3370 Part 2 - 2009, Annexure B)

Horizontal Limiting crack width, w

Max Sx Characteristic cube strength of Concrete, fck

Mx-Max Sx Yield Strength of Steel, fy


Modulus Elasticity of Concrete Ec = 5000 x SQRT( fck )

Modulus Elasticity of Steel, Es

Applied Moment at service condition, M

Applied Tension at service condition, N 891.7

σcbc = 10 N/mm2 Modular Ratio, m, 280/(3*σcbc) =

Breadth, b (mm) = 1000 Depth, h (mm) = 370

Reinf, Ast mm2 = 00-000+20-100 3140 Clear Cover, CC mm = 50

Reinf, Asc mm2 = 00-000+20-100 3140 Clear Cover, CC mm = 50

Distance between centroid of Ast and Asc, Zs = 370-50-0.5x20-50-0.5x20

Distance - Centroid of Ast to CG of Ast & Asc, Xs

= 3140x250/(3140+3140)

Modified Moment M' = M - N * Xs

Modified moment, M' < 0, section in tension


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

Effecive Depth, d = 370-50-0.5x20

Cover to the centre of compression steel, d' = 50+0.5x20

Tension excess tensile face, T'

= (891.7x3140/(3140+3140))+(0.12x1000/(310-60))

Tension less tensile face, T''

= (891.7x3140/(3140+3140))-(0.12x1000/(310-60))

Stress in Tension reinforcement, fst = 446.33x1000/3140

Total Concrete Area, Ac = 1000x370+(9.33-1)x(3140+3140)

Direct Tension in Concrete, fct = 891.7x1000/422312.4

Max spacing of bars, S =

acr = maximum spacing of tensile bar from outer edge of concrete (mm)

= SQRT((0.5x100)^2+(50+0.5x20)^2)-0.5x20

Strain at the level considered, ε1 = fs / Es

Strain due to stiffening effect in concrete, ε2 = bD/EsAs


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
εm = Average surface strain = ε1 - ε2

Crack Width, w = 3 acr εm


MENT NO.
NALSTP20CDD003

28-Nov-18

R0

0.1 mm

30 N/mm2

500 N/mm2

2.7E+04 N/mm2

2.0E+05 N/mm2

0.12 kN-m

891.70 kN

9.33

250.0 mm

125.0 mm

-111.3 kN-m
MENT NO.
NALSTP20CDD003

28-Nov-18

R0
MENT NO.
NALSTP20CDD003

28-Nov-18

R0

310 mm

60 mm

446.3 kN

445.4 kN

142.1 N/mm2

4.2E+05 mm2

2.11 N/mm2

100 mm

68.1 mm

7.11E-04

2.95E-04
MENT NO.
NALSTP20CDD003

28-Nov-18

R0
4.16E-04

0.085 mm
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W6A-3 DESIGN OF WALL W6A GROUP 3 Height from 4.50 to 6.70 m

Grade of Concrete, fck = 30 N/mm2 Grade of Steel, fy = 500 N/mm2

Limiting Moment of Resistance Index = 0.133

+Z Face -Z Face

Clear Cover = Water Face ### Water Face ###

STAAD Group Analysis Report


Shear Membrane Bending Moment

Plate L/C SQX SQY SX SY (local) SXY Mx My kNm/m


(local) (local) (local) kN/m2 (local) kNm/m
kN/m2 kN/m2 kN/m2 kN/m2
Max Qx 3911 14 FULL2 181.427 2.781 1493.28 8.503 -84.193 -31.694 -1.485

Min Qx 3911 13 FULL1-180.241 -2.999 1503.27 9.359 -90.663 31.855 1.497

Max Qy 3882 13 FULL1-172.435 43.324 792.631 21.157 -120.928 47.732 6.98

Min Qy 3882 14 FULL2 172.33 -43.257 786.265 13.753 -99.905 -47.466 -6.831

Max Sx 3911 17 FULL 0.629 -0.206 3424.58 48.158 -313.982 0.734 0.04

Min Sx 3911 18 EMPT 1.475 0.104 -4877.81 -132.372 756.467 -1.45 -0.097

Max Sy 3903 17 FULL -2.24 0.402 2836.16 558.78 -967.874 0.954 0.183

Min Sy 3903 18 EMPT 5.411 -3.736 -3634.42 -1405.971 2334.04 -1.907 -0.343

Max Sxy 3903 18 EMPT 5.411 -3.736 -3634.42 -1405.971 2334.04 -1.907 -0.343

Min Sxy 3903 17 FULL -2.24 0.402 2836.16 558.78 -967.874 0.954 0.183

Max Mx 3903 13 FULL1-161.138 13.02 1296.3 135.74 -272.006 53.919 7.926

Min Mx 3903 14 FULL2 161.019 -13.971 1283.94 122.51 -248.995 -53.774 -7.83

Max My 3887 14 FULL2 35.468 1.016 811.309 34.773 -85.993 19.392 12.331

Min My 3887 13 FULL1 -35.555 -1.247 800.763 35.821 -112.736 -19.162 -12.217

Max Mxy 3886 13 FULL1 -52.795 3.461 815.019 50.716 -136.253 -14.318 -9.812

Min Mxy 3886 14 FULL2 52.758 -3.649 820.966 49.068 -109.461 14.557 9.935
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

Results from STADD output

Max Vertical BM in wall creating tension on Water Face Max My 12.33 kN-m/m

Max Horizontal BM in wall creating tension on Water Face Max Mx 53.92 kN-m/m

Tension corresponding to Max Mx Sx-Max Mx 1.296 N/mm2

Max Vertical BM in wall creating tension on Water Face Min My 12.22 kN-m/m

Max Horizontal BM in wall creating tension on Water Face Min Mx 53.77 kN-m/m

Tension corresponding to Min Mx Sx-Min Mx 1.284 N/mm2

Max Tension in Wall Max Sx 3.425 N/mm2

BM at wall corresponding to Max Sx on Water Face Mx-Max Sx 0.73 kN-m/m

Thickness check:
Required effective thickness SQRT(53.92x1000000x1.5/(0.133x30x1000))

Provided overall thickness

Min Ast for each surface zone (mm2/m) in % = 0.24 = 0.24x161x1000/100

Area of vertical reinforcement required on Water Face

Max My 12.33 kN-m/m

Effective Depth (mm) = 322-50-0.5x16

Mu / bd2 = 12.33x1.5x10^6/(1000x264^2)

Refer SP-16 Percentage of reinforcement required, %

Req area of Vertical reinf, Water Face, mm2 = MAX(0.062x264x1000/100,386)

Area of horizontal reinforcement required on Water Face

Max Mx 53.92 kN-m/ Corresponding Tension Sx = 1.296 N/mm2


Effective Depth (mm) = 322-50-0.5x20

Mu / bd2 = 53.92x1.5x10^6/(1000x262^2)
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
Refer SP-16 Percentage of reinforcement required, %

Required area of reinforcement for Mx, mm2 = 0.284x262x1000/100

Factored Tension, kN/m = 1.296x322x1.5

Required area of reinf on each face for Sx, mm2 = 0.5x626x1000/(0.8x500)

Req area of Hor reinf, Water Face, mm2 = MAX(744+783,386)

Area of vertical reinforcement required on Water Face

Min My 12.22 kN-m/m

Effective Depth (mm) = 322-45-0.5x16

Mu / bd2 = 12.22x1.5x10^6/(1000x269^2)

Refer SP-16 Percentage of reinforcement required, %

Req area of Vertical reinf, Water Face, mm2 = MAX(0.059x269x1000/100,386)


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
Area of horizontal reinforcement required on Water Face

Min Mx 53.77 kN-m/ Corresponding Tension Sx = 1.284 N/mm2


Effective Depth (mm) = 322-45-0.5x20

Mu / bd2 = 53.77x1.5x10^6/(1000x267^2)

Refer SP-16 Percentage of reinforcement required, %

Required area of reinforcement for Mx, mm2 = 0.273x267x1000/100

Factored Tension, N/m = 1.284x322x1.5

Required area of reinf on each face for Sx, mm2 = 0.5x620.2x1000/(0.8x500)

Req area of Hor reinf, Water Face, mm2 = MAX(729+775,386)

Ast Required Ast Provided

Vertical Water Face 386 00-000+16-180 1117

Hor Water Face 1527 00-000+20-080 3925

Vertical Water Face 386 00-000+16-180 1117

Hor Water Face 1504 00-000+20-080 3925

Check for Shear at Junction of Base and Wall

Max Qy, (13 FULL1) = 0.043 Min Qy, (14 FULL2) = -0.043
Factored Shear Stress, N/mm2 = 1.5x0.043

Percentage of Steel provided on Water Face

Thickness of wall
Factor k for thickness of slab (Refer Clause 40.2.1.1 of IS 456)

Factor for enhanced Shear Stress near the support (Refer Clause 40.5.1 of IS 456)

Maximum shear stress in concrete for limit state method of design, tc max
Permissible Shear Stress, N/mm2 (Value from Table 19 of IS 456 * k * Enhancement)
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W6A-3 Check for Temperature Reinforcement (As per Annexure A of IS 3370 - 2009, Part 2)

Horizontal Direction

Ast Provided (both faces) = 3925+3925

Percentage of reinforcement provided = 7850/322/1000x100

Max spacing of cracks Smax = (fct/fb) * (f / 2 r) (2/3)x(0.5x(20+20)/2)x(100/2.44)

fct / fb = 2/3 for deformed bars as recommended in Code

Crack Width, Wmax = Smax * (a/2)* (T1 + T2)

273x(0.7/100000/2)x(15+15)

Permissible crack width = 0.1 mm, Hence OK


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
O.
20CDD003

28-Nov-18

R0

ding Moment

Mxy kNm/m

-5.872

5.774

4.881

-4.987

-0.197

0.188

-0.353

0.601

0.601

-0.353

2.894

-2.993

-16.377

16.286

17.027

-17.112
O.
20CDD003

28-Nov-18

R0

142 mm

322 mm

386

264.0

0.265

0.062

386

262.0

1.178
O.
20CDD003

28-Nov-18

R0
0.284

744

626

783

1527

269.0

0.253

0.059

386
O.
20CDD003

28-Nov-18

R0

267.0

1.131

0.273

729

620.2

775

1504

% Ast

0.423%

1.459%

0.426%

1.470%

0.065

0.423%

322 mm

3.50

0.460
O.
20CDD003

28-Nov-18

R0
O.
20CDD003

28-Nov-18

R0

7850 mm2

2.44

273 mm

0.03 mm
O.
20CDD003

28-Nov-18

R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W6A-3 CRACK WIDTH - FLEXURE (IS 3370 Part 2 - 2009, Annexure B)

Vertical Limiting crack width, w

Max My Characteristic cube strength of Concrete, fck

Yield Strength of Steel, fy

Modulus Elasticity of Concrete Ec = 5000 x SQRT( fck )

Modulus Elasticity of Steel, Es

Applied Moment at service condition, M

σcbc = 10 N/mm2 Modular Ratio, m, 280/(3*σcbc) =

Breadth, b (mm) = 1000 Depth, h (mm) = 322

Reinf, Ast mm2 = 00-000+16-180 1117 Clear Cover, CC mm = 50

Reinf, Asc mm2 = 00-000+16-180 1117 Clear Cover, CC mm = 50

Effecive Depth, d = 322-50-0.5x16

Cover to the centre of compression steel, d' = 50+0.5x16

Max spacing of bars, S =

acr = maximum spacing of tensile bar from outer edge of concrete (mm)

= SQRT((0.5x180)^2+(50+0.5x16)^2)-0.5x16

Depth of NA from Compression face = x

Solve equation = (bx2/2) + (1.5m-1) Asc (x - d') - m Ast (d-x) = 0 to get x. x=

(x - d ') bxf c x
A sc fsc = (1.5 m -1) A sc f c (d - ) + A sc f sc (d - d ') = M
x 2 3
f c (d - x)
Ast f st = (m -1) A st
x Solve these equations to get fc

Stress in extreme compression fibre, fc

Stress in Tension reinforcement, fst = 9.33x1.55x(264-63.4)/63.4


Distance from compression face to point where crack width is being calculated, a

Strain at the level considered, ε1 = (h - x)fs/Es(d - x)

Strain due to stiffening effect in concrete, ε2 = 1.5b(h - x)(a - x)/(3EsAs(d - x))

εm = Average surface strain = ε1 - ε2

Crack Width, w = 3 acr εm/(1+2(acr - Cmin)/(h - x))


MENT NO.
RNALSTP20CDD003

28-Nov-18

R0

0.1 mm

30 N/mm2

500 N/mm2

2.7E+04 N/mm2

2.0E+05 N/mm2

12.33 kN-m

9.33

264 mm

58 mm

180 mm

99.1 mm

63.4 mm

1.55 N/mm2

45.8 N/mm2
322 mm

2.95E-04

7.46E-04

-4.51E-04

-0.097 mm
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W6A-3 CRACK WIDTH - FLEXURE & TENSION (IS 3370 Part 2 - 2009, Annexure B)

Horizontal Limiting crack width, w

Max Mx Characteristic cube strength of Concrete, fck

Sx-Max Mx Yield Strength of Steel, fy


Modulus Elasticity of Concrete Ec = 5000 x SQRT( fck )

Modulus Elasticity of Steel, Es

Applied Moment at service condition, M

Applied Tension at service condition, N 417.312

σcbc = 10 N/mm2 Modular Ratio, m, 280/(3*σcbc) =

Breadth, b (mm) = 1000 Depth, h (mm) = 322

Reinf, Ast mm2 = 00-000+20-080 3925 Clear Cover, CC mm = 50

Reinf, Asc mm2 = 00-000+20-080 3925 Clear Cover, CC mm = 50

Distance between centroid of Ast and Asc, Zs = 322-50-0.5x20-50-0.5x20

Distance - Centroid of Ast to CG of Ast & Asc, Xs = 3925x202/(3925+3925)

Modified Moment M' = M - N * Xs

Modified moment, M' > 0, section is in bending

Effecive Depth, d = 322-50-0.5x20

Cover to the centre of compression steel, d' = 50+0.5x20


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

bxf c bxf c x
A st f st - - A sc f sc = N (d - ) + A sc f sc (d - d ') = M - N X S
2 2 3

f c (d - x) (x - d ')
Ast fst = (m -1) A st A sc f sc = (1.5 m -1) A sc f c
x x

Solve above equations to get the value of fc and x

Depth of NA from Compression face = x

Stress in extreme compression fibre, fc

Stress in Tension reinforcement, fst

= (9.33-1)x3.22x(262-48.88)/48.88

Distance from compression face to point where crack width is being calculated, a

Max spacing of bars, S =

acr = maximum spacing of tensile bar from outer edge of concrete (mm)

= SQRT((0.5x80)^2+(50+0.5x20)^2)-0.5x20

Strain at the level considered, ε1 = (h - x)fs/Es(d - x)

Strain due to stiffening effect in concrete, ε2 = 1.5b(h - x)(a - x)/(3EsAs(d - x))

εm = Average surface strain = ε1 - ε2

Crack Width, w = 3 acr εm/(1+2(acr - Cmin)/(h - x))


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
MENT NO.
NALSTP20CDD003

28-Nov-18

R0

0.1 mm

30 N/mm2

500 N/mm2

2.7E+04 N/mm2

2.0E+05 N/mm2

53.92 kN-m

417.31 kN

9.33

202.0 mm

101.0 mm

11.8 kN-m

262 mm

60 mm
MENT NO.
NALSTP20CDD003

28-Nov-18

R0
MENT NO.
NALSTP20CDD003

28-Nov-18

R0

d ') = M - N X S

48.88 mm

3.22 N/mm2

116.9 N/mm2

322 mm

80 mm

62.1 mm

7.49E-04

2.23E-04

5.26E-04

0.090 mm
MENT NO.
NALSTP20CDD003

28-Nov-18

R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W6A-3 CRACK WIDTH - FLEXURE & TENSION (IS 3370 Part 2 - 2009, Annexure B)

Horizontal Limiting crack width, w

Max Sx Characteristic cube strength of Concrete, fck

Mx-Max Sx Yield Strength of Steel, fy


Modulus Elasticity of Concrete Ec = 5000 x SQRT( fck )

Modulus Elasticity of Steel, Es

Applied Moment at service condition, M

Applied Tension at service condition, N 1102.85

σcbc = 10 N/mm2 Modular Ratio, m, 280/(3*σcbc) =

Breadth, b (mm) = 1000 Depth, h (mm) = 322

Reinf, Ast mm2 = 00-000+20-080 3925 Clear Cover, CC mm = 50

Reinf, Asc mm2 = 00-000+20-080 3925 Clear Cover, CC mm = 50

Distance between centroid of Ast and Asc, Zs = 322-50-0.5x20-50-0.5x20

Distance - Centroid of Ast to CG of Ast & Asc, Xs

= 3925x202/(3925+3925)

Modified Moment M' = M - N * Xs

Modified moment, M' < 0, section in tension


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

Effecive Depth, d = 322-50-0.5x20

Cover to the centre of compression steel, d' = 50+0.5x20

Tension excess tensile face, T'

= (1102.85x3925/(3925+3925))+(0.73x1000/(262-60))

Tension less tensile face, T''

= (1102.85x3925/(3925+3925))-(0.73x1000/(262-60))

Stress in Tension reinforcement, fst = 555.039x1000/3925

Total Concrete Area, Ac = 1000x322+(9.33-1)x(3925+3925)

Direct Tension in Concrete, fct = 1102.85x1000/387390.5

Max spacing of bars, S =

acr = maximum spacing of tensile bar from outer edge of concrete (mm)

= SQRT((0.5x80)^2+(50+0.5x20)^2)-0.5x20

Strain at the level considered, ε1 = fs / Es


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
Strain due to stiffening effect in concrete, ε2 = bD/EsAs

εm = Average surface strain = ε1 - ε2

Crack Width, w = 3 acr εm


MENT NO.
NALSTP20CDD003

28-Nov-18

R0

0.1 mm

30 N/mm2

500 N/mm2

2.7E+04 N/mm2

2.0E+05 N/mm2

0.73 kN-m

1102.85 kN

9.33

202.0 mm

101.0 mm

-110.7 kN-m
MENT NO.
NALSTP20CDD003

28-Nov-18

R0
MENT NO.
NALSTP20CDD003

28-Nov-18

R0

262 mm

60 mm

555.0 kN

547.8 kN

141.4 N/mm2

3.9E+05 mm2

2.85 N/mm2

80 mm

62.1 mm

7.07E-04
MENT NO.
NALSTP20CDD003

28-Nov-18

R0
2.05E-04

5.02E-04

0.094 mm
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

DESIGN OF WALL W8A


NT NO.
LSTP20CDD003

28-Nov-18

R0

A
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W8A-DATA DESIGN OF WALL W8A

DESIGNED THICKNESS
Height from bottom 0.00 7.50 10.40
Designed Thickness 850 600 350
Provided Thickness 850 600 350

Length of Wall = 6.50 m

Minimum reinforcement as per clause 8.1.1 of IS 3370 (Part 2) - 2009 0.24 %

Height Thickness Thickness for Temp.


Group Avg Th
From To From To From To Avg. Th
1 0.00 2.50 850 767 808 850 767 808
2 2.50 5.00 767 683 725 767 683 725
3 5.00 7.50 683 600 642 683 600 642
4 7.50 10.40 600 350 475 600 350 475

Direction and Type of Fill BOW BOF TOW TOF HOF

+Z Water Face Liquid 233.10 233.10 243.50 241.50 8.40

-Z Water Face Liquid 233.10 234.70 243.50 241.50 6.80

Fill k r Pressure Additional Loads, if any

+Z 1.00 10.30 86.52

-Z 1.00 10.30 70.04 SURCHARGE 70.04+(.2*25).33=24.76


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
O.
20CDD003

28-Nov-18

R0
O.
20CDD003

28-Nov-18

R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W8A-1 DESIGN OF WALL W8A GROUP 1 Height from 0.00 to 2.50 m

Grade of Concrete, fck = 30 N/mm2 Grade of Steel, fy = 500 N/mm2

Limiting Moment of Resistance Index = 0.133

+Z Face -Z Face

Clear Cover = Water Face ### Water Face ###

STAAD Group Analysis Report


Shear Membrane Bending Moment

Plate L/C SQX SQY SX SY (local) SXY Mx My kNm/m


(local) (local) (local) kN/m2 (local) kNm/m
kN/m2 kN/m2 kN/m2 kN/m2
Max Qx 4347 14 FULL2 256.935 179.138 -570.521 119.831 -302.774 60.168 12.418

Min Qx 4294 16 FULL4-254.043 -46.128 -129.449 -49.7 73.633 27.564 -47.577

Max Qy 4334 14 FULL2 39.135 294.06 13.137 84.379 316.473 -27.015 -144.419

Min Qy 4273 16 FULL4-197.722 -460.154 -109.213 -39.204 -72.395 2.094 -147.703

Max Sx 4347 13 FULL1 200.954 77.61 629.948 -128.571 102.782 41.443 -1.285

Min Sx 4347 15 FULL3 85.958 -10.542 -732.609 -22.549 -267.951 12.563 24.635

Max Sy 4328 14 FULL2 -33.622 -12.981 -24.22 257.601 268.67 -6.539 -64.479

Min Sy 4325 18 EMPT -25.393 -14.809 291.467 -516.546 0.575 -12.396 -70.063

Max Sxy 4375 18 EMPT -2.244 -30.882 -6.582 -129.436 557.735 -22.73 -27.55

Min Sxy 4327 13 FULL1 -4.156 -231.751 127.005 -124.577 -597.62 5.658 -44.623

Max Mx 4347 14 FULL2 256.935 179.138 -570.521 119.831 -302.774 60.168 12.418

Min Mx 4363 14 FULL2 -6.732 -29.904 -142.855 69.239 37.864 -43.3 -27.973

Max My 4334 15 FULL3 37.974 -175.785 -108.951 -357.544 155.51 24.747 78.384

Min My 4284 13 FULL1 6.615 -200.976 50.941 -40.419 -360.737 -28.647 -196.009

Max Mxy 4348 14 FULL2 5.885 152.722 -118.747 122.609 -432.912 23.453 17.526

Min Mxy 4274 16 FULL4 -45.327 -232.238 -45.014 -47.117 -32.974 -31.374 -163.07
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

Results from STADD output

Max Vertical BM in wall creating tension on Water Face Max My 78.38 kN-m/m

Max Horizontal BM in wall creating tension on Water Face Max Mx 60.17 kN-m/m

Tension corresponding to Max Mx Sx-Max Mx 0 N/mm2

Max Vertical BM in wall creating tension on Water Face Min My 196.01 kN-m/m

Max Horizontal BM in wall creating tension on Water Face Min Mx 43.30 kN-m/m

Tension corresponding to Min Mx Sx-Min Mx 0 N/mm2

Max Tension in Wall Max Sx 0.63 N/mm2

BM at wall corresponding to Max Sx on Water Face Mx-Max Sx 41.44 kN-m/m

Thickness check:
Required effective thickness SQRT(196.01x1000000x1.5/(0.133x30x1000))

Provided overall thickness

Min Ast for each surface zone (mm2/m) in % = 0.24 = 0.24x250x1000/100

Area of vertical reinforcement required on Water Face

Max My 78.38 kN-m/m

Effective Depth (mm) = 808-50-0.5x16

Mu / bd2 = 78.38x1.5x10^6/(1000x750^2)

Refer SP-16 Percentage of reinforcement required, %

Req area of Vertical reinf, Water Face, mm2 = MAX(0.048x750x1000/100,600)

Area of horizontal reinforcement required on Water Face

Max Mx 60.17 kN-m/ Corresponding Tension Sx = 0.000 N/mm2


Effective Depth (mm) = 808-50-0.5x12

Mu / bd2 = 60.17x1.5x10^6/(1000x752^2)
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
Refer SP-16 Percentage of reinforcement required, %

Required area of reinforcement for Mx, mm2 = 0.037x752x1000/100

Factored Tension, kN/m =0

Required area of reinf on each face for Sx, mm2 =0

Req area of Hor reinf, Water Face, mm2 = MAX(278+0,600)

Area of vertical reinforcement required on Water Face

Min My 196.01 kN-m/m

Effective Depth (mm) = 808-45-0.5x16

Mu / bd2 = 196.01x1.5x10^6/(1000x755^2)

Refer SP-16 Percentage of reinforcement required, %

Req area of Vertical reinf, Water Face, mm2 = MAX(0.121x755x1000/100,600)


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
Area of horizontal reinforcement required on Water Face

Min Mx 43.30 kN-m/ Corresponding Tension Sx = 0.000 N/mm2


Effective Depth (mm) = 808-45-0.5x12

Mu / bd2 = 43.3x1.5x10^6/(1000x757^2)

Refer SP-16 Percentage of reinforcement required, %

Required area of reinforcement for Mx, mm2 = 0.026x757x1000/100

Factored Tension, N/m =0

Required area of reinf on each face for Sx, mm2 =0

Req area of Hor reinf, Water Face, mm2 = MAX(197+0,600)

Ast Required Ast Provided

Vertical Water Face 600 16-180+12-180 1744

Hor Water Face 600 00-000+12-100 1130

Vertical Water Face 914 16-180+12-180 1744

Hor Water Face 600 00-000+12-100 1130

Check for Shear at Junction of Base and Wall

Max Qy, (14 FULL2) = 0.294 Min Qy, (16 FULL4) = -0.460
Factored Shear Stress, N/mm2 = 1.5x0.46

Percentage of Steel provided on Water Face

Thickness of wall
Factor k for thickness of slab (Refer Clause 40.2.1.1 of IS 456)

Factor for enhanced Shear Stress near the support (Refer Clause 40.5.1 of IS 456)

Maximum shear stress in concrete for limit state method of design, tc max
Permissible Shear Stress, N/mm2 (Value from Table 19 of IS 456 * k * Enhancement)
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W8A-1 Check for Temperature Reinforcement (As per Annexure A of IS 3370 - 2009, Part 2)

Horizontal Direction

Ast Provided (both faces) = 1130+1130

Percentage of reinforcement provided = 2260/500/1000x100

Max spacing of cracks Smax = (fct/fb) * (f / 2 r) (2/3)x(0.5x(12+12)/2)x(100/0.45)

fct / fb = 2/3 for deformed bars as recommended in Code

Crack Width, Wmax = Smax * (a/2)* (T1 + T2)

889x(0.7/100000/2)x(15+15)

Permissible crack width = 0.1 mm, Hence OK


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
O.
20CDD003

28-Nov-18

R0

ding Moment

Mxy kNm/m

46.064

-33.127

-10.571

-32.697

16.846

-12.633

5.302

-1.187

4.734

-4.84

46.064

2.404

-2.769

20.586

54.717

-42.897
O.
20CDD003

28-Nov-18

R0

271 mm

808 mm

600

750.0

0.209

0.048

600

752.0

0.160
O.
20CDD003

28-Nov-18

R0
0.037

278

600

755.0

0.516

0.121

914
O.
20CDD003

28-Nov-18

R0

757.0

0.113

0.026

197

600

% Ast

0.233%

0.150%

0.232%

0.149%

0.690

0.233%

808 mm

3.50

2.160
O.
20CDD003

28-Nov-18

R0
O.
20CDD003

28-Nov-18

R0

2260 mm2

0.45

889 mm

0.09 mm
O.
20CDD003

28-Nov-18

R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W8A-1 CRACK WIDTH - FLEXURE (IS 3370 Part 2 - 2009, Annexure B)

Vertical Limiting crack width, w

Max My Characteristic cube strength of Concrete, fck

Yield Strength of Steel, fy

Modulus Elasticity of Concrete Ec = 5000 x SQRT( fck )

Modulus Elasticity of Steel, Es

Applied Moment at service condition, M

σcbc = 10 N/mm2 Modular Ratio, m, 280/(3*σcbc) =

Breadth, b (mm) = 1000 Depth, h (mm) = 808

Reinf, Ast mm2 = 16-180+12-180 1744 Clear Cover, CC mm = 50

Reinf, Asc mm2 = 16-180+12-180 1744 Clear Cover, CC mm = 50

Effecive Depth, d = 808-50-0.5x16

Cover to the centre of compression steel, d' = 50+0.5x16

Max spacing of bars, S =

acr = maximum spacing of tensile bar from outer edge of concrete (mm)

= SQRT((0.5x90)^2+(50+0.5x16)^2)-0.5x16

Depth of NA from Compression face = x

Solve equation = (bx2/2) + (1.5m-1) Asc (x - d') - m Ast (d-x) = 0 to get x. x=

(x - d ') bxf c x
A sc fsc = (1.5 m -1) A sc f c (d - ) + A sc f sc (d - d ') = M
x 2 3
f c (d - x)
Ast f st = (m -1) A st
x Solve these equations to get fc

Stress in extreme compression fibre, fc

Stress in Tension reinforcement, fst = 9.33x1.44x(750-129.4)/129.4


Distance from compression face to point where crack width is being calculated, a

Strain at the level considered, ε1 = (h - x)fs/Es(d - x)

Strain due to stiffening effect in concrete, ε2 = 1.5b(h - x)(a - x)/(3EsAs(d - x))

εm = Average surface strain = ε1 - ε2

Crack Width, w = 3 acr εm/(1+2(acr - Cmin)/(h - x))


MENT NO.
RNALSTP20CDD003

28-Nov-18

R0

0.1 mm

30 N/mm2

500 N/mm2

2.7E+04 N/mm2

2.0E+05 N/mm2

78.38 kN-m

9.33

750 mm

58 mm

90 mm

65.4 mm

129.4 mm

1.44 N/mm2

64.4 N/mm2
808 mm

3.52E-04

1.06E-03

-7.11E-04

-0.134 mm
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W8A-1 CRACK WIDTH - FLEXURE & TENSION (IS 3370 Part 2 - 2009, Annexure B)

Horizontal Limiting crack width, w

Max Mx Characteristic cube strength of Concrete, fck

Sx-Max Mx Yield Strength of Steel, fy


Modulus Elasticity of Concrete Ec = 5000 x SQRT( fck )

Modulus Elasticity of Steel, Es

Applied Moment at service condition, M

Applied Tension at service condition, N 0

σcbc = 10 N/mm2 Modular Ratio, m, 280/(3*σcbc) =

Breadth, b (mm) = 1000 Depth, h (mm) = 808

Reinf, Ast mm2 = 00-000+12-100 1130 Clear Cover, CC mm = 50

Reinf, Asc mm2 = 00-000+12-100 1130 Clear Cover, CC mm = 50

Distance between centroid of Ast and Asc, Zs = 808-50-0.5x12-50-0.5x12

Distance - Centroid of Ast to CG of Ast & Asc, Xs = 1130x696/(1130+1130)

Modified Moment M' = M - N * Xs

Modified moment, M' > 0, section is in bending

Effecive Depth, d = 808-50-0.5x12

Cover to the centre of compression steel, d' = 50+0.5x12


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

bxf c bxf c x
A st f st - - A sc f sc = N (d - ) + A sc f sc (d - d ') = M - N X S
2 2 3
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
bxf c bxf c x
A st f st - - A sc f sc = N (d - ) + A sc f sc (d - d ') = M - N X S
2 2 3

f c (d - x) (x - d ')
Ast fst = (m -1) A st A sc f sc = (1.5 m -1) A sc f c
x x

Solve above equations to get the value of fc and x

Depth of NA from Compression face = x

Stress in extreme compression fibre, fc

Stress in Tension reinforcement, fst

= (9.33-1)x0.7x(752-102.75)/102.75

Distance from compression face to point where crack width is being calculated, a

Max spacing of bars, S =

acr = maximum spacing of tensile bar from outer edge of concrete (mm)

= SQRT((0.5x100)^2+(50+0.5x12)^2)-0.5x12

Strain at the level considered, ε1 = (h - x)fs/Es(d - x)

Strain due to stiffening effect in concrete, ε2 = 1.5b(h - x)(a - x)/(3EsAs(d - x))

εm = Average surface strain = ε1 - ε2

Crack Width, w = 3 acr εm/(1+2(acr - Cmin)/(h - x))


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
MENT NO.
NALSTP20CDD003

28-Nov-18

R0
1

0.1 mm

30 N/mm2

500 N/mm2

2.7E+04 N/mm2

2.0E+05 N/mm2

60.17 kN-m

1.00 kN

9.33

696.0 mm

348.0 mm

59.8 kN-m

752 mm

56 mm
MENT NO.
NALSTP20CDD003

28-Nov-18

R0

d ') = M - N X S
MENT NO.
NALSTP20CDD003

28-Nov-18

R0

d ') = M - N X S

102.75 mm

0.70 N/mm2

36.8 N/mm2

808 mm

100 mm

69.1 mm

2.00E-04

1.69E-03

-1.49E-03

-0.294 mm
MENT NO.
NALSTP20CDD003

28-Nov-18

R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W8A-1 CRACK WIDTH - FLEXURE & TENSION (IS 3370 Part 2 - 2009, Annexure B)

Horizontal Limiting crack width, w

Max Sx Characteristic cube strength of Concrete, fck

Mx-Max Sx Yield Strength of Steel, fy


Modulus Elasticity of Concrete Ec = 5000 x SQRT( fck )

Modulus Elasticity of Steel, Es

Applied Moment at service condition, M

Applied Tension at service condition, N 509.04

σcbc = 10 N/mm2 Modular Ratio, m, 280/(3*σcbc) =

Breadth, b (mm) = 1000 Depth, h (mm) = 808

Reinf, Ast mm2 = 00-000+12-100 1130 Clear Cover, CC mm = 50

Reinf, Asc mm2 = 00-000+12-100 1130 Clear Cover, CC mm = 50

Distance between centroid of Ast and Asc, Zs = 808-50-0.5x12-50-0.5x12

Distance - Centroid of Ast to CG of Ast & Asc, Xs

= 1130x696/(1130+1130)

Modified Moment M' = M - N * Xs

Modified moment, M' < 0, section in tension


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

Effecive Depth, d = 808-50-0.5x12

Cover to the centre of compression steel, d' = 50+0.5x12

Tension excess tensile face, T'

= (509.04x1130/(1130+1130))+(41.44x1000/(752-56))

Tension less tensile face, T''

= (509.04x1130/(1130+1130))-(41.44x1000/(752-56))

Stress in Tension reinforcement, fst = 314.06x1000/1130

Total Concrete Area, Ac = 1000x808+(9.33-1)x(1130+1130)

Direct Tension in Concrete, fct = 509.04x1000/826825.8

Max spacing of bars, S =

acr = maximum spacing of tensile bar from outer edge of concrete (mm)

= SQRT((0.5x100)^2+(50+0.5x12)^2)-0.5x12

Strain at the level considered, ε1 = fs / Es

Strain due to stiffening effect in concrete, ε2 = bD/EsAs


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
εm = Average surface strain = ε1 - ε2

Crack Width, w = 3 acr εm


MENT NO.
NALSTP20CDD003

28-Nov-18

R0

0.1 mm

30 N/mm2

500 N/mm2

2.7E+04 N/mm2

2.0E+05 N/mm2

41.44 kN-m

509.04 kN

9.33

696.0 mm

348.0 mm

-135.7 kN-m
MENT NO.
NALSTP20CDD003

28-Nov-18

R0
MENT NO.
NALSTP20CDD003

28-Nov-18

R0

752 mm

56 mm

314.1 kN

195.0 kN

277.9 N/mm2

8.3E+05 mm2

0.62 N/mm2

100 mm

69.1 mm

1.39E-03

1.79E-03
MENT NO.
NALSTP20CDD003

28-Nov-18

R0
-3.98E-04

-0.082 mm
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W8A-2 DESIGN OF WALL W8A GROUP 2 Height from 2.50 to 5.00 m

Grade of Concrete, fck = 30 N/mm2 Grade of Steel, fy = 500 N/mm2

Limiting Moment of Resistance Index = 0.133

+Z Face -Z Face

Clear Cover = Water Face ### Water Face ###

STAAD Group Analysis Report


Shear Membrane Bending Moment

Plate L/C SQX SQY SX SY (local) SXY Mx My kNm/m


(local) (local) (local) kN/m2 (local) kNm/m
kN/m2 kN/m2 kN/m2 kN/m2
Max Qx 4397 14 FULL2 182.972 -92.268 192.551 -30.063 -271.638 58.131 4.952

Min Qx 4399 14 FULL2-123.553 -102.81 37.861 -128.959 155.941 48.855 79.987

Max Qy 4420 14 FULL2 -58.223 228.319 22.308 -215.139 167.451 36.063 66.119

Min Qy 4399 14 FULL2-123.553 -102.81 37.861 -128.959 155.941 48.855 79.987

Max Sx 4460 17 FULL 51.36 -8.411 386.61 -65.102 -143.392 62.873 14.01

Min Sx 4481 18 EMPT -20.019 9.339 -268.641 -67.692 371.4 -29.665 -1.843

Max Sy 4385 14 FULL2 -1.007 -52.388 -178.589 61.991 -13.453 -41.344 -10.952

Min Sy 4420 18 EMPT -18.953 64.068 135.875 -428.444 43.471 19.896 -12.775

Max Sxy 4396 18 EMPT -1.642 -20.5 -50.821 -104.645 549.36 -24.999 -11.911

Min Sxy 4395 15 FULL3 -20.265 26.82 -25.047 -180.681 -301.748 26.01 33.93

Max Mx 4481 14 FULL2 126.398 -15.91 218.146 -14.313 -165.372 94.238 18.869

Min Mx 4468 14 FULL2 -3.486 42.902 -119.136 -6.728 -39.969 -44.919 -17.752

Max My 4399 14 FULL2-123.553 -102.81 37.861 -128.959 155.941 48.855 79.987

Min My 4462 18 EMPT 14.562 14.937 162.136 -326.011 16.146 8.087 -31.356

Max Mxy 4391 14 FULL2 54.743 1.119 -26.047 -3.262 -291.52 27.882 -15.37

Min Mxy 4431 15 FULL3 -18.683 -33.802 -79.867 -68.216 -55.156 -2.321 1.17
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

Results from STADD output

Max Vertical BM in wall creating tension on Water Face Max My 79.99 kN-m/m

Max Horizontal BM in wall creating tension on Water Face Max Mx 94.24 kN-m/m

Tension corresponding to Max Mx Sx-Max Mx 0.218 N/mm2

Max Vertical BM in wall creating tension on Water Face Min My 31.36 kN-m/m

Max Horizontal BM in wall creating tension on Water Face Min Mx 44.92 kN-m/m

Tension corresponding to Min Mx Sx-Min Mx 0 N/mm2


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

Max Tension in Wall Max Sx 0.387 N/mm2

BM at wall corresponding to Max Sx on Water Face Mx-Max Sx 62.87 kN-m/m

Thickness check:
Required effective thickness SQRT(94.24x1000000x1.5/(0.133x30x1000))

Provided overall thickness

Min Ast for each surface zone (mm2/m) in % = 0.24 = 0.24x250x1000/100

Area of vertical reinforcement required on Water Face

Max My 79.99 kN-m/m

Effective Depth (mm) = 725-50-0.5x16

Mu / bd2 = 79.99x1.5x10^6/(1000x667^2)

Refer SP-16 Percentage of reinforcement required, %

Req area of Vertical reinf, Water Face, mm2 = MAX(0.063x667x1000/100,600)

Area of horizontal reinforcement required on Water Face

Max Mx 94.24 kN-m/ Corresponding Tension Sx = 0.218 N/mm2


Effective Depth (mm) = 725-50-0.5x12

Mu / bd2 = 94.24x1.5x10^6/(1000x669^2)

Refer SP-16 Percentage of reinforcement required, %

Required area of reinforcement for Mx, mm2 = 0.074x669x1000/100

Factored Tension, kN/m = 0.218x725x1.5

Required area of reinf on each face for Sx, mm2 = 0.5x237.1x1000/(0.8x500)

Req area of Hor reinf, Water Face, mm2 = MAX(495+296,600)

Area of vertical reinforcement required on Water Face


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
Min My 31.36 kN-m/m

Effective Depth (mm) = 725-45-0.5x16

Mu / bd2 = 31.36x1.5x10^6/(1000x672^2)

Refer SP-16 Percentage of reinforcement required, %

Req area of Vertical reinf, Water Face, mm2 = MAX(0.024x672x1000/100,600)


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
Area of horizontal reinforcement required on Water Face

Min Mx 44.92 kN-m/ Corresponding Tension Sx = 0.000 N/mm2


Effective Depth (mm) = 725-45-0.5x12

Mu / bd2 = 44.92x1.5x10^6/(1000x674^2)

Refer SP-16 Percentage of reinforcement required, %

Required area of reinforcement for Mx, mm2 = 0.034x674x1000/100

Factored Tension, N/m =0

Required area of reinf on each face for Sx, mm2 =0

Req area of Hor reinf, Water Face, mm2 = MAX(229+0,600)

Ast Required Ast Provided

Vertical Water Face 600 16-180+12-180 1744

Hor Water Face 791 00-000+12-100 1130

Vertical Water Face 600 16-180+12-180 1744

Hor Water Face 600 00-000+12-100 1130

Check for Shear at Junction of Base and Wall

Max Qy, (14 FULL2) = 0.228 Min Qy, (14 FULL2) = -0.103
Factored Shear Stress, N/mm2 = 1.5x0.228

Percentage of Steel provided on Water Face

Thickness of wall
Factor k for thickness of slab (Refer Clause 40.2.1.1 of IS 456)

Factor for enhanced Shear Stress near the support (Refer Clause 40.5.1 of IS 456)

Maximum shear stress in concrete for limit state method of design, tc max
Permissible Shear Stress, N/mm2 (Value from Table 19 of IS 456 * k * Enhancement)
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W8A-2 Check for Temperature Reinforcement (As per Annexure A of IS 3370 - 2009, Part 2)

Horizontal Direction

Ast Provided (both faces) = 1130+1130

Percentage of reinforcement provided = 2260/500/1000x100

Max spacing of cracks Smax = (fct/fb) * (f / 2 r) (2/3)x(0.5x(12+12)/2)x(100/0.45)

fct / fb = 2/3 for deformed bars as recommended in Code

Crack Width, Wmax = Smax * (a/2)* (T1 + T2)

889x(0.7/100000/2)x(15+15)

Permissible crack width = 0.1 mm, Hence OK


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
O.
20CDD003

28-Nov-18

R0

ding Moment

Mxy kNm/m

-4.347

-3.771

-6.356

-3.771

-1.596

-1.345

7.964

9.668

-0.128

-18.454

-10.495

19.875

-3.771

6.837

33.175

-24.438
O.
20CDD003

28-Nov-18

R0
O.
20CDD003

28-Nov-18

R0

188 mm

725 mm

600

667.0

0.270

0.063

600

669.0

0.316

0.074

495

237.1

296

791
O.
20CDD003

28-Nov-18

R0

672.0

0.104

0.024

600
O.
20CDD003

28-Nov-18

R0

674.0

0.148

0.034

229

600

% Ast

0.261%

0.168%

0.261%

0.168%

0.342

0.261%

725 mm

3.50

0.380
O.
20CDD003

28-Nov-18

R0
O.
20CDD003

28-Nov-18

R0

2260 mm2

0.45

889 mm

0.09 mm
O.
20CDD003

28-Nov-18

R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W8A-2 CRACK WIDTH - FLEXURE (IS 3370 Part 2 - 2009, Annexure B)

Vertical Limiting crack width, w

Max My Characteristic cube strength of Concrete, fck

Yield Strength of Steel, fy

Modulus Elasticity of Concrete Ec = 5000 x SQRT( fck )

Modulus Elasticity of Steel, Es

Applied Moment at service condition, M

σcbc = 10 N/mm2 Modular Ratio, m, 280/(3*σcbc) =

Breadth, b (mm) = 1000 Depth, h (mm) = 725

Reinf, Ast mm2 = 16-180+12-180 1744 Clear Cover, CC mm = 50

Reinf, Asc mm2 = 16-180+12-180 1744 Clear Cover, CC mm = 50

Effecive Depth, d = 725-50-0.5x16

Cover to the centre of compression steel, d' = 50+0.5x16

Max spacing of bars, S =

acr = maximum spacing of tensile bar from outer edge of concrete (mm)

= SQRT((0.5x90)^2+(50+0.5x16)^2)-0.5x16

Depth of NA from Compression face = x

Solve equation = (bx2/2) + (1.5m-1) Asc (x - d') - m Ast (d-x) = 0 to get x. x=

(x - d ') bxf c x
A sc fsc = (1.5 m -1) A sc f c (d - ) + A sc f sc (d - d ') = M
x 2 3
f c (d - x)
Ast f st = (m -1) A st
x Solve these equations to get fc

Stress in extreme compression fibre, fc

Stress in Tension reinforcement, fst = 9.33x1.76x(667-121.8)/121.8


Distance from compression face to point where crack width is being calculated, a

Strain at the level considered, ε1 = (h - x)fs/Es(d - x)

Strain due to stiffening effect in concrete, ε2 = 1.5b(h - x)(a - x)/(3EsAs(d - x))

εm = Average surface strain = ε1 - ε2

Crack Width, w = 3 acr εm/(1+2(acr - Cmin)/(h - x))


MENT NO.
RNALSTP20CDD003

28-Nov-18

R0

0.1 mm

30 N/mm2

500 N/mm2

2.7E+04 N/mm2

2.0E+05 N/mm2

79.99 kN-m

9.33

667 mm

58 mm

90 mm

65.4 mm

121.8 mm

1.76 N/mm2

73.5 N/mm2
725 mm

4.07E-04

9.57E-04

-5.50E-04

-0.103 mm
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W8A-2 CRACK WIDTH - FLEXURE & TENSION (IS 3370 Part 2 - 2009, Annexure B)

Horizontal Limiting crack width, w

Max Mx Characteristic cube strength of Concrete, fck

Sx-Max Mx Yield Strength of Steel, fy


Modulus Elasticity of Concrete Ec = 5000 x SQRT( fck )

Modulus Elasticity of Steel, Es

Applied Moment at service condition, M

Applied Tension at service condition, N 158.05

σcbc = 10 N/mm2 Modular Ratio, m, 280/(3*σcbc) =

Breadth, b (mm) = 1000 Depth, h (mm) = 725

Reinf, Ast mm2 = 00-000+12-100 1130 Clear Cover, CC mm = 50

Reinf, Asc mm2 = 00-000+12-100 1130 Clear Cover, CC mm = 50

Distance between centroid of Ast and Asc, Zs = 725-50-0.5x12-50-0.5x12

Distance - Centroid of Ast to CG of Ast & Asc, Xs = 1130x613/(1130+1130)

Modified Moment M' = M - N * Xs

Modified moment, M' > 0, section is in bending

Effecive Depth, d = 725-50-0.5x12

Cover to the centre of compression steel, d' = 50+0.5x12


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

bxf c bxf c x
A st f st - - A sc f sc = N (d - ) + A sc f sc (d - d ') = M - N X S
2 2 3

f c (d - x) (x - d ')
Ast fst = (m -1) A st A sc f sc = (1.5 m -1) A sc f c
x x

Solve above equations to get the value of fc and x

Depth of NA from Compression face = x

Stress in extreme compression fibre, fc

Stress in Tension reinforcement, fst

= (9.33-1)x2.34x(669-58.85)/58.85

Distance from compression face to point where crack width is being calculated, a

Max spacing of bars, S =

acr = maximum spacing of tensile bar from outer edge of concrete (mm)

= SQRT((0.5x100)^2+(50+0.5x12)^2)-0.5x12

Strain at the level considered, ε1 = (h - x)fs/Es(d - x)

Strain due to stiffening effect in concrete, ε2 = 1.5b(h - x)(a - x)/(3EsAs(d - x))

εm = Average surface strain = ε1 - ε2

Crack Width, w = 3 acr εm/(1+2(acr - Cmin)/(h - x))


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
MENT NO.
NALSTP20CDD003

28-Nov-18

R0

0.1 mm

30 N/mm2

500 N/mm2

2.7E+04 N/mm2

2.0E+05 N/mm2

94.24 kN-m

158.05 kN

9.33

613.0 mm

306.5 mm

45.8 kN-m

669 mm

56 mm
MENT NO.
NALSTP20CDD003

28-Nov-18

R0

d ') = M - N X S

58.85 mm

2.34 N/mm2

202.1 N/mm2

725 mm

100 mm

69.1 mm

1.10E-03

1.61E-03

-5.06E-04

-0.099 mm
MENT NO.
NALSTP20CDD003

28-Nov-18

R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W8A-2 CRACK WIDTH - FLEXURE & TENSION (IS 3370 Part 2 - 2009, Annexure B)

Horizontal Limiting crack width, w

Max Sx Characteristic cube strength of Concrete, fck

Mx-Max Sx Yield Strength of Steel, fy


Modulus Elasticity of Concrete Ec = 5000 x SQRT( fck )

Modulus Elasticity of Steel, Es

Applied Moment at service condition, M

Applied Tension at service condition, N 280.575

σcbc = 10 N/mm2 Modular Ratio, m, 280/(3*σcbc) =

Breadth, b (mm) = 1000 Depth, h (mm) = 725

Reinf, Ast mm2 = 00-000+12-100 1130 Clear Cover, CC mm = 50

Reinf, Asc mm2 = 00-000+12-100 1130 Clear Cover, CC mm = 50

Distance between centroid of Ast and Asc, Zs = 725-50-0.5x12-50-0.5x12

Distance - Centroid of Ast to CG of Ast & Asc, Xs

= 1130x613/(1130+1130)

Modified Moment M' = M - N * Xs

Modified moment, M' < 0, section in tension


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

Effecive Depth, d = 725-50-0.5x12

Cover to the centre of compression steel, d' = 50+0.5x12

Tension excess tensile face, T'

= (280.58x1130/(1130+1130))+(62.87x1000/(669-56))

Tension less tensile face, T''

= (280.58x1130/(1130+1130))-(62.87x1000/(669-56))

Stress in Tension reinforcement, fst = 242.851x1000/1130

Total Concrete Area, Ac = 1000x725+(9.33-1)x(1130+1130)

Direct Tension in Concrete, fct = 280.58x1000/743825.8

Max spacing of bars, S =

acr = maximum spacing of tensile bar from outer edge of concrete (mm)

= SQRT((0.5x100)^2+(50+0.5x12)^2)-0.5x12

Strain at the level considered, ε1 = fs / Es

Strain due to stiffening effect in concrete, ε2 = bD/EsAs


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
εm = Average surface strain = ε1 - ε2

Crack Width, w = 3 acr εm


MENT NO.
NALSTP20CDD003

28-Nov-18

R0

0.1 mm

30 N/mm2

500 N/mm2

2.7E+04 N/mm2

2.0E+05 N/mm2

62.87 kN-m

280.58 kN

9.33

613.0 mm

306.5 mm

-23.1 kN-m
MENT NO.
NALSTP20CDD003

28-Nov-18

R0
MENT NO.
NALSTP20CDD003

28-Nov-18

R0

669 mm

56 mm

242.9 kN

37.7 kN

214.9 N/mm2

7.4E+05 mm2

0.38 N/mm2

100 mm

69.1 mm

1.07E-03

1.60E-03
MENT NO.
NALSTP20CDD003

28-Nov-18

R0
-5.29E-04

-0.110 mm
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W8A-3 DESIGN OF WALL W8A GROUP 3 Height from 5.00 to 7.50 m

Grade of Concrete, fck = 30 N/mm2 Grade of Steel, fy = 500 N/mm2

Limiting Moment of Resistance Index = 0.133

+Z Face -Z Face

Clear Cover = Water Face ### Water Face ###

STAAD Group Analysis Report


Shear Membrane Bending Moment

Plate L/C SQX SQY SX SY (local) SXY Mx My kNm/m


(local) (local) (local) kN/m2 (local) kNm/m
kN/m2 kN/m2 kN/m2 kN/m2
Max Qx 4502 14 FULL2 112.893 -9.894 203.042 -11.979 -143.715 93.07 18.542

Min Qx 4517 15 FULL3 -107.48 12.043 73.767 -91.553 -62.253 -49.66 -3.506

Max Qy 4483 14 FULL2 -17.957 51.068 -42.374 -114.033 64.224 -18.803 -18.011

Min Qy 4499 14 FULL2 22.817 -23.88 130.252 -62.159 -119.431 26.546 4.436

Max Sx 4567 19 SERVI -6.261 -4.388 359.572 -155.205 31.327 8.984 -11.443

Min Sx 4502 18 EMPT -22.867 9.519 -275.893 -79.766 328.424 -30.504 -2.688

Max Sy 4565 14 FULL2 73.103 2.302 139.671 -9.46 -92.486 79.78 15.505

Min Sy 4483 18 EMPT 16.13 5.142 177.792 -288.831 15.598 5.384 -33.413

Max Sxy 4500 18 EMPT -24.213 5.548 -172.196 -92.861 348.674 -16.545 1.3

Min Sxy 4496 14 FULL2 109.176 -14.946 51.758 -84.495 -171.559 37.145 -1.563

Max Mx 4502 14 FULL2 112.893 -9.894 203.042 -11.979 -143.715 93.07 18.542

Min Mx 4517 15 FULL3 -107.48 12.043 73.767 -91.553 -62.253 -49.66 -3.506

Max My 4509 15 FULL3 -2.4 -6.364 15.45 -74.522 5.547 33.627 34.274

Min My 4483 18 EMPT 16.13 5.142 177.792 -288.831 15.598 5.384 -33.413

Max Mxy 4493 14 FULL2 46.419 1.913 -40.592 -40.455 -127.771 -25.08 -21.66

Min Mxy 4576 18 EMPT -5.032 -1.675 149.658 -95.441 145.22 0.881 -9.81
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

Results from STADD output

Max Vertical BM in wall creating tension on Water Face Max My 34.27 kN-m/m

Max Horizontal BM in wall creating tension on Water Face Max Mx 93.07 kN-m/m

Tension corresponding to Max Mx Sx-Max Mx 0.203 N/mm2

Max Vertical BM in wall creating tension on Water Face Min My 33.41 kN-m/m

Max Horizontal BM in wall creating tension on Water Face Min Mx 49.66 kN-m/m

Tension corresponding to Min Mx Sx-Min Mx 0.074 N/mm2

Max Tension in Wall Max Sx 0.36 N/mm2

BM at wall corresponding to Max Sx on Water Face Mx-Max Sx 8.98 kN-m/m

Thickness check:
Required effective thickness SQRT(93.07x1000000x1.5/(0.133x30x1000))

Provided overall thickness

Min Ast for each surface zone (mm2/m) in % = 0.24 = 0.24x250x1000/100

Area of vertical reinforcement required on Water Face

Max My 34.27 kN-m/m

Effective Depth (mm) = 642-50-0.5x16

Mu / bd2 = 34.27x1.5x10^6/(1000x584^2)

Refer SP-16 Percentage of reinforcement required, %

Req area of Vertical reinf, Water Face, mm2 = MAX(0.035x584x1000/100,600)

Area of horizontal reinforcement required on Water Face

Max Mx 93.07 kN-m/ Corresponding Tension Sx = 0.203 N/mm2


Effective Depth (mm) = 642-50-0.5x12

Mu / bd2 = 93.07x1.5x10^6/(1000x586^2)
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
Refer SP-16 Percentage of reinforcement required, %

Required area of reinforcement for Mx, mm2 = 0.095x586x1000/100

Factored Tension, kN/m = 0.203x642x1.5

Required area of reinf on each face for Sx, mm2 = 0.5x195.5x1000/(0.8x500)

Req area of Hor reinf, Water Face, mm2 = MAX(557+244,600)

Area of vertical reinforcement required on Water Face

Min My 33.41 kN-m/m

Effective Depth (mm) = 642-45-0.5x16

Mu / bd2 = 33.41x1.5x10^6/(1000x589^2)

Refer SP-16 Percentage of reinforcement required, %

Req area of Vertical reinf, Water Face, mm2 = MAX(0.033x589x1000/100,600)


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

Area of horizontal reinforcement required on Water Face

Min Mx 49.66 kN-m/ Corresponding Tension Sx = 0.074 N/mm2


Effective Depth (mm) = 642-45-0.5x12

Mu / bd2 = 49.66x1.5x10^6/(1000x591^2)

Refer SP-16 Percentage of reinforcement required, %

Required area of reinforcement for Mx, mm2 = 0.049x591x1000/100

Factored Tension, N/m = 0.074x642x1.5

Required area of reinf on each face for Sx, mm2 = 0.5x71.3x1000/(0.8x500)

Req area of Hor reinf, Water Face, mm2 = MAX(290+89,600)

Ast Required Ast Provided

Vertical Water Face 600 00-000+16-180 1117

Hor Water Face 801 00-000+12-100 1130

Vertical Water Face 600 00-000+16-180 1117

Hor Water Face 600 00-000+12-100 1130

Check for Shear at Junction of Base and Wall

Max Qy, (14 FULL2) = 0.051 Min Qy, (14 FULL2) = -0.024
Factored Shear Stress, N/mm2 = 1.5x0.051

Percentage of Steel provided on Water Face

Thickness of wall
Factor k for thickness of slab (Refer Clause 40.2.1.1 of IS 456)

Factor for enhanced Shear Stress near the support (Refer Clause 40.5.1 of IS 456)

Maximum shear stress in concrete for limit state method of design, tc max
Permissible Shear Stress, N/mm2 (Value from Table 19 of IS 456 * k * Enhancement)
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W8A-3 Check for Temperature Reinforcement (As per Annexure A of IS 3370 - 2009, Part 2)

Horizontal Direction

Ast Provided (both faces) = 1130+1130

Percentage of reinforcement provided = 2260/500/1000x100

Max spacing of cracks Smax = (fct/fb) * (f / 2 r) (2/3)x(0.5x(12+12)/2)x(100/0.45)

fct / fb = 2/3 for deformed bars as recommended in Code

Crack Width, Wmax = Smax * (a/2)* (T1 + T2)

889x(0.7/100000/2)x(15+15)

Permissible crack width = 0.1 mm, Hence OK


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
O.
20CDD003

28-Nov-18

R0

ding Moment

Mxy kNm/m

-9.345

-7.968

-4.294

6.591

9.198

-0.401

-5.594

5.248

-3.577

20.654

-9.345

-7.968

-6.037

5.248

25.24

-18.22
O.
20CDD003

28-Nov-18

R0

187 mm

642 mm

600

584.0

0.151

0.035

600

586.0

0.407
O.
20CDD003

28-Nov-18

R0
0.095

557

195.5

244

801

589.0

0.144

0.033

600
O.
20CDD003

28-Nov-18

R0

591.0

0.213

0.049

290

71.3

89

600

% Ast

0.191%

0.192%

0.191%

0.191%

0.077

0.191%

642 mm

3.50

0.330
O.
20CDD003

28-Nov-18

R0
O.
20CDD003

28-Nov-18

R0

2260 mm2

0.45

889 mm

0.09 mm
O.
20CDD003

28-Nov-18

R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W8A-3 CRACK WIDTH - FLEXURE (IS 3370 Part 2 - 2009, Annexure B)

Vertical Limiting crack width, w

Max My Characteristic cube strength of Concrete, fck

Yield Strength of Steel, fy

Modulus Elasticity of Concrete Ec = 5000 x SQRT( fck )

Modulus Elasticity of Steel, Es

Applied Moment at service condition, M

σcbc = 10 N/mm2 Modular Ratio, m, 280/(3*σcbc) =

Breadth, b (mm) = 1000 Depth, h (mm) = 642

Reinf, Ast mm2 = 00-000+16-180 1117 Clear Cover, CC mm = 50

Reinf, Asc mm2 = 00-000+16-180 1117 Clear Cover, CC mm = 50

Effecive Depth, d = 642-50-0.5x16

Cover to the centre of compression steel, d' = 50+0.5x16

Max spacing of bars, S =

acr = maximum spacing of tensile bar from outer edge of concrete (mm)

= SQRT((0.5x180)^2+(50+0.5x16)^2)-0.5x16

Depth of NA from Compression face = x

Solve equation = (bx2/2) + (1.5m-1) Asc (x - d') - m Ast (d-x) = 0 to get x. x=

(x - d ') bxf c x
A sc fsc = (1.5 m -1) A sc f c (d - ) + A sc f sc (d - d ') = M
x 2 3
f c (d - x)
Ast f st = (m -1) A st
x Solve these equations to get fc

Stress in extreme compression fibre, fc

Stress in Tension reinforcement, fst = 9.33x1.18x(584-94.8)/94.8


Distance from compression face to point where crack width is being calculated, a

Strain at the level considered, ε1 = (h - x)fs/Es(d - x)

Strain due to stiffening effect in concrete, ε2 = 1.5b(h - x)(a - x)/(3EsAs(d - x))

εm = Average surface strain = ε1 - ε2

Crack Width, w = 3 acr εm/(1+2(acr - Cmin)/(h - x))


MENT NO.
RNALSTP20CDD003

28-Nov-18

R0

0.1 mm

30 N/mm2

500 N/mm2

2.7E+04 N/mm2

2.0E+05 N/mm2

34.27 kN-m

9.33

584 mm

58 mm

180 mm

99.1 mm

94.8 mm

1.18 N/mm2

56.8 N/mm2
642 mm

3.18E-04

1.37E-03

-1.05E-03

-0.265 mm
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W8A-3 CRACK WIDTH - FLEXURE & TENSION (IS 3370 Part 2 - 2009, Annexure B)

Horizontal Limiting crack width, w

Max Mx Characteristic cube strength of Concrete, fck

Sx-Max Mx Yield Strength of Steel, fy


Modulus Elasticity of Concrete Ec = 5000 x SQRT( fck )

Modulus Elasticity of Steel, Es

Applied Moment at service condition, M

Applied Tension at service condition, N 130.326

σcbc = 10 N/mm2 Modular Ratio, m, 280/(3*σcbc) =

Breadth, b (mm) = 1000 Depth, h (mm) = 642

Reinf, Ast mm2 = 00-000+12-100 1130 Clear Cover, CC mm = 50

Reinf, Asc mm2 = 00-000+12-100 1130 Clear Cover, CC mm = 50

Distance between centroid of Ast and Asc, Zs = 642-50-0.5x12-50-0.5x12

Distance - Centroid of Ast to CG of Ast & Asc, Xs = 1130x530/(1130+1130)

Modified Moment M' = M - N * Xs

Modified moment, M' > 0, section is in bending

Effecive Depth, d = 642-50-0.5x12

Cover to the centre of compression steel, d' = 50+0.5x12


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

bxf c bxf c x
A st f st - - A sc f sc = N (d - ) + A sc f sc (d - d ') = M - N X S
2 2 3

f c (d - x) (x - d ')
Ast fst = (m -1) A st A sc f sc = (1.5 m -1) A sc f c
x x

Solve above equations to get the value of fc and x

Depth of NA from Compression face = x

Stress in extreme compression fibre, fc

Stress in Tension reinforcement, fst

= (9.33-1)x2.93x(586-63.22)/63.22

Distance from compression face to point where crack width is being calculated, a

Max spacing of bars, S =

acr = maximum spacing of tensile bar from outer edge of concrete (mm)

= SQRT((0.5x100)^2+(50+0.5x12)^2)-0.5x12

Strain at the level considered, ε1 = (h - x)fs/Es(d - x)

Strain due to stiffening effect in concrete, ε2 = 1.5b(h - x)(a - x)/(3EsAs(d - x))

εm = Average surface strain = ε1 - ε2

Crack Width, w = 3 acr εm/(1+2(acr - Cmin)/(h - x))


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
MENT NO.
NALSTP20CDD003

28-Nov-18

R0

0.1 mm

30 N/mm2

500 N/mm2

2.7E+04 N/mm2

2.0E+05 N/mm2

93.07 kN-m

130.33 kN

9.33

530.0 mm

265.0 mm

58.5 kN-m

586 mm

56 mm
MENT NO.
NALSTP20CDD003

28-Nov-18

R0

d ') = M - N X S

63.22 mm

2.93 N/mm2

201.8 N/mm2

642 mm

100 mm

69.1 mm

1.12E-03

1.42E-03

-3.00E-04

-0.058 mm
MENT NO.
NALSTP20CDD003

28-Nov-18

R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W8A-3 CRACK WIDTH - FLEXURE & TENSION (IS 3370 Part 2 - 2009, Annexure B)

Horizontal Limiting crack width, w

Max Sx Characteristic cube strength of Concrete, fck

Mx-Max Sx Yield Strength of Steel, fy


Modulus Elasticity of Concrete Ec = 5000 x SQRT( fck )

Modulus Elasticity of Steel, Es

Applied Moment at service condition, M

Applied Tension at service condition, N 231.12

σcbc = 10 N/mm2 Modular Ratio, m, 280/(3*σcbc) =

Breadth, b (mm) = 1000 Depth, h (mm) = 642

Reinf, Ast mm2 = 00-000+12-100 1130 Clear Cover, CC mm = 50

Reinf, Asc mm2 = 00-000+12-100 1130 Clear Cover, CC mm = 50

Distance between centroid of Ast and Asc, Zs = 642-50-0.5x12-50-0.5x12

Distance - Centroid of Ast to CG of Ast & Asc, Xs

= 1130x530/(1130+1130)

Modified Moment M' = M - N * Xs

Modified moment, M' < 0, section in tension


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

Effecive Depth, d = 642-50-0.5x12

Cover to the centre of compression steel, d' = 50+0.5x12

Tension excess tensile face, T'

= (231.12x1130/(1130+1130))+(8.98x1000/(586-56))

Tension less tensile face, T''

= (231.12x1130/(1130+1130))-(8.98x1000/(586-56))

Stress in Tension reinforcement, fst = 132.503x1000/1130

Total Concrete Area, Ac = 1000x642+(9.33-1)x(1130+1130)

Direct Tension in Concrete, fct = 231.12x1000/660825.8

Max spacing of bars, S =

acr = maximum spacing of tensile bar from outer edge of concrete (mm)

= SQRT((0.5x100)^2+(50+0.5x12)^2)-0.5x12

Strain at the level considered, ε1 = fs / Es

Strain due to stiffening effect in concrete, ε2 = bD/EsAs


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
εm = Average surface strain = ε1 - ε2

Crack Width, w = 3 acr εm


MENT NO.
NALSTP20CDD003

28-Nov-18

R0

0.1 mm

30 N/mm2

500 N/mm2

2.7E+04 N/mm2

2.0E+05 N/mm2

8.98 kN-m

231.12 kN

9.33

530.0 mm

265.0 mm

-52.3 kN-m
MENT NO.
NALSTP20CDD003

28-Nov-18

R0
MENT NO.
NALSTP20CDD003

28-Nov-18

R0

586 mm

56 mm

132.5 kN

98.6 kN

117.3 N/mm2

6.6E+05 mm2

0.35 N/mm2

100 mm

69.1 mm

5.86E-04

1.42E-03
MENT NO.
NALSTP20CDD003

28-Nov-18

R0
-8.34E-04

-0.173 mm
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W8A-4 DESIGN OF WALL W8A GROUP 4 Height from 7.50 to 10.40 m

Grade of Concrete, fck = 30 N/mm2 Grade of Steel, fy = 500 N/mm2

Limiting Moment of Resistance Index = 0.133

+Z Face -Z Face

Clear Cover = Water Face ### Water Face ###

STAAD Group Analysis Report


Shear Membrane Bending Moment

Plate L/C SQX SQY SX SY (local) SXY Mx My kNm/m


(local) (local) (local) kN/m2 (local) kNm/m
kN/m2 kN/m2 kN/m2 kN/m2
Max Qx 4695 18 EMPT 257.183 -189.611 457.222 -225.944 120.756 33.212 -15.21

Min Qx 4696 18 EMPT -260.45 -189.534 437.929 -223.677 -112.602 33.634 -15.202

Max Qy 4695 17 FULL -122.135 91.188 84.936 -231.44 119.628 -16.073 7.319

Min Qy 4695 18 EMPT 257.183 -189.611 457.222 -225.944 120.756 33.212 -15.21

Max Sx 4693 19 SERVI 61.749 -10.541 595.291 -41.431 0.156 3.899 -1.059

Min Sx 4696 16 FULL4 36.429 23.52 -288.294 -220.169 -119.892 -1.705 1.938

Max Sy 4707 19 SERVI 17.962 4.527 257.466 -2.058 43.308 -4.046 -0.539

Min Sy 4695 16 FULL4 -24.411 23.591 -281.472 -231.472 118.004 -1.241 1.935

Max Sxy 4603 19 SERVI 1.041 7.915 96.487 -66.473 179.561 9.607 2.822

Min Sxy 4696 16 FULL4 36.429 23.52 -288.294 -220.169 -119.892 -1.705 1.938

Max Mx 4607 14 FULL2 46.087 7.516 90.518 -10.74 -69.73 63.524 11.994

Min Mx 4593 14 FULL2 10.446 -17.869 -85.301 -56.543 -12.788 -35.827 -20.164

Max My 4591 15 FULL3 5.524 20.872 52.423 -82.704 14.807 18.716 22.772

Min My 4590 18 EMPT 6.848 -19.145 304.448 -142.75 43.921 16.528 -30.014

Max Mxy 4673 18 EMPT 21.971 -47.063 452.383 -96.576 52.059 15.866 -15.132

Min Mxy 4597 18 EMPT -12.422 -2.056 175.687 -76.837 126.809 0.517 -9.143
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

Results from STADD output

Max Vertical BM in wall creating tension on Water Face Max My 22.77 kN-m/m

Max Horizontal BM in wall creating tension on Water Face Max Mx 63.52 kN-m/m

Tension corresponding to Max Mx Sx-Max Mx 0.091 N/mm2

Max Vertical BM in wall creating tension on Water Face Min My 30.01 kN-m/m

Max Horizontal BM in wall creating tension on Water Face Min Mx 35.83 kN-m/m

Tension corresponding to Min Mx Sx-Min Mx 0 N/mm2

Max Tension in Wall Max Sx 0.595 N/mm2

BM at wall corresponding to Max Sx on Water Face Mx-Max Sx 3.9 kN-m/m

Thickness check:
Required effective thickness SQRT(63.52x1000000x1.5/(0.133x30x1000))

Provided overall thickness

Min Ast for each surface zone (mm2/m) in % = 0.24 = 0.24x237.5x1000/100

Area of vertical reinforcement required on Water Face

Max My 22.77 kN-m/m

Effective Depth (mm) = 475-50-0.5x16

Mu / bd2 = 22.77x1.5x10^6/(1000x417^2)

Refer SP-16 Percentage of reinforcement required, %

Req area of Vertical reinf, Water Face, mm2 = MAX(0.045x417x1000/100,570)

Area of horizontal reinforcement required on Water Face

Max Mx 63.52 kN-m/ Corresponding Tension Sx = 0.091 N/mm2


Effective Depth (mm) = 475-50-0.5x12

Mu / bd2 = 63.52x1.5x10^6/(1000x419^2)
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
Refer SP-16 Percentage of reinforcement required, %

Required area of reinforcement for Mx, mm2 = 0.128x419x1000/100

Factored Tension, kN/m = 0.091x475x1.5

Required area of reinf on each face for Sx, mm2 = 0.5x64.8x1000/(0.8x500)

Req area of Hor reinf, Water Face, mm2 = MAX(536+81,570)

Area of vertical reinforcement required on Water Face

Min My 30.01 kN-m/m

Effective Depth (mm) = 475-45-0.5x16

Mu / bd2 = 30.01x1.5x10^6/(1000x422^2)

Refer SP-16 Percentage of reinforcement required, %

Req area of Vertical reinf, Water Face, mm2 = MAX(0.059x422x1000/100,570)


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
Area of horizontal reinforcement required on Water Face

Min Mx 35.83 kN-m/ Corresponding Tension Sx = 0.000 N/mm2


Effective Depth (mm) = 475-45-0.5x12

Mu / bd2 = 35.83x1.5x10^6/(1000x424^2)

Refer SP-16 Percentage of reinforcement required, %

Required area of reinforcement for Mx, mm2 = 0.07x424x1000/100

Factored Tension, N/m =0

Required area of reinf on each face for Sx, mm2 =0

Req area of Hor reinf, Water Face, mm2 = MAX(297+0,570)

Ast Required Ast Provided

Vertical Water Face 570 00-000+16-180 1117

Hor Water Face 617 00-000+12-100 1130

Vertical Water Face 570 00-000+16-180 1117

Hor Water Face 570 00-000+12-100 1130

Check for Shear at Junction of Base and Wall

Max Qy, (17 FULL) = 0.091 Min Qy, (18 EMPTY) = -0.190
Factored Shear Stress, N/mm2 = 1.5x0.19

Percentage of Steel provided on Water Face

Thickness of wall
Factor k for thickness of slab (Refer Clause 40.2.1.1 of IS 456)

Factor for enhanced Shear Stress near the support (Refer Clause 40.5.1 of IS 456)

Maximum shear stress in concrete for limit state method of design, tc max
Permissible Shear Stress, N/mm2 (Value from Table 19 of IS 456 * k * Enhancement)
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W8A-4 Check for Temperature Reinforcement (As per Annexure A of IS 3370 - 2009, Part 2)

Horizontal Direction

Ast Provided (both faces) = 1130+1130

Percentage of reinforcement provided = 2260/475/1000x100

Max spacing of cracks Smax = (fct/fb) * (f / 2 r) (2/3)x(0.5x(12+12)/2)x(100/0.48)

fct / fb = 2/3 for deformed bars as recommended in Code

Crack Width, Wmax = Smax * (a/2)* (T1 + T2)

833x(0.7/100000/2)x(15+15)

Permissible crack width = 0.1 mm, Hence OK


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED
PROJECT: ON SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
O.
20CDD003

28-Nov-18

R0

ding Moment

Mxy kNm/m

11.71

-12.6

-5.02

11.71

5.888

2.37

-0.911

-0.409

0.057

2.37

-3.214

8.046

-5.32

0.741

15.259

-18.523
O.
20CDD003

28-Nov-18

R0

155 mm

475 mm

570

417.0

0.196

0.045

570

419.0

0.543
O.
20CDD003

28-Nov-18

R0
0.128

536

64.8

81

617

422.0

0.253

0.059

570
O.
20CDD003

28-Nov-18

R0

424.0

0.299

0.070

297

570

% Ast

0.268%

0.268%

0.267%

0.267%

0.285

0.268%

475 mm

3.50

0.380
O.
20CDD003

28-Nov-18

R0
O.
20CDD003

28-Nov-18

R0

2260 mm2

0.48

833 mm

0.09 mm
O.
20CDD003

28-Nov-18

R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W8A-4 CRACK WIDTH - FLEXURE (IS 3370 Part 2 - 2009, Annexure B)

Vertical Limiting crack width, w

Max My Characteristic cube strength of Concrete, fck

Yield Strength of Steel, fy

Modulus Elasticity of Concrete Ec = 5000 x SQRT( fck )

Modulus Elasticity of Steel, Es

Applied Moment at service condition, M

σcbc = 10 N/mm2 Modular Ratio, m, 280/(3*σcbc) =

Breadth, b (mm) = 1000 Depth, h (mm) = 475

Reinf, Ast mm2 = 00-000+16-180 1117 Clear Cover, CC mm = 50

Reinf, Asc mm2 = 00-000+16-180 1117 Clear Cover, CC mm = 50

Effecive Depth, d = 475-50-0.5x16

Cover to the centre of compression steel, d' = 50+0.5x16

Max spacing of bars, S =

acr = maximum spacing of tensile bar from outer edge of concrete (mm)

= SQRT((0.5x180)^2+(50+0.5x16)^2)-0.5x16

Depth of NA from Compression face = x

Solve equation = (bx2/2) + (1.5m-1) Asc (x - d') - m Ast (d-x) = 0 to get x. x=

(x - d ') bxf c x
A sc fsc = (1.5 m -1) A sc f c (d - ) + A sc f sc (d - d ') = M
x 2 3
f c (d - x)
Ast f st = (m -1) A st
x Solve these equations to get fc

Stress in extreme compression fibre, fc

Stress in Tension reinforcement, fst = 9.33x1.35x(417-79.2)/79.2


Distance from compression face to point where crack width is being calculated, a

Strain at the level considered, ε1 = (h - x)fs/Es(d - x)

Strain due to stiffening effect in concrete, ε2 = 1.5b(h - x)(a - x)/(3EsAs(d - x))

εm = Average surface strain = ε1 - ε2

Crack Width, w = 3 acr εm/(1+2(acr - Cmin)/(h - x))


MENT NO.
RNALSTP20CDD003

28-Nov-18

R0

0.1 mm

30 N/mm2

500 N/mm2

2.7E+04 N/mm2

2.0E+05 N/mm2

22.77 kN-m

9.33

417 mm

58 mm

180 mm

99.1 mm

79.2 mm

1.35 N/mm2

53.7 N/mm2
475 mm

3.15E-04

1.04E-03

-7.23E-04

-0.172 mm
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W8A-4 CRACK WIDTH - FLEXURE & TENSION (IS 3370 Part 2 - 2009, Annexure B)

Horizontal Limiting crack width, w

Max Mx Characteristic cube strength of Concrete, fck

Sx-Max Mx Yield Strength of Steel, fy


Modulus Elasticity of Concrete Ec = 5000 x SQRT( fck )

Modulus Elasticity of Steel, Es

Applied Moment at service condition, M

Applied Tension at service condition, N 43.225

σcbc = 10 N/mm2 Modular Ratio, m, 280/(3*σcbc) =

Breadth, b (mm) = 1000 Depth, h (mm) = 475

Reinf, Ast mm2 = 00-000+12-100 1130 Clear Cover, CC mm = 50

Reinf, Asc mm2 = 00-000+12-100 1130 Clear Cover, CC mm = 50

Distance between centroid of Ast and Asc, Zs = 475-50-0.5x12-50-0.5x12

Distance - Centroid of Ast to CG of Ast & Asc, Xs = 1130x363/(1130+1130)

Modified Moment M' = M - N * Xs

Modified moment, M' > 0, section is in bending

Effecive Depth, d = 475-50-0.5x12

Cover to the centre of compression steel, d' = 50+0.5x12


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

bxf c bxf c x
A st f st - - A sc f sc = N (d - ) + A sc f sc (d - d ') = M - N X S
2 2 3
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
bxf c bxf c x
A st f st - - A sc f sc = N (d - ) + A sc f sc (d - d ') = M - N X S
2 2 3

f c (d - x) (x - d ')
Ast fst = (m -1) A st A sc f sc = (1.5 m -1) A sc f c
x x

Solve above equations to get the value of fc and x

Depth of NA from Compression face = x

Stress in extreme compression fibre, fc

Stress in Tension reinforcement, fst

= (9.33-1)x3.44x(419-67.64)/67.64

Distance from compression face to point where crack width is being calculated, a

Max spacing of bars, S =

acr = maximum spacing of tensile bar from outer edge of concrete (mm)

= SQRT((0.5x100)^2+(50+0.5x12)^2)-0.5x12

Strain at the level considered, ε1 = (h - x)fs/Es(d - x)

Strain due to stiffening effect in concrete, ε2 = 1.5b(h - x)(a - x)/(3EsAs(d - x))

εm = Average surface strain = ε1 - ε2

Crack Width, w = 3 acr εm/(1+2(acr - Cmin)/(h - x))


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
MENT NO.
NALSTP20CDD003

28-Nov-18

R0
1

0.1 mm

30 N/mm2

500 N/mm2

2.7E+04 N/mm2

2.0E+05 N/mm2

63.52 kN-m

43.23 kN

9.33

363.0 mm

181.5 mm

55.7 kN-m

419 mm

56 mm
MENT NO.
NALSTP20CDD003

28-Nov-18

R0

d ') = M - N X S
MENT NO.
NALSTP20CDD003

28-Nov-18

R0

d ') = M - N X S

67.64 mm

3.44 N/mm2

148.9 N/mm2

475 mm

100 mm

69.1 mm

8.63E-04

1.04E-03

-1.82E-04

-0.034 mm
MENT NO.
NALSTP20CDD003

28-Nov-18

R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

W8A-4 CRACK WIDTH - FLEXURE & TENSION (IS 3370 Part 2 - 2009, Annexure B)

Horizontal Limiting crack width, w

Max Sx Characteristic cube strength of Concrete, fck

Mx-Max Sx Yield Strength of Steel, fy


Modulus Elasticity of Concrete Ec = 5000 x SQRT( fck )

Modulus Elasticity of Steel, Es

Applied Moment at service condition, M

Applied Tension at service condition, N 282.625

σcbc = 10 N/mm2 Modular Ratio, m, 280/(3*σcbc) =

Breadth, b (mm) = 1000 Depth, h (mm) = 475

Reinf, Ast mm2 = 00-000+12-100 1130 Clear Cover, CC mm = 50

Reinf, Asc mm2 = 00-000+12-100 1130 Clear Cover, CC mm = 50

Distance between centroid of Ast and Asc, Zs = 475-50-0.5x12-50-0.5x12

Distance - Centroid of Ast to CG of Ast & Asc, Xs

= 1130x363/(1130+1130)

Modified Moment M' = M - N * Xs

Modified moment, M' < 0, section in tension


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0

Effecive Depth, d = 475-50-0.5x12

Cover to the centre of compression steel, d' = 50+0.5x12

Tension excess tensile face, T'

= (282.63x1130/(1130+1130))+(3.9x1000/(419-56))

Tension less tensile face, T''

= (282.63x1130/(1130+1130))-(3.9x1000/(419-56))

Stress in Tension reinforcement, fst = 152.059x1000/1130

Total Concrete Area, Ac = 1000x475+(9.33-1)x(1130+1130)

Direct Tension in Concrete, fct = 282.63x1000/493825.8

Max spacing of bars, S =

acr = maximum spacing of tensile bar from outer edge of concrete (mm)

= SQRT((0.5x100)^2+(50+0.5x12)^2)-0.5x12

Strain at the level considered, ε1 = fs / Es


M/S. TATA PROJECTS LIMITED

DOCUMENT NO.
20 MLD SEWAGE TREATMENT PLANT BASED ON
PROJECT: SBR TECHNOLOGY AT KARNAL TPLKIPLJVKARNALSTP20CDD003

STRUCTURAL DESIGN CALCULATION OF RAW DATE 28-Nov-18


TITLE: SEWAGE SUMP & PUMP HOUSE
REV R0
Strain due to stiffening effect in concrete, ε2 = bD/EsAs

εm = Average surface strain = ε1 - ε2

Crack Width, w = 3 acr εm


MENT NO.
NALSTP20CDD003

28-Nov-18

R0

0.1 mm

30 N/mm2

500 N/mm2

2.7E+04 N/mm2

2.0E+05 N/mm2

3.90 kN-m

282.63 kN

9.33

363.0 mm

181.5 mm

-47.4 kN-m
MENT NO.
NALSTP20CDD003

28-Nov-18

R0
MENT NO.
NALSTP20CDD003

28-Nov-18

R0

419 mm

56 mm

152.1 kN

130.6 kN