2 A frame Base no.2 1. Patching 6mm steel
plate 900mm length
√ √ √
3 Counter weight Base 1. To support & replace
frame damage base pole &
frame.
√ √ √
4 Side walk way, 1. Side walk way to
staircase, support change staircase,
angle and handrail. support angle complete
handrail 4000mm x
800mm
√ √ √ √
Page 1 of 9
Steel Structure Assesment and Repair
Date Conduct 5-Jul-18 RB 809
Team Member
No Condition Hazard Action Qouted Price
Area Before After
Corroded Wear of Paint peel High Medium RM
5 A frame lower side 1. Patching 6mm steel
horizontal channel plate.
√ √ √
6 A frame highest side Patching 6mm steel
horizontal channel plate.
√ √ √
7 A frame highest side 1. Patching 6mm steel
horizontal support plate.
frame
√ √ √
8 A frame middle side 1. Patching 6mm plate
base pole c channel both leg front and back
900mm length
√ √ √
Page 2 of 9
Steel Structure Assesment and Repair
Date Conduct 5-Jul-18 RB 809
Team Member
No Condition Hazard Action Qouted Price
Area Before After
Corroded Wear of Paint peel High Medium RM
9 A frame middle side 1. remove & replace
zig zag angle support. angle
√ √ √
10 A frame middle side 1. Replace angle iron &
horizontal support c channel.
frame
√ √ √
11 Head drum platfrom 1. To fabricate new
platfrorm with same
level c/w staircase.
√ √ √
Page 3 of 9
Steel Structure Assesment and Repair
Date Conduct 5-Jul-18 FEEDING
Team Member
No
Area Before After
3 WS802 washing
screen platrom motor
side.
4 WS802 washing
screen platrom
counter weight side
Page 4 of 9
Steel Structure Assesment and Repair
Date Conduct 5-Jul-18 FEEDING
Team Member
No
Area Before After
8 Inspection chute
staircase
Page 5 of 9
Steel Structure Assesment and Repair
Date Conduct 5-Jul-18 FEEDING
Team Member
No
Area Before After
9 Inspection chute
platform
Page 6 of 9
Steel Structure Assesment and Repair
Date Conduct 5-Jul-18 FEEDING
Team Member
No
Area Before After
Page 7 of 9
Steel Structure Assesment and Repair
Date Conduct 5-Jul-18 RB804
Team Member
No Condition Hazard Action Qouted Price
Area Before After
Corroded Wear of Paint peel High Medium RM
1 A frame highest side 1. Patching 6mm plate
both leg from bottom to
top.
√ √ √ √
2 Top horizontal beam 1. Extend new channel
and attach with existing
conveyor frame.
√ √ √ √
3 Side walk way angle 1. Remove & replace
frame angle iron for support
walk way.
√ √ √
4 Conveyor frame left 1. To replace side angle.
side intake portion.
√ √ √ √
Page 8 of 9
Steel Structure Assesment and Repair
Date Conduct 5-Jul-18 HOPPER
Team Member
No Condition Hazard Action Qouted Price
Area Before After
Corroded Wear of Paint peel High Medium RM
1 FH801B feeding 1. Replace 4 unit pole
hopper and cross frame.
√ √ √
2 VE801 Vibrating 1. To normalise position
Extractor of rear belt skirt.
√ √ √
2
Page 9 of 9