PROJECT : PENINSULA HOMES

NAME: Property Management Group


(Additional) RFO Peninsula Homes Block 01 Lot 14

MATERIALS QTY UNIT UNIT COST


A. Dismantling, Repair, Replacement of Windows, Door and Jamb, Water closet fittings and fixtures, Outlet
Window glass putty 3 bags 350.00
Hinges 3 sets 105.00
Receptacle 1 pc 75.00
Door with Jamb 1 pc 4,300.00
Convinience outlet 1 pc 130.00
1/8 x 38.5 x 34 Clear Glass 1 pc 120.00
1/8 x 48 x 34 Clear Glass 1 pc 120.00
1/8 x 48 x 34.5 Clear Glass 1 pc 120.00
Shower head 1 pc 180.00
1/2 x 1/2 Flexible hose 3 pcs 210.00
Angle valve 2 pcs 245.00
Switch 2 gang 1 set 130.00
Lockset 3 pcs 450.00
Faucet 2 pcs 210.00
TOTAL MATERIAL COST

LABOR MANPOWER UNIT RATE


Mason / Carpenter / Installer
1 lot 10,000.00
Laborer
TOTAL LABOR COST

SCOPE OF WORK
Dismantling of Door and jamb, Window TOTAL DIRECT COST
Replacement of Door and jamb, Window glass CONTINGENCIES (10%)
Repuuty of Door glass
Rectification of windows and door TOTAL PROJECT COST
Replacement of Fitting and fixtures, C.O., Receptacle
Installation of faucet, valve and lockset
Cleaning of work area

Prepared By: Checked By:

August Jeffrey R. Bautista April Kristine Martin


Planning and Design
PMG Engineer CE/QS

Reccomending Approval: Noted By:

Prency I. Glory
PMG Manager

Nilo Peñalba Paul Angelo Maranion


PMG Head PDDG - Head

Erico Loreto
AVP - CSG
Approved By:

Miguel P. Mendoza `
VP - Operation
TOTAL COST
fixtures, Outlet
1,050.00
315.00
75.00
4,300.00
130.00
120.00
120.00
120.00
180.00
630.00
490.00
130.00
1,350.00
420.00
9,430.00

AMOUNT

10000.00

10,000.00

19,430.00
1,943.00

21,373.00

Rosalie Beronio
AVP - PMD
`