Sei sulla pagina 1di 8

Perunding Azman Ooi Rao S/B Consultant Daily Site Record Date/Day:_____________________

CADANGAN MEREKABENTUK, MEMBINA DAN MENYIAPKAN PROJEK PEMBINAAN TAPAK PERLUPUSAN


SISA PEPEJAL SANITARI (TPS) DI BUKIT PAYONG, MUKIM SIMPANG KIRI, DAERAH BATU PAHAT, JOHOR
DARUL TAKZIM
1.0 WEATHER CHART 2.0 VISITOR (NAME,ORGANISATION)
LEGEND 1)
Heavy Rain 2)
Drizzle 3)
Fine 4)
5)

3.0 SITE PERSONNEL/WORKER


Management No Worker No Machineries and Tools No
Project Manager Site Excavator
Site Manager Foreman Long Arm Excavator
Site Engineer Machine Operator Back Pusher
Site Supervisor Skilled Worker Roller Compactor
Safety Site Supervisor General Worker Lori hantu
Clerk Flagman Lorry U41
Cleaner Dump truck/Lorry
General Helper Backhoe
Consultant Laboratory Crane
Resident Engineer Technician Showel
Inspector of Works Skilled Worker Welding set
Environment Officer General Worker Oxy Set
4.0 ACTIVITIES OF THE DAY (If No Activities Please State the Reason(s))

5.0 ACCIDENT RECORD

6.0 MATERIAL DELIVERY


1 3 5
2 4 6
7.0 INSTRUCTION FROM JPSPN/SWCORP/AUTHORITY
Name Organization Detail of Instruction Signature

8.0 DRAWING/DOCUMENT
No.Drawing/Document Reference Number
1
2
Prepared By Verified By

Perunding Azman Ooi Rao S/B Consultant Daily Site Record Form 1a: PAOR/WI/ENG-10
Perunding Azman Ooi Rao S/B Consultant Daily Site Record Date/Day:_____________________
Name: Nor Syazwan Norzaid Name: Muhammad Farid Abdullah

Perunding Azman Ooi Rao S/B Consultant Daily Site Record Form 1a: PAOR/WI/ENG-10
Perunding Azman Ooi Rao S/B Overtime Sheet

CADANGAN MEREKABENTUK, MEMBINA DAN MENYIAPKAN PROJEK PEMBINAAN TAPAK PERLUPUSAN


SISA PEPEJAL SANITARI (TPS) DI BUKIT PAYONG, MUKIM SIMPANG KIRI, DAERAH BATU PAHAT, JOHOR
DARUL TAKZIM

NAME:
COMPANY:
MONTH:

JOB DETAIL TIME


JOB SUPERVISOR
DATE JOB DESCRIPTION HOUR START FINISH
NO SIGN

SIGN: SIGN:
Perunding Azman Ooi Rao S/B Overtime Sheet

RESIDENT ENGINEER: NAME OF MANAGER:


JUNE
11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6
FDT
CH0070 CH0140 2 2
CH0300 CH0550 3
CH0780 CH0900
CH1260 CH1320 3 3
CH2200 CH2300 3
CELL 1 CELL2
CUT
CH0000 CH0070
CH0140 CH0300
CH0550 CH0780
CH0900 CH1260
CH1320 CH2200
BACKFILL
CH0070 CH0140
CH0300 CH0550
CH0780 CH0900
CH1260 CH1320
CH2200 CH2300
CELL 1 CELL2
BERM
CH0000 CH0070
CH0140 CH0300
CH0550 CH0780
CH0900 CH1260
CH1320 CH2200

CULVERT
CH0110 RBC1
CH0478 PC1
CH0875 PC2
CH1300 PC3
CH2228 PC4
CH2350 RBC3
CH2381 RBC2
RJS
CASCADE
CH0000 CH0070
CH0140 CH0300
CH0550 CH0780
CH0900 CH1260
CH1320 CH2200
DUMPING
NonSuitMat
SILT TRAP POND
JULY
7 8 9 10 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12
AUGUST
13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

Potrebbero piacerti anche