Eligibility: Net Metering ( As per prevailing regulation of WBERC)

 Consumer of WBSEDCL.
 Installed Capacity- Not less than 5 KW
 Connection type- 3 Ph
 Type of Consumer:
 Hospitals / Health centers run by Govt. / Private/ Private charitable
organization.
 Schools/ Academic institutions run by Govt./ Private/ Govt. aided
 Govt. offices/ organisations.
 Local bodies like Municipalities/ Panchayats
 Housing Complex.
 Commercial/industrial organisations and any institutions registered under any
statute
2
Process Flow for Grid Connectivity of Solar PV by Consumers: Net Metering

 Flow Chart-1 :
Application & Acknowledgement – Related Forms: S1, S1A & S2

 Flow Chart –II:


Application review & Inspection – Related Forms: S3, S4, S5 & S6

 Flow Chart –III:


Installation,Testing, Commissioning & Billing – Related Forms: S7, S8,S9 & S10

3
APPLICATION

Online Mode
Form-S1

Collected
Form-S1
from office Application
Application Receipt
Off line Mode
(Form-S1) (Form-S2)
Downloaded
Form-S1
from website Online/Offline
System

SMS Intimation

Download filled up
Application format
(Form-S1A)
4
DATA MANAGEMENT OF ONLINE APPLICATION

• Input by Applicant (Form-S1) • Popped-up from system


 Consumer Id  Name of CCC
 Installed Capacity of Solar plant  Name & Address of applicant
 Type of Consumer  Class of consumer
 Acceptance by the consumer  Contractual load
bearing the cost for phase  Supply voltage & phase
conversion/ alteration of service
 Mobile No, Aadhar No(optional),
email-id (optional).
APPLICATION REVIEW AND INSPECTION
Tech. feasibility/Eligibility Study
(Form-S3) Non Eligible/
Non-feasible
Feasible Within 15 days ( DTR capacity constarint)

Not required Intimation


Required Within 7 days
3-ph
conversion Intimation
Within 7 days Off-line/
on non-
feasibility Online/SMS
(Form-S4)
Within Go ahead clearance +Draft
7 days Agreement+ Work
Completion Report Format
(Form-S6, S-7& S-8)

Deemed termination of
Application
Yes
Quotation
For 90 days Off-line/Online
Validity Payment
(Form-S5) No 6
Already Feasible INSTALLATION
Consumer

Quotation amount Go ahead Installation of Solar


received clearance Plant
Within 180 days
Within 7 days by Applicant
(Online/Off-line)
Execution of
Work Agreement
Work Completion
Order (Form- S6)
(Form- S8)
Within 30 days by
WBSEDCL Within 7 days Within 5 days
Not OK Intimation
Connectivity
Inspection (Online/Off-line)
(Form-S9)
OK

Installation of Meter & Intimation


(Online/SMS)
Grid Synchronization (Form-S10)

Billing