OBRA:
CONSTRUCCION DEL PUENTE CARROZABLE EN EL ANEXO DE PUYE-DISTRITO DE TAMBO-HUAYTARA-
HUANCAVELICA
HUANCAVELICA -HUAYTARA-
UBICACIÓN: TAMBO-PUYE
MONTOS AUTORIZADOS
SIN IGV IGV CON IGV
1.2.0 PAGADO
1.2.1 Contrato Principal S/. 319,175.72
1.2.2 Adicionales S/. 0.00
Sub Total S/. 319,175.72
I.G.V. ( 18 %) S/. 57,451.62
Total S/. 376,627.34
1.4.0 PAGADO
1.4.1 Reajuste Contrato Principal S/. 0.00
1.4.2 Reajuste Adicionales S/. 0.00
Sub Total S/. 0.00
I.G.V. (18%) S/. 0.00
Total S/. 0.00
1.6.0 PAGADO
1.6.1 Mayores Gastos Generales S/. 0.00
1.6.2 Intereses S/. 0.00
1.6.3 Resarcimiento de daños y perjuicios S/. 0.00
Sub Total S/. 0.00
I.G.V. (18%) S/. 0.00
Total S/. 0.00
SALDO A FAVOR DEL CONTRATISTA
- En efectivo S/. 0.00
- I.G.V. S/. 0.00
LIQUIDACION FINAL DEL CONTRATO DE OBRA
RESUMEN DE SALDOS
- En efectivo 31,146.75
I.G.V 18% S/. 5,606.41
AUTORIZADO Y PAGADO REINTEGROS
- En efectivo 7,435.74 1,338.43
I.G.V. 18%
II ADELANTOS 0.00
III DEVOLUCION DEL FONDO DE GARANTIA 0.00 0.00 0.00
1. CONCLUSIONES
El resultado de la liquidación final del contrato nos indica que la obra se ha ejecutado conforme a los plazos
establecidos, con un saldo a favor del Contratista de: devolucion por Fondo de Garantía y de Valorizacion por
los Rejustes de los precios que es como sigue:
OBRA:
CONSTRUCCION DEL PUENTE CARROZABLE EN EL ANEXO DE PUYE-DISTRITO DE TAMBO-HUAYTARA-
CONTRATISTA: CONSORCIO VAUS
HUANCAVELICA
HUANCAVELICA -HUAYTARA-TAMBO-
UBICACIÓN: PUYE SUPERVISOR: ING. CAMILO ORLANDO SAAVEDRA HUAYLLA
RESIDENTE: ING. ALFONSO FERNANDO LAURA PALOMINO
MONTO MONTO VALOR. VALOR. VALOR. VALOR. VALOR. VALORIZ. DE TOTAL SALDO
DESCRIPCION
CONTRATADO EJECUTADO ,1 ,2 ,3 ,4 ,5, ADICIONAL VALORIZADO OBRA
VALORIZACION CONTRACTUAL (V)
01- TODOS 311,467.46 350,322.46 54,271.82 75,593.25 67,651.58 39,425.27 74,525.53 38,855.02 350,322.48 -
TOTAL CONTRACTUAL 311,467.46 350,322.46 54,271.82 75,593.25 67,651.58 39,425.27 74,525.53 38,855.02 350,322.48 -
% DE AVANCE DE OBRA A LA FECHA 17.42% 24.27% 21.72% 12.66% 23.93% 12.47% 100.00% 0.00%
REAJUSTES (S)
01- TODOS
TOTAL REAJUSTES - - - - - - -
DEDUCCIONES ADELANTO DIRECTO (D)
01- TODOS
TOTAL DEDUCCIONES ADELANTO DIRECTO - - - - - -
DEDUCCIONES ADELANTO MATERIALES (M)
01- TODOS
OBRA:
CONSTRUCCION DEL PUENTE CARROZABLE EN EL ANEXO DE PUYE-DISTRITO DE TAMBO-HUAYTARA-
CONTRATISTA: CONSORCIO VAUS
HUANCAVELICA
HUANCAVELICA -HUAYTARA-TAMBO-
UBICACIÓN: PUYE SUPERVISOR: ING. CAMILO ORLANDO SAAVEDRA HUAYLLA
RESIDENTE: ING. ALFONSO FERNANDO LAURA PALOMINO
01- TODOS 311,467.46 350,322.46 48,844.64 68,033.93 60,886.42 35,482.75 67,072.98 38,855.00 319,175.72 7,435.74 31,146.75
TOTAL CONTRACTUAL 311,467.46 350,322.46 48,844.64 68,033.93 60,886.42 35,482.75 67,072.98 38,855.00 319,175.72 7,435.74 31,146.75
% DE AVANCE DE OBRA A LA FECHA 13.94% 19.42% 17.38% 10.13% 19.15% 11.09% 91.11%
REAJUSTES (S)
01- TODOS
TOTAL REAJUSTES - - - - - -
DEDUCCIONES ADELANTO DIRECTO (D)
01- TODOS
01- TODOS
OBRA:
CONSTRUCCION DEL PUENTE CARROZABLE EN EL ANEXO DE PUYE-DISTRITO DE TAMBO-HUAYTARA-
CONTRATISTA: CONSORCIO VAUS
HUANCAVELICA
HUANCAVELICA -HUAYTARA-TAMBO-
UBICACIÓN: PUYE SUPERVISOR: ING. CAMILO ORLANDO SAAVEDRA HUAYLLA
RESIDENTE: ING. ALFONSO FERNANDO LAURA PALOMINO
EN IGV (VN*0.18) 56,064.14 63,058.04 8,792.03 12,246.11 10,959.55 6,386.89 12,073.14 6,993.90 57,451.62 1,338.43 5,606.41
MONTO TOTAL CON IGV 367,531.60 413,380.50 57,636.67 80,280.04 71,845.97 41,869.64 79,146.12 45,848.90 376,627.34 8,774.17 36,753.16
TOTAL COMPROMISO S/. 367,531.60 413,380.50 57,636.67 80,280.04 71,845.97 41,869.64 79,146.12 45,848.90 376,627.34 8,774.17 36,753.16
|
RESUMEN DE VALORIZACION Nº 01 (DEL 10 AL 15 DE OCTUBRE DEL 2011)
OBRA:
CONSTRUCCION DEL PUENTE CARROZABLE EN EL ANEXO DE PUYE-
DISTRITO DE TAMBO-HUAYTARA-HUANCAVELICA
CONTRATISTA: CONSORCIO GESTION DE CALIDAD
REAJUSTES (S) - -
01- TODOS - -
TOTAL REAJUSTES - -
01- TODOS - -
AMORTIZACIONES (A) -
AMORTIZACION ADEL. DIRECTO -
AMORTIZACION DE MATERIALES -
TOTAL AMORTIZACIONES - - - - -
REAJUSTES (S) - -
01- TODOS - -
TOTAL REAJUSTES - -
01- TODOS - -
AMORTIZACIONES (A) -
AMORTIZACION ADEL. DIRECTO -
AMORTIZACION DE MATERIALES -
TOTAL AMORTIZACIONES - - - - -
REAJUSTES (S) - -
01- TODOS - -
TOTAL REAJUSTES - -
01- TODOS - -
AMORTIZACIONES (A) -
AMORTIZACION ADEL. DIRECTO -
AMORTIZACION DE MATERIALES -
TOTAL AMORTIZACIONES - - - - -
REAJUSTES (S) - -
01- TODOS - -
TOTAL REAJUSTES - -
01- TODOS - -
AMORTIZACIONES (A) -
AMORTIZACION ADEL. DIRECTO -
AMORTIZACION DE MATERIALES -
TOTAL AMORTIZACIONES - - - - -
OBRA:
CONSTRUCCION DEL PUENTE CARROZABLE EN EL ANEXO DE PUYE-DISTRITO
DE TAMBO-HUAYTARA-HUANCAVELICA
CONTRATISTA: CONSORCIO GESTION DE CALIDAD
UBICACIÓN: HUANCAVELICA -HUAYTARA-TAMBO-PUYE
SUPERVISOR:
FECHA: 1/10/2012 ING. CAMILO ORLANDO SAAVEDRA HUAYLLA
REAJUSTES (S) - -
01- TODOS - -
TOTAL REAJUSTES - -
01- TODOS - -
AMORTIZACIONES (A) -
AMORTIZACION ADEL. DIRECTO -
AMORTIZACION DE MATERIALES -
TOTAL AMORTIZACIONES - - - - -
OBRA:
CONSTRUCCION DEL PUENTE CARROZABLE EN EL ANEXO DE PUYE-
DISTRITO DE TAMBO-HUAYTARA-HUANCAVELICA
CONTRATISTA: CONSORCIO GESTION DE CALIDAD
UBICACIÓN: HUANCAVELICA -HUAYTARA-TAMBO-PUYE
SUPERVISOR:
FECHA: 1/10/2012 ING. CAMILO ORLANDO SAAVEDRA HUAYLLA
REAJUSTES (S) - -
01- TODOS - -
TOTAL REAJUSTES - -
01- TODOS - -
AMORTIZACIONES (A) -
AMORTIZACION ADEL. DIRECTO -
AMORTIZACION DE MATERIALES -
TOTAL AMORTIZACIONES - - - -
MONTO EJECUTADO
SUB - TOTALES 350,322.46 - - - - 350,322.45 - - 350,322.45 63,058.05 413,380.50 36,753.16 376,627.34 - 376,627.34
TOTALES - - -
TOTALES - - -
FORMULA POLINOMICA
CÁLCULO DEL K DE REAJUSTE
CODIGO INDICE - MATERIAL I.U. COEF. INCID. BASE REAJUSTE REAJUSTE REAJUSTE REAJUSTE REAJUSTE REAJUSTE REAJUSTE
May-11 Nov-16 K Dec-16 K Jan-17 K Feb-17 K Mar-17 K Apr-17 K May-17 K
M MANO DE OBRA INC. LEYES SOCIALES 47 0.221 100.000% 544.12 562.24 0.228 562.24 0.228 563.25 0.229 563.25 0.229 563.25 0.229 563.25 0.229 563.25 0.229
C CEMENTO PORTLAND TIPO I 21 0.078 100.000% 408.40 408.40 0.078 408.40 0.078 417.67 0.080 426.29 0.081 426.29 0.081 426.29 0.081 426.29 0.081
A AGREGADO GRUESO 5 0.143 100.000% 402.47 414.32 0.147 412.38 0.147 412.58 0.147 414.50 0.147 417.07 0.148 411.28 0.146 413.36 0.147
M MADERA NACIONAL PARA ENCOFRADO Y CARP. 43 0.071 100.000% 862.41 859.67 0.071 865.00 0.071 860.93 0.071 866.56 0.071 872.50 0.072 870.40 0.072 860.51 0.071
P PERFIL DE ACERO LIVIANO 51 0.060 100.000% 262.28 266.56 0.061 279.97 0.064 270.80 0.062 263.40 0.060 263.89 0.060 272.43 0.062 269.19 0.062
F FLETE TERRESTRE 32 0.060 100.000% 463.41 462.71 0.060 463.60 0.060 463.60 0.060 463.60 0.060 465.79 0.060 465.79 0.060 465.79 0.060
M MAQUINARIA Y EQUIPO IMPORTADO 49 0.067 100.000% 298.57 304.74 0.068 304.12 0.068 299.32 0.067 293.63 0.066 293.92 0.066 292.48 0.066 295.46 0.066
I INDICE GENERAL DE PRECIOS AL CONSUMIDOR 39 0.300 100.000% 428.47 434.89 0.304 436.35 0.306 437.38 0.306 438.80 0.307 444.52 0.311 443.37 0.31 441.50 0.309
1.000 K 1.017 K 1.022 K 1.022 K 1.021 K 1.027 K 1.026 K 1.025
TODOS
71,936.74 71,936.74 54,271.82 54,271.82 ATRAZADA 1.017 1,222.92 922.62 922.62
OCTUBRE 2011 Agosto 2010
TODOS 151,435.60 223,372.34 143,244.83 197,516.66 ATRAZADA 1.022 3,331.58 3,151.39 3,151.39
TODOS 126,950.10 350,322.44 152,805.80 350,322.46 ADELANTADA 1.022 2,792.90 3,361.73 3,361.73
DICIEMBRE 2011-
Octubre 2010
10 ENERO 2012
TODOS 126,950.10 477,272.54 0.00 350,322.46 ATRAZADA 0.000 -126,950.10 0.00 0.00
ENERO 2017-10
Octubre 2010
ENERO 2012
TODOS 126,950.10 604,222.64 180,310.84 530,633.30 ADELANTADA 0.000 -126,950.10 -180,310.84 -180,310.84
DICIEMBRE 2011-
Octubre 2010
10 ENERO 2012
CALCULO DEL REAJUSTE AUTOMATICO DE PRECIOS
TODOS 126,950.10 731,172.74 0.00 530,633.30 ATRAZADA 0.000 -126,950.10 0.00 0.00
DICIEMBRE 2011-
Octubre 2010
10 ENERO 2012
REAJUSTE RECONOCIDO
∑ REINTEGRO EJECUTADO ≤ ∑ REINTEGRO PROGRAMADO
R. Ejecutado R.Programado
Acumulado Acumulado Reconocido
Octubre. 11 922.62 < 1,222.92 922.62
Diciembr.2011,
7,435.74 < 2,792.90 3,361.73
Enero 2012
Item Descripción Und. Metrado Precio S/. Parcial S/. 10 al 15 octu-11 16-31 Octu-11 1-15 Novi-11 16-30 Novi-11 1-15 Dicie-11 15-31Dici-11 1-10 Ener-12
01 TRABAJOS PRELIMINARES
01.01 CARTEL DE OBRA 3.60x4.80 CON MARCO DE MADERA Y Und 1.00 1,189.15 1,189.15 594.58 0.00 594.58 0.00 0.00 0.00 0.00
01.02 CAMPAMENTO PROVISIONAL DE LA OBRA glb 1.00 1,382.70 1,382.70 691.35 691.35 0.00 0.00 0.00 0.00 0.00
01.03 TRAZO DURANTE DURANTE LA EJECUCION DE LA OBRA est 1.00 49.90 49.90 24.95 24.95 0.00 0.00 0.00 0.00 0.00
01.04 TRAZO DURANTE DURANTE FINALES DE LA OBRA glb 1.00 1,431.16 1,431.16 715.58 715.58 0.00 0.00 0.00 0.00 0.00
01.05 MOVILIZACION Y DESMOVILIZACION DE TQUIPOS Y HER glb 1.00 1,100.00 1,100.00 550.00 550.00 0.00 0.00 0.00 0.00 0.00
02 MOVIMIENTO DE TIERRAS 0.00 0.00 0.00 0.00 0.00 0.00 0.00
02.01 EXCAVACION C/ I (MAQ) NORMAL HASTA 4.50 M PROF m3 15.16 7.53 114.15 114.15 0.00 0.00 0.00 0.00 0.00
02.02 CORTE EN ROCA FIJA m3 715.00 41.08 29,372.20 4,405.83 24,966.37 0.00 0.00 0.00 0.00
02.03 RELLENO COMPACTADO CON MATERIAL PROPIO m3 129.03 20.55 2,651.57 1,325.79 1,325.79 0.00 0.00 0.00 0.00 0.00
02.04 ELIMINACION DE MATERIAL EXCEDENTE m3 595.13 2.26 1,344.99 672.50 672.50 0.00 0.00 0.00 0.00 0.00
03 OBRAS DE CONCRETO SIMPLE 0.00 0.00 0.00 0.00 0.00 0.00 0.00
03.01 SOLADOS CONCRETO PARA ZAPATAS DE ESTRIBOS DE 4" m2 114.04 15.60 1,779.02 889.51 889.51 0.00 0.00 0.00 0.00 0.00
03.02 CONCRETO CICLOPEO FC = 140 KG/CM2 + 30% P.G CIMI m3 125.88 286.42 36,054.55 9,013.64 13,520.46 4,506.82 9,013.64 0.00
03.03 ENCOFRADO Y DESENCOFRADO CIMIENTOS ALETAS m2 86.15 29.28 2,522.47 630.62 630.62 0.00 630.62 630.62 0.00 0.00
03.04 ACERO fy=4200 kg/cm2 CIMIENTO, ALETAS, APOYO FIJO kg 1,234.17 3.77 4,652.82 2,326.41 2,326.41 0.00 0.00 0.00 0.00 0.00
03.05 CONCRETO CICLOPEO FC = 175 KG/CM2 + 30% PM CAJU m3 349.69 240.90 84,240.32 8,424.03 16,848.06 21,060.08 12,636.05 25,272.10 0.00 0.00
03.06 ENCOFRADO Y DESENCOFRADO DE CAJUELA DE ESTRI m2 454.49 38.23 17,375.15 0.00 0.00 8,687.58 8,687.58 0.00 0.00
04 OBRAS DE CONCRETO ARMADO 0.00 0.00 0.00 0.00 0.00 0.00 0.00
04.01 CONCRETO f 'c=210 kg/cm2 PARA BARANDAS Y SARDINE m3 12.87 319.67 4,114.15 0.00 0.00 0.00 2,057.08 2,057.08 0.00 0.00
04.02 ENCOFRADO Y DESENCOFRADOPARA BARANDAS Y SAR m2 58.10 33.52 1,947.51 0.00 0.00 0.00 973.76 973.76 0.00 0.00
04.03 CONCRETO f 'c=210 kg/cm2 PARA LOSA PUENTE m3 14.94 501.19 7,487.78 0.00 0.00 0.00 3,743.89 3,743.89 0.00 0.00
04.04 ENCOFRADO Y DESENCOFRADO PARA LOSA DE PUENTE m2 24.90 42.00 1,045.80 0.00 0.00 0.00 522.90 522.90 0.00 0.00
04.05 ACERO fy=4200 kg/cm2 PARA LOSA PUENTE kg 1,401.98 3.77 5,285.46 0.00 0.00 0.00 2,642.73 2,642.73 0.00 0.00
04.06 CONCRETO f 'c=210 kg/cm2 PARA VIGA DE PUENTE m3 42.99 526.22 22,622.20 0.00 0.00 0.00 5,655.55 5,655.55 5,655.55 5,655.55
04.07 ENCOFRADO Y DESENCOFRADO PARA VIGA DE PUENTE m2 248.00 51.94 12,881.12 0.00 0.00 0.00 6,440.56 6,440.56 0.00 0.00
04.08 ACERO fy=4200 kg/cm2 PARA VIGA DE PUENTE kg 4,753.34 3.77 17,920.09 0.00 0.00 0.00 8,960.05 8,960.05 0.00
05 REVESTIMIENTO 0.00 0.00 0.00 0.00 0.00 0.00 0.00
05.01 TARRAJEO DE SUPERFICIE DE BARANDA Y SARDINELES m2 78.02 16.10 1,256.12 0.00 0.00 0.00 0.00 0.00 628.06 628.06
06 CARPINTERIA METALICA 0.00 0.00 0.00 0.00 0.00 0.00 0.00
06.01 BARANDA METALICA PARA PUENTES m 33.20 148.58 4,932.86 0.00 0.00 0.00 0.00 0.00 2,466.43 2,466.43
06.02 JUNTA DE DILATACION DE ACERO m 7.20 185.00 1,332.00 0.00 0.00 0.00 0.00 0.00 666.00 666.00
07 PINTURAS 0.00 0.00 0.00 0.00 0.00 0.00 0.00
07.01 PINTURA ESMALTE EN BARANDAS Y SARDINELES m2 31.54 9.03 284.81 0.00 0.00 0.00 0.00 0.00 142.41 142.41
07.02 PINTURA ESMALTE EN BARANDAS METALICAS m2 33.20 11.89 394.75 0.00 0.00 0.00 0.00 0.00 197.38 197.38
08 APOYOS 0.00 0.00 0.00 0.00 0.00 0.00 0.00
08.01 APOYO FIJO CON NEOPRENE G = 60 Und 2.00 783.27 1,566.54 0.00 0.00 0.00 0.00 0.00 783.27 783.27
08.02 APOYO MOVIL CON NEOPRENE G = 60 Und 2.00 783.27 1,566.54 0.00 0.00 0.00 0.00 0.00 783.27 783.27
09 DRENAJES 0.00 0.00 0.00 0.00 0.00 0.00 0.00
09.01 TUBERIA DE DRENAJE PVC SAC DE 3" EN LOSA m 2.40 12.09 29.02 0.00 0.00 0.00 0.00 0.00 14.51 14.51
09.02 SUB DRENES DE SUPRESION D=3" Und 14.00 18.80 263.20 0.00 0.00 0.00 0.00 0.00 131.60 131.60
09.03 FILTRO DE DRENAJE GRAVAS m3 15.90 79.87 1,269.93 0.00 0.00 0.00 0.00 0.00 634.97 634.97
CRONOGRAMA VALORIZADO REPROGRAMADO DE OBRA
Presupuesto CONSTRUCCION DEL PUENTE CARROZABLE EN EL ANEXO DE PUYE-DISTRITO DE TAMBO-HUAYTARA-HUANCAVELICA
Subpresupuesto CONSTRUCCION DEL PUENTE CARROZABLE EN EL ANEXO DE PUYE-DISTRITO DE TAMBO-HUAYTARA-HUANCAVELICA
Cliente MUNICIPALIDAD DISTRITAL DE TAMBO
Lugar HUANCAVELICA - HUAYTARA - TAMBO
Item Descripción Und. Metrado Precio S/. Parcial S/. 10 al 15 octu-11 16-31 Octu-11 1-15 Novi-11 16-30 Novi-11 1-15 Dicie-11 15-31Dici-11 1-10 Ener-12
01 TRABAJOS PRELIMINARES
10 FALSO PUENTE 0.00 0.00 0.00 0.00 0.00 0.00 0.00
10.01 FALSO PUENTE DE MADERA ROLLIZO m2 69.72 102.45 7,142.81 0.00 0.00 0.00 3,571.41 3,571.41 0.00 0.00
11 ENSAYOS DE LABORATORIOS 0.00 0.00 0.00 0.00 0.00 0.00 0.00
11.01 DISEÑO DE MEZCLAS CONCRETO f'c= 175 kg/cm2 Und 1.00 296.61 296.61 0.00 0.00 0.00 148.31 148.31 0.00 0.00
11.02 DISEÑO DE MEZCLAS CONCRETO f'c= 210 kg/cm2 Und 1.00 296.61 296.61 0.00 0.00 0.00 148.31 148.31 0.00 0.00
11.03 ENSAYO DE RESISTENCIA DEL CONCRETO Und 24.00 12.71 305.04 0.00 0.00 0.00 152.52 152.52 0.00 0.00
11.04 TRANSPORTE PARA ENSAYO DE LABORATORIO Und 1.00 127.12 127.12 0.00 0.00 0.00 63.56 63.56 0.00 0.00
12 FLETE TERRESTRE 0.00 0.00 0.00 0.00 0.00 0.00 0.00
12.01 FLETE TERRESTRE glb 1.00 25,000.00 25,000.00 3,750.00 3,750.00 10,000.00 0.00 0.00 3,750.00 3,750.00
Costo Directo 304,628.22 20,709.45 41,844.23 78,829.06 52,854.08 60,710.84 33,827.12 15,853.44
Gastos Generales ( 8%) 24,370.26 1,656.76 3,347.54 6,306.32 4,228.33 4,856.87 2,706.17 1,268.27
Utilidad ( 7%) 21,323.98 1,449.66 2,929.10 5,518.03 3,699.79 4,249.76 2,367.90 1,109.74
Sub Total 350,322.46 23,815.87 48,120.86 90,653.41 60,782.20 69,817.47 38,901.19 18,231.45
AVANCE MENSUAL 71,936.74 151,435.60 126,950.10
IGV (18%) 63,058.04 4,286.86 8,661.76 16,317.61 10,940.80 12,567.14 7,002.21 3,281.66
Total Presupuesto 413,380.50 28,102.73 56,782.62 106,971.03 71,722.99 82,384.61 45,903.40 21,513.11
Avance Mensual % 6.80 13.74 25.88 17.35 19.93 11.10 5.20
Avance acumulado Monto % 6.80 20.53 46.41 63.76 83.69 94.80 100.00
CRONOGRAMA REPROGRAMADO Y VALORIZACIONES TRAMITADAS POR ESPECIALIDADES
CONSTRUCION : CONSTRUCCION E IMPLEMENTACIONJ DE LA CASA DE LA MUJER Y EL NIÑO EN ABANDONO
UBICACIÓN : DISTRITO DE NUEVO IMPERIAL -PROVINCIA DE CAÑETE-DEPARTAMENTO DE LIMA
CONTRATISTA : CONSORCIO VUAS
CRONOGRAMA ACELERADO 1er Mes - 8 dias 2do Mes- 30 dias 3er Mes- 31 dias 4to Mes -30 dias 5to Mes-31 dias 6to Mes-31 dias 7mo Mes-20 dias
REPROGRAMADO PRESUPUESTO Del 24/08/10 al Del 01/09/10 al Del 01/10/10 al Del 01/11/10 al Del 01/12/10 al Del 01/01/11 al Del 01/02/11 al PRESUPUESTO
POR ESPECIALIDAD 8/31/2010 9/30/2010 10/31/2010 11/30/2010 12/31/2010 1/31/2011 2/20/2011
ESTRUCTURA 447,440.82 45,730.70 96,989.48 130,960.33 65,485.42 53,142.48 33,993.10 21,139.31 447,440.82
ARQUITECTURA 239,236.57 0.00 0.00 14,612.11 45,180.43 78,822.83 38,417.05 62,204.17 239,236.58
SANITARIAS 22,407.24 0.00 0.00 3,000.67 2,629.59 4,785.47 2,491.51 9,500.00 22,407.24
ELECTRICAS 48,963.82 0.00 0.00 2,000.00 8,727.12 16,044.86 8,963.68 13,228.15 48,963.82
EQUIPO 82,330.00 0.00 0.00 0.00 0.00 5,000.00 0.00 77,330.00 82,330.00
TOTAL COSTO DIRECTO 840,378.45 45,730.70 96,989.48 150,573.11 122,022.56 157,795.64 83,865.34 183,401.63 840,378.45
GASTOS GENERALES Y UTILIDAD (2 168,075.69 9,146.14 19,397.90 30,114.62 24,404.51 31,559.13 16,773.07 36,680.33 168,075.70
SUB-TOTAL 1,008,454.14 54,876.84 116,387.38 180,687.73 146,427.07 189,354.76 100,638.40 220,081.96 1,008,454.15
F . R 0.9 907,608.74 49,389.16 104,748.64 162,618.96 131,784.36 170,419.29 90,574.57 198,073.76 907,608.74
IGV (19.00 %) 172,445.66 9,383.94 19,902.24 30,897.60 25,039.03 32,379.66 17,209.17 37,634.01 172,445.66
TOTAL 1,080,054.40 58,773.10 124,650.88 193,516.56 156,823.39 202,798.95 107,783.74 235,707.78 1,080,054.40
AVANCE DEL MES % 5.44 11.54 17.92 14.52 18.78 9.98 21.82
AVANCE ACUMULADO % 5.44 16.98 34.90 49.42 68.20 78.18 100.00
CRONOGRAMA REPROGRAMADO Y VALORIZACIONES TRAMITADAS POR ESPECIALIDADES
CONSTRUCION : CONSTRUCCION E IMPLEMENTACIONJ DE LA CASA DE LA MUJER Y EL NIÑO EN ABANDONO
UBICACIÓN : DISTRITO DE NUEVO IMPERIAL -PROVINCIA DE CAÑETE-DEPARTAMENTO DE LIMA
CONTRATISTA : CONSORCIO VUAS
TOTAL COSTO DIRECTO 840,378.45 45,730.70 96,989.48 150,573.11 122,022.56 125,183.63 87,756.70 212,122.27 840,378.45
GASTOS GENERALES Y UTILIDAD (2 168,075.69 9,146.14 19,397.90 30,114.62 24,404.51 25,036.73 17,551.34 42,424.45 168,075.70
SUB-TOTAL 1,008,454.14 54,876.84 116,387.38 180,687.73 146,427.07 150,220.35 105,308.04 254,546.72 1,008,454.14
F . R 0.9 907,608.74 49,389.16 104,748.64 162,618.96 131,784.35 135,198.32 94,777.23 229,092.07 907,608.74
IGV (19.00 %) 172,445.66 9,383.94 19,902.24 30,897.60 25,039.03 25,687.68 18,007.67 43,527.50 172,445.66
TOTAL 1,080,054.40 58,773.10 124,650.88 193,516.56 156,823.39 160,886.00 112,784.90 272,619.57 1,080,054.40
AVANCE DEL MES % 5.44 11.54 17.92 14.52 14.90 10.44 25.24
AVANCE ACUMULADO % 5.44 16.98 34.90 49.42 64.32 74.76 100.00
VALORIZACION Nº 01 (DEL 10/10/11 AL 15/10/11) VALORIZACION Nº 02 (DEL 16/10/11 AL 15/11/11)
4 AMORTIZACIONES 4 AMORTIZACIONES
S/A 0 S/A
0
0
5 DEDUCCIONES 5 DEDUCCIONES
S/A 0 S/A
0
0
6 RETENCIONES 6 RETENCIONES
6 RETENCIONES
4 AMORTIZACIONES
0 S/A 0
0 0
0 0
5 DEDUCCIONES
0 S/A 0
0 0
0 0
6 RETENCIONES
45848.90
VALORIZACION Nº 04 (DEL 01/12/11 AL 14/12/11) VALORIZACION Nº 05 (DEL 15/12/11 AL 10/01/12)
4 AMORTIZACIONES 4 AMORTIZACIONES
S/A 0 S/A
0
0
5 DEDUCCIONES 5 DEDUCCIONES
S/A 0 S/A
0
0
6 RETENCIONES 6 RETENCIONES
350322.46
(DEL 15/12/11 AL 10/01/12)
PARCIAL
S/.
05 ( 10 ENERO 2012) 74525.53
74525.53
Valorizaciones 0
0
0
74525.53
0
0
0
0
0
0
74525.53
13414.6
S/. 87940.13