4, MINUTES OF THE 146 MEETING OF THE BOARD OF ENGINEERS
or Date: 05.12.2012, at 05.30 p.m,
Item No.1.
To ‘confirm the Minutes of the 145% Meeting held on
21.11.2012,
Confirmed and recorded
Item No.2.
‘To review the action taken on the decisions of 144! Meeting
held on 24.09.2012. .
Reviewed and recorded
Item No.3.
‘The Chief Engineer (H) Construction and Maintenance and the Chief
Engineer (H) NABARD and Rural Roads tabled the agenda of the sbore
Subject before the Board of Engineers and requested to revise the rates of
the Lumpsum Provisions in the bridge data,
by preter General (Highways) in Circular Meme
8089/Techcell/2011, Dated: 24.03.2011.
he Board of Engineers discussed the subject in detail and appraised
ihe details furnished by the Chief Engineer (H) Construction & Maintenance
it rates of the certain Lumpsum
provisions in the bridge data as detailed in the Annexure. :
8d/ Chairman
& Members
‘Board of Engineers
Bpetfes ul 2
for Secret
Board of Engineers
ysAnnexure
to
*
146% Meéting of the BOARD OF ENGINEERS held on 05.12.2012 at 5.30 Pm.
Revision of Rates of the Lumpsum Provisions in the Bridge Data
a. Description Rate
No.
For Earthwork
] | Formation and maintaining of Rs.30,00/ One cum
protective bunds and coffer dams | (Rupees Thirty per Cubic metre)
eae s.30.00/ One cum
2 | eee ecee (Rupees Thirty per Cubic metre)
Rs.28.00/ One cum
3. | Refilling sides (Rupees Twenty Bight per Cubi
metre) ss
areas 5.25.00/ One cam
ft cee ene (Rupees Twenty Five per Cubic metre)
Sees Rs.25.00/ One cum
S| eecanenee bene (Rupees Twenty Five per Cubie metre)
| | Removal of protective bunds and R5.20.00/ One cum
clearing the sites (Rupees Twenty per Cubic metre)
For Concrete works :
= ae Rs.20.00/ One cum
1 _| Water Charges for Curingconerete | (Rupees Twenty per Cubic metre)
ae 'R3.84.00/ One cum
2 [ire charges for tools and Plants | (rupees Bighty Four per Cubic metre)
‘S4/ Chairman
‘& Members
Board of Engineers
Bor) ouloli2— |
for Secret
Board of Engineers