3 PLASTER
1:5 0 0.000 --
bags bags
1:4 0 0.000 --
bags cum
4 BRICKWORK 29 9.686 --
bags bags
5 MOORUM -- -- --
--
--
--
--
--
70.019
cum
70.019
652.30
4723.28
1400.39
6775.97
1st RA Bill of SHC PALAGI
Plinth Height 1.10 M
GROUND FLOOR
S.N. SOR NO PARTIULAR OF ITEMS NO. L B
1 1.2
Bore
2 21.17
Carrying out the resistivity survey by VES
method using Schlumberger configuration for
locating the proper spot for drilling of tube well
within the selected habitation, including
photography, interpretation of resistivity data
and submission of report in the desired format
along with resistivity readings, necessary
graph and photographs. (only successful
point is
payable) 1
Submersible Pump
8 26.3 Supplying, installation, testing and
commissioning of submersible pump set for
water supply system with submersible motor
directly coupled to multi-stage submersible
pump of specified discharge capacity, head,
delivery size in existing bore well including 2
sets of suitable size holding clamps made out
of 50 mm X 6 mm MS flat, connection with
suitable submersible cable of standard length
etc. as required.
26.5.6 32 mm dia.
11 26.14
Supplying, laying and fixing following size
submersible cable along with GI/PVC/HDFC
pipe line or laid in ground etc as required
26.14.2 3x2.5 sqmm
12 1.1
13 1.6
Extra for every additional lift of 1.5m or part
thereof
1.6.1 all types of soil
For footing
F1 4 1.500 1.500
F2 4 1.900 1.900
F3 4 1.900 1.900
14 2.1
Providing and fixing form work including
centring, shuttering, strutting,
staging, propping bracing etc. complete and
including its removal at all
levels, for:
2.1.1
Foundations, footings, bases of columns plinth
beam, curtain wall in any
shape and size and all type of wall below plinth
level.
For footing
F1 4x4 1.400
F2 4x4 1.800
F3 4x4 1.800
3.1.2
1:4:8 (1 cement : 4 coarse sand : 8 graded
stone aggregate 40mm
nominal size).
For footing
F1 4 1.400 1.400
F2 4 1.800 1.800
F3 4 1.800 1.800
16 3.12
Providing and placing in position
reinforcement for R.C.C. work including
straightening, cutting, bending, binding etc.
complete as per drawings
including cost of binding wire in foundation
and plinth all complete:
@ 1.58
0.000
17 2.1
Providing and fixing form work including
centring, shuttering, strutting,
staging, propping bracing etc. complete and
including its removal at all
levels, for:
2.1.1
Foundations, footings, bases of columns plinth
beam, curtain wall in any
shape and size and all type of wall below plinth
level.
For footing
F1 4x4 1.200
F2 4x4 1.600
F3 4x4 1.600
18 3.2
Providing and laying nominal mix reinforced
cement concrete with crushed
stone aggregate using concrete mixer in all
works upto plinth level
excluding cost of form work.
3.2.1
1:1½:3 (1 cement : 1½ coarse sand : 3 graded
stone aggregate 20mm
nominal size).
For footing
F1 4 1.200 1.200
F2 4 1.600 1.600
F3 4 1.600 1.600
19 2.1
Providing and fixing form work including
centring, shuttering, strutting,
staging, propping bracing etc. complete and
including its removal at all
levels, for:
2.1.5
Columns, Pillars, Piers and likes- rectangular or
square in shape
column upto Ground Beam top C1 4x2 (0.4+0.23)
C2 4x2 (0.4+0.23)
C3 4x2 (0.4+0.23)
20 3.2
Providing and laying nominal mix reinforced
cement concrete with crushed
stone aggregate using concrete mixer in all
works upto plinth level
excluding cost of form work.
3.2.1
1:1½:3 (1 cement : 1½ coarse sand : 3 graded
stone aggregate 20mm
nominal size).
column upto Ground Beam Top C1 4 0.400 0.230
C2 4 0.400 0.230
C3 4 0.400 0.230
21 1.17
3.1.2
1:4:8 (1 cement : 4 coarse sand : 8 graded
stone aggregate 40mm
nominal size).
For Plinth Beam (in ground level)
In horizontal direction
1 7.600 0.300
1 7.600 0.300
1 1.100 0.300
1 7.600 0.300
1 1.150 0.300
1 7.600 0.300
In vertical direction
1 8.680 0.300
1 2.450 0.300
1 8.770 0.300
1 6.400 0.300
1 8.680 0.300
23 3.12
Providing and placing in position
reinforcement for R.C.C. work including
straightening, cutting, bending, binding etc.
complete as per drawings
including cost of binding wire in foundation
and plinth all complete:
Bottom 2x2x(2.359+1.841+2.359) --
Ring 2x(22+17+22)x1.044 --
Grid A-B (2-3)
Main Bar Top 2x3.15 --
Bottom 4x3.15 --
Ring 17x1.044 --
Grid B (1-4)
Main Bar Top 2x9.95 --
Bottom 4x9.95 --
Ring (22+17+22)x1.044 --
Grid C-D (1-2), (3-4)
Main Bar Top 2x2x4.1 --
Bottom 2x4x3.95 --
Ring 2x22x1.044 --
39.512
@1.58
62.429
24 2.1
Providing and fixing form work including
centring, shuttering, strutting,
staging, propping bracing etc. complete and
including its removal at all
levels, for:
2.1.1
Foundations, footings, bases of columns plinth
beam, curtain wall in any
shape and size and all type of wall below plinth
level.
For plinth beam
In Horizontal Direction
2 7.600
2 7.600
2 1.100
2 7.600
2 1.150
2 7.600
In Vertical Direction
2 8.680
2 2.400
2 8.770
2 6.400
2 8.680
25 3.2
Providing and laying nominal mix reinforced
cement concrete with crushed
stone aggregate using concrete mixer in all
works upto plinth level
excluding cost of form work.
3.2.1
1:1½:3 (1 cement : 1½ coarse sand : 3 graded
stone aggregate 20mm
nominal size).
For plinth beam
In Horizontal Direction
Grid 1 1 7.600 0.200
Grid 2 1 7.600 0.200
Grid 2-3 1 1.100 0.200
Grid 3 1 7.600 0.200
Grid 3-4 1 1.150 0.200
Grid 4 1 7.600 0.200
In Vertical Direction
Grid A 1 8.680 0.200
Grid A-B 1 2.400 0.200
Grid B 1 8.770 0.200
Grid C-D 1 6.400 0.200
Grid D 1 8.680 0.200
26 2.1
Providing and fixing form work including
centring, shuttering, strutting,
staging, propping bracing etc. complete and
including its removal at all
levels, for:
2.1.5
Columns, Pillars, Piers and likes- rectangular or
square in shape
For column from GB to DPC
C1 4x2 (0.4+0.23)
C2 4x2 (0.4+0.23)
C3 4x2 (0.4+0.23)
27 3.2
Providing and laying nominal mix reinforced
cement concrete with crushed
stone aggregate using concrete mixer in all
works upto plinth level
excluding cost of form work.
3.2.1
1:1½:3 (1 cement : 1½ coarse sand : 3 graded
stone aggregate 20mm
nominal size).
column upto Ground Beam Top C1 4 0.400 0.230
C2 4 0.400 0.230
C3 4 0.400 0.230
29 3.13
30 3.15
Applying a coat of hot bitumen VG-10 using @
1.7kg/ sqm on damp proof
course after cleaning the surface with brushes
and finally with a piece of
cloth lightly soaked in kerosene oil.
Over Plinth Beam
In Horizontal Direction
Grid 1 1 7.500 0.200
Grid 2 1 7.500 0.200
Grid 2-3 1 1.200 0.200
Grid 3 1 4.400 0.200
Grid 3-4 1 1.300 0.200
Grid 4 1 7.500 0.200
In Vertical Direction
Grid A 1 8.680 0.200
Grid A-B 1 1.850 0.200
Grid B 1 8.970 0.200
Grid C-D 1 3.200 0.200
Grid C-D 1 3.100 0.200
Grid D 1 8.680 0.200
32 2.1
Providing and fixing form work including
centring, shuttering, strutting,
staging, propping bracing etc. complete and
including its removal at all
levels, for:
2.1.5
Columns, Pillars, Piers and likes- rectangular or
square in shape
Column above PB upto LB
C1 4x2 (0.4+0.23)
C2 4x2 (0.4+0.23)
C3 4x2 (0.4+0.23)
33 3.2
Providing and laying nominal mix reinforced
cement concrete with crushed
stone aggregate using concrete mixer in all
works upto plinth level
excluding cost of form work.
3.2.1
1:1½:3 (1 cement : 1½ coarse sand : 3 graded
stone aggregate 20mm
nominal size).
Column above PB upto LB
C1 4 0.400 0.230
C2 4 0.400 0.230
C1 4 0.400 0.230
34 7.5 Brick work with modular fly-ash lime bricks
(FaLG Bricks) confirming to
IS:12894-2002 of class designation 4.0 in
foundation and plinth in:
35 7.6
Extra for brick work in superstructure above
plinth level for every floor or
part thereof in addition to rate for foundation
and plinth:
total quantity of brick work
37 7.12
Extra for half brick work in superstructure
above plinth level for every story
or part thereof in addition to rate for upto plinth
level:
Quantity of half brick work
39 2.1
Providing and fixing form work including
centring, shuttering, strutting,
staging, propping bracing etc. complete and
including its removal at all
levels, for:
2.1.13
Weather shade, chhajja, Cornices and
mouldings
Chajja Window, W1- 5 no 5 2.100 0.900
Channael Gate, CG2- 1no 1 1.800 0.900
40 3.12
Providing and placing in position
reinforcement for R.C.C. work including
straightening, cutting, bending, binding etc.
complete as per drawings
including cost of binding wire in foundation
and plinth all complete:
41 2.1
Providing and fixing form work including
centring, shuttering, strutting,
staging, propping bracing etc. complete and
including its removal at all
levels, for:
42 3.2
Providing and laying nominal mix reinforced
cement concrete with crushed
stone aggregate using concrete mixer in all
works upto plinth level
excluding cost of form work.
3.2.1
1:1½:3 (1 cement : 1½ coarse sand : 3 graded
stone aggregate 20mm
nominal size).
For GF Lintel Beam
In horizontal direction
Grid 1 1 8.700 0.200
Grid 4 1 8.700 0.200
Vertical Direction
Grid A 1 9.600 0.200
Grid D 1 9.600 0.200
3.1.2
1:4:8 (1 cement : 4 coarse sand : 8 graded
stone aggregate 40mm
nominal size).
Clinic 1 3.050 3.150
Waiting 1 2.200 3.180
MWP 1 2.620 3.150
Labour Room 1 3.150 3.100
1 1.810 2.450
Toilet (Labour) 1 1.100 2.250
Ward 1 3.400 3.150
Toilet (Ward) 1 1.200 1.400
Toilet (Ward) 1 1.200 1.500
Passage Below Stair 1 4.950 2.450
Distribution bar
6x2.37+17x1.17+8x2.37
Main Bar upto L/3 9x2.973
Distribution bar 10x1.17+7x2.37
0 rm
@1.58
0.000
46 3.2
Providing and laying nominal mix reinforced
cement concrete with crushed
stone aggregate using concrete mixer in all
works upto plinth level
excluding cost of form work.
3.2.1
1:1½:3 (1 cement : 1½ coarse sand : 3 graded
stone aggregate 20mm
nominal size).
for GF to FF stair case
PB to Landing slab 1 5.063 1.400
Landing to FF Slab 1 5.739 1.400
Steps 0.5x23 1.400 0.300
47 2.1
Providing and fixing form work including
centring, shuttering, strutting,
staging, propping bracing etc. complete and
including its removal at all
levels, for:
2.1.5
Columns, Pillars, Piers and likes- rectangular or
square in shape
Column from GF LB to GF Slab Top
C1 4x2 (0.4+0.23)
C2 4x2 (0.4+0.23)
C3 4x2 (0.4+0.23)
48 3.2
Providing and laying nominal mix reinforced
cement concrete with crushed
stone aggregate using concrete mixer in all
works upto plinth level
excluding cost of form work.
3.2.1
1:1½:3 (1 cement : 1½ coarse sand : 3 graded
stone aggregate 20mm
nominal size).
Column from GF LB to GF Slab Top
C1 4 0.400 0.230
C2 4 0.400 0.230
C3 4 0.400 0.230
52 7.12
Extra for half brick work in superstructure
above plinth level for every story
or part thereof in addition to rate for upto plinth
level:
Quantity of half brick work
54 2.1
Providing and fixing form work including
centring, shuttering, strutting,
staging, propping bracing etc. complete and
including its removal at all
levels, for:
In Horizontal Direction
Grid 1 2 7.500
Grid 2 2 7.500
Grid 3 2 7.500
Grid 4 2 7.500
In Vertical Direction
Grid A 2 8.750
Grid B 2 5.600
Grid C 2 3.140
Grid C-D 2 3.200
Grid D 2 8.750
55 2.1
Providing and fixing form work including
centring, shuttering, strutting,
staging, propping bracing etc. complete and
including its removal at all
levels, for:
56 2.1
Providing and fixing form work including
centring, shuttering, strutting,
staging, propping bracing etc. complete and
including its removal at all
levels, for:
57 3.12
Providing and placing in position
reinforcement for R.C.C. work including
straightening, cutting, bending, binding etc.
complete as per drawings
including cost of binding wire in foundation
and plinth all complete:
4x3.5+9x0.86+9x0.86+3x3.5
6x8.7+12x1.16+12x1.9+12x0.
94+6x8.7
Vertical
5x9.6+12x1.4+12x0.88+5x6.8
8+4x3.6+8x0.88+8x0.88+8x3.
6+10x0.88+10x0.88+4x3.6
2x4.12+18x0.88+10x1.4+3x0.
88+12x3.6+14x0.88+14x0.88
+5x3.6
132.920
@1.58
210.014
58 3.2
Providing and laying nominal mix reinforced
cement concrete with crushed
stone aggregate using concrete mixer in all
works upto plinth level
excluding cost of form work.
3.2.1
1:1½:3 (1 cement : 1½ coarse sand : 3 graded
stone aggregate 20mm
nominal size).
for GF slab beam
In horizontal direction
grid1,2,3,4 gridA-D 4 7.50 0.200
in vertical direction
gridA-D grid 1-2-3-4 2 8.68 0.200
grid B 1 5.600 0.200
grid C grid 3-4 1 3.14 0.200
between gridC-D grid1-2 1 3.2 0.200
for slab GF
1 9.60 8.700
In front projection 1 8.70 0.250
Deduction for staire case 1 4.950 2.400
FIRST FLOOR
59 3.12
Providing and placing in position
reinforcement for R.C.C. work including
straightening, cutting, bending, binding etc.
complete as per drawings
including cost of binding wire in foundation
and plinth all complete:
@ 1.58
0.000
60 2.1
Providing and fixing form work including
centring, shuttering, strutting,
staging, propping bracing etc. complete and
including its removal at all
levels, for:
2.1.5
Columns, Pillars, Piers and likes- rectangular or
square in shape
Column from GB Slab to FF LB
C1 4x2 (0.4+0.23)
C2 4x2 (0.4+0.23)
C3 4x2 (0.4+0.23)
61 3.2
Providing and laying nominal mix reinforced
cement concrete with crushed
stone aggregate using concrete mixer in all
works upto plinth level
excluding cost of form work.
3.2.1
1:1½:3 (1 cement : 1½ coarse sand : 3 graded
stone aggregate 20mm
nominal size).
Column from GF Slab to FF LB
C1 4 0.400 0.230
C2 4 0.400 0.230
C3 4 0.400 0.230
63 7.6
Extra for brick work in superstructure above
plinth level for every floor or
part thereof in addition to rate for foundation
and plinth:
Quantity of Brick work 2
65 7.12
Extra for half brick work in superstructure
above plinth level for every story
or part thereof in addition to rate for upto plinth
level:
Quantity of half brick work 2
66 7.20 Extra for providing and placing in position
hopping 25x1.60 mm or 2 Nos
6mm dia MS bars reinforcement at every third
course of half brick
masonry.
3.00 kg/meter
0.400 3.600
0.400 5.776
0.400 5.776
15.152 cum 26.50 401.53
0.150 3.360
0.150 4.320
0.150 4.320
12.000 sqm 139.00 1668.00
0.150 1.176
0.150 1.944
0.150 1.944
5.064 cum 2659.00 13465.18
12mm 10mm 8mm
-- 122.400 --
-- 201.600 --
-- 201.600 --
225.600 -- --
-- -- 223.488
225.600 -- --
-- -- 223.488
225.600 -- --
-- -- 223.488
676.800 525.600 670.464
@ 0.888 @ 0.617 @ 0.395
600.998 324.295 264.833
1190.127 kg 54.50 64861.91
0.400 7.680
0.400 10.240
0.400 10.240
28.160 sqm 139.00 3914.24
0.400 2.304
0.400 4.096
0.400 4.096
10.496 cum 4163.00 43694.85
1.800 9.072
1.800 9.072
1.800 9.072
27.216 sqm 297.00 8083.15
1.800 0.662
1.800 0.662
1.800 0.662
1.987 cum 4163.00 8272.71
71.972
-5.064
-10.496
1.350 -0.497
1.350 -0.497
1.350 -0.497
54.922 cum 65.00 3569.90
0.100 0.228
0.100 0.228
0.100 0.033
0.100 0.228
0.100 0.035
0.100 0.228
0.100 0.260
0.100 0.074
0.100 0.263
0.100 0.192
0.100 0.260
2.029 cum 2659.00 5394.85
7.700 -- --
7.700 -- --
5.632 -- --
4.340 -- --
-- -- 19.836
-- -- --
-- -- --
-- -- --
-- -- --
-- -- 34.452
54.300 -- --
54.300 -- --
37.698 -- --
34.860 -- --
-- -- 162.864
3.700 -- --
7.400 -- --
-- -- 8.352
3.640 -- --
7.280 -- --
-- -- 8.352
39.800 -- --
39.800 -- --
27.304 -- --
26.236 -- --
-- -- 127.368
6.300 -- --
12.600 -- --
-- -- 17.748
19.900 -- --
39.800 -- --
-- -- 63.684
16.400 -- --
32.800 -- --
-- -- 45.936
489.490 488.592
@0.888 @0.617 @ 0.395
434.667 0.000 192.99
690.090 kg 54.50 37609.90
0.350 5.320
0.350 5.320
0.350 0.770
0.350 5.320
0.350 0.805
0.350 5.320
0.350 6.076
0.350 1.680
0.350 6.139
0.350 4.480
0.350 6.076
47.306 sqm 139.00 6575.53
0.350 0.532
0.350 0.532
0.350 0.077
0.350 0.532
0.350 0.081
0.350 0.532
0.350 0.608
0.350 0.168
0.350 0.614
0.350 0.448
0.350 0.608
4.731 cum 4163.00 19693.49
0.650 3.276
0.650 3.276
0.650 3.276
9.828 sqm 297.00 2918.92
0.650 0.239
0.650 0.239
0.650 0.239
0.718 cum 4163.00 2987.37
0.600 0.900
0.600 0.900
0.600 0.144
0.600 0.528
0.600 0.156
0.600 0.900
0.600 1.042
0.600 0.222
0.600 1.076
0.600 0.384
0.600 0.372
0.600 1.042
7.666 cum 3350.00 25679.76
0.050 0.075
0.050 0.075
0.050 0.012
0.050 0.044
0.050 0.013
0.050 0.075
0.050 0.087
0.050 0.019
0.050 0.090
0.050 0.032
0.050 0.031
0.050 0.087
0.639 cum 4237.00 2706.60
1.500
1.500
0.240
0.880
0.260
1.500
0.000
1.736
0.370
1.794
0.640
0.620
1.736
12.776 sqm 93.50 1194.56
1.000 83.520
-4.731
-7.666
1.000 -0.368
1.000 -0.368
1.000 -0.368
70.019 cum 371.00 25977.20
2.100 10.584
2.100 10.584
2.100 10.584
31.752 sqm 297.00 9430.34
2.100 0.773
2.100 0.773
2.100 0.773
2.318 cum 4163.00 9651.50
2.100 3.150
2.100 3.150
2.100 1.848
2.100 3.150
2.100 3.646
2.100 3.767
2.100 1.344
2.100 3.646
1.200 -2.520
0.450 -0.162
1.000 -2.520
2.100 -0.924
2.100 -0.504
17.071 cum 3350.00 57186.51
2.100 2.520
2.100 2.730
2.100 3.885
2.100 6.510
2.100 -5.040
10.605 sqm 382.00 4051.11
9.450
1.620
11.070 sqm 294.00 3254.58
8mm
--
77.376
--
90.768
--
44.640
--
10.656
--
8.000
--
47.500
278.940
@ 0.395
110.181
292.073 kg 54.50 15917.97
0.200 3.480
0.200 3.480
0.200 3.840
0.200 3.840
0.200 4.560
0.150 1.260
20.460 sqm 202.00 4132.92
0.200 0.348
0.200 0.348
0.200 0.384
0.200 0.384
0.200 0.336
0.150 0.050
0.100 0.570
0.100 0.096
2.516 cum 4163.00 10472.03
0.100 0.961
0.100 0.700
0.100 0.825
0.100 0.977
0.100 0.443
0.100 0.248
0.100 1.071
0.100 0.168
0.100 0.180
0.100 1.213
6.785 cum 2659.00 18040.92
10.190
11.664
4.830
26.684 sqm 230.00 6137.27
12mm 10mm 8mm
16.785
9.360
58.930
42.300
24.354
28.320
18.063
24.810
56.400
53.070
26.757
28.290
115.330 85.959 186.15
@0.888 @0.617 @ 0.395
102.413 53.037 73.53
228.979 kg 54.50 12479.36
0.100 0.709
0.100 0.803
0.150 0.725
2.237 cum 4163.00 9311.72
1.200 6.048
1.200 6.048
1.200 6.048
18.144 sqm 297.00 5388.77
1.200 0.442
1.200 0.442
1.200 0.442
1.325 cum 4163.00 5515.14
0.800 1.216
0.800 1.216
0.800 0.704
0.800 1.216
0.800 1.389
0.800 0.923
1.100 0.704
0.800 0.512
0.800 1.389
-1.850
7.419 cum 3350.00 24852.98
1.100 1.320
1.100 1.430
1.100 2.035
1.100 3.410
8.195 sqm 382.00 3130.49
0.300 5.250
0.300 3.360
0.300 1.884
0.300 1.920
0.300 5.250
35.664 sqm 202.00 7204.13
83.520
-11.880
71.640 sqm 235.00 16835.40
37.600
37.600 meter 34.00 1278.40
59.49
108.60
178.46
79.60
27.36
139.57
15.74
25.17
6.90
19.45
15.80
5.44
25.17
8.50
25.17
503.300
546
93.90
39.98
152.4
198.24
125.44
304.140 503.300 1628.43
@0.888 @0.617 @ 0.395
270.076 310.536 643.23
1433.857 kg 54.50 78145.19
0.300 1.800
0.300 1.042
0.300 0.336
0.300 0.188
0.300 0.192
0.115 9.605
0.115 0.250
0.115 -1.366
12.047 cum 4163.00 50150.52
2.100 10.584
2.100 10.584
2.100 10.584
31.752 sqm 297.00 9430.34
2.100 0.773
2.100 0.773
2.100 0.773
2.318 cum 4163.00 9649.83
2.100 3.150
2.100 1.932
2.100 1.953
2.100 3.150
2.100 3.675
2.100 1.344
2.100 3.675
1.200 -3.960
0.450 -0.108
1.000 -0.840
13.971 cum 3350.00 46802.85
2.100 4.095
2.100 6.615
2.100 4.200
2.100 13.230
2.100 18.753
2.100 -8.400
2.100 -3.360
31.038 sqm 382.00 11856.52
x20+1.49x15=46.15@0.79 255.210
x20+1.49x15=46.15@0.79 401.044
656.253 kg 67.50 44297.08
2.1+1.0+2.1=5.20 31.200
2.1+0.8+2.1=5.00 15.000
2.1+1.0+2.1=5.20 31.200
2.1+0.8+2.1=5.00 10.000
1.5+1.2+1.5+1.2=5.40 37.800
1.5+1.2+1.5+1.2=5.40 59.400
184.600
3.00 kg/meter 553.800 kg 73.50 40704.30
4.620
2.520
7.140 sqm 3330.00 23776.20
2.318 2.318
2.516 2.516
2.237 2.237
1.325 1.325
12.047 12.047
20.443 cum 97.50 1993.19
2.318 4.636
4.636 cum 97.50 452.01
968429.25