Supply, Installation, Testing and Commissioning of Bollard Lighting System at Pemimpin Drive
SCHEDULE OF PRICES
Note:
The Contractor shall note that all the
works in Schedule of Prices are to be
designed and built by the Contractor
and these works shall be priced
hereunder and the Contractor's rate
shall be inclusive of all ancillary and
other expenditure, whether separately
or specially mentioned and/or
described in the Quotation Document
or not, which are indispensably
necessary to carry out the works to
completion.
General:
Engagement of all Qualified
Engineers for design, installation,
testing and commissioning of required
works under the Contract for
completion of whole of the work.
F Bollard Lightings
Include bollard lightings with all 1 Job
necessary mounting/ support,
stainless steel screw mounted on
concrete base, light fixtures assembly,
bollard erection, cable connection
inside bollard, supply, installation,
testing and commissioning in
accordance with the Drawings and
specifications
G Cable Installation
Design, supply, laying, testing and 1 Job
commissioning of cables (type and
size of cable shall be in accordance
with CP5:1998, Singapore Standards
Code of Practice for Electrical
Installations) including all necessary
cleats, supports, brackets, glands,
cable terminals, etc. as per
specifications. All electrical cabling
and wiring shall be laid within
conduits already provided on site.
H Conduit Installation
Design, supply, lay and joint heavy-
duty UPVC conduit pipe in trenches 1 Job
including cable detection, excavation,
saw-cutting, backfilling, jointing, end
caps, warning slab/plate/tape, draw
ropes, markers, bends, tees, etc. as
per specifications.
J Project Signboard
Installation of project signboard as
shown in drawing. The signboard
shall be removed after the completion No 1
of the works as per drawing and
contract specifications.
K ____________________________ Sum -
L _____________________________ Sum -
M ______________________________ Sum -
________________________
N ___________________________ Sum -
Date: __________________________________
Note: (a) Quotationers are required to price each and every item.
(b) Items not quoted in the offers should be clearly indicated.
(c) This copy is to be submitted together with your quotation through GeBIZ as an
attachment file. Failure to submit this Schedule may preclude the quotation from
consideration.