NARI SOLUTION
NARI
About Us Who are we? NARI Group Corporation
Patents
2992 International and National
Patents
Industry Standards
Leading 15 International Standards and
112 National Standards
Ranking
Ranked NO.2 in National Enterprise
Technology Center Evaluation
NARI
1.2 Business Scope
Part 01 Introduction
Intelligent
Intelligent
Distributi Railway
on Transporta
Intelligent Intelligent tion
Transmiss Transforma
ion tion
Intelligent
Dispatch
Intelligent
Power
Consumpt
Smart ion Rail
Power Transit
Devices Automati
on
Electric
Railway
Hydroelec
tric Power
Automati
on
Green
Ports
NARI
1.3 A Whole Solution Provider
Part 01 Introduction
NARI
1.5 PT.NARI INDONESIA FOREVER Introduction
Part 01 Introduction
NARI Group Corporation open the representative’s office
PT .NARI Indonesia Forever, which is located in AIA
Central Building Jendral 25 Floor Sudirman, Jakarta.
Indonesia, and has been established since 2013.
Combining with the advanced technology and successful
experience of Chinese electrical power construction and
in accordance with Indonesian national conditions and
characteristics, PT. NARI Indonesia Forever will provide
total solutions, related products and localization service
of power generation, transmission, transformation,
distribution, new energy, information & communication,
industrial automation and other fields.
Part 02
Brief Introduction to the Solution
NARI
NARI Solution Brief Introduction to the Solution
NARI
2.1 Hardware Infrastructure
Part 02 : NARI Solution
Distribution Network
• Conductors
• Pole Structure HV/MV Part
• Distribution Transformer Distribution
• Break Switches/Isolators Substation
Target:
Substation Distribution • Automation, Reliable, Resiliency
Automation • Loss & Power Quality
• Renewable Energy Accessible
• RTU • Flexible Consumption
• DTU
• Compensation Capacitor
FTU
Communication System
• Backbone: MPLS
• Cellular
• OLT DTU
• ONU
Informatization
LV Part
• OMS
• GIS
Micro-grid
Phase Switching
• BESS Switchgear
Compensation Smart Meters
EV Charger DG and BESS
Capacitor
• Distributed Energy
Access and Control
NARI
2.2 Software Infrastructure
Part 02 : NARI Solution Renewable Energy and Smart Park Management
Distributed energy Distributed energy Distribution network Smart community Smart home/Smart Smart Water/Smart
resources (DER) plug and resources (DER) cluster energy management integrated management building/Smart Energy...
play control service platform community
NARI
Advantages of the NARI
Part 03
Advantages and Opportunities of the Solution
NARI
2
Renewable
1
Less Outage and Energy Access
More Stability
3
Demand
Response
NARI
3.1 Less Outage and More Stability
Part 03:Advantages of the NARI
56.83 minute 100% 99.99%
97.89% 99.96%
10.86 minute
Average Switching Operation Time Grid Interconnect Rate Power Supply Reliability
Wind-Solar-Storage Co-generation
• Wind Farm Control System
• Battery Storage
• Solar panel and smart
inverters
Renewable Energy
Dispatch and Control • …
Typical Distribution Network with DER and more Power Peak Load Voltage Drop Voltage Regulation with OLTC,
Electronics SVC
Part 04
Architecture, Function, Highlights, Advantages
NARI
4.1 Smart Distribution Overall Solution
Part 04:NARI Technical Description
SCADA DMS GIS OMS DERMS
Master
Station
Dispatching
Backbone Center Substation
Network
Substation
Substation Substation
Access eLTE/
ONT Public Network
Network
ONU CPE
Terminal
RTU FLTU DTU TTU FICU
NARI
4.2 Advanced Distribution Management System (ADMS) Architecture Overall Solution
Part 04:NARI Technical Description
QF1 c O c QF2
110/11 kV 110/11 kV
Substation 2
Substation 1
c c O c
Fault event detection and location Outage event detection and fault affected area location
Affected area isolation and power Display outage information on the map
restoration to non fault area
Automatically send work orders and crew to the outage site
Outage analysis and switching plan
Outage cause analysis and restoration time estimation
Full power restoration
NARI
4.3 Advanced Distribution Management System (ADMS) Architecture Overview
Part 04:NARI Technical Description
Control Systems DMZ Zone
SCADA DMS OMS DERMS IS&R WEB/ICCP Patch
Database Servers Servers Servers Servers Servers Servers /IEB NMS Updates
GPS
Firewall
Stacked Stacked
Switches IS&R Switches
Router
DA DTS Management Cluster
DA
Firewall Firewall GIS AMI ….
Router Router
Cluster Cluster
MPLS
SDH -VPN
Control Center
NARI
4.4 Fault Location, Isolation & Service Restoration (FLISR)
Part 04:NARI Technical Description
Normal State
NARI
4.5 Outage Management System (OMS) Overview
Part 04:NARI Technical Description
Improving Customer Satisfaction
With Efficiency and Interaction
8. Reply to Customers 4. Fault Location
7. Cause of Outageand
Customers GIS OMS Procedures
Repair Situation
NARI
4.7 Communication Network System
Part 04:NARI Technical Description ↙ Communication Layer
Backbone: MPLS
Cellular
OLT
Optical splitter ↙ Field Area Network
ONU PLC Mesh
RF Mesh
Ad Hoc Wireless
← Interface Layer
RTU
DTU
FTU
NARI
4.8-1 Digital Substation Automation System Based on IEC 61850
Part 04:NARI Technical Description
IEC 61850 is an international standard defining Basic Terms:
communication protocols for intelligent electronic • MMS: Manufacturing Message Specification
devices at substations. • GOOSE: Generic Object Oriented Substation Event
• SMV: Sampled Measured Values
• ACSI: Abstract Communications Service Interface
Part 05
NARI
5.1-1 NARI Typical References
Part 05:NARI References
Thailand, Brazil,
Philippine,Laos,Vietnam, Australia,
Greek and Sudan over 16 countries
Within these international projects,
NARI gains lots of experience and
successfully integrated with
automation substation systems of
different manufactures, including
SIEMENS, ABB, GE, CEPEL etc.
NARI
5.1-2 NARI Typical References
Part 05:NARI References
NARI
5.1-3 NARI Typical References
Part 05:NARI References
NARI
5.1-4 NARI Typical References
Part 05:NARI References
NARI
5.2 NARI Reference List in Indonesia
Part 05:NARI References
NARI
No. Contract Name Actual Date of Product
Operation
1 PT.PJPP 2*15MW project phase Two 2006SCADA
2 PT.CI 2*7MW Thermal power plant extend 2006SCADA
3 Indonesia Paiton 1 X 660 MW 2007Ash from ESP
4 Indonesia Ecogreen 1x7.5MW 2007Excitation System
5 Indonesia Perawang Project 2x36MW 2007Excitation System
6 Indonesia Perawang Extention Project 1x150MW 2007Excitation System
7 North Sulawisi wind harbour 2*115MW PLTU 2007SCADA
8 PT.NJ 2*7.5MW Thermoelectricity project 2007SCADA
9 PT CP 1*3MW power plant 2008SCADA
10 PT.EIP 1*7.5MW power plant 2008SCADA
11 PT.PPE 2*7MW power plant 2008SCADA
12 PLTG power plant 2008SCADA
13 Longwan power plant 2008SCADA
14 SIBAYAK Geothermal Power Plant Project NS2000/MGT 2008IED
15 Indonesia Muyin Power Plant 2x150MW 2008Excitation System & Ash
from ESP
16 PT.MSE 2*7.5MW power plant 2009 SCADA
17 ATAMBUA 4*7MW power plant 2009 SCADA
18 ECOGREEN 1*7.5MW Thermal Power Plant Project 2009 SCADA NARI
No. Contract Name Actual Date of Product
Operation
19 Sulawesi power plant 2010 SCADA
20 PT.IFI 1*15MW power plant engineering auxiliary equipment 2010 IED
21 PT.SJM 1*7MW power plant engineering auxiliary equipment 2010 IED
22 PT.PI 2*15MW power plant engineering auxiliary equipment 2010 IED
23 West Kalimantan 2*50MW power plant automation system 2010 SCADA
24 Thermal Power Plant in East Kalimantan Indonesia 2010 SCADA
25 Sulawisi 2*50MW PLTU 2011 SCADA
26 PLTU MALUKU(AMBON)2*15MW SCADA 2011 SCADA
27 PT.KP2*15MW power plant automation system 2011 SCADA
28 PT.TLG 2*12.5MW power plant electrical equipment 2011 SCADA
procurement
29 Indonesia Sinar Mas Asia Pulp & Paper (APP) 1x150MW 2011 Excitation System
30 Coal Fired Power Plant Project in West Sumatra Indonesia 2011 SCADA
31 2×25MW Thermal Power Plant NS2000 in East Kalimantan 2011 SCADA
Indonesia
32 PT.BA2*8MW power plant engineering auxiliary equipment 2012 IED NARI
No. Contract Name Actual Date Product
of Operation
33 PT.BAU BAU 2*7MW power plant engineering auxiliary equipment 2012 IED
34 PT.PLN KENDARI 1*10MW power plant microcomputer protection 2012 SCADA
SCADA
35 PT.PHPO 1*12MW power plant engineering auxiliary equipment 2012 IED
36 PT.WIJAYA 1*30MW power plant electric control device 2013 IED
37 PT.PHPO 1*6MW power plant automation system phase two 2013 SCADA
38 PT.EEI 2*7MW power plant automation system 2013 SCADA
39 EMBALUT 1X60MW Power Plant Expansion Project in East Kalimantan 2013 SCADA
Indonesia
40 Indonesia Sumatera Sumsel 5 Power Plant 2X150MW 2013 Ash from ESP and
Economizer
41 Indonesia Banten Power Plant 1X670MW 2013 Ash from ESP and
Economizer
42 Phosphoric acid PKG project automation system 2014 SCADA
43 PARIT BARU project microcomputer protection and related equipment 2014 IED
NARI
For You For Us For the World
NARI