Sei sulla pagina 1di 2

Mount Zion College of Engineering & Technology

To Make Man Whole!! An ISO 9001:2008 Certified Institution

Encl. 25 a : QUESTION BANK

CE6605 ENVIRONMENTAL ENGINEERING II


UNIT I PLANNING FOR SEWERAGE SYSTEMS
TB 1 Garg, S.K., "Environmental Engineering" Vol. II, Khanna Publishers,2017th Edition New Delhi.
REF 1 "Manual on Sewerage and Sewage Treatment", CPHEEO, Ministry of Urban Development, Government of India, New Delhi,
1997.
REF 2 Metcalf & Eddy, "Wastewater Engineering" – Treatment and Reuse, Tata McGraw Hill Company, New Delhi, 2003.
REF 3 Eswary Devi T & Herald Lessly s, "Environmental Engineering II", Magnus Publications,Chennai.

Student
Textbook Ans -
Qs. No. Questions Univ Qs. Referred Mark
No. Page Nos.
Page No.
TLP Sources of wastewater generation
No.1
1. List the sources of wastewater Apr,May-17&
REF3 1.2 2
May,Jun-16
2. How do you classify the sewage Apr,May-18 TB1 1 2
3. Time of concentration Nov,Dec-16 REF3 1.12
TLP Effects
No.2
4. What are the major effects due to wastewater -
generation? REF3,CN 1.3 2
TLP Estimation of sanitary sewage flow
No.3
5. How do you estimate sanitary sewage - TB1 14 2
6. Advantage of using circular sections for sewage Apr,May-17 REF3,CN 2.9 2
7. Objectives of providing sewerage works Apr,May-18 TB 1 4 2
8. The population of a town as per records are given Nov, Dec - 12 CN - 10
below. Forecastthe population in the year 2020
and 2035 using arithmetical increase method and
incremental Increase method. Estimate thewater
demand at 90lpcd for the year 2035.
Year 1961 1971 1981 1991 2001
Population 39250 54390 68010 83630 9985
9. Define dry weather flow & various sources & Nov,Dec-18 REF3,CN 1.8 8
factors affecting it
TLP Estimation of storm runoff
No.4
10. How do you estimate storm runoff? Apr, May- 15 TB1 13 2
11. Define time of Concentration. Apr,May-17 TB1 14 2
12. Differentiate dry weather flow and wet weather Nov, Dec -12 TB 1 7,13 2
flow.
13. Estimation of storm runoff & the factors Apr,May-17 TB 1 14 8
influencing it
TLP Characteristics and composition of sewage
No.5 and their significance
14. Define BOD Nov,Dec-18 REF3,CN 1.25 2
15. Explain the first stage BOD. -- REF3,CN 1.29 2
16. Explain the terms BOD and COD. Differentiate May, Jun – 16 REF3 1.30 8
between first and second stage BOD. & Nov,Dec-16
17. BOD of a sewage incubated for 1 day at 300c was Apr,May-17 & CN - 8
found to be 120 mg/l. Find the value of May,Jun-16 &
5 day 200c BOD. Assume k (base 10) at 20oc as 0.21 Nov,Dec-16
per day.
18. Explain the various physico chemical characteristics Apr, May- 15 REF3,CN 1.17 16
of sewage and state their significance.
19. What are the Typical characteristics of sewage Nov,Dec-16 REF3 1.17
TLP Effluent standards
No.6
20. State the five parameters of effluent standards for May, Jun - 14 REF 3 1.41 2
sewage disposal.
21. List out about 10 water quality parameters as per Nov, Dec - 12 REF 3 1.41 16
tamilnadupollution control board standards.
Pilivalam P.O, Pudukkottai Dt., Tamil Nadu. Pin - 622 507, Fax: 04333 – 277125, Ph: 04322 - 320801, 320802, Website: www.mzcet.in, Email: info@mzcet.in
Page 1 of 2
Mount Zion College of Engineering & Technology
To Make Man Whole!! An ISO 9001:2008 Certified Institution

Encl. 25 a : QUESTION BANK

CE6605 ENVIRONMENTAL ENGINEERING II


UNIT I PLANNING FOR SEWERAGE SYSTEMS
TLP Legislation requirements
No.7
22. Mentionthe necessity of legal requirements and Nov, Dec - 11 REF 3 1.42 8
effluents disposal of sewage
23. Discuss the environmental legislation requirements Apr, May- 15 REF 1 533 16
while planning sewerage system.

Prepared by: Balamurugan.A

Completion Verified by Concerned Dept.


Signature of Faculty Completion Verified by Dept. HOD
HOD

Sign Sign Sign

dd/mm/yy dd/mm/yy dd/mm/yy

Pilivalam P.O, Pudukkottai Dt., Tamil Nadu. Pin - 622 507, Fax: 04333 – 277125, Ph: 04322 - 320801, 320802, Website: www.mzcet.in, Email: info@mzcet.in
Page 2 of 2

Potrebbero piacerti anche