Sei sulla pagina 1di 2

IPS ANOMALY INSPECTION REPORT

Unit: SMPL mainline


Section: Salaya- Mathura (SM)
Feature Log distance: 40.212

4.8 m 5.637 m 5.24m

Upstream Pipe Anomaly pipe Downstream pipe

X2
X1 Y1 Y2

Feature (Dent)

Girths weld Log distance:

Weld log distance 40.212 Weld number


Sleeve measurements Pipe Length a) Anomaly pipe 5.637 M
1) 0.5 M (Patch) X 1: 4.5 M b) Upstream Pipe 4.8 M
Y1 : 0.5 M
2) X2__ c) Downstream pipe 5.240 M
Y2__

Feature Covered:

Feature Log Distance Wall loss % Length Width Orientation


No. O’clock
Reported Actual Reported Actual Reported Actual Reported Actual Reported Actual
40.212 40.212 62 60 65 mm 62 mm 194 mm 195 mm 5:37 5:37
OTHER:

O’clock Starting log Anomaly log End log


position
12:00 14.5 14 14.5
03:00 14 14 14.5
06:00 5.7 14.5 14.5
09:00 14 14.5 14.5
Thickness Survey

Condition of old coating:


1. At Feature location: Coating was found damaged.
2. Overall: Normal.

Soil Condition:
The mainline stretch with soil & morroum, pipeline was resting on soil.

Photograph of feature/Pipe Surface:

Note: Photograph has been not taken because anomaly was in tank farm area where mobile phone was
not allowed.

After sleeving of pipeline near the anomaly location, coating with R95 material was carried out.

Name & signature of Contractor: _______________

Name & signature of Site Engineer: _____________