GENERAL NOTES

.4m
19
1. All dimensions are in millimeter (mm)
1. Do not scale from the drawing

50
.6m

.4m
39
5.1m
10.7m

m
8.3
m
.4

36.8m
19

15
.6m

LEGEND
A = SECURITY POST AT NORTH WING
B = CAR POT
C = EXPRESS MAINTENANCE BUILDING
D = SHOWROOM BUILDING
E = R.C SLAB FLOOR
F = TRANSFORMER
G = SECURITY POST AT EAST WING
H = CAR WASHING BAY
I = CANTEEN BUILDING
J = SECURITY POST AT SOUTH WING
K = SERVICING YARD REHABILITATION WORKS FOR TOYOTA GHANA YARD

51.3m
86
L = SERVICING YARD .7m
ADJUMA CRESCENT,ACCRA
M = SERVICING YARD 2
N = CHANGING ROOM
O = EXTERNAL ROAD
P = U-DRAIN
Q = UNDERGROUND DRAIN TOYOTA GHANA
2
TOTAL SURFACE AREA TO BE DEMOLISHED = 207.97 m

AS SHOWN

DEMOLISHING ACTIVITIES

WORK SCOPE SURFACE AREAS(m )


2 ADJUMA CRESCENT STREET
WORK ITEM
Demolish,regrade external floor to 0.9m formation level and rebuild
ACCRA,GHANA
A= Security post at North wing security post

B= Car Pot Scarify existing floor level and regrade to 0.9m 81.41
1 : 100
73.21
C = Express maintenance building/Servicing yard Demolish,regrade external floor to 0.9m formation
level and rebuild Structural Steel framed building 11th July,2019
E = External r.c floor slab at servicing yard Scarify existing floor level and regrade to 0.9m 34.51
Emmanuel
I = Canteen building Demolish and regrade to 0.9m 18.84
Demolish,regrade external floor to 0.9m formation
Emmanuel
J = Security post at South wing
level and rebuild security post
Mr.Wu
H = Car washing bay Demolish,regrade external floor to 0.9m formation 4.83
level and rebuild car washing bay

N = Changing room Demolish,regrade external floor to 0.9m formation 3.64

45 A-001 01
P = U-Drain Demolish,regrade external floor to 0.9m formation and rebuild U-drain

Q = Underground drain Demolish,regrade external floor to 0.9m formation and rebuild U-drain walls EXISTING SITE LAYOUT