Karachi
Submitted By:
SMBBTC, CHK
Shaheed Mohtarma Benazir Bhutto Trauma Centre-Civil Hospital
Karachi
1. Purpose:
The purpose of this report shows monthly status of Fire and Safety Department,
SMBB Trauma Center, Dr Ruth K.M Pfau civil hospital Karachi.
2. Scope:
This report includes status of fire and safety arrangements with in SMBB Trauma
Center, CHK. This includes the status of fire safety arrangements in SMBBTC.
4. Major Issues:
Almost MCPS and Smoke detectors are not working (except floors from 9
to 11) immediate mantainence required for MCPS and SDs.
As per drawing Smoke detectors of some floors are missing. i.e. (12 th floor)
has 20+ SD missing but drawing is showing actually there are Placed.
Fire hydrant has no any connection with fire pump, pump has no any
connection with fire hydrant, and hence there is no any advantage of fire
hydrant. More over fire hydrant pipe is also not installed with all fire
hydrants. The cable of Fire hydrant is not connected with Generator , this
cable must be installed for proper working of fire hydrant
No any External emergency exits are available for building; management
must focus and raise this issue in Board meeting to start working on
external exits.
No any emergency exit is available in Store, Firefighting equipment for
store required installations.
5. Look ahead Plan:
Staff Trainings:
For enhancing the knowledge of staff of SMBTTC, Fire and Safety
department has developed a series of training sessions, for this purpose
three training sessions of 01 hour duration were done in month of of
March-2019. More than 150 staff members have attended these session.
But senior staff members were limited numbers.
Emergency Drills:
Fire and Safety emergency drills are also planned to enhance the
knowledge of staff to fight in case of real emergences
SOPs:
Fire and Safety Department has developed different SOPs related to Fire
Emergencies and routine maintenance of F&S arrangements with in
building, a copy of Fire Emergency Plan is submitted to AMS and DMS for
their review, after review and approval this Plan will be circulated to HODs
and trainings on these SOPs will be conducted.
Shaheed Mohtarma Benazir Bhutto Trauma Centre-Civil Hospital
Karachi
Smoke Detectors Maintenance: Telecom Engineering company which
Installed smoke detectors) visited twice in month of March and
Maintained Fire alarm panel to keep up to date Fire Alarm.
MCP MCP NOT SOUNDER SOUNDER NOT S/D S/D NOT FIRE FIRE FIRE
S.No FLOOR
INSTALL INSTALL INSTALL INSTALL INSTALL INSTALL EXTINGUISHER HYDRANT HOSE REELS
NEED TO NEED TO
1 BASEMENT 2 2 2 2 0 0 4 BE INSTALL BE INSTALL
2 GROUND 5 1 5 1 42 9 10 3 3
3 1ST FLOOR 3 1 2 2 48 5 6 3 3
4 2ND FLOOR 4 0 0 4 0 0 5 3 3
5 3RD FLOOR 2 2 0 4 0 0 4 3 3
6 4TH FLOOR 3 1 0 4 0 0 4 3 3
7 5TH FLOOR 2 2 2 2 0 0 8 3 3
9 7TH FLOOR 5 1 4 2 60 8 10 3 3
10 8TH FLOOR - - - - - - - 1 1
11 9TH FLOOR 5 1 5 1 86 8 7 3 3
12 10TH FLOOR 0 6 0 6 61 10 11 3 3
13 11TH FLOOR 5 1 5 1 72 5 14 3 3
14 12TH FLOOR 0 6 0 6 50 24 13 3 3
NEED TO NEED TO
15 13TH FLOOR 3 1 3 1 29 0 9 BE INSTALL BE INSTALL
Grand Total
44 26 33 37 557 69 119 37 37