RISK ASSESSMENT WORK SHEET

REDCO Safety Management


Construction of Viva Bahriya Tower 12&13 Project :- Hazard Risk Analysis

Contract number and title: RA number: Element of work: Risk assessment author: Date:31/08/2016
Viva Bahriya Towers 12&13 Package 01 at Pearl Qatar , VL-MS-PD- Chlorination & Disinfection of Water Safety Engineer
Doha 017 Rev.00 Supply System.

Severity Likelihood Evaluation of risk


NO INJURY 1 RARE 1 12 - 25 High Action required urgently to control the risk, further resources may be required, work must stop immediately
MINOR 2 UNLIKELY 2
MODERATE 3 OFTEN 3 5 – 10 Med Action required to control the risk, interim measures may be necessary in the short term, able to proceed with work under supervision
MAJOR 4 LIKELY 4
FATALITY 5 EXPECTED 5
1–4 Low This represents a low risk, although control measures must be maintained

Who might be Residual


Initial risk?
harmed? risk?
Employees
Job / What are the hazards? What controls are required? Action by

Risk Rating

Risk Rating
Likelihood

Likelihood
Contractors How?

Severity

Severity
Public
Others
Environment
Mobilization / delivering of Driver , Slip, trip, due to bad access. 3 2 6  Only competent drivers with driving permit 1 2 2 Site
Chemicals containers passengers, Back sprain due to manual handling will be allowed on site. Engineers
 Improper traffic third party of material during mobilization of  Site traffic rules shall be enforced. and
management / resources for work.  Vehicles shall travel strictly through Supervisors
Improper unloading designated routes on site.
 Manufacturer recommended lifting /
placing methods shall be strictly adhered
to.
 Trained and experienced personnel will be
used for the rigging / lifting activities.
 Proper supervision of the job by a
competent person.

Prepared by: ……. (QA/QC Engineer) Checked by: ………. (Plumbing In-Charge) Reviewed by: (Safety In Charge) Approved by: (Construction
Manager)

RA-REF: VBT-VL-PD-017 REV.00 Page 1 of 11


Viva Bahriya Towers 12&13 Package 01 at Pearl Qatar ,Doha

RISK ASSESSMENT WORK SHEET


Who might What controls are required? Action by
Job / What are the hazards? Initial risk?
be harmed?
Employees Residual

Risk Rating

Risk Rating
Likelihood

Likelihood
How?

Severity

Severity
Contractors
Public
Others
Environment
Unloading / shifting and Operatives Falling Objects, Slip/Trip,  Obtain the Redco work permit and
handling of Chemical and workers Unauthorized entry, Struck by the ensuring all the safety requirement) by the
containers / Carry bags by assigned the moving equipment authorized person prior to start the task
using Crane / Fork lift / task Incompetent operator and Rigger  Execution team to be well aware of the
Failure of Crane and Lifting Gears.
Manual Permit to work system procedures.
Moving boom can hit to the structure
 Constant supervision to be Present until
finishing the task.
 Safety Tool Box talk / STARRT talk to be
conducted by supervision team prior to
commencing the task on regular basis
about the hazards and risks involved in the
activity
 Communication and coordination with Safety
3 4 12 Redco / other Sub Contractor before work 1 4 4 Officers, Site
start with area supervisor and engineer. Engineers,
 Follow the unloading / shifting / handling Supervisors
procedures as per manufacture & operatives
recommendations.
 Follow Redco safety procedures and
Approved Method statement
 Must be followed the methodology of work
and risk assessment at all times and it
should be communicated to all involved
parties.
 Emergency evacuation plan should be
explained to all workmen in the event of
emergency situations on site.
 Trained signalman / Banks man / Rigger
shall give hand signals.
 Work area to be neat & clean
 Always ensure the SWL (Safe Working Load)
Prepared by: ……. (QA/QC Engineer) Checked by: ………. (Plumbing In-Charge) Reviewed by: (Safety In Charge) Approved by: (Construction
Manager)

RA-REF: VBT-VL-PD-017 REV.00 Page 2 of 11


Viva Bahriya Towers 12&13 Package 01 at Pearl Qatar ,Doha

RISK ASSESSMENT WORK SHEET


Who might What controls are required? Action by
Job / What are the hazards? Initial risk?
be harmed?
Employees Residual

Risk Rating

Risk Rating
Likelihood

Likelihood
How?

Severity

Severity
Contractors
Public
Others
Environment
of the lifting gears and shifting equipments
 Ensure all handling equipments are good
condition and colour coded.
 All materials to be arranged properly
 Ensure chemical containers are tied and it
should in the right place to avoid slipping or
movement
 Obtain proper balance while transportation
 Periodic Inspection of Hand Tools.
 Keep the shifting area clear of debris at all
time.
 Proper signage, Barricading and assigned
standby person must be provided to restrict
unauthorised entry
 Ensuring sufficient lighting are provided by
immediate supervisor / foreman at work
area
 Only competent persons allowed to
perform the task
 Use of proper PPEs as per job required.
 The lifiting & shifting equipments should
examined by competent operator daily
 Ensure that vehicles lifting not more than
the SWL.
 Operator must have valid Qatari Driving
Licence as well assessment certificate.
 Lifting Area must be barricaded
 Load must be secured properly
 Crane, Rigger must have third Party
Certificate
 Prior to use inspect the lifting Gears &
Prepared by: ……. (QA/QC Engineer) Checked by: ………. (Plumbing In-Charge) Reviewed by: (Safety In Charge) Approved by: (Construction
Manager)

RA-REF: VBT-VL-PD-017 REV.00 Page 3 of 11


Viva Bahriya Towers 12&13 Package 01 at Pearl Qatar ,Doha

RISK ASSESSMENT WORK SHEET


Who might What controls are required? Action by
Job / What are the hazards? Initial risk?
be harmed?
Employees Residual

Risk Rating

Risk Rating
Likelihood

Likelihood
How?

Severity

Severity
Contractors
Public
Others
Environment
shifting equipments.
 All Lifting gears shall be colourCoded.
 All Lifting gears / equipments must have
Third Party Certificate (TPC).
 No one shall stand under Suspended load
Tag Line must be used.
 Proper instructions must be given to wokers
to ensure that they will be aware of the
risks of manual handling.
Stocking / Storage Damage to Uneven Surface, 3 2 6  Constant supervision to be Present until 2 2 4 Store in
property, Sharp objects, Trapping finishing the task. charge, Site
personal  provide sufficient signage at storage area. Engineers
injuries  Fire fighting facilities shall be provided and
nearby for ready use. Supervisors
 Storage area to be neat & clean
 All chemical containers to be arranged
properly
 Ensure that separated stacking of chemicals
as per manufacturer’s recommendations.
 Only competent persons allowed to
perform the task
 Use of proper PPEs as per MSDS.
 Follow all the site safety procedures at all
time.
 Chemicals should be stored / stacked in a
dry, cool and well- ventilated area, tightly
sealed in orginal containers.
 Strictly follow manufacturee’s / supplier
instructions for storing / stacking the
chemicals.
 All kind of chemicals storage at designated
Prepared by: ……. (QA/QC Engineer) Checked by: ………. (Plumbing In-Charge) Reviewed by: (Safety In Charge) Approved by: (Construction
Manager)

RA-REF: VBT-VL-PD-017 REV.00 Page 4 of 11


Viva Bahriya Towers 12&13 Package 01 at Pearl Qatar ,Doha

RISK ASSESSMENT WORK SHEET


Who might What controls are required? Action by
Job / What are the hazards? Initial risk?
be harmed?
Employees Residual

Risk Rating

Risk Rating
Likelihood

Likelihood
How?

Severity

Severity
Contractors
Public
Others
Environment
area as per MSDS.
 Chemicals should be kept away from other
organic materials, acids, corrosive liquids,
oxidizers etc. As per MSDS To prevent
contamination.

Site /work preparation. Workers and Slip, trip due to bad access and or 2 3 6  Area to be inspected prior to work begins 1 3 3 Safety
supervisors’ poor housekeeping. and if required housekeeping shall be Officers, Site
Back sprain due to manual handling carried out to ensure safe and unobstructed Engineers,
of material during mobilization of access and egress. Supervisors
resources for work.  Before starting the work obtain clearance & operatives
from civil contractor to ensure readiness of
site to start MEP works.
 Before starting the work Co-ordination with
other services shall be done in the area of
work.
 Approved and latest shop drawings shall be
available at the site.
 Pre task briefing to be carried out by
immediate supervisors.
 Flushing area must be barriacded and
provide sufficient signage to restrict
unauthorized entry.
 Flushing area to be neat & clean.
 Prior to filling the system, a through
inspection of all pipe work fittings and plant
should be made to ensure that the system
is complete and water tight.
 Close all plant, terminal unit and end of eun
by pass isolating valves before the initial fill
of the system.
Prepared by: ……. (QA/QC Engineer) Checked by: ………. (Plumbing In-Charge) Reviewed by: (Safety In Charge) Approved by: (Construction
Manager)

RA-REF: VBT-VL-PD-017 REV.00 Page 5 of 11


Viva Bahriya Towers 12&13 Package 01 at Pearl Qatar ,Doha

RISK ASSESSMENT WORK SHEET


Who might What controls are required? Action by
Job / What are the hazards? Initial risk?
be harmed?
Employees Residual

Risk Rating

Risk Rating
Likelihood

Likelihood
How?

Severity

Severity
Contractors
Public
Others
Environment
 Ensure that no debrid would be lodged and
damage equipments coil and components
prior to system flushing opeartion.
 Pump system should be isolated from
chlorination process to avoid damage /
corrosion.
 Drains sholud be identified properly &
tested for blockages prior to use.
 Emergency evacuation plan should be
explained to all workmen in the event of
emergency situations on site.
Manual Handling workers Ergonomics 4 3 12  Provision of handling equipments 1 3 3 Safety Officers,
assigned the Slip, Trip,  Follow safe manual handling procedures Site Engineers
task  Proper technique of manual handling to be and
Supervisors
used.
 Competent / Trained personnel shall involve
in manual handling.
 Constant supervision shall be there until
finishing the task.
 Good arrangements of material / tools at
work place.
 Lift appropriate weight
 Proper instructions must be given to
workers to ensure that they will be aware of
the risks of manual handling
Chlorination & Disinfection of Operatives Damage to property due to Falling 3 3 9  Tool Box Talk shall be conducted and to be 2 3 6 Safety
water supply system by using and workers objects, Slip/Trip, incompetent communicated RA & MSDS. Officers, Site
pump set and accessaries assigned the persond (untarined persons),  Constant supervision to be provided until Engineers
task Unauthorized entry. Skin & eye finishing the task. and
irritation due to exposure, health  Restrict access to area as appropriate until Supervisors
effects due to inhalation & ingestion. operation are complete
Prepared by: ……. (QA/QC Engineer) Checked by: ………. (Plumbing In-Charge) Reviewed by: (Safety In Charge) Approved by: (Construction
Manager)

RA-REF: VBT-VL-PD-017 REV.00 Page 6 of 11


Viva Bahriya Towers 12&13 Package 01 at Pearl Qatar ,Doha

RISK ASSESSMENT WORK SHEET


Who might What controls are required? Action by
Job / What are the hazards? Initial risk?
be harmed?
Employees Residual

Risk Rating

Risk Rating
Likelihood

Likelihood
How?

Severity

Severity
Contractors
Public
Others
Environment
 Provision of apprpriate PPE as per MSDS.
 All the involved personnel to be under gone
in-house chemical handling trianing.
 Adequate ventilation / illumination to be
provided at the work place and storage
area.
 System water pumps and it’s connections
should be connected propely and secured
prior to commencing the task.
 Keep the container close when not in use,
 Do not get in to eyes, on skin, on clothing
 Do not breath dust
 Ensure all the container with labelled
 Safety Tool Box talk / STARRT talk to be
conducted prior to commencing the task on
regular basis.
 Co-ordinate with other services in-charge
prior start of the activity.
 Ensure that nobody will enter the tanks
during chlorination period.
 Area to be inspected prior to work begins
and if required housekeeping shall be
carried out to ensure safe and unobstructed
access and egress.
 Personal protective equipment for the body
should be worn / use based on the task
while handling the chemicals and the risks
involved as per MSDS.
 Safety eyewear complying with an
approved standard should be used as per
MSDS to avoid exposure to dusts, etc.
Prepared by: ……. (QA/QC Engineer) Checked by: ………. (Plumbing In-Charge) Reviewed by: (Safety In Charge) Approved by: (Construction
Manager)

RA-REF: VBT-VL-PD-017 REV.00 Page 7 of 11


Viva Bahriya Towers 12&13 Package 01 at Pearl Qatar ,Doha

RISK ASSESSMENT WORK SHEET


Who might What controls are required? Action by
Job / What are the hazards? Initial risk?
be harmed?
Employees Residual

Risk Rating

Risk Rating
Likelihood

Likelihood
How?

Severity

Severity
Contractors
Public
Others
Environment
 Competent/Trained personnel shall be
involved in the task.
 Must be use appropriate respiratory mask,
certified respirators (if required) as per
MSDS.
 Use compressed air or fresh air respiratory
equipment in confined spaces if required.
 Use a buddy system.
 Wear suitable hand gloves as per MSDS.
 Always wash hands thoroughly before
eating.
 Never take food into the work area where
chemicals are being used or stored.
 All substances containers / bottles should
be labelled
 Follow label/use instructions as per MSDS
while handling the chemicals / hazardous
substances.
 Immediately wipe away spilled material
before it hardens.
 Place in a container for proper disposal in
accordance with site chemicals disposal
procedures.
 Use the drip tray to protect leakage /
spillage reach to the ground.
 Properly sealed the substances after
finishing the task.
 All opened containers must be carefully
resealed and kept upright to prevent
leakage / spillage.
 Area must be cleaned and free from any
Prepared by: ……. (QA/QC Engineer) Checked by: ………. (Plumbing In-Charge) Reviewed by: (Safety In Charge) Approved by: (Construction
Manager)

RA-REF: VBT-VL-PD-017 REV.00 Page 8 of 11


Viva Bahriya Towers 12&13 Package 01 at Pearl Qatar ,Doha

RISK ASSESSMENT WORK SHEET


Who might What controls are required? Action by
Job / What are the hazards? Initial risk?
be harmed?
Employees Residual

Risk Rating

Risk Rating
Likelihood

Likelihood
How?

Severity

Severity
Contractors
Public
Others
Environment
dust or water dampness before working.
 Avoid to dispose the waste chemical in the
drains or any non designated place
 Disposing of chemical waste at designated
place only.
 Emergency evacuation plan should be
explained to all workmen in the event of
emergency situations on site.
 Fire fighting media, emergency facilities,
first aid facilities (eye wash, ,etc.) as per
MSDS shall be provided nearby for ready
use.
 Provision of apprpriate PPE as per MSDS.
Working at height (Using of Operatives Poorly 3 4 12  Full body safety harness to be worn while 2 4 8 Safety
step ladder, scaffold). and workers designed/erected working above 2 meters height. Officers, Site
assigned the of scaffold  Use inspected and colour coded fall Engineers
task • Unsafe access protection and 100% tie off with proper and
• Open edge of anchor point. Supervisors
staging.  Pre check inspection on the scaffolding tag
• Poor (Green/Red) if it is RED, Do Not Use the
Housekeeping scaffolding. Only the scaffolding with green
tag to be permitted to use.
 Scaffolding to be inspected by the
scaffolding inspector only.
 Working ladder is only permitted for short
term work, always ensure that scaffolding
or any standard working platforms is only
allowed to use for long term work.
 Awareness to be given to the operatives
regarding the hazard associated with the
task and especially working at height and
Prepared by: ……. (QA/QC Engineer) Checked by: ………. (Plumbing In-Charge) Reviewed by: (Safety In Charge) Approved by: (Construction
Manager)

RA-REF: VBT-VL-PD-017 REV.00 Page 9 of 11


Viva Bahriya Towers 12&13 Package 01 at Pearl Qatar ,Doha

RISK ASSESSMENT WORK SHEET


Who might What controls are required? Action by
Job / What are the hazards? Initial risk?
be harmed?
Employees Residual

Risk Rating

Risk Rating
Likelihood

Likelihood
How?

Severity

Severity
Contractors
Public
Others
Environment
use of safety harness.
 3 point contact to be observed while
working on the ladder a second man to be
hold the ladder in the ground while the
person on the ladder.
Usage of Hand Tools. Operatives  Hand, Finger injury, Abrasion, 4 4 16  Do not force tools & use correct tool for 2 4 8 Safety
and workers Tripping, Splinters, Eye/ hand/ the task. Officers, Site
assigned the body/ feet injuries.  Wear suitable and sufficient PPE as per job Engineers,
task  Damage to the tools if used required. Supervisors
incorrectly  Inspect tools & discard damaged tools or & operatives
return to store.
 Ensure that only competent person will use
hand tools.
 Sufficient supervision will be in place to
monitor works at all times.
 Hand tools used must be for the right job,
altered and homemade tools should not be
used for work.
 Open bladed knives, screwdrivers, and
other sharp tools are to be carried and
used so as not to cause injury to the user
or others.
 Insulated tools must be used where there
is a possibility of live electrical work.
All tools should be kept clear of
unnecessary grease, moisture or dirt.
 provided to certain types of tools to ensure
good working order, i.e. timber plane,
chisels, etc.

Prepared by: ……. (QA/QC Engineer) Checked by: ………. (Plumbing In-Charge) Reviewed by: (Safety In Charge) Approved by: (Construction
Manager)

RA-REF: VBT-VL-PD-017 REV.00 Page 10 of 11


Viva Bahriya Towers 12&13 Package 01 at Pearl Qatar ,Doha

RISK ASSESSMENT WORK SHEET


Who might What controls are required? Action by
Job / What are the hazards? Initial risk?
be harmed?
Employees Residual

Risk Rating

Risk Rating
Likelihood

Likelihood
How?

Severity

Severity
Contractors
Public
Others
Environment
 House-keeping Employees Material and unwanted items spread 3 2 6  Maintain Housekeeping on regular basis, 1 2 2 Safety
and nearby around the work area (Fall, Slip, Trip)  Proper arrangement of materials, tools Officers, Site
personnel  Equipment should be at proper place. Engineers,
 Excess materials and tools shall be removed Supervisors
from working area. & operatives
Hot and humid climatic Operatives Heat related illness (heat cramps, 4 4 16  Workers shall be advised to drink plenty of 1 4 4 Safety
conditions and heat stress and heat stroke) due to water. Officers, Site
 Heat related illness supervisors workers been exposed to sun, hot  Oral rehydration drinks can be supplied to Engineers
and humid climatic conditions. workers in humid climatic conditions & and
heavy sweat loss. Supervisors
 Workers shall be informed about does and
don’t while working in hot and humid
climatic condition.
 State or Qatar law for restriction of works
exposed to sun during summer shall be
enforced.

Prepared By Checked By Reviewed By Approved By


(QA/QC Engineer) (Plumbing In-Charge) (Safety In Charge) ( Construction Manager )

Prepared by: ……. (QA/QC Engineer) Checked by: ………. (Plumbing In-Charge) Reviewed by: (Safety In Charge) Approved by: (Construction
Manager)

RA-REF: VBT-VL-PD-017 REV.00 Page 11 of 11