Sei sulla pagina 1di 5

SEMANA 01

ITEN
NOMBRE
1 2 3 4 5

- U-35 RAJO DESCARGUE 5 18 18 16 6


- U-35 CORRIDA CAJA 10 3
-
TOTAL CARROS U-35 MIN 15 18 21 16 6
TOTAL TONELAS EXTRAIDAS 25.5 30.6 35.7 27.2 10.2
SEMANA 02
6 7 8 9 10 11 12 13

18 32 20 12
6

18 0 32 6 0 20 12
30.6 0.0 54.4 10.2 0.0 34.0 20.4
SEMANA 03
14 15 16 17 18 19 20 21

5 4 25 6 17 22
4

5 8 25 10 17 22
8.5 13.6 42.5 17.0 28.9 37.4
SEMANA 04
22 23 24 25 26 27 28 29

12 21 8 19 9 6 20
4

12 21 12 19 9 6 20
20.4 35.7 20.4 32.3 15.3 10.2 34.0
TOTAL OBSERVACIONES
30 31

20 339 Rebaje carga de Rajo


27 Labor desquinche Mins piso
0 Labor recorte cuadro ppal.
20 0 366 Total Carros Mineros Extraido 366
34.0 0.0 629.0 Descaje 0,2% 31.45%