Sei sulla pagina 1di 2

Description of

Item No
item No Length Width Height Quantity Explanatory note
Eart work
1 in
excavation
in L=5.3+0.9/2+0.9/
Long wall
foundation 2 6.2 0.9 0.9 10
2
L=4.3+0.9/2+0.9/
Short wall 2 3.4 0.9 0.9 5.51
2
TOTAL= 16 CUM

Concrete in
2
foundation
L=5.3+0.9/2+0.9/
Long wall 2 6.2 0.9 0.3 3.35
2
L=4.3+0.9/2+0.9/
Short wall 2 3.4 0.9 0.3 1.84
2
TOTAL= 5.18 CUM
Brick work in
3 foundation
and plinth
Long wall
L=5.3+0.6/2+0.6/
1st footing 2 5.9 0.6 0.3 2.124
2
L=5.3+0.5/2+0.5/
2nd footing 2 5.8 0.5 0.3 1.74
2
L=5.3+0.4/2+0.4/
3rd footing 2 5.7 0.4 0.6 2.736
2
Short wall

1st footing 2 3.7 0.6 0.3 1.332 L=4.3-0.6/2-0.6/2

2nd footing 2 3.8 0.5 0.3 1.14 L=4.3-0.5/2-0.5/2


3rd footing 2 3.9 0.4 0.6 1.872 L=4.3-0.4/2-0.4/2
TOTAL= 10.944 CUM
Brick work in
4 super
structure
L=5.3+0.3/2+0.3/
Long wall 2 5.3 0.6 3.5 22.26
2
Short wall 2 4 0.3 3.5 8.4 L=4.3-0.3/2-0.3/2
TOTAL= 30.66

Page 1 of 2
L=5.3+0.9/2+0.9/
Long wall 2 6.2 0.9 0.9 10
2

124.68

Page 2 of 2

Potrebbero piacerti anche