Amount in
S. No. Description of item
lakhs of Rs.
1 Works Head
a De-siltation
d Steps
e Branding
Activities Total
2 Miscellaneous
Inauguration, handing over and
i purchase of small tools (10% on
Activities expenditure)
3 Administration
Need Assessment Study (with
i surveying, mapping, testing, etc.),
Preparation of DPRs
ii Cost of IA (overheads etc.)
Grand TOTAL
A B S T R A C T - DESILTATION
S.
Quantity Rate Per Amount in Rs.
No.
1 2 4 5 6
Clearing thick jungle growth ( less than 50
percent open space ) including bushes upto
1 30 cm / parthenium and other weeds
including burning or disposing off the same as
directed etc., complete.
A B S T R A C T - BUND
S.
Quantity Rate Per Amount in Rs.
No.
1 2 4 5 6
1 Clearing thick jungle growth ( less than 50
percent open space ) including bushes upto
30 cm / parthenium and other weeds
including burning or disposing off the same as
directed etc., complete.
Name of work : 0
S.
Quantity Rate Per Amount in Rs.
No.
1 2 4 5 6
1 Excavation for foundation in all kinds of soil
including boulders upto 0.30 m diameter for dam,
spillway, intake structure and other appurtenant
works and placing the excavated soil neatly in
dump area or disposing off the same as directed
etc., complete with initial lead upto 1 km and all
lifts.
S.
Quantity Rate Per Amount in Rs.
No.
1 Excavation for foundation in all kinds of soil
including boulders upto 0.30 m diameter for dam,
spillway, intake structure and other appurtenant
works and placing the excavated soil neatly in
dump area or disposing off the same as directed
etc., complete with initial lead upto 1 km and all
lifts.
2 Providing and laying insitu vibrated M-10 ( 28 days
cube compressive strength not less than 10 N / sq
mm ) grade cement concrete using 40 mm down
size approved, clean, hard, graded aggregates for
foundation filling including cost of all materials,
machinery, labour, formwork, cleaning, batching,
mixing, placing in position, levelling, vibrating,
finishing, curing etc., complete with initial lead
upto 50 m and all lifts. ( Cement content : 220 kg
/ cum )
A B S T R A C T - Branding
S.
Quantity Rate Per Amount in Rs.
No.
1 2 4 5 6
1 Iron Name boards on the bund, including
labor charges for pits digging, filling with
CC including 20 mm stones
Total Amount
Rs.