Sei sulla pagina 1di 10

Human Resource and Development Fund

Jeddah, Kingdom Of Saudi Arabia

REFURBISHMENT OF HRDF - JEDDAH BRANCH OFFICE

Sl. No. Description Unit Qty DWG Reference Unit rate Total
Mechanical works
Note: The contractor shall submit accounting
notes and complete design for the FM 200 or
NOVEC SYSTEM
Sanitray Works
1.0 Plumbing Works

Supply, installation, testing and operation of tools


and sanitary equipment including traps, pipes,
1.1 valves, piping, water mixers, accessories and
fittings of short lengths for water supply and
according to the drawings and specifications.

A western toilet (WWC )with a flush valve and a


1.1.1 hand sower ( shattaf bidet). no. 13

Oriental toilet (EWC)with a flush valve and a


1.1.2 hand sower (shattaf bidet). . no. 2

Handicap toilet (HWC) with a flush valve and


1.1.3 hand shower (shattaf bidet ) no. 4

1.1.4 Hand wash basin installed in a marble no. 13


1.1.5 Handicap wash basin hanging on wall no. 4
1.1.6 Kitchen sink no. 3
1.1.7 Janitor sink no. 3

Supply, installation and testing of UPVC drainage


pipes Schedule(40) including special pipe parts
(all fitting) including suspension,
1.2 reinforcement,drilling, excavation and reloading
as well as ventilation pipes to the roof and cover
on the surface according to the drawings and
specifications

1.2.1 UPVC pipe with diameter 160 mm mtrs 10


1.2.2 UPVC pipe with diameter 110 mm mtrs 130
1.2.3 UPVC pipe with diameter 75 mm mtrs 165
1.2.4 UPVC pipe with diameter 50 mm mtrs 100
1.2.5 Floor drain with diameter 110 mm no. 2
1.2.6 Floor drain with diameter 75 mm no. 30
1.2.7 Cleanout with diameter 110 mm no. 5
1.2.8 Cleanout with diameter 75 mm no. 6
1.2.9 Roof rain drain with diameter 110 mm no. 2
1.2.10 Roof rain drain with diameter 75 mm no. 2
Rain drain outlet with daimeter 110
1.2.11 mm(downspout nozzle) no. 2

Rain drain outlet with daimeter 75 mm


1.2.12 (downspout nozzle) no. 2

Supply and construction of inspection room for


drainage of reinforced concrete and cover and
1.3 frame of the room from a certified manufacturer no. 5
of cast iron according to the drawings and
specifications 15420 and approved by the owner.

1.4 Supply, installation and testing of gully trap no. 5


Human Resource and Development Fund
Jeddah, Kingdom Of Saudi Arabia

REFURBISHMENT OF HRDF - JEDDAH BRANCH OFFICE

Supply, installation and testing of cold water


pipes from POLY PROPYLENE pipes, including
special pipe parts, including suspension,
1.5 reinforcement, drilling,excavation, reloading,
insulation, conduction and isolating valve
according to the specifications according to
specifications

1.5.1 PPR pipe with diameter 75 mm mtrs 15


Total
Human Resource and Development Fund
Jeddah, Kingdom Of Saudi Arabia

REFURBISHMENT OF HRDF - JEDDAH BRANCH OFFICE

Sl. No. Description Unit Qty DWG Reference Unit rate Total
1.5.2 PPR pipe with diameter 63 mm mtrs 20
1.5.3 PPR pipe with diameter 50 mm mtrs 50
1.5.4 PPR pipe with diameter 40 mm mtrs 15
1.5.5 PPR pipe with diameter 32 mm mtrs 65
1.5.6 PPR pipe with diameter 25 mm mtrs 100
1.5.7 PPR pipe with diameter 20 mm mtrs 150
Supply, installation and testing of hot water pipes
from POLY PROPYLENE pipes, including special
pipe parts, including hanging, reinforcement,
1.6 drilling,excavation, reloading, insulation,
conduction and isolation valve according to the
attached drawings and the specifications.
1.6.1 PPR pipe with diameter 25 mm mtrs 75
1.6.2 PPR pipe with diameter 20 mm mtrs 100

Supply and installation of electric water heater


with internal stainless steel storage tank with
thermostat including a temperature indicator,
shut off valve, isolation valve, non-return valve
1.7 and the pipe including the hanging and fixing, all
electrical and sanitary connections, all its
requirements and all necessary to complete the
work according to the attached drawings and the
specifications.

1.7.1 Electric water heater with capacity 80 liter no. 2


1.7.2 Electric water heater with capacity 50 liter no. 3
1.7.3 Electric water heater with capacity 30 liter no. 4
1.8 Water hammer arrestor no. 15

Supply and installation of a system of water


meter including shut off valve, non-return
1.9 no. 1
valveaccording to the attached drawings and the
specifications.

2.0 Fire fighting system.


The contractor provides companies specialized in
the fire fighting works approved by the civil
defense to approve a company to execution the
fire fighting system works for the project and
approved The drawings from the civil defense
before starting the execution of the work in the
project and handing over works to the civil
defense.

Total

Sl. No. Description Unit Qty DWG Reference Unit rate Total
Human Resource and Development Fund
Jeddah, Kingdom Of Saudi Arabia

REFURBISHMENT OF HRDF - JEDDAH BRANCH OFFICE

Supplying, installing, testing and commissioning


of Galvanized steel pipes As per ASTM
A53,including, grooved fittings expansion joints ,
malleable specials extruded type, such as
Reducers, elbows, flanges. The pipes shall be
painted with primer & Paint using approved
type, Galvanized, supports at standard spacing,
anchor fasteners, bolts, nuts, clamps, rails "U" &
threaded bolt, Including cutting, Welding, fixing
in / on walls, ceiling by using the supports etc, as
2.1 per drawings. The quoted rate shall also include
for chasing / chipping walls, Floors, making bore
holes in walls / floor and making them good with
Non shrink filler material (as approved by
Architect )in bore holes / finished in cement
mortar etc. complete. (Above Ground )The
quoted rate shall includes of Acrylic Fire stop
Sealant ( as per IS 12458:1988 ) in the opening
for pipes passing through fire compartment
walls of RCC floors, masonry walls to provide up
to 2 hours fire rating.

2.1.1 25mm dia mtrs 640


2.1.2 32mm dia mtrs 118
2.1.3 40mm dia mtrs 132
2.1.4 50mm dia mtrs 92
2.1.5 65mm dia mtrs 236
2.1.6 80mm dia mtrs 160
2.1.7 100mm dia mtrs 48
Supplying, installing ,testing and commissioning
of approved make 25mm dia. automatic air
2.2 no. 1
release valve with suitable size of ball valves and
unions etc. complete.

Supplying, installing, testing and commissioning


of standard response Sprinkler quartzoid bulb
2.3 type with 15mm screwed end connection of 68
deg. C. temperature rating,K 80 and orifice shall
Not be less than 3 mm. shall be UL/FM approved

2.3.1 Pendent sprinkler no. 280


2.3.2 Side Wall sprinkler no. 4

Supplying, installing, testing and commissioning,


set to work, and commission Fire Hose cabinet
with 30 meters 25 mm (1 Inch) diameter fire
rubber hose cabinet assembly , bronze
2.4 adjustable spray nozzle, (multi-purpose dry
chemical powder fire extinguisher 10-Kg
capacity), as per drawings(Civil Defense
Approved).

2.4.1 Fire Hose Cabinet Surface Mounted type no. 4


Human Resource and Development Fund
Jeddah, Kingdom Of Saudi Arabia

REFURBISHMENT OF HRDF - JEDDAH BRANCH OFFICE

Supplying, installing, testing and commissioning,


set to work, and commission Inspector test valve
2.5 assembly 50 mm (1 Inch) diameter c/w with test
globe valve drain valve sight glass double
window, as per drawings

2.5.1 Test and drain valve no. 2

Supplying, installing, testing and commissioning,


set to work, and commission Fire control valve
(FCV) consisting of OS&y Gate valve Complete
2.6 with all its parts shall include the valve, lock and
tamper switch , pressure guages ,etc. as per
drawing

total

Sl. No. Description Unit Qty DWG Reference Unit rate Total
4'' Fire control valve complete with all
2.6.1 Accessories as per NFPA 13 and Civil defence no. 2
Approval

2.7 Fire Extinguishers


Supply, install, test, set to work, and commission
2.7.1 Fire Extinguisher Dry chemical & co2 capacity no. 8
6kg

Providing and fixing internal fire hydrant


comprising of gunmetal fire hydrant valve 80mm
inlet with single headed with single outlet with
control and fitted with 63mm dia instantaneous
2.8 female coupling on the outlet complete with no. 1
orifice flange as required, blank cap and chain
locations as per drawings (inlet flanges to I.S
5290-1977 class C)

Providing and fixing gunmetal collecting head


with 63mm dia instantaneous type inlet and
150mm dia flanged outlet with built-in check
2.9 valve for fire department connection to
underground tanks and wet risers including
necessary supports complete in all respects as
per standard design.

2.9.1 Two way (for wet riser) no. 1

Supply , lift into position ,install,test ,set to to


Work and comission NOVEC system including
pipe, fitting ,valves ,Solenoid valves cylinder and
2.10 spare cylinder complete as system with the
Approved Design Software and software copy as
per Specifications.

NOVEC System Type 1 as per drawings and


2.10.1 specifications no. 1
Human Resource and Development Fund
Jeddah, Kingdom Of Saudi Arabia

REFURBISHMENT OF HRDF - JEDDAH BRANCH OFFICE

Supply, lift into position, install, test, set


to work, and commission Electric fire
pump, UL/FM and NFPA-20 approved,
split case of capacity 500 GPM, 87 PSI, 28
Kw motor, operating at 380/3/60 Hz,
pump shall have dry run protection and
also shall have over run protection, with
2.1 all valves, fittings and accessories, pipes, set 1
and necessary control panel, complete as
shown and described in the drawings and
for proper operation. Grundfos or equal
model

Total
Human Resource and Development Fund
Jeddah, Kingdom Of Saudi Arabia

REFURBISHMENT OF HRDF - JEDDAH BRANCH OFFICE

Sl. No. Description Unit Qty DWG Reference Unit rate Total

3.0 HVAC systems

Supply and installation and testing of a air


conditioning from type Ducted Spilt Unit, hot
and cold, The air conditioning unit consists of an
air fan unit hanged to the ceiling and an external
unit for cooling and condensation. The price
includes cooling gas pipes(cupper pipe) that are
placed within the PVC pipe diameter (75 mm) in
the wall and condensation pipes that drain to the
nearest drainage point with fire resistant
sealants made of acrylic and silicon are placed
around the pipes that penetrate the walls and
3.1 ceilings. Electrical connections with all necessary
requirements to finsh the work required
according to the drawings, specifications and
equipment schedules, as approved by the owner
as the capacity of cooling (kW), with electric
supply cable from shut off switch for the external
cooling and condensing unit to the shut off
switch for the internal air fan unit as well as the
control cable from the external cooling and
condensing unit to the control panel and the
external and internal anti-vibration.

3.1.1 Ducted Split Unit Type (FCU-01 ) no. 11


3.1.2 Ducted Split Unit Type (FCU-02 ) no. 12
3.1.3 Ducted Split Unit Type (FCU-03 ) no. 15
3.1.4 Ducted Split Unit Type (FCU-04 ) no. 10
3.1.5 Ducted Split Unit Type (FCU-05 ) no. 16
Human Resource and Development Fund
Jeddah, Kingdom Of Saudi Arabia

REFURBISHMENT OF HRDF - JEDDAH BRANCH OFFICE

Supply and installation and testing of a air


conditioning from type DX Spilt Unit, hot and
cold, The air conditioning unit consists of an air
fan unit hanged to the ceiling and an external
unit for cooling and condensation. The price
includes cooling gas pipes(cupper pipe) that are
placed within the PVC pipe diameter (75 mm) in
the wall and condensation pipes that drain to the
nearest drainage point with fire resistant
sealants made of acrylic and silicon are placed
around the pipes that penetrate the walls and
3.2 ceilings. Electrical connections with all necessary
requirements to finsh the work required
according to the drawings, specifications and
equipment schedules, as approved by the owner
as the capacity of cooling (kW), with electric
supply cable from shut off switch for the external
cooling and condensing unit to the shut off
switch for the internal air fan unit as well as the
control cable from the external cooling and
condensing unit to the control panel and the
external and internal anti-vibration.

3.2.1 (SU-2/ACCU-1) no. 3


Total
Human Resource and Development Fund
Jeddah, Kingdom Of Saudi Arabia

REFURBISHMENT OF HRDF - JEDDAH BRANCH OFFICE

Sl. No. Description Unit Qty DWG Reference Unit rate Total

Ventilation systems:
Supply, installation, testing and operation of air-
exhaust fans with all accessories, connections
and fire-proof sealants made of acrylic and
3.3 silicon around all air ducts that penetrate walls,
ceilings and supplies according to the drawings,
schedules of equipment and specifications. As
per owner's approval, fans are indicated by
number and air volume CFM

3.3.1 (INLINE EF-01). no. 3


3.3.2 (INLINE EF-02). no. 1

Supply, installation and operation of air curtains


that is suitable for the main entrance (men's
3.4 no. 2
entrance & women's entrance) working with
remote control with a warranty for two years.

Air distributor

Supply and installation of air distributor for


supply, return, and exhaust from electrolyticated
aluminum in the paint to be specified for the
3.5 contractor. The price includes volume damper, air
box and flexible air ducts according to the
drawings and specifications as approved by the
owner.

3.5.1 Supply linear slot diffuser (SLSD2) no. 5


3.5.2 Supply linear slot diffuser (SLSD3) no. 175
3.5.3 Supply linear slot diffuser (SLSD4) no. 75
3.5.4 Return linear slot diffuser (RLSD2) no. 5
3.5.5 Return linear slot diffuser (RLSD3) no. 175
3.5.6 Return linear slot diffuser (RLSD4) no. 75
3.5.7 Supply ceilling diffuser ( SCD ) 14"X14" no. 2
Return ceilling diffuser ( SCD ) 14"X14" no. 2
3.5.7 Exhaust grill for toilets (ER.G) no. 35
Air ducts works :-
Human Resource and Development Fund
Jeddah, Kingdom Of Saudi Arabia

REFURBISHMENT OF HRDF - JEDDAH BRANCH OFFICE

Supply, installation and testing of air ducts made


of metal sheets for SMACNA air conditioning. The
price includes thermal insulation of 1 inch for
indoor air ducts and 2 inch heat insulation for air
ducts installed externally and wrapped with
aluminum thickness 0.6mm thickness and the
item includuing all supplies from Supports,
3.6 volume dampers, fire dampers, hanging system
and all accessories and accessories with fireproof
fire retardants made of acrylic and silicon around
all air ducts that penetrate walls, ceilings and all
that is necessary to ensure full and excellent
installation the works all these according the
drawing and the specifications and the owner
approved

3.6.1 Insulated air duct Tons 7.5

3.6.2 Non-insulated air duct Tons 1

Supply, installation, testing and operation of


electrical elevator of the finest international
brands including complete operating
mechanisms, lift frame, lift rail, entrances, rails,
suitable ventilation fan, steering rollers, beams,
signals, indicating devices and control systems,
lighting, Elevator and all accessories and spare
parts required as described in specifications and
drawings

Supply, installation and testing elevator


passenger electricity three stops at 1 m / s and
one elevator load 1000 kg for the installation
area elevator, elevator with dimensions of 1.80
m? varies according to the drawings and no. 2
specifications and approved by the owner with
the supply of the elevator battery emergency
operated in case of power outages to reach the
nearest role (UPS system).

Total

mechanical works total