Item Rate BoQ

Tender Inviting Authority: MUMBAI RAILWAY VIKAS CORPORATION LIMITED


Name of Work: Construction of Major Bridges, MInor Bridges, ROB, Drains, Retaining wall, Boundary wall and Earthwork between
Virar station (Including) & Dahanu Road Station (Including) excluding Station between Km. 68.00 to Km. 75.00 for the Quadrupling
of Railway Track between Virar - Dahanu Road under MUTP-III.
Contract No: RFB No:- MRVC/W/101

Name of the
Bidder/
Bidding Firm /
PRICE SCHEDULE
NUMBER # TEXT # TEXT # NUMBER # TEXT # NUMBER # NUMBER # TEXT #

Sl. Item Description Item Quantity Units RATE TO BE TOTAL TOTAL


No. Code / ENTERED BY AMOUNT AMOUNT
Make THE BIDDER IN in In Words
RS. Rs.
P
1 2 3 4 5 13 53 55
0 SCHEDULE A PART I - CIVIL
ENGINEERING WORKS
Please refer RFB for detailed description
of items.
1 1. Demolishing/Dismantling of plain cement AI.1 3588.00 Cum 0.00 INR Zero
concrete of all grade and of all type of work Only
with all contractor's labour and equipments,
breaker, scaffolding including disposal of
material with all lead and lift etc. complete.

2 2. Demolishing/breaking/dismantling AI.2 4168.00 Cum 0.00 INR Zero


Reinforced Cement Concrete (R.C.C.) work Only
of all grade and of all type of work with all
contractor's labour and equipments
including cutting and stacking of steel bars
and disposal of unserviceable material with
all lead and lift etc. complete.

3 3. Demolishing/breaking/dismantling stone AI.3 5088.00 Cum 0.00 INR Zero


rubble masonry of all size, height with all Only
contractor's labour, tools , Plants and
scaffolding including stacking of serviceable
material and disposal of unserviceable
material with all lead & lift etc. complete.
4 4. Providing Cofferdam made up of Earth or AI.4 31700.00 Cum 0.00 INR Zero
bags filed with imprervious material such as Only
clay for the construction of substructure of
bridge as per technical Specification with all
Contractor’s labour, materials, tools and
plants, dewatering, etc. complete with all
lead & lift.
Note :-
1. The height of cofferdam shall be decided
as per site conditions and approved by the
Engineer-In-Charge. Railway's decision is
final and binding on the contractor.
2. Top width of cofferdam maximum
payable is 1.50m with 1:1 side slopes or
actual provided whichever is less for 3 sides
and 3.50 m for one side with 1:1 side slopes
or actual provided whichever is less. The
wider side will be used as working platform
cum access for vehicle for work.
3. Payment for coffer dam for particular
structure will be made only once in
execution period. Payment for rebuilding of
cofferdam due to any reason, such as flood,
monsoon shall not be accepted.
4. Released material/ earth of cofferdam
shall be used for embankment after
completion of substrucutre work.
5. Quantity paid under this item will be
deducted from total quantity payable under
5 5. Dismantling Cofferdam made up of Earth AI.5 31700.00 Cum 0.00 INR Zero
or sand/clay for the construction of Only
substrucutre of bridges with all Contractor’s
labour, materials, tools and plants etc.
complete
6 6. Excavation for foundations in all type of AI.6 69220.00 Cum 0.00 INR Zero
soils, boulders including rock not requiring Only
blasting/chiseling including dewatering by
manual or mechanical means etc. as per
specifications with all contractor’s own
machinery and equipments, labour, taxes,
royalty, materials, all lead & lift, shoring,
strutting, timbering and buttressing with
sand/clay bags and all such measures
necessary to retain in position the sides of
the foundation pit and including refilling the
excavated material with ramming, leveling
the site and disposing off the
surplus/unusable earth to low lying area
within railway boundary or outside railway
premises as per directions of Engineer-in-
charge.
Note :- Only good earth should be used in
refilling of bank as per technical
specifications. Rate shall be inclusive of all
lead, lifts and transportation etc. complete.
7 7. Excavation for foundation of bridges in AI.7 6220.00 Cum 0.00 INR Zero
rock cutting by chiseling, burning, chemically Only
splitting etc. at all locations such as under
running track and adjacent to existing
structures, building ensuring compete safety
of trains and railway installations with all
contractors labour, tools, plants, machinery
and all blasting and other materials etc.
complete including loosening of excavated
material loading, in contractors transport
and leading it to nominated locations as
directed by engineer - in - charge unloading
stacking/ dressing with all lift and lead. All
the temporary arrangement will be done by
the contractor. No blasting of any type will
be permitted for excavation for foundation of
bridges.
NOTE:
1) The rate is inclusive of lighting arrangement
required during night working.
2) The rates are inclusive of all safety measures
to be adopted for protection of structures etc. in
the vicinity of works, obtaining license from local
authority.
3) Payment shall be made only for design profile
and no payment shall be given for any over cut.
4) Rate is inclusive of all type of dewatering i.e.
manually or by electic / diesel operated
pumps/motor. No extra payment is admissible for
dewatering.
8 8. Designing, providing and casting in Situ AI.8 5150.00 Cum 0.00 INR Zero
RCC 250mm dia micro pile including boring Only
by rotary method in all soils, boulders, rock
etc. (2m embedded in hard rock) or as
directed by Engineer-in-charge as per site
condition and providing with 1:1 sand
cement grout with W/c ratio 0.5 by tremie
method using antishrikage compound or M-
20 grade concrete with 10mm MAS
aggregate with all conctractor's labour,
material, cement, admixture, tools & plants,
equipments etc. complete as approved by
Engineer in charge. The diameter of bore in
rock shall be 225mm. Rate includes design
of retension system. (Measurement of micro
pills will be from cut-off level to top of pile).
Rate includes false concreting, breaking and
dewatering etc. complete (Reinforcement
and liner will be paid sparely under
appropriate items.)
Note :-
1. Boring for piles shall be done by rotary
drilling machine.
3. Mild steel liner and reinforcement steel
will be paid under relevant item.
4. Extra payment for using re`ady mix
concrete from automatic batching plant will
be made under relevant item.
5. Payment for pile will be made from pile
9 9.Providing Ready Mixed Concrete of M-20 AI.9 28645.00 Cum 0.00 INR Zero
grade concrete, produced from approved Only
microprocessor controlled automatic
batching plant, in levelling course of
foundation for bridge with machine crushed
graded stone aggregate and sand of
approved quality including all lead & lift,
dewatering, transporting, placing ,
compaction, curing of concrete including
using all types of form work, shuttering,
centering, scaffolding, etc. complete with all
contractors labour, cement, material,
construction chemicals such as plasticizer,
retarder etc, plants & machineries with all
lead & lift complete as per technical
specifications. (Minimum cement content
325 kg per cum & Maximum W/C ratio 0.4)

10 10. Providing design mixed M- 25 grade AI.10 0 INR Zero


Cement Concrete produced from approved Only
microprocessor controlled automatic
batching plant, for mass concrete bridge
work with Maximum aggregate size of
40/20mm crushed graded stone aggregate
and sand of approved quality including all
lead & lift, dewatering, weigh batching,
mechanical mixing, compaction, curing
including using all types of form work,
shuttering, centering, scaffolding, providing
necessary arrangment for fixing OHE mast
& bolts etc. complete with all contractors
labour, cement, material, construction
chemicals such as plasticizer, retarder etc,
plants & machineries with all lead & lift
complete as per technical specifications.
(Minimum cement content 350 kg per cum &
Maximum W/C ratio 0.4)

10.1 a) In foundations of bridge , drains, AI.10(a) 24300.00 Cum 0.00 INR Zero
retaining wall etc. Only
10.2 b) In pier, abutment, return walls, pier cap, AI.10(b) 75075.00 Cum 0.00 INR Zero
abutment cap of the bridge, retaining wall Only
and Drain walls
11 11. Providing design mixed Reinforced AI.11 0 INR Zero
Cement Concrete produced from approved Only
microprocessor controlled automatic
batching plant for RCC bridge work with
Maximum aggregate size of 20mm crushed
graded stone aggregate and sand of
approved quality including all lead & lift,
dewatering, weighbatching, mechanical
mixing, compaction, curing including using
all types of form work, shuttering, centering,
scaffolding, providing necessary arrangment
for fixing OHE mast & bolts etc. complete
with all contractors labour, cement, material,
construction chemicals such as plasticizer,
retarder etc, plants & machineries with all
lead & lift complete as per technical
specifications.

11.1 11(a) Reinforced Cement Concrete of M- AI.11(a) 17614.00 Cum 0.00 INR Zero
35 grade in pile caps, footing, RCC Only
Approach Slab, Raft and foundations of
bridge sub structures( Minimum cement
content 400 kg per cum & Maximum W/C
ratio 0.4)
11.2 11(b) Reinforced Cement Concrete of M- AI.11(b) 7817.00 Cum 0.00 INR Zero
35 grade in RCC walls & slabs of RCC BOX Only
bridge sub structures( Minimum cement
content 400 kg per cum & Maximum W/C
ratio 0.4)
11.3 11(c )Reinforced Cement Concrete of M-35 AI.11(c) 12010.00 Cum 0.00 INR Zero
grade in Piers, abutment, pier & abutment Only
caps of bridge sub structures( Minimum
cement content 400 kg per cum & Maximum
W/C ratio 0.4)
11.4 11(d) Reinforced Cement Concrete of M- AI.112(d) 2200.00 Cum 0.00 INR Zero
35 grade in RCC walls having thichkness Only
less than 300 mm for retaining wall,
boundary wall, dirt wall, RCC BOX, bridge
sub structures etc.( Minimum cement
content 400 kg per cum & Maximum W/C
ratio 0.4)
12 12. Providing, casting and placing in AI.13 1150.00 Cum 0.00 INR Zero
position precast Reinforced Cement Only
Concrete (RCC) Ballast retainer as per
RDSO's drg. No RDSO/B-10241 R for clear
span 9.15m in M-35 grade concrete
produced from approved microprocessor
controlled automatic batching plant, on
substructure of bridge, with Maximum
aggregate size of 20mm crushed graded
stone aggregate and sand of approved
quality including all lead & lift, weigh
batching, mechanical mixing, compaction,
curing including using all types of form
work, shuttering, centering, etc. complete
with all contractors labour, cement, material,
construction chemicals such as plasticizer,
retarder etc, plants & machineries with all
lead & lift complete as per technical
specifications.(Minimum cement content
400 kg per cum & Maximum W/C ratio 0.42)
Rate of this item is inclusive of
a)All labours, tools and plants required for
the work.
b) Cost of applying a bitumen layer of
atleast 2 mm thickness or equivalent
insulating layer over the deck slab if any.
c)Cost of providing PVC pipe as per drawing
for drainage.
d) launching of ballast retainer on
13 13. Providing design mixed M-45 grade AI.13 4239.00 Cum 0.00 INR Zero
cement concrete produced from Only
microprocessor controlled batching and
mixing plant, with Maximum aggregate
size(MAS) of 20mm graded stone
aggregates for precast post tensioned
Prestressed Concrete Girders, precast post
tensioned Prestressed concrete
slabs(casting in yard) , Cast in situ Voided
PSC Slab and Cast in situ PSC Box Girders
& launching of girders/slabs with all
contractors labour, material, tools and plants
including all lead and lift etc. complete as
per technical specification.

(Minimum Ordinary Portland cement & Micro


Silica content per cum of concrete shall be
440kg per cum & 30 kg per cum
respectively. Maximum W/C ratio 0.35)

The rate of the item is inclusive of


1.Providing HDPE pipes for future HTS
strand if any.
2.Platform, formwork, shuttering,
centering, scaffolding and supporting
system for concreting
3.mixing, vibrating, compaction and curing
of the concrete
4.Chemical compound such as super
14 14.Providing, casting and fixing design AI.14 550.00 Cum 0.00 INR Zero
Mixed concrete of M 25 grade for casting of Only
Pre-cast RCC members like footpath slabs,
Coping of bridges, Bridge Tablets, Bridge
Plaqe, etc with 20 mm graded machine
crushed stone aggregate, weigh-batching,
mechanical mixing, placing, compaction,
finishing the surface and curing of concrete
etc. with all special type of shuttering,
transportation fixing, staging, scaffolding
complete with contractor's tools, plants,
labours and materials of approved quality
including all lead and lift etc. complete as
per specifications & direction of Engineer-in-
charge. ( Minimum Cement Content- 350
Kg & Maximum Water/Cemet Ratio-0.45).
Note :-
1. Only reinforcement steel will be paid
under relevant items.
2. Rate is inclusive of casting in yard ,
curing, transporting and placing in position
with all contractor's labour with all lead & lift.
3. Rate is also inclusive of multiple handling
before final placing & fiixng of member.
4. Measurement for payment of this item will
be based on dimension of precast member.
5. Payment of this item will be relased only
after fixing of precast member at its final
position.
15 15.Providing and placing in position high AI.15 5000.00 MT 0.00 INR Zero
yield strength deformed TMT bars Fe 500 D Only
procured from primary manufacturer such
as SAIL, JINDAL, TISCO or Rashtriya Ispat
Nigam Ltd. conforming to IS 1786 of all
diameters in R.C.C items. The rates include
supply, loading, unloading, transporting to
site, cutting, bending, hooking, placing and
fixing in position with contractor’s galvanized
binding wire of 18 SWG, labour, tools &
plants all lead & lift, crossing of tracks etc.
as per the approved drawings as directed
by the Engineer.
Note:
(i) The item will be paid only for quantities
used actually excluding overlaps other than
designed
(ii) The wastage, cut pieces shall be taken
away by the contractor and the same will
not be paid.
(iii) The design overlaps / embedment
length only will be paid and other overlaps
will not be paid.

16 16.Extra for using G grade (410L) Ferritic AI.16 2300.00 MT 0.00 INR Zero
Stainless Steel Rebar confirming to Bureau Only
of Indian Standards (BIS): IS 16651:2017 in
lieu of HYSD TMT bars Fe 500 D grade
under item no. 15.
17 17. Extra for providing Fusion Bonded AI.17 500.00 MT 0.00 INR Zero
Epoxy coating to Reinforced Steel Only
18 18. Providing, fabricating, fixing in position AI.18 400.00 MT 0.00 INR Zero
to exact design profiles and prestressing of Only
H.T. steel cables of all classification made
from high tensile, Low Relaxation strands
conforming to IS:14268 -1995 in
Prestressed Concrete girders/slabs etc.
including supplying, cutting, making into
cables with necessary spacers, colour
coding, protecting with water soluble oil at
all time, including supplying and fixing in
position anchorages of approved quality and
make conforming to BS:4447, covering with
rich epoxy mortar pad of all anchorages,
recesses after stressing and anchoring of
cables, including supplying and placing
spiral corrugated type galvanised metal
steel ducts sheathing made up of Cold
Rolled Cold Annealed (CRCA) mild steel
conforming to IS:513 of required diameter
and thickness, placing, bending,
routing,fixing, grouting of cable ducts with
cement grout after stressing etc. including
all lead and lift with contractor’s own
materials, cement, labours, taxes,
equipments, machineries for prestressing
etc. complete as per drawings,
specifications and direction of Engineer.

19 19. Providing two coats of coal tar epoxy of AI.19 31800.00 sqm. 0.00 INR Zero
anticorrosive coal tar epoxy Hi Build Only
compound over one primer coat of epoxy
zinc phosphate with all lead and lift
including all contractors labour, material,
tools & plants etc. complete.
20 20. Providing protective coating to exposed AI.20.c 42778.00 sqm. 0.00 INR Zero
concrete face of bridge as per CECRI, Only
Karaikudi - integrated 4 coat system having
1st cost of micaceous iron oxide under coat,
second coat polymide primer, third coat of
polymide finish coat and last coat of
aliphatic acrylic polyurthane finish coat
(Bergerthane or similar paint) as per
detailed specification attached.

21 21. Providing 40 mm thick mastic asphaltic AI.21 2748.00 Cum 0.00 INR Zero
wearing coat on deck slab by applying Only
primer coat of bitumen 10/20 grade at the
rate of 0.80 kg/m2 compacting with
approved tamping equipment etc. complete
as per technical specifications & as directed
by Engineer in charge at site.

22 22. Extra for using Ready Mix Concrete AI.22 189090.00 Cum 0.00 INR Zero
(RMC) for MS or NS items of concrete Only
wherein concrete will be produced from
approved microprocessor controlled
automatic batching plant and transportation
to site using rotating transit mixture as per
the instruction of Engineer in charge,
including all lead and lifts till the point of
placement of concrete.
23 23 Extra for using equipments like placer AI.23 189090.00 Cum 0.00 INR Zero
boom/concrete pump/ crane bucket method Only
for pouring/placing of concrete in its final
position, with all contractors labours, tools,
plants, machinery, consumables, etc
complete and as directed by Engineer-in-
Charge.
24 24. Preparing and submitting to Railways, 1 AI.24 358.00 sqm. 0.00 INR Zero
sets of completion drawings (all detailed Only
drawings) after completion of work, on
polyester based tracing films (min. 75
microns thick, one side mat of superior
quality) in black indelible ink duly
incorporating all additions and alterations in
red ink, along with a copy of the same on a
CD, 6 blue prints and 1 copy on RTF.
25 25. Providing and fixing shoring for AI.25 6500.00 sqm. 0.00 INR Zero
protection of Railway embankment with Only
Steel sheet piles/ Steel plates, channels, I
section, bolts and nuts with all contractors
material, labour, tools and plants with all
lead & lift Including excavation, concreting,
dewatering if any required for shoring
including strutting and removing the shoring
when not required.
NOTE :-
1. This item will be operated only for
protection of existing embankment of
railway track for extension of bridge having
embankment height more than 3.00 m .
2. Contractor shall provide detailed drawing
of shoring supported with detailed design
calculation and erection scheme for
approval of Railway Engineer.
3. The mode of measurement for this item is
area of shoring protecting embankment
work out by measuring height & length of
shoring.
4. After completion of work released
material of shoring will be the property of the
contractor.
5. Execution of this item is solely on
discretions of Engineer-In-charge. His
decision is final and binding.
6. Erection and dismantling of shoring within
26 26. .Providing levelling cource over AI.26 1510.00 sqm. 0.00 INR Zero
abutment, pier for slab bed 50 mm thick in Only
cement and cast iron boring in 1:1 mix
proportion by weight up to paste consistancy
with all contractor's labour, material,
equipments, tools & plants with all lead &
lift, including mixing, laying, levelling,
setting, compacting, finishing, curing etc.
complete as per the direction of engineer-in -
charge.
27 27. SProviding & placing boulders/stones AI.27 19300.00 Cum 0.00 INR Zero
behind abutment/ retaining wall by hand Only
packing to required height and width with all
contractor's labour, material, stone etc.
complete with all lead & lift as per Railway
Specification and directions of Engineer-in-
charge.
28 28 Supplying and filling back fill materials AI.28 12290.00 Cum 0.00 INR Zero
consisting of granular materials of GW, GP, Only
SW group as per IS -1498-1970 in required
profile behind boulder filling of abutments,
return wall above bed level including the
cost of all material, labours, all lead, lifts
tools, plants as per drawings and technical
specifications as directed by Engineer.

29 29. Providing rubble soling in foundations, AI.29 6000.00 Cum 0.00 INR Zero
etc. with all contractor's stone, material, Only
labour, tools & plants etc. including all lead
& lift, transportation etc complete as per
Railway's/MRVC’s specifications and
direction of Engineer-in-charge

30 30. Providing and laying Pitching with stone AI.30 6100.00 Cum 0.00 INR Zero
boulders weighing not less than 35 kg each Only
with the voids filled with cement sand mortar
1:4 on slopes laid over prepared filter media
including boulder apron laid dry in front of
toe of embankment complete as per
drawing and Technical specifications (Filter
media to be paid separately under the
relevant item)
31 31. Obtaining administrative approval from AI.31 10.00 Each 0.00 INR Zero
tree authority for the cutting/transplanting of Only
trees coming in the way of proposed work
including preparation of drawing showing
the details of trees, processing for the
sanction etc. complete.
Note:-
(1) Fees for obtaining permission of tree
cutting/transplanting etc. will be paid
separately by MRVC.
(2) The required permission/all formalities
from concerned tree authority will be
obtained by contractor.
(3) Once job means permission for tree
cutting/transplanting in an area specified by
Engineer

32 32. Removal and transplantation of all size of AI.32 0 INR Zero


trees with all contractor's machines, tools and Only
plants, equipments, labour etc. at the specified
place as per instructions of the Engineer-In-
Charge. The work has to be carried out as per
special condition attached. The contractor shall
take the services of good gardener (having vast
experience of transplantation) during the time of
transplantation of trees the contractor has to
maintain the tree by guarding, protecting,
watering trees during maintenance period.
Payment will be made as per special condition
attached. The rate is inclusive of cost of uprooting
the tree after excavation for exposing the roots
excavation of pit for transplantation of size
suitable to the size of uprooted tree, filling of
earth soil, manure watering etc. including
transportation of trees from original places to
earmarked places. The rate also includes the
purning of trees required for balancing as well as
making access if required.
Mode of Payment :
i) One week after transplantation of trees - 50%
of accepted rate.
ii) Three months after transplantation of trees -
10% of accepted rate.
iii) Six months after transplantation of trees -
15% of accepted rate.
iv) Nine months after transplantation of trees -
32.1 (a) Small size trees having girth up to 600 AI.32(a) 100.00 Each 0.00 INR Zero
mm. Only
32.2 (b) Trees having girth above 600 mm up to AI.32(b) 150.00 Each 0.00 INR Zero
1499 mm. Only
32.3 (c) Trees having girth above 1500 mm. AI.32(c) 100.00 Each 0.00 INR Zero
Only
33 33.Felling trees of girth (measured at a AI.33 0 INR Zero
height of 1m above ground level) including Only
lead and stacking of material within 100m.
Note : 1. When stumps are grubbed up in
addition, the rates shall be doubled for trees
cut and grubbed. 2. Payment for grubbing
shall only be made where specially ordered.
3. Grubbing shall be ordered only where it is
essential to remove the stumps, including
the roots, as per specification. 4. Grubbing
shall include removal of roots of trees and
saplings to a depth of 60 cm below ground
level - or 30 cm below formation level or 15
cm below sub grade level, whichever is low

33.1 (a) Girth over 30 cm and upto 60 cm AI.33(a) 764.00 Each 0.00 INR Zero
Only
33.2 (b) Girth over 60 cm and upto 1.5m AI.33(b) 1452.00 Each 0.00 INR Zero
Only
33.3 (c) Girth over 1.5m AI.33(c) 312.00 Each 0.00 INR Zero
Only
34 34. Providing, Driving/boring and casting AI.34 0 INR Zero
bored Cast in-situ Reinforced Cement Only
Concrete Pile (As per IS :2911 of 1997) of
1200mm dia in M-40 grade Design Mix
Cement Concrete produced from
microprocessor control automatic concrete
batching and mixing plant using MAS of
20mm machine crushed graded stone
aggregate in all types of strata including
boring in soil of all type, soft rock, hard rock,
boulder etc.to the required depth as decided
by the Engineer-in-charge including
chiselling in rock and socketing in hard rock,
bailing out water, flushing, placing of
concrete with tremmie pipe, Chipping off of
pile top to remove laitance concrete above
cut off level with all contractor's material,
labour,tools,plants with all lead and lift etc.
complete.as per specifications. Rate is
inclusive of weigh-batching of ingredients,
mechanical mixing, placing, compaction with
tremmi pipe, disposal of excavated
materials outside railway premises or as per
direction of Engineer-in-charge, levelling of
ground, etc complete as per direction of
Engineer-in-charge.
Note :-
1. Boring for piles shall be done by rotary
drilling machine only.
34.1 a. 1200 mm Dia RCC Pile in M-40 Grade AI.34(a) 9946.00 RM 0.00 INR Zero
Only
34.2 b. 1000 mm Dia RCC Pile in M-40 Grade AI.34(b) 750.00 RM 0.00 INR Zero
Only
34.3 c. 900 mm Dia RCC Pile in M-40 Grade AI.34(c) 500.00 RM 0.00 INR Zero
Only
35 35. Extra for chieselling in addition to boring AI.35
of piles if chieselling is resorted to in hard
rock or big stone boulders larger than 30 cm
depth by any means i.e. by chiesel or
manual chiesel and hammer method

35.1 a. 1200 mm Dia RCC Pile AI.35.1 1492.00 RM 0.00 INR Zero
Only
35.2 b. 1000 mm Dia RCC Pile AI.35.2 113.00 RM 0.00 INR Zero
Only
35.3 c. 900 mm Dia RCC Pile AI.35.3 75.00 RM 0.00 INR Zero
Only
36 36. Supplying, fabricating, fixing, driving and AI.36 1140.00 MT 0.00 INR Zero
providing mild steel liners 6 mm to 8 mm Only
thick as per directions of Engineer-in-charge
and permanently left in place cast in steel
RCC pile with bending to shape, welding,
with all contractor's materials, labour, tool &
plant etc. complete as per specifications and
direction of Engineer-in-charge.
Note:
1. Liners shall be provided for full height of
pile or upto the depth of refusal of liners
including the height of pile to be chipped off
or as per the instructions of the Engineer.
Liner shall be paid only upto cut off level of
pile. Liner above cut off level, if initially
provided, shall not be paid. Contractor will
be allowed to take away liner-wastage
above cut off level.
2. Nothing extra shall be payable for any
wastage, fabrication tolerances etc.
3. Depth of liner shall be decided by
Engineer-in-charge at site and his decision
shall be final and binding on the contractor.
37 37. Conducting static load testing of a single AI.37
pile Up to full capacity in accordance with IS
2911(Part IV) including installation of
loading platform and preparation of pile
head or construction of test cap and
dismantling of test cap after test etc with all
labour, material, tool & plants, equipment,
machinery, etc complete as per drawing and
specification, as directed by the Engineer

37.1 a. Initial Load Test AI.37(a) 12.00 Each 0.00 INR Zero
Only
37.2 b. Routine Load Test AI.37(b) 12.00 Each 0.00 INR Zero
Only
38 38. Lateral load testing of single pile in AI.38 12.00 Each 0.00 INR Zero
accordance with “IS Code of practice IS: Only
2911 (Part IV) for determining safe
allowable lateral load of pile” with all labour,
material, tool & plants, equipment,
machinery, etc complete as per drawing and
specification as directed by the Engineer

39 39. Conducting High strain Dynamic testing AI.39 15.00 Each 0.00 INR Zero
as per ASTM D 4945-89 (Code of American Only
Society for Testing and Material ) on cast-in -
situ RCC pile of 1200 mm diameter inclusive
of analysis including all contractor's
equipments, manpower, site preparation,
build up of pile head, lead and lifts etc
complete as per standard procedure, and as
directed by the Engineer in Charge.
Note :- Rate is inclusive
1 All eqiupment such as hammer, crane,
steel plate, plywood, fuel, power, water etc.
2 All labour and consumable required
3 Mobilisation of equipments, staff etc.
4 Preparation and submission of Reports in
3 copies.
5 Site preparation
6 Extra legth of pile head to be casted for
dynamic testing and also dismantling of the
same after test.

40 40. Conducting Pile low strain integraty test AI.40 836.00 Each 0.00 INR Zero
as per ASTM D 5882- 96 code of American Only
Society for Testing on cast-in -situ RCC pile
of 1200 mm & 1500 mm diameter inclusive
of analysis, with all contractor's equipments,
manpower, site preparation, lead and lifts
etc complete as per standard procedure,
and as directed by the Engineer in Charge.
Note :- Rate is inclusive
1 All eqiupment .
2 All labour and consumable required
3 Mobilisation of equipments, staff etc.
4 Preparation and submission of Reports in
3 copies.
5 Site preparation

41 41. Painting the HFL and danger level AI.41 200.00 Each 0.00 INR Zero
marks, year of HFL on bridge abutments substru Only
and piers with ready mixed paint as per cture
standard in two coats over one coat of
primer with all materials, labour, tools,
scaffolding, all lead and lift etc including
writing complete
42 42. Boring vertically for sampling & field AI.42 1000.00 RM 0.00 INR Zero
testing of strata through all type of soil Only
strata, weathered rock and soft rock except
hard rock with rotary drilling machine for
bore diameter of 100 mm for depths as
measured below from existing ground level
at rig location with all contractors labours,
tools, plants, machinery, consumables,
transport etc. complete and as per direction
of Engineer-in- Charge.

43 43. Drilling 70 mm diameter bore holes AI.43 759.00 RM 0.00 INR Zero
vertically through boulders and bedrocks Only
strata using NX size diamond bit using
double core barrel with suitable core cutter
including collection and logging of cores in a
proper sequence, numbering each core etc
all as per BIS specifications for the depths
as required for fixing depth of foundation
and as required for deciding foundation
depth and as decided by Engineer-in-
Charge, measured beyond the depth
covered by item NS-2 above with
contractors labours, tools, plants,
machinery, consumables, transport
complete and as directed by Engineer-in-
Charge.
44 44. Determination of Ultimate compressive AI.44 50.00 Nos. 0.00 INR Zero
strength of rock as per BIS code 9143:1979 Only
for rock samples obtained from bore hole
location with contractors labours, tools,
plants, machinery, consumables, transport
complete and as directed by Engineer-in-
Charge with contractors labours, tools,
plants, machinery, consumables, transport
complete and as directed by Engineer-in-
Charge.

45 45. Supplying, laying and jointing in cement AI.45 246.00 RM 0.00 INR Zero
mortar 1:1 contractors Hume pipe of Only
1200mm dia NP-4 (conforming to RDSO
Drg. No. R-372 and RDSO/B-1609-R for
1200mm dia Hume pipe ) including
transportation, placing in position,
alignment, etc. complete with all leads and
lifts loading and unloading with all leads and
lifts loading and unloading with all
contractor's labour and materials including
Hume pipe, collars, tools and equipment,
etc. complete. (Min. Cement consumption
0.115 bags per joint.)
46 46. Boring, providing and installing Precast AI.46
reinforced concrete piles of specified
diameter below the pile cap in Ready mixed
controlled cement concrete of M35 grade, to
carry safe working load not less than
specified, excluding the cost of steel
reinforcement but including the length of pile
to be embedded in the pile cap etc. all
complete. The item includes precast pile
shuttering for casting, boring in all types of
soil including chiseling in hard rock for
socketing, temporary liners or use of
bentonite slurry for avoiding side collapse of
ground, chipping off pile top above cut off
level etc. complete with contractor’s tools,
materials, plants, chemical admixtures etc.
as per Railway’s specification and relevant
codes. Note:-1) Rate of RMC is
inclusive in the Item hence no extra
payment will be made for RMC. (2) No site
concreting is allowed for casting of pile only
RMC is allowed.

46.1 a. 600 MM DIA AI.46.a 1250.00 RM 0.00 INR Zero


Only
46.2 b.300 mm Dia AI.46.b 1250.00 RM 0.00 INR Zero
Only
47 47. Providing and removing barricading with AI.47 56000.00 RM 0.00 INR Zero
the help of portable fencing along the Only
running track where the work is to be done
in close vicinity of the track. Fencing shall
consist of self supporting steel angles of
size 50 x 50 x 6mm, 1.5m long provided
with hooks etc. and embedded in CC 1:2:4
block of size 0.23x0.23x0.23M placed at c/c
distance of 2.0 M along the track. 12 mm
dia rods in three horizontal layers tack
welded with the angle posts including
providing green colour cloth &Retro-
reflective tapes in Horizontal & vertical
direction. Note : Released material
will be the property of the contractor after
the completion of work. Rate is also
inclusive of protection and maintenance of
barricading during construction period.
48 Earth work with compaction in all height in AI.48 0 INR Zero
Railway embankment including bridge Only
approaches with contractors own earth as
per specification attached in the tender
document with all lead and lift, spreading in
layers, watering and rolling at OMC with
contractors power driven vibro roller of
minimum 8 to10 tonne capacity to the
required density of min.98% of MDD as
obtained from heavy compaction modified
proctors test in accordance with IS2720(pt
VIII) 1983 and IS 10379 of 1982 including
dressing the top and side slopes and
forming the profile with all contractors tools,
labours, materials and plants, fuel,
consumable etc. complete. The work shall
be carried out as per RDSO’s GUIDELINES
FOR EARTHWORK IN RAILWAY
PROJECT (GE:G-14) OF JULY 2009.
Note:-
1). Only vibro roller shall be used for
compaction of earthwork.
2). Each layer of the earthwork shall be
leveled in proper side and longitudinal
slopes with grader machine.
3) The work within 3.5m from existing track
centre shall be done only in traffic block,
during day/night .
4) The rate is inclusive of lighting
48.1 a. In the Section From Km. 60 (Ch. 0.00) to AI.48.a 650000.00 Cum 0.00 INR Zero
Km. 62 (Ch. 2000.00) and Km. 74 (CH. Only
16000) to Km. 111 (Ch. 52200)
48.2 b. In the Section From Km. 62(CH. 2000) to AI.48.b 818000.00 Cum 0.00 INR Zero
Km. 68 (CH. 9000) and 111 km(Ch. 52200) Only
to 123 km (CH. 64000)
Note :- This section is affected by tidal water
having comprissible sub soil strata and will
be given treatment to achive 90%
cosolidation in sub soil in construction stage
itself by providing PVD band drain and pre
loading of embankment
49 49. Providing prefabricated vertical PVC AI.49 1500000.00 RM 0.00 INR Zero
drainage system (band drain) Only
(100mmx4mm) with all contractor's material,
tools and plants, equipment, labour etc.
complete with all lead and lift and as per
RDSO report No. GE-R-68 (Prefabricated
Vertical PVC drainage system for
construction of embankment on
compressible soft soil) and as directed by
Engineer-in-charge.
Note :-
1) Railways decision on spacing and
pattern of vertical PVC will be final and
binding on the contractor.
2) Contractor shall take approval to the
make of the prefabricated vertical PVC drain
system from the engineer in charge of the
work before placing order.
3) Contractor shall submit detailed
methodology for the provision of
prefabricated PVC vertical drainage system
for approval of engineer-in charge.
4) The work within 3.5m from existing track
centre shall be done only in traffic block,
during day/night only.
5) The rate is inclusive of lighting
arrangement required during night working.
6) Rate is inclusive submitting design for
spacing of PVC band drains duly proof
50 50. Providing prefabricated PVC drainage AI.50 180400.00 RM 0.00 INR Zero
system (band drain) (100mmx4mm) Only
horizontally in the embankment with all
contractor's material, tools and plants,
equipment, labour etc. complete with all
lead and lift and as per RDSO report No. GE-
R-68 (Prefabricated Vertical PVC drainage
system for construction of embankment on
compressible soft soil) and as directed by
Engineer-in-charge.
51 51. Earthwork in filling with compaction in AI.51 10000.00 Cum 0.00 INR Zero
Foundation with contractors own earth as Only
per specification in the tender document
including leading, lifting, transportation,
spreading, in layers, watering and rolling
at OMC with contractors power driven roller
8 to10 tonne capacity to the required density
of minimum 95% of MDD as obtained from
heavy compaction modified proctors test in
accordance with IS2720(pt VIII) 1983 and IS
10379 of 1982 including dressing the top
and side slopes and forming the profile with
all contractors tools, labours, materials and
plants etc. complete. The work shall be
carried out as per RDSO's GUIDELINES
FOR EARTHWORK IN RAILWAY
PROJECT (GE: G-14)
Note: -
1. This item will be operated for refilling of
earth in removed marine clay subsoil of
existing ground for foundation of bridges
from ch. 2000 to ch. 14000
2. Payment under this item will be made up
to original ground level.
3. In case, if there is difficulty in operation of
roller due to underground water, compaction
with plate compacter with 20 cm loose layer
will be permitted for this item.

52 52. Earth work with compaction in all height AI.52 0 INR Zero
on Railway embankment for preloading of Only
earthen embankment including bridge
approaches with contractors own earth as
per specification attached in the tender
document with all lead and lift, spreading in
layers, watering and rolling at OMC with
contractors power driven vibro roller of
minimum 8 to10 tonne capacity to the
required density of min.90% of MDD as
obtained from heavy compaction modified
proctors test in accordance with IS2720(pt
VIII) 1983 and IS 10379 of 1982 including
dressing the top and side slopes and
forming the profile with all contractors tools,
labours, materials and plants, fuel,
consumable etc. complete. The work shall
be carried out as per RDSO's GUIDELINES
FOR EARTHWORK IN RAILWAY
PROJECT (GE:G-1) OF JULY 2003.
52.1 a) km 60 to km 68.6 and 82 km to 124 km AI.52.a 182250.00 Cum 0.00 INR Zero
Note:- Only
1). Only vibro roller shall be used for
compaction of earthwork.
2) Rate is inclusive of protecting track side
slope of earth loading by bags filled with
clay/sand/granular material.
3) The work within 3.5m from existing track
centre shall be done only in traffic block,
during day/night only.
4) The rate is inclusive of lighting
arrangement required during night working.

53 53. Removing earth used for preloading of AI.53 546750.00 Cum 0.00 INR Zero
Railway formation by excavation /cutting Only
and re-use the same for preloading of
railway formation at subsequent sub
sections or development of forecourt
area/railway formation including loading,
unloading, transportation with all lead & lift,
spreading, watering, compaction, testing
etc. complete with all contractor’s labour,
tool & plant etc.
Note:
1. Earth removed from first sub section of
embankment used for preloading after
required/design waiting period shall be used for
preloading of subsequent sections.
2. Payment of preloading of second &
subsequent section will be paid under this item.
3. Earth removed from last subsection used for
preloading shall be used for filling in low laying
area in Uran station yard with all lead & lift and it
will be paid under this item.
4. Only vibro roller shall be used for compaction
of earthwork.
5. Rate is inclusive of protecting track side slope
of earth loading by bags filled with
clay/sand/granular material
6. The work within 3.5m from existing track centre
shall be done only in traffic block, during
day/night only.
7. The rate is inclusive of lighting arrangement
54 54. Provision of Blanketing over finished AI.54 206000.00 Cum 0.00 INR Zero
formation as per RDSO's latest specification Only
and procedures by supplying materials of
approved quality, blending/ mixing,
spreading in layers not exceeding in 30 cm
in thickness in loose conditions by paver,
leveling by grader, compacting by vibro
roller of required capacity upto desired
degree of compaction (not less than 98% of
MDD), finishing of correct profile with all lead
& lift, complete in all respect upto the
satisfaction of Railway site engineer. Rate
also includes watering wherever requiring,
all tools, plants, machinery, testing
equipment and charges, labours, all taxes,
Royalties, Octroi etc. as may be required.
The work shall be carried out as per RDSO
Guidelines for earthwork in Railway Project
(GE:G-1) OF JULY 2003, Specification for
mechanically produced blanketing material
for Railway formations including guidelines
for laying (IRS-GE-2) and RDSO/2007/GE :
0011.
Note:-
1)Blanketing material shall be prepared by
blending of different type of mechanically
produced crushed material. Blending of
material shall be done with either
a) Drum type blenders or by
55 55. Earthwork in cutting in all type of soils, AI.55 259000.00 Cum 0.00 INR Zero
boulders including rock not requiring Only
blasting/chiseling in formation, trolley
refuges, side drains, level crossing
approaches, platforms, catch water drains,
diversion of nallah & finishing to required
dimension and slopes to obtain a neat
appearance to standard profile inclusive of
all labour, machine and materials and
removing & leading all cut spoils for filling in
embankment with all leads within the
section limit, lifts, ascent, descent, loading,
unloading, all taxes/royalty, clearance of site
and all incidental charges, bailing &
pumping out water if required, etc.,
complete as per directions of the Engineer-
in-Charge. The work is to be executed as
per Latest / updated edition of "Guidelines
for Earthwork in Railway Projects" issued by
RDSO, Lucknow. Cut trees shall be property
of Railways and to be deposited in the
railway godown unless specified otherwise
in the Special conditions of contract.
Note :-
1. This item is applicable for excavation in
all type of soils including ordinary soil, clay,
soft murum, hard Murum, soft rock,
boulders, hard rock but excluding hard rock
requiring blasting.
56 56. Earthwork in cutting in hard rock AI.56 65000.00 Cum 0.00 INR Zero
requiring blasting by chiseling / controlled Only
blasting in formation, trolley refuges, side
drains, level crossing approaches,
platforms, catch water drains, diversion of
nallah & finishing to required dimension and
slopes to obtain a neat appearance to
standard profile inclusive of all labour,
machine and materials and removing &
leading all cut spoils for filling in
embankment with all leads within the
section limit, lifts, ascent, descent, loading,
unloading, all taxes/royalty, clearance of site
and all incidental charges, bailing &
pumping out water if required, etc.,
complete as per directions of the Engineer-
in-Charge. The work is to be executed as
per Latest / updated edition of "Guidelines
for Earthwork in Railway Projects" issued by
RDSO, Lucknow. Cut trees shall be property
of Railways and to be deposited in the
railway godown unless specified otherwise
in the Special conditions of contract.
NOTE:
1) This item is applicable for excavation in
hard rock requiring blasting only.
2) Excavation under this item shall be done
by either chiselling such as pavement
breaker attached with mechanical earth
57 57. Providing Dry Lean Conrete in AI.57 1400.00 Cum 0.00 INR Zero
approaches of Bridges with Maximum Only
Aggregate Ceent Ratio of 11:1 and
minimum OP Cement content of 170 Kg per
cum and Fly Ash of 50 Kg per cum with
Optimum Water content with all contractors
material Labour, plant & equipments and all
lead and lift etc complete. Seven day
crushing strength of Dry lean mix shall be
minimum 10 Mpa and Dry density of Conete
mox shall be minimum 2350 Kg per cum.
Rate is inclusinve of mixing, placing,
compaction and curing of Dry lean concrete.
58 58. Conducting in situ full size Plate load AI.58 180.00 Each 0.00 INR Zero
test (PLT) at selected location to determine Only
Ev2 Modulus of elasticity (also Deformation)
at the second step loading as per German
code DIN 18134:20018 FOR DETERMINE
THE DEFORMATION AND STRENGTH
cHARACTORSTICS OF SOIL BY PLATE
LOAD TEST including making loading
arrangements etc. with all contractor's
labour, tools, gauges etc. complete with all
lead and lift including excavation and
refilling of trial pit

59 59. Dismantling & removing of existing track AI.59 16000.00 MT 0.00 INR Zero
including T/outs of any description, including Only
hauling of materials , track crossing ,loading
unloading transporting the materials as such
as rails steel sleepers ( Except PSC
sleepers ) & fittings etc to railway’s depot
and stacking the same at the suitable places
within the lead of 100 m. as per the
direction of Rly Engineer (Including
dismantling of concrete/ masonry,
foundations which will be paid in relevant
item) with all contractor’s labour material,
transport arrangement tools and plants etc
complete.
Note:
1) Payment against this item shall be
released only after the material is
transported and stacked in Rly’s
depot/stacking place & properly accounted
for to the satisfaction of Engineer-in-charge.
2) Turn out length will be considered as 1.6
times of plain track
3) Released scrap material will be sent to
Mahalaxmi/Haji Bunder depot by the
contractor. 4)Transportation charges will be
paid separately under relevant items, 50%
payment will be withheld till
5) If the material is to be handed over to
open line, then it should be well stacked at
60 60. Providing following machineries on hire AI.60 0 INR Zero
basis for railway work as directed by Only
engineer incharge at site. With all
contractor’s machinery, fuel, operator, crew,
assisting labour etc, complete . The rate of
hiring the machinery will be per shift, one
shift means working of 8 hrs or part there of.

60.1 a) JCB machine AI.60.a 100.00 Per Shift 0.00 INR Zero
Only
60.2 b) Dumper/Truck of 9.5 MT capacity AI.60.b 200.00 Per Shift 0.00 INR Zero
Only
61 61. Hiring of Hydra cranes 8-10 tonnes AI.61 200.00 Per Shift 0.00 INR Zero
capacity during traffic block or otherwise at Only
the discretion of the engineer, the
requirement is over and above the
schedule item. The requirement of hydra if
any for the normal working to execute a
particular item is covered in the relevant
items only.
62 62. Transportation of small fittings, with all AI.62 120.00 MT 0.00 INR Zero
contractor's truck, trailer, labour, Only
consumables etc., complete with lead up to
50 Kms with in Mumbai division from any
place to any place including loading and
unloading. Rate is also inclusive of stacking
material and with lead of 100m for manual
hauling from stack to loading/ unloading
point.
63 63. Transportation of all types of MBC, rails, AI.63 1750.00 MT 0.00 INR Zero
SEJ, CMS Xings, switches of T/out and Only
Derailing switches etc., with all contractor's
truck, trailer, labour, consumables etc.,
complete with lead up to 50 Kms with in
Mumbai division from any place to any place
including loading and unloading. Rate is
also inclusive of stacking material and with
lead of 100m for manual hauling from stack
to loading/ unloading point.

64 64. Unloading of P.Way materials from AI.64 0 INR Zero


Railway's BFR, BRH wagons, trucks, trailers Only
with or without traffic block during day or
night at MRVC yard and jurisdiction of CPM-
II , MRVC and at specified location as
directed by the Engineer-in-charge and
stacking the same neatly free from any
infringement upto a lead of 50m with all
contractor's machinery, tools and plants,
labours etc. complete.

64.1 a. Ordinary/special PSC sleepers AI.64.a 9130.00 MT 0.00 INR Zero


Only
64.2 b. Single rails, rail panels, switches & AI.64.b 2400.00 MT 0.00 INR Zero
crossing/SEJ and fittings Only
65 65. Transportation of (excluding loading AI.65 0 INR Zero
and unloading) PSC main line or any other Only
PSC sleepers including point and crossing
sleepers and P.Way fittings & fastenings
and other similar materials (other than rails,
crossing, switches) etc. by contractor's road
vehicles from any place in Central Railway
to Kasara and any other location under
jurisdiction of CPM-I,I MRVC with contractor
vehicles, cranes crew fuel and other
consumables, labour, tools & plants and all
lead and lift etc. complete as per pecified
and as directed by the Engineer at site.
NOTE:-
i) For the purpose of variation, gross total of
this item will be considered, variation in
individual sub item may be upto any extent.
ii)For the purpose of payment, actual
sleepers transported with the shortest
distance from the factory will be considered.
iii) Payment will be made as per weight of
sleeper according to latest sleeper drawing
No.RDSO/T 2496 (60 Kg) UIC for main line
sleepers and drawing No.RT-4512 to RT
4594 for 1 in 12 T/out and RT-4793 to RT-
4844 & 4512 for 1 in 8.5 T/out.
iv)Loading of PSC sleepers will not be paid
separately transported from sleeper factory,
as PSC sleepers loading is being done by
65.1 a) For lead upto and including 50 Km AI.65.a 342790.00 MT km 0.00 INR Zero
Only
65.2 b) For additional lead above 50 km and upto AI.65.b 342790.00 MT km 0.00 INR Zero
and 100 Km including. Only
65.3 c) For additional lead beyond 100 Kms AI.65.c 1371160.00 MT km 0.00 INR Zero
Only
66 66. Loading of PSC M/L and other PSC AI.66 6855.80 MT 0.00 INR Zero
sleepers, including points and crossing Only
sleepers P.way fastenings and other similar
materials ( other than rails, crossings and
switches) on to Railways/ Contractor's)
Road vehicles / BFRs (covered/ open
wagons/ BFRs) and stacking neatly in/on
the above mentioned vehicles at any of the
stations/sleeper factory, or in mid section of
Central Railway including up to 50m lead
and lift upto 1.5m including crossing of
tracks if any with contractor's labour, tools,
plant equipment, machinery, all lead and
lifts etc. complete as per specifications and
as directed by the Engineer-in-charge

67 67. Loading of rails, crossing and other AI.67 2400.00 MT 0.00 INR Zero
similar materials on to (Railways/ Only
Contractor's) Road vehicles/ BFRs
(covered/open wagons/ BFRs) and stacking
neatly in/on the above mentioned vehicles
at any of the stations/sleeper factory, or in
mid section of Central Railway including
leading up to 200m including crossing of
tracks if any with contractor's labour, tools,
plant equipment, machinery, all lead and
lifts any consumables required etc.
complete as per specifications and as
directed by the Engineer-in-charge

68 68. Transportation of (excluding loading and AI.68 0 INR Zero


unloading) of rails, crossing, switches and Only
other similar materials by contractor's road
vehicles such as trailers, trucks etc. to
leading places from any stations/ mid
sections in Western Railway at any location
under the jurisdiction of CPM-II MRVC with
contractor vehicles, cranes, crew, fuel and
other consumables, labour, tools and all
lead and lift etc. complete as per sections
and as directed by the Engineer at site.

68.1 a) For lead upto and including 50 Km AI.68.a 2400.00 MT km 0.00 INR Zero
Only
68.2 b) For additional lead above 50 km and upto AI.68.b 2400.00 MT km 0.00 INR Zero
and 100 Km including. Only
68.3 c) For additional lead beyond 100 Kms AI.68.c 720000.00 MT km 0.00 INR Zero
Only
69 69. Supplying, collecting and stacking of AI.69 0 INR Zero
hard stone, machine crushed 65mm gauge Only
ballast as per revised specification IRS GE-
1, June 2004 (with updated correction slips)
along the cess / within Railway land or
whenever space is available or on the
completed embankment as directed by
Engineer – in – charge including leveling the
ground before stacking all lead lift, ascent,
descent, crossing of nallah, track or any
other type of obstruction etc. making
approach road wherever required for this
work including all taxes, royalty, Octoroi and
other charges, if any levied from time to
time. Measuring instruments and manpower
for measurement of ballast will be arranged
by contractor on his own cost.

69.1 a) In the entire section from Virar to AI.69.a 180000.00 Cum 0.00 INR Zero
Dahanu Road Except Section Between Only
Bridge No. 92 & Bridge No. 93
69.2 b) In the Section Between Bridge NO. 92 & AI.69.b 3450.00 Cum 0.00 INR Zero
Bridge No. 93 i.e. on Wadhiv Island Only
70 70. Providing site offices for Employer with AI.70 900.00 per 0.00 INR Zero
Contractor's material, Labour, Tools and sqm. Of Only
Plant, Equipment plinth
etc. including provision of Water Supply, area
Drainage, Power arrangements, office
maintenance as per the details mentioned in
clauses 3.1 to 3.2.8 & 3.5 to 3.5.2 of
Chapter 3 (Site Facilities for the Employer
and the Engineer) of Section 5 (Work's
Requirement) of Tender Documents.
Note 1: This item is provided with the
contention that new site offices will be
constructed for this purpose and 75%
payment of the accepted rates will be made
after making available functional office,
balance 15% payment shall be made at the
end of the completion period and the
remaining 10% will be paid after clearance
of site by the contractor.
Note 2: Alternatively if suitable
accommodation is available on hire basis at
suitable location acceptable to the
employer, the contractor can arrange the
same under the item but in such a case the
payment shall be regulated as below.
(a) 10% payment shall be made on
completion of one month from the date of
making available the office fit for functioning.
b) Remaining 90% payment shall be paid in
71 71. Providing Furniture as given under AI.71 4.00 Lump sum 0.00 INR Zero
clauses 3.3, 3.3.1 of Chapter 3 (Site Only
Facilities for the Employer)of Section 5
(work's Requirement) of Tender Documents.
Note: Payment shall be made @ 75% of the
accepted rate after making available the
furniture items in functional office, balance
15% payment shall be made at the end of
the completion period and the remaining
10% will be paid after clearance of site by
the contractor.

72 72. Providing 4 wheeler vehicles such as AI.72 0 INR Zero


Tata sumo, Tavera, Innova, Scorpio or Only
equivalent on hiring basis upto 2000 Km &
for 26 days in a month for transporting
MRVC officials as per specifications. The
rates includes petrol/ diesel, driver,
furnishing, vehicle maintenance, overtime
allowances as applicable.
72.1 a) 1 Vehicle Tata SUMO or Mahindra AI.72.a 432.00 Month 0.00 INR Zero
Scorpio or Similar. Only
72.2 b) Extra for running and maintenance of AI.72.b 216000.00 Km 0.00 INR Zero
every additional km over and above 2500 Only
kms as specified in item 72 (a)
73 73. Providing fully furnished porta cabin with AI.73 0 INR Zero
partition & urinal on hire of minimum size Only
6.1m x 2.4m fully wired, one Table with
Chair, two Visitor chairs, small almirah, one
side table, AC computer, printer,wifi router
etc. in one side of partition and 1 big table
with six chairs on
73.1 a) Porta/Container cabins AI.73.a 672.00 Month 0.00 INR Zero
Note :- These cabins are to be provided with Only
in 15 days from award of Work or
commencement of work at site which ever
is earlier.
74 74. Provision of multipurpose assistants for AI.74 76650.00 Man days 0.00 INR Zero
implementation of safety and traffic Only
management plan.
75 75. Providing cast in situ bridge number AI.75 344.00 Each 0.00 INR Zero
plaques as per Railway drawing in cement Only
concrete 1:2:4 mix using 20mm hard stone
aggregate embedded in 30mm notch in
Bridge parapet coping duly engraving the
letter and figures and an arrow indicating
the direction of flow and finishing the top
exposed surface with cement mortar 1:3,
painting letters and figures with two coats of
black enamel paint on two coats of white
back ground with all labour, tools, cement,
paint etc.with all lead and lifts.

76 76. Preparation of subgrade by excavating AI.76 45000.00 sqm. 0.00 INR Zero
earth upto 22.5cm depth, dressing to Only
camber and consolidating with power road
roller of 8 to 12 tonne capacity including
making good the undulations etc. and
disposal of surplus earth with lead upto 50
metres
77 77. Consolidation of subgrade with power AI.77 45000.00 sqm. 0.00 INR Zero
road roller of 8 to 12 tonne capacity Only
including making good the undulations etc.
with earth or quarry spoils etc. and re-rolling
the subgrade
78 78. Providing and spreading 6mm thick AI.78 45000.00 sqm. 0.00 INR Zero
layer of red bajri/ moorum, watering and Only
rolling with 3 T roller or light power roller
complete including preparation of the
surface and rolling
79 79. Providing and fixing permanently colour AI.79 700.00 sqm. 0.00 INR Zero
coated trapezoidal profiled sheet of depth Only
28-30mm at 195-205mm pitch distance with
precisely engineered “Rib & Flute” design.
Profiled sheets shall be min. 0.5mm
TCT/0.45mm BMT high tensile zinc
aluminium alloy coa
80 80. Constructing brick masonry manhole in AI.80 0 INR Zero
cement mortar 1:4 (1cement: 4coarse sand) Only
R.C.C. top slab with 1:2:4 (1cement:
2coarse sand: 4graded stone aggregate
20mm nominal size), foundation concrete
1:4:8 mix (1cement: 4coarse sand: 8graded
stone aggregate 40mm nominal size) inside
plastering 12mm thick with cement mortar
1:3 (1cement: 3coarse sand) finished with
floating coat of neat cement and making
channels in cement concrete 1:2:4
(1cement: 2coarse sand: 4graded stone
aggregate 20mm nominal size) finished with
a floating coat of neat cement complete as
per standard design.

80.1 a) Inside size 120x90cm and 90cm deep AI.80.a 64.00 Each 0.00 INR Zero
including C.I. cover with frame (medium Only
duty) 500mm internal diameter, total weight
of cover and frame to be not less than
116kg (weight of cover 58kg and weight of
frame 58kg). With F.P.S. flyash bricks class
designation 7.5
81 81. Providing and laying non-pressure NP3 AI.81 0 INR Zero
class (medium duty ) R.C.C. pipes including Only
bends etc with collars jointed with stiff
mixture of cement mortar in the proportion
of 1:2 (1cement: 2fine sand) including
testing of joints etc. complete
81.1 a) 300 mm Dia RCC Pipe AI.81.a 1600.00 Meter 0.00 INR Zero
Only
81.2 b) 600mm dia RCC pipe AI.81.b 3500.00 Meter 0.00 INR Zero
Only
81.3 c) 900 mm Dia RCC Pipe AI.81.c 900.00 Meter 0.00 INR Zero
Only
82 82. Providing and laying design mix cement AI.82 9000.00 Cum 0.00 INR Zero
concrete in roads, having a cube strength of Only
M-30 using cement, coarse sand and
graded stone aggregate of 40mm nominal
size as per approved design mechanically
vibrated, steel form work, curing, providing
and filling construction & dummy joints with
approved joint filler (conforming to grade B
of IS: 1834) rounding of the edges, making
& filling the grooves as per drawing with all
contractor's labours, material, cement with
all lead & lift. (Minimum OP Cement 350 Kg
/cum, Fly ash contain 50kg/cum & Maximum
Water Cement Ratio 0.4)

83 83. Excavation for diversion of Drain/creek AI.83 115200.00 Cum 0.00 INR Zero
channel in marshy area by means of Only
mannual/mechanical
machinery(excavator/floating barge/sput
barge) etc.as per specifications with all
contractor’s own machinery and
equipments, labour, taxes, royalty,
materials, all lead & lift, shoring, strutting,
timbering and all such measures necessary
to retain in position the sides of the
drain/creek channel and including disposing
off the surplus/unusable earth to low lying
area within railway boundary or outside
railway premises as per directions of
Engineer-in-charge.
84 84. Providing Enviornmental Monitering AI.84 0 INR Zero
services from NABL Accredited and Only
recognised by Ministry of Enviornment &
Forest (MoEF) Laboratories with all
coontractor's equipments, consultant,
Technical staff, labours on location decided
by MRVC for monitering following
parameters.
Rate is inclusive of all charges of
Laboratories, testing charges, mobilisation
and demobilisation etc. complete.

84.1 a) Ambient Air Monitoring to monitor AI.84.a 180.00 per 0.00 INR Zero
following parameters. sample Only
i.. Respirable Suspended Particular Matter per
(RSPM) PM 10 & PM 2.5, location
ii. Suiphor -Di- Oxides (SO2)
iii. Oxides of Nitrogen (Nox)
iv. Lead (Pb)
v. Carbon Monoxide (CO)
vi. Nickel (Ni)
vii. Ozone (O3)
viii. Ammonia (NH3)
ix. Benzene (C6H6)
x. Benzo (A) Pyrine (BAP)
xi. Aresenic (AS)
84.2 b) Noise Level Monitoring by calibrated AI.84.b 180.00 per 0.00 INR Zero
Noise Level Meter in dB at Day Time & location Only
Night Time.
Parameter to be Analysed : Leq dB(A)
84.3 c) Analysis of Dinking Water Sample as per AI.84.c 180.00 per 0.00 INR Zero
IS 10500 (Total 65 Parameters) sample Only
84.4 d) Analysis of Soil Sample AI.84.d 180.00 per 0.00 INR Zero
Following Parameter to be analysed for sample Only
each sample.
i. pH
ii. Chloride as Cl
iii. Supphate as SO4
iv. Calcium as Ca
v. Magnesium as Mg
vi. Sodium as Na
vii. Potassium as K
viii. Total Phosphate
ix.. Conductivity
85 85. Providing and Fixing temporary AI.85 8000.00 sqm. 0.00 INR Zero
barricading to enclose construction area of Only
minimum 2.40 meters high with mild steel
angle frame of size 75x75x8 mm and GI
corrugated sheet of 0.7mm thickness as per
the approved drawings, including
foundations. The rate includes one coat of
red oxide primer before erection, two coats
of approved paint & shade (including MRVC
logo at every 15-20 metre) as per the
specifications, erecting in position, welding /
bolting. The rate includes cost of materials,
labour, transportation, leads, lifts, crossing
of tracks, etc., complete. as directed by the
engineer.
Note: I Payment schedule. a) 60% payment
will be released on installation as per
approved drawing b) 10% of the payment
will be made for satisfactory maintenance of
barricading after six months including one
coat of painting. Additional 10% will be paid
after satisfactory maintenance after 12
months including one coat of painting c)
Balance 20% payment will be made on
completion of work at site as certified and
directed by Engineer-in Charge and on
removal & clearing of site.
II. Released materials will be the property of
contractor after satisfactory completion of
86 Supplying (good quality healthy plants of AI.86 0 INR Zero
minimum 30 cm height), Planting , watering Only
and maintaining plants for a period of 2
years from plantation with all contractor's
labour, tools & equipments etc. complete.
Note :-
1. Final Payment of this item will be made
after 3 years from date of planting
depending up on number of trees survived
after 3 years.
2. On account payment will be made at the
rate of 15% of schedule rate after every 6
months based on the number of tree
survived.

86.1 a)Casorina /Eucalyptus/Gul AI.86.a 4000.00 Each 0.00 INR Zero


Mohor/Cassia/Pelta form/Bhendi tree Only
86.2 b) Teak / Shisham / Peepal / Putranjo / AI.86.b 4000.00 Each 0.00 INR Zero
Amaltas / Pride of India / Bauhonia / Rain Only
free
86.3 c) Ashoka/Banyanee/Amla/Jamun/Bell/ AI.86.c 4000.00 Each 0.00 INR Zero
Tamarind/ Jackaranda Only

86.4 d) Tall growing palms(Royal Palm)/Mango AI.86.d 4000.00 Each 0.00 INR Zero
of approved variety Only
87 Rebate for taking away dismantled AI.87 200.00 MT 0.00 INR Zero
structural steel work including structure Only
across the running track requiring working
under traffic block including clearing site,
lifting loading,taking away the contractor's
labour,tools, transport,all risk, all charges
and taxes etc.complete.
88 88. Providing data logger / data entry AI.88 120.00 per month 0.00 INR Zero
operator to assist AEN incharge forday -to- Only
day work.
89 89. Providing 1.2m high fencing with 1.8m AI.89 10000.00 Meter 0.00 INR Zero
R.C.C. Post placed every 3m apart, Only
embedded in cement concrete blocks, every
15th post (or nearer if there is abrupt
change of ground slope), last but one end
post and corner post shall be strutted on
both sides and end post one side only, and
struts embedded in cement concrete blocks,
provided with 5 horizontal lines and two
diagonals of G.I. barbed wire 9.38 kg per
100metres (min) between the two posts
fitted and fixed with G.I. staples on turn
buckles or G.I. binding wire tied to 6mm bar
nibs fixed while casting the post (cost of
posts, struts and concrete to be paid for
separately)

90 90. Precast R.C.C. Standard posts (for AI.90 1000.00 Each 0.00 INR Zero
barbed wire fencing) 1.8m long Only
91 91. Dismantling steel work, the contractor AI.91 200.00 per MT 0.00 INR Zero
will take all safety precaution and remove Only
the material immediately. The released
material will be contractor's property, the
cost will be recovered as per the relevant
schedule item. Dismantaling of steel
structures can be carried out with or without
Railway traffic blocks.

92 92. Supplying, fitting and fixing in position AI.92 0 INR Zero


true to line and level POT-PTFE bearing Only
consisting of a metal piston supported by a
disc or un reinforced elastomer confined
within a
metal cylinder, sealing rings, dust seals,
PTFE surface sliding against stainle
92.1 a) POT-PTFE Bearing AI.92.a 13380.00 MT 0.00 INR Zero
bearing Only
capacity
92.2 b) POT Bearing AI.92.b 4130.00 MT 0.00 INR Zero
bearing Only
capacity
93 93. Providing and fixing hand rail by welding AI.93 0 INR Zero
etc.to steel ladders railing, balcony railing Only
and staircase railing including applying a
priming coat of approved steel primer

93.1 a) G.I pipes 40mm nominal bore (class B) AI.93.a 3000.00 kg 0.00 INR Zero
Only
94 94. Providing & fixing Precast Chequred AI.94 0 INR Zero
tiles conforming to IS:13801:1993, Only
manufactured under mechanical vibration &
hydraulic pressing machine in double layer;
top layer of 10 to 12mm thickness of
Dolomite Powder, graded chips, fibre and
UV stabilised iron oxide Lanexess colour
and bottom layer of 1:3 CC mixed with
galvanised steel fibre of
approved quality, jointed with neat cement
slurry mixed with pigment to match shade of
tiles including rubbing and cleaning etc.
complete on 20mm thick bed of cement
morter 1:4 of sizes:
94.1 a) 250 mmx250mmx25mm thick AI.94.a 400.00 sqm. 0.00 INR Zero
Only
95 95. Providing and laying interlock precast AI.95 0 INR Zero
cement concrete block pavers of approved Only
design factory manufactured of specified
grade cement concrete on passenger
platform,foot paths,circulating areas,etc.,
including setting in position over 25mm thick
bedding layer of fine sand,filling the joints
with fine sand,levelling including compaction
as per IS 15658.

95.1 a) 60 mm thick block of M-30 grade for light AI.95.a 400.00 sqm. 0.00 INR Zero
traffic Only
96 96. Extra over items for lacquer finish AI.96 400.00 sqm. 0.00 INR Zero
Only
97 97. Dismantling and disposal of AI.97 0 INR Zero
unserviceable material within 50m lead Only
97.1 a) Under layer of road of water bound AI.97.a 400.00 sqm. 0.00 INR Zero
macadam/ stone soling etc. Only
97.2 b) Bituminous top layer of road AI.97.b 400.00 sqm. 0.00 INR Zero
Only
98 98. Exploratory drilling of Boreholes down to AI.98 0 INR Zero
required depth, drilling of 150mm diameter Only
boreholes in all type of soils except hard
rock and large boulders (boulder core more
than 30 cm), including refilling and
reinstating surface, and disposing off
surplus material including use of mechanical
rigs with power operated winches as well as
percussion / chieselling tool for advancing
through occasional seams of hard strata to
be employed, where necessary in Dry area

98.1 a) 0m to 10m AI.98.a 260.00 Meter 0.00 INR Zero


Only
98.2 b) 10m to 20m AI.98.b 240.00 Meter 0.00 INR Zero
Only
99 99. Taking out 100mm dia & 450mm long AI.99 28.00 Each 0.00 INR Zero
undisturbed samples of soil from bore holes, Only
including provision of air tight containers for
packing and, labelling incl. transporting the
samples to laboratory. Piston sampler shall
be used for extracting undisturbed samples
where necessary. Samples shall be
collected as per IS 2720

100 100. Conducting standard penetration test AI.100 140.00 Each 0.00 INR Zero
as per IS 2131 at approximate1.5 m Only
intervals in bore holes, as directed by the
Engineer in charge
101 101. Collection of water samples at required AI.101 28.00 Each 0.00 INR Zero
intervals Only
102 102. Conducting laboratory Tests on AI.102 0 INR Zero
collected soil samples as per relevant IS Only
code
102.1 a) Moisture contents/ Dry density AI.102.a 28.00 Each 0.00 INR Zero
Only
102.2 b) Atterberg Limit AI.102.b 28.00 Each 0.00 INR Zero
Only
102.3 c) Specific Gravity AI.102.c 28.00 Each 0.00 INR Zero
Only
102.4 d) Grain size analysis including Hydrometer AI.102.d 28.00 Each 0.00 INR Zero
analysis Only
102.5 e) Natural density AI.102.e 28.00 Each 0.00 INR Zero
Only
102.6 f) Consolidation test AI.102.f 28.00 Each 0.00 INR Zero
Only
102.7 g) Unconfined compression test AI.102.g 28.00 Each 0.00 INR Zero
Only
102.8 h) Tri-axial test AI.102.h 28.00 Each 0.00 INR Zero
Only
103 103. Conducting Laboratory tests on AI.103 0 INR Zero
collected ROCK SAMPLES as per relevant Only
IS code
103.1 a) Density test AI.103.a 28.00 Each 0.00 INR Zero
Only
103.2 b) Water absorption & Porosity AI.103.b 28.00 Each 0.00 INR Zero
Only
103.3 c) Hardness AI.103.c 28.00 Each 0.00 INR Zero
Only
103.4 d) Unconfined compression test AI.103.d 28.00 Each 0.00 INR Zero
Only
104 104. Supplying, spreading and filling coarse AI.104 5160.00 Cum 0.00 INR Zero
sand (no cohesive materials to be used) of Only
approved quality including watering and
ramming in foundation, plinth ,behind the
abutment, wing wall, retaining wall in layers
not exceeding 150mm thick including its
compaction as per direction of Engineer-in-
charge. The rate includes all lead, lift,
ascent, descent, crossing of railway line,
etc. complete with contractor's labour,
materials, tools and plant.

105 105. 4 cm thick bitumastick sheet with hot AI.105 4680.00 sqm. 0.00 INR Zero
bitumen of approved quality using stone Only
chippings (60% 12.5 mm nominal size and
40%$ 10mm nominal size)2.60 cum and
course sand 2.60cum of road surface and
with 478 kg bitumen per 100 sqm of road
surface over at tack coat including
consolidation with road roller of 8 to 10
tonneetc. complete. i)with paving bitumen
80/100 heated and then mixed with solvent
at the rate of 70 grams per kg of asphalt.

106 106. Providing and applying seal coat of AI.106 12020.00 sqm. 0.00 INR Zero
premixed fine aggregate with bitumen using Only
128 kg of bitumen of grade 80/100 bitumen
an 0.60 cum of fine aggregate per 100sqm
of roof surface including rolling and finishing
with road roller all complete. Note - This
should not be operated along with Hot mix
carpeting.
107 107. Excavation for foundations & trenches AI.107 10000.00 Cum 0.00 INR Zero
by Manual means in all types of soils, Only
boulders, WBM roads, including rock not
requiring blasting including dewatering by
manual or mechanical means etc. as per
specifications with all contractor's own
machinery and equipments, crossing of
track, shoring, strutting, timbering and
buttressing with sand /clay bags and all
such measures necessary to retain in
position the sides of the foundation pit and
including backfilling, rolling the excavated
material with watering, ramming, levelling
the site and disposing off the
surplus/unusable earth to low lying area
within railway boundary with lead & all lifts
as per directions of Engineer.

108 108. Supply and laying precast kerb stone of AI.108 1590.00 Meter 0.00 INR Zero
concrete M25 Grade 30cm*20cm (In Only
Section/ including chamfering as per design
if any) including fixing in1:6 cement sand
morter and pointing with 1:2 cement morter
(1 cement: 2 Sand ordinary) including all
excavation/ refilling, ramming and other
incidental works as required.
109 110. Providing, laying, spreading (with paver AI.109 1560.00 Cum 0.00 INR Zero
finisher only) and compacting wet mix Only
macadam (WMM) base course comprising
of graded stone aggregate and granular
material conforming to MORT&H
specifications (Table 400-II) in layers of
equal compacted thickness each
consolidated, including pre-mixing the
material with water at OMC in mechanical
mixer (Pug Mill), carriage of mixed material
by tippers to site, laying in uniform layers in
base course on a well prepared sub-base/
base course and compacting with power
vibratory-roller to achieve the desired
density complete as per MoRT&H
specification clause - 406 including all
material, labour, machinery, lighting,
guarding.
110 110. Providing and laying Dense Bituminous AI.110 580.00 sqm. 0.00 INR Zero
macadam on prepared surface with Only
specified graded crushed stone aggregate
for profile corrective base /binding course
mixing of stone aggregate ,filler and bitumen
in hot mix plant, transporting the mixed
material and laying with paver finisher fitted
with electronic sensing device to the
required level and grade and rolling by road
roller as per specifications, to achieve the
desired density ,but excluding the cost of
primer/tar coat 75mm average compacted
thickness with bitumen of 60/70 grade @5%
by weight of total mix and lime filler @2% by
weight of aggregate.

111 111. Providing and laying Dense Bituminous AI.111 420.00 Cum 0.00 INR Zero
concrete on prepared surface with specified Only
graded stone aggregate for wearing course,
mixing of bitumen ,filler & stone aggregate
in hot mix plant , transporting the mixed
material and laying with mechanical paver
finisher fitted with electronic sensing device
to the required level and grade and rolling
with road rolers, as per specification, to
achieve the desired density and compaction
but excluding cost of primer/ tack 40mm
/50mm compacted thickness with bitumen
of grade 60/70 @6.5 % and lime @ 3% by
weight of total mix.

112 112. Providing and laying bitumen mastic AI.112 3730.00 sqm. 0.00 INR Zero
wearing course (as per specifications) with Only
industrial bitumen of grade 85/25
conforming to IS :702 prepared by using
mastic cooker and laid to required level and
slope including providing antiskid surface
with bitumen precoated fine grained hard
stone chipping of approved size at the rate
of 0.005 cum per 10 sqm and at both
directions, pressed into surface protruding
1mm to 4mm over mastic surface , including
cleaning the surface, removal of debris etc.
all complete. 25mm thick.
113 113. Providing and laying of an elastomeric AI.113 110.00 RM 0.00 INR Zero
strip seal expansion joint, catering to right or Only
skew (less than 20 deg.) or moderately
curved with maxim mum horizontal
movement up to 109mm. Etc. complete as
per approved drawings and specifications to
be installed by manufacturer / supplier or
their authorized representative ensuring
compliance to the manufacturer's
instructions for installation (for road work &
Bridge work) &/or as directed by Engineer-in-
Charge.

114 114. Providing & fixing in position 20mm AI.114 500.00 Each 0.00 INR Zero
thick Cast Iron Grating with 100 micron thick Only
galvanized mild steel collection chamber
and 100 mm dia GI pipe for drainage spouts
in deck slab as per Rly. Drawing with all
contractors materials, labours, tools & plant
with all lead & lift etc complete.

115 115. Carrying out load test of bridge AI.115 2.00 Span 0.00 INR Zero
superstructure as per IRS/IRC concrete Only
bridge code para 10.5 including making all
arrangements for Kent ledge, material,
labours, tools & plants, loading & unloading
of Kent ledges, measuring deflection etc.
with all contractor's Kent ledges, dial gauge,
equipments, labours etc. complete with all
lead and lift. Single span of 30m length.

116 116. Designing, providing, casting and AI.116 3320.00 sqm. 0.00 INR Zero
erecting in position RMC precast reinforced Only
M-40 grade, facia (panels only) for
reinforced soil embankment for approach
retaining wall with corrosion protected
reinforcing tie strips / mesh / geogrid as
specified in design including all materials,
labours, connection, joint fillers, inserts,
drainage outlets, erection of panel,
perforated PVC pipe of 150 mm dia. for
drain, wrapped with geotextile, applying coal
tar epoxy paint on earth retaining face of
panel as per design including providing
RMC M-40 cast insitu coping beam on top of
facia panel etc. complete as per approved
drawing and as per specifications and as
per detailed drawings (including
reinforcement with anticorrosive treatment
with galvanization) for all heights. as
directed by engineer in charge.
117 117. Providing, laying, spreading and AI.117 1420.00 Cum 0.00 INR Zero
compacting of granular sub-base by Only
providing close graded Material, mixing in a
mechanical mix plant at OMC, carriage of
mixed Material to work site, spreading in
uniform layers with motor grader on
prepared surface and compacting with
vibratory power roller to achieve the desired
density, (98% of MDD) etc. Complete as per
MORT&H specification clause - 401 the rate
includes for test on completion of each GSB
layer the strength of each GSB layer shall
be evaluated by conducting CBR (IS: 2720
part 16 & 31) or plate load test using 750
mmdia .plate (IS:9214) for obtaining
equivalent CBR value @ one test per 3000
m2 compacted surface area or per the
grading.The items including of all material,
labour, machinery, lighting, guarding.
Taxes,royalty,cess etc. complete. for Grade -
I of close graded GSB Material.

118 118.Supplying, manufacturing, fabrication, AI.118 4500.00 Nos. 0.00 INR Zero
testing and welding with stud guns etc. of Only
normal headed/ round studs shear
connector 25mm dia. and 200 mm length
are conforming to IS 3935-66 as per
specification of RDSO Drg. No. B11553, 52,
51 & RDSO B 11557-1 along with ferrules
on top flange of girder for deck slabs as per
the direction/approval of Engineer in charge.
In case shear connectors/ studs of other
sizes are required, then payment /recovery
on prorata basis of weight shall be
made.The rate is inclusive of all taxes,
service charges, transportation, lead, lift,
wastage etc. complete in all respect.
Nothing extra shall be payable other than
the rate quoted. Nothing extra shall be
payable against any breakdown of
machines. Site facilities shall be provided by
the contractor at site.The facility of required
Electricity of 400/440 V power source k/380
KVA DG set, cable 400A switch fuse,
loading & unloading the machine from truck
and to carry to site shall be done by the
contractor.
119 119. Fabrication of steel girder spans as per AI.119 200.00 MT 0.00 INR Zero
the approved drawing for composite Only
construction i.e. (Steel + RCC) of
superstructure of the Road over bridge with
contractor's own mild structural steel
confirming to IS: 2062-1992 with all welding,
rivets, nuts bolts etc. with contractor's own
materials, fabrication, machinery, templates,
fixtures, equipment’s tools and plant,
transportation skilled/unskilled labours,
excise duty, Octroi, sale and tax and other
taxes, all leads, lifts, desent, loading,
unloading, crossing one or more Railway
track if required etc. complete and as per
technical specifications section 1900 of
MORTH. The rate is inclusive of
transportation of fabricated girder parts to
site by contractor's own means at his cost.
The rate shall also be inclusive of cold
straightening of deformed and bent girder
parts before their assembly and painting.

120 120. Erection and launching of steel girder AI.120 200.00 MT 0.00 INR Zero
span to Railways approved drawings with Only
ancillary steel structures fixed to the girder
where necessary in proper level and
alignment and as per technical specification
section 1900 of MORTH. And all Railway's
relevant specification the rate shall be
inclusive of supply erection and dismantling
of staging and scaffolding and other
temporary arrangements required for the
propose of assembly, erection and
launching of column straightening of
deformed and bent girder, part before/after
their assembly.

121 121. Providing Aluminum Spray Metalizing AI.121 3000.00 sqm. 0.00 INR Zero
to various members of ROB Girders such Only
as main girders, cross girders, stiffeners,
bracings, etc in two layers after preparing
surface by sand/grit blasting as per
provisions laid in Appendix VII of IRS B-1-
2001 code (latest edition) and provisions of
bridge manuals with contractor's own
materials, tools, plants, labour, loading,
unloading, transportation, handling, re-
handling, if any including all lead, lifts,
descents, crossing of track, etc. complete in
all respect and as per direction of the
engineer-in-charge.

122 122. Providing , supplying & Fixing Security AI.122 0 INR Zero
Cameras of following specification with Only
DVR Box of suitable capacity/campability for
real time VIDEO, CAT CABLE to connect
cameras with DVR Box to be used for CCTV
& TP link Router USB with WI-FI with Broad
band Internet connection till the completion
of Work. Specification Webcam for moniter
progress at site
a. Range – 100 M
b. Lens _ 12 mm
c. Type – Suitable for Use in external
Enviorment in exposed condition
d. Brand Name :- Zebion, Dhowa, Hikvision,
CP plus or Similar Type
122.1 a) Supplying & fixing Security cameras per AI.122.a 45.00 Nos. 0.00 INR Zero
specification Only

122.2 b) Supplying & fixing DVR Box with 16 ports AI.122.b 4.00 Nos. 0.00 INR Zero
, compatible with specifications of camera Only
mentioned above for Real time video,
convenient and precise video search,
multiple operation, playback, remote, view
multiple location instantly with prescribed
software, remote viewing over internet, easy
back up via usb/external drive, easy set up
and user friendly operation interface,
including power supply system compatible
with DVR Box.

122.3 c) Supplying & fixing Cables with following AI.122.c 5000.00 Meter 0.00 INR Zero
specifications to connect cameras with DVR Only
Box : a. CAT -5 / Specia cables of
Polycab or similar make, to be used for
CCTV
122.4 d) Tp link Router USB with wi-fi AI.122.d 3.00 Nos. 0.00 INR Zero
Note :- Only
1. Cameras shall be provided and made
functional within 15 days from
commencement of work.
2. Rate is inclusive of cost of all cameras,
cables, router and all other equipments and
it's instalaltion and maintenanous of these
equipments for entire contract period.
3. Rate is also inclusive of recurring
charges/cost required for broad band
internet uses.
4. After completion of construction work
equipments will be property of the
contractor.

123 Supplying Fabricating and erecting in AI 123 100.00 Metric 0.00 INR Zero
position (with or without Railway traffic Tonne Only
block, wherever required) standard
structural steel sections procured from
primary manufacturer such as SAIL, TISCO,
Rashtriya Ispat Nigam LTD, Jindal & Essar
steel confirming to IS 2062-1992 (including
latest amendment) including welding with
approved quality welding rods, supply &
fixing of correct sixe turn bolts with nuts and
washers confirming to IS: 1364 and/or black
bolts etc. complete with all contractor's
material, labour, plant , equipment,
consumable and all lead and lift.
Note: 1. Payment will be made for standerd
weight of structural steel sections.
2. Rate includes supply of HSFG/HTS bolts
(except foundation bolt), nuts, washers, welding
rod, tools & plants, loading & unloading, transport
& fuel, labours, taxes, duties, octrai, all lead and
lift, crossing of trck if required etc. and item is
payable as per weight assessment based on
standard sectional weights of members. Nothing
extra will be paid for Railway traffic block working.
3. (a) 70% of the payment will be made on
fabrication of steel element and bringing to the
site of work.
(b) 20% of the payment will be released on
erection of steel work at proper location.
(c) 10% of payment will be released on
124 Providing and applying Epoxy zinc AI 124 3000.00 Square 0.00 INR Zero
phosphate Primer of "ASIAN" or similaer Meter Only
brand of approved standard and quality on
steel works as per specification attached,
including cleaning/prepairing steel surface
by sand blasting/papering to required grade,
with all contractors material, labours, tools
& plants, machineries, consumables etc.
complete as directed by Engineer-in-
charge.

125 Providing and applying with Micaceous Iron AI 125 3000.00 Square 0.00 INR Zero
Oxide intermediate coat of "ASIAN" or Meter Only
similaer brand of approved standard and
quality on steel works as per specification
attached, with all contractors material,
labours, tools & plants, machineries,
consumables etc. complete as directed by
Engineer-in-charge.

126 Providing and applying two coat of AI 126 3000.00 Square 0.00 INR Zero
Polyurethane Aluminium paint of "ASIAN" or Meter Only
similaer brand of approved standard and
quality on steel works as per specification
attached, with all contractors material,
labours, tools & plants, machineries,
consumables etc. complete as directed by
Engineer-in-charge.

127 127.Providing including casting, supplying AI 127 3000.00 Cum 0.00 INR Zero
and installation of Pre-cast cement concrete Only
blocks of size 25X25 X20cm. or of required
size as directed by the Engineer for
protective works at bridges & banks, like toe
wall, flooring ,etc. using 1:2:4 concrete mix
with 20mm aggregate size with all
contractor’s shuttering, leading to bridge site
from casting depot, including earthwork,
providing gravel backing, laying with
Contractor's labour pointing with 1:3 mix and
as directed by Engineer-in-charge (Rate is
inclusive of all labour and materials
including cement by Contractor with all lead
and lift).
Note:
i) Payment for gravel backing will be paid
under relevant item.
ii) 60% Payment shall be made after
casting of pre-cast concrete slabs. The
balance 40% will be made on completion of
laying and finishing
(Filter media to be paid separately
under the relevant item)

128 128.Turfing / planting with planted doob AI 128 115000.00 Square 0.00 INR Zero
grass, including all lead and lift, and Meter Only
watering as required until properly rooted,
with.
Note - Initially payment of only 40% will be
made. Balance 60% will be paid as under if
the turfing is properly rooted:
1. After 1st monsoon - 20%
2. After one Year - 20%
3.After handing over of section to
railways/another agency - 20%
129 127 Provision for any other incidental AI 129
Western Railway USSOR 2011 items with
32% above basic rates required for
successful completion of work and provision
for shifting of utilities encounter during
execution of work.
Note: Contractor to quote percentage
above/below/at par for this item and total
amount of various items to be operated from
USSOR 2011 items of Western Railway
shall be Rs 5,00,00,000/-. Permission of
CPM will be required for deciding items to
be operated from USSOR 2011.

129.01 Chapter 2 Carriage of Materials AI.129 a ########### Lump 0.00 INR Zero
sum Only
Adding
32%
above

129.02 Chapter 3 Plain Concrete AI.129 b ########### Lump 0.00 INR Zero
sum Only
Adding
32%
above

129.03 Chapter 4 Reinforced Cement Concrete AI.129 c ########### Lump 0.00 INR Zero
sum Only
Adding
32%
above

129.04 Chapter 5 Brick Work AI.129 d ########### Lump 0.00 INR Zero
sum Only
Adding
32%
above

129.05 Chapter 6 Stone Work AI.129 e ########### Lump 0.00 INR Zero
sum Only
Adding
32%
above

129.06 Chapter 7 Wood Work AI.129 f ########### Lump 0.00 INR Zero
sum Only
Adding
32%
above

129.07 Chapter 8 Steel And Aluminium Work AI.129 g ########### Lump 0.00 INR Zero
sum Only
Adding
32%
above

129.08 Chapter 9 Flooring, Paving And Dado AI.129 h ########### Lump 0.00 INR Zero
sum Only
Adding
32%
above

129.09 Chapter 10 Roofs And Ceilings AI.129 i ########### Lump 0.00 INR Zero
sum Only
Adding
32%
above
129.10 Chapter 11 Finishing Masonary AI.129 j ########### Lump 0.00 INR Zero
sum Only
Adding
32%
above

129.11 Chapter 12 Painting, Polishing And AI.129 k ########### Lump 0.00 INR Zero
Varnishing sum Only
Adding
32%
above

129.12 Chapter 13 Water Supply AI.129 l ########### Lump 0.00 INR Zero
sum Only
Adding
32%
above

129.13 Chapter 14 Drainage And Sewerage AI.129 m ########### Lump 0.00 INR Zero
sum Only
Adding
32%
above

129.14 Chapter 15 Sanitary Installations AI.129 n ########### Lump 0.00 INR Zero
sum Only
Adding
32%
above

129.15 Chapter 16 Horticulture And Landscaping AI.129 o ########### Lump 0.00 INR Zero
sum Only
Adding
32%
above

129.16 Chapter 17 Miscellaneous Building Works AI.129 p ########### Lump 0.00 INR Zero
sum Only
Adding
32%
above

129.17 Chapter 18 Dismantling And Demolishing AI.129 q ########### Lump 0.00 INR Zero
sum Only
Adding
32%
above

129.18 Chapter 19 Bridge Works : Substructure AI.129 r ########### Lump 0.00 INR Zero
sum Only
Adding
32%
above

129.19 Chapter 20 Bridge Works : Superstructure - AI.129 s ########### Lump 0.00 INR Zero
R.C.C sum Only
Adding
32%
above

129.20 Chapter 22 Bridge Works - Miscellaneous AI.129 t ########### Lump 0.00 INR Zero
sum Only
Adding
32%
above

129.21 Chapter 23 Roads And Platform Works AI.129 u ########### Lump 0.00 INR Zero
sum Only
Adding
32%
above
129.22 Chapter 24 Fencing And Boundary Marks AI.129 v ########### Lump 0.00 INR Zero
sum Only
Adding
32%
above

130 128.Payment for ensuring implementation AI.130 0.00 Lump 0.00 INR Zero
and monitoring of all provisions in Safety, sum Only
Health and Environmental Manual (SHE
Manual) of MRVC during execution of works
through entire contract period including
deployment of required SHE organization as
mentioned in SHE manual with required
qualification, arranging training to all
workers and staff engaged for work, regular
health check up of labours, arranging SHE
meetings, SHE Inspection, SHE audit, SHE
communication i.e.
posters/signages/VIDEO/Audio, SHE
housekeeping, Safety training, provision of
protective wears, labour welfare measures,
Environmental management, traffic
management of vehicles for construction
activities, etc. complete as detailed in
Safety, Health and Environment manual of
MRVC.
Notes :-
1. Rate for this item is to be quoted as
percentage of total cost of Schedule A Civil
Work (Sum of Amount of all items from Item
no. 1 to 130 of Schedule A). For example,
total cost of the civil work under Schedule A
is Rs. 100 Million and rate quoted by the
tenderer is 1% then total payment under this
item will be Rs 1 Million. Payment against
Total in SCHEDULE A PART I - CIVIL 0.00 INR Zero
Figures ENGINEERING WORKS Only
Quoted Rate in Figures Select 0.0000 Zero Only
Quoted Rate #NAME?
in Words