Sei sulla pagina 1di 6

DAFTAR PUSTAKA

Ahn, Y. H., Cho, C.-S., & Lee, N. (2013). Building Information Modeling:
Systematic Course Development for Undergraduate Construction Students.
Journal of Professional Issues in Engineering Education and Practice, 139(4),
290–300. https://doi.org/10.1061/(ASCE)EI.1943-5541.0000164

Akhund, M. A., Khoso, A. R., Memon, U., Khahro, S. H., & Uet, M. (2017). Time
Overrun in Construction Projects of Developing Countries, (5), 124–129.

Alaghbari, W., Al-Sakkaf, A. A., & Sultan, B. (2017). Factors affecting


construction labour productivity in Yemen. International Journal of
Construction Management, 3599(October), 1–13.
https://doi.org/10.1080/15623599.2017.1382091

Andi A., Lalitan D., & Loanata V.R. (2010). Owner and Contractor Perceptions
Toward Factors Causing Delays in Structural and Finishing Works. Civil
Engineering Dimension, 12(1), 8–17. Retrieved from
http://puslit2.petra.ac.id/ejournal/index.php/civ/article/view/17347

Aulady, M., & Orleans, C. (2016). Perbandingan Durasi Waktu Proyek Konstruksi
Antara Metode Critical Path Method ( CPM ) dengan Metode Critical Chain
Project Management ( Studi Kasus : Proyek Pembangunan Apartamen Menara
Rungkut ). Iptek, 20(1).

Azhar, S. (2011). Building Information Modeling (BIM): Trends, Benefits, Risks,


and Challenges for the AEC Industry, 11(Bazjanac 2006), 241–252.
Benjaoran, V., & Bhokha, S. (2009). Enhancing visualization of 4D CAD model
compared to conventional methods. Engineering, Construction and
Architectural Management, 16(4), 392–408.
https://doi.org/10.1108/09699980910970860

Bie, L., Cui, N., & Zhang, X. (2012). Buffer sizing approach with dependence
assumption between activities in critical chain scheduling. International
Journal of Production Research, 50(24), 7343–7356.
https://doi.org/10.1080/00207543.2011.649096

Bryde, D., Broquetas, M., & Volm, J. M. (2013). The project benefits of building
information modelling (BIM). International Journal of Project Management,
31(7), 971–980. https://doi.org/10.1016/j.ijproman.2012.12.001

Callahan, M. T. (1992). Construction Project Scheduling. McGraw-Hill.

Candelario-Garrido, A., García-Sanz-Calcedo, J., & Reyes Rodríguez, A. M.

244 UNIVERSITAS MERCUBUANA


(2017). A quantitative analysis on the feasibility of 4D Planning Graphic
Systems versus Conventional Systems in building projects. Sustainable Cities
and Society, 35(February), 378–384.
https://doi.org/10.1016/j.scs.2017.08.024
Chua, D. K. H., & Shen, L. J. (2005). Key Constraints Analysis with Integrated
Production Scheduler. Journal of Construction Engineering and Management,
131(7), 753–764. https://doi.org/10.1061/(ASCE)0733-
9364(2005)131:7(753)

Ciob. (2009). Managing the risk of delayed completion in the 21st Century,
(January).

Cost & World Bank. (2011). Briefing note 5: Baseline Studies, 1–3. Retrieved from
http://www.constructiontransparency.org/documentdownload.axd?documentr
esourceid=50

Dr. Riduwan, M. B. . (2010). Metode dan Teknik Menyusun Tesis.


Eastman, C., Teicholz, P., & Sacks, R. (2008). BIM Handbook: A Guide to Building
Information Modeling for Owners, Managers, Designers, Engineers and
Contractors. New York: John Wiley and Sons.

Enshassi, A., Mohamed, S., & Abushaban, S. (2009). Factors affecting the
performance of construction projects in the Gaza strip. Journal of Civil
Engineering and Management, 15(3), 269–280. https://doi.org/10.3846/1392-
3730.2009.15.269-280

Ghaffari, M., & Emsley, M. W. (2015). Current Status and Future Potential of the
Research on Critical Chain Project Management. PM World Journal, IV(Ix),
1–25.

Gledson, B., Bleanch, P., & Henry, D. (2012). Does size matter? Experiences and
perspectives of BIM implementation from large and SME construction
contractors. 1st UK Academic Conference on Building Information
Management (BIM) 2012, (September), 97–108.
https://doi.org/10.13140/RG.2.1.5168.7280

Goldratt, E. M. (1990). Theory of Constraints. New York: North River Press.

Gündüz, M., Nielsen, Y., & Özdemir, M. (2013). Quantification of Delay Factors
Using the Relative Importance Index Method for Construction Projects in
Turkey. Journal of Management in Engineering, 29(2), 133–139.
https://doi.org/10.1061/(ASCE)ME.1943-5479.0000129.

https://www.criticalpoint.co.uk/. (2017).

Husen, A. (2011). Manajemen Proyek : Perencanaan, Penjadwalan, dan

245 UNIVERSITAS MERCUBUANA


Pengendalian Proyek. Yogyakarta: ANDI.

International, C. (2015). Jakarta Property Market Review.

Jalaei, F., & Jrade, A. (2014). Construction Research Congress 2014 ©ASCE 2014
140. Construction Research Congress 2014, (2008), 140–149.
https://doi.org/10.1061/9780784413517.176

Kaming, P. F., Olomolaiye, P. O., Holt, G. D., & Harris, F. C. (1997). Factors
influencing construction time and cost overruns on high-rise projects in
Indonesia. Construction Management and Economics, 15(1), 83–94.
https://doi.org/10.1080/014461997373132

Kementrian pekerjaan umum dan perumahan rakyat. (2015). Rencana Strategis


Kementrian Pekerjaan Umum dan Perumahan Rakyat Tahun 2015-2019.
Www.pu.go.id.

Kerzner, H. (2006). Project Management: A Systems Approach to Planning,


Scheduling, and Controlling (Ninth Edit). Canada: John Wiley & Sond.

Kog, Y. C., Chua, D. K. H., Loh, P. K., & Jaselskis, E. J. (1999). Key determinants
for construction schedule performance. International Journal of Project
Management, 17(6), 351–359. https://doi.org/10.1016/S0263-7863(98)00058-
1
Leach, L. (2000). Critical Chain Project Management. Massachusetts: Artech
House, Inc., Norwood.

Lee, K., Park, Y.-H., Lee, G., Jung, W., Lee, S., & Lee, H. (2016). An Introduction
to South Korea’s BIM Knowledge Base Development Project, 2–6.

Lu, N., & Korman, T. (2010). Implementation of Building Information Modeling


(BIM) in Modular Construction: Benefits and Challenges. In Construction
Research Congress 2010 (pp. 1136–1145).
https://doi.org/10.1061/41109(373)114

Lukas, J. A. (2007). Is your schedule correct?Common scheduling mistakes and


how to avoid them. PMI Global Congress 2007-North America, Atlanta, GA.
Newtown Square, PA: Project Management Institute.

Ma, G., Wang, A., Li, N., Asce, M., Gu, L., & Ai, Q. (2014). Improved Critical
Chain Project Management Framework for Scheduling Construction Projects.
Journal of Construction Engineering and Management, 140(12), 1–12.
https://doi.org/10.1061/(ASCE)CO.1943-7862.0000908.

McGraw Hill Construction. (2014). The business value of BIM for construction in
major global markets. SmartMarket Report. https://doi.org/b

246 UNIVERSITAS MERCUBUANA


Moon, H., Kim, H., Kamat, V. R., & Kang, L. (2015). BIM-Based Construction
Scheduling Method Using Optimization Theory for Reducing Activity
Overlaps. Journal of Computing in Civil Engineering, 29(3), 4014048.
https://doi.org/10.1061/(ASCE)CP.1943-5487.0000342

Muhwezi, L., Acai, J., & Otim, G. (2014). An assessment of the factors causing
delays on building construction projects in Uganda. Construction Engineering
and Management, 3(1), 13–23. https://doi.org/10.5923/j.ijcem.20140301.02

Peng, W., & Huang, M. (2014). A critical chain project scheduling method based
on a differential evolution algorithm. International Journal of Production
Research, 52(13), 3940–3949.
https://doi.org/10.1080/00207543.2013.865091

Permatasari, C. A. B., Adhi, R. P., Hidayat, A., & Hari Nugroho. (2016).
Perbandingan Efisiensi Waktu, Biaya, dan Sumber Daya Manusia Antara
Metode Building Information Modelling (BIM) dan Konvensional (Studi
Kasus: Perencanaan Gedung 20 Lantai). Jurnal Karya Teknik Sipil, 5(2), 220–
229.

PMI. (2013). A Guide to the Project Management Body of Knowledge. Project


Management Institute (Vol. 5). https://doi.org/10.1002/pmj.20125

Project Management Institute. (2013). A Guide to the Project Management Body of


Knowledge (PMBOK Guide) (Fifth Edit). Newtown Square, Pennsylvania: 14
Campus Boulevard.

Pusat Pengelolaan Dana Pembiayaan Perumahan. (2017). Konsep Backlog.


Www.ppdpp.id.

Repp, L. (2012). Factors that Influence Critical Chain Project Management


Implementation Success, 220.

Robinson, G. (2017). Global Construction 2030 Graham Robinson – Global


Construction Perspectives. Global Construction 2030, (October). Retrieved
from http://www.cchc.cl/uploads/evento/archivos/Graham_Robinson_-
_Tendencias_de_los_Mercados_Mundiales_en_la_Construccion.pdf

Shu-Hui, J., & Ping, H. S. (2006). Construction project buffer management in


scheduling planning and control. 23rd International Symposium on Robotics
and Automation in Construction, ISARC 2006, 858–863. Retrieved from
http://www.scopus.com/inward/record.url?eid=2-s2.0-
84861536471&partnerID=40&md5=3aa701e4e97abcd97889c43d96a35d0f

Shurrab, M. (2015). Traditional Critical Path Method versus Critical Chain Project

247 UNIVERSITAS MERCUBUANA


Management: A Comparative View. International Journal of Economics &
Management Sciences, 4(9), 4–9. https://doi.org/10.4172/21626359.1000292

Smith, D. K., & Batcheler, B. (2010). Building Information Modeling-Develop As


a Professional, 1–6.

Soeharto Imam. (1999). Manajemen Proyek (Dari Konseptual Sampai


Operasional). In 2 (p. 37). Jakarta: Erlangga.

Soemardi, B. W., & Rayendra. (2014). Studi Aplikasi Teknologi Building


Information Modeling Untuk Pra-Konstruksi, 14–21.

Stanfort, M. B., & Linn C. Stuckenbruck. (1981). “Project Planning” in The


Implementation of Project Management: The Professional’s Handbook.
Addison-Wesley Publishing Company.

Steyn, H. (2002). Project management applications of the theory of constraints


beyond critical chain scheduling. International Journal of Project
Management, 20(1), 75–80. https://doi.org/10.1016/S0263-7863(00)00054-5

Subdirektorat Statistik Konstruksi. (2017). Konstruksi Dalam Angka 2017, 105.

Tjell, B. J. (2010). Building Information Modeling ( BIM ) ‐ in Design Detailing


with Focus on Interior Wall Systems. Department of Civil and Environmental
Engineering at U.C. Berkeley DTU Management at the Technical University
of Denmark April 22nd 2010, 1–148.

Wang, C. C., & Chien, O. (2014). The Use of BIM in Project Planning and
Scheduling in the Australian Construction Industry. Iccrem 2014, 126–133.
https://doi.org/10.1061/9780784413777.015

Watts, S., & Langdon, D. (2010). The Economics of High-rise (as per 2nd Qarter
2010). CTBUH Journal 2010 Issue III - Tall Buildings in Numbers, (III), 44–
45. Retrieved from
http://www.ctbuh.org/LinkClick.aspx?fileticket=rJbb7oNXnZw=&tabid=110
8&language=en-GB

Widayat, W. (1996). Pengantar Manajemen Proyek & Ekonomi Teknik. Depok.

Wong, A. K. D., Wong, F. K. W., & Nadeem, A. (2010). Attributes of building


information modelling implementations in various countries. Architectural
Engineering and Design Management, 6(SPECIAL ISSUE), 288–302.
https://doi.org/10.3763/aedm.2010.IDDS6

yi Su, Gunnar Lucko, & Richard C. Thompson, J. (2016). Evaluating Performance


of Critical Chain Project Ma Nagement To Mitigate Delays Based on Different

248 UNIVERSITAS MERCUBUANA


Schedule Network Complexitie. Ieee, (2013), 3314–3324. Retrieved from
http://ieeexplore.ieee.org/stamp/stamp.jsp?arnumber=7822362

Yin, R. K. (2002). Studi Kasus Desain & Metode. Jakarta: PT Rajagrafindo.

249 UNIVERSITAS MERCUBUANA

Potrebbero piacerti anche